Additional Protocol Regulations
Federal RegisterJul 25, 2008
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF COMMERCE
Bureau of Industry and Security
15 CFR Parts 781, 782, 783, 784, 785 and 786
[Docket No. 08021265-8693-01]
RIN 0694-AD26
Additional Protocol Regulations
AGENCY:
Bureau of Industry and Security, Commerce.
ACTION:
Proposed rule and request for comments.
SUMMARY:
This proposed rule would implement the provisions of the Protocol Additional to the Agreement Between the United States of America and the International Atomic Energy Agency (IAEA) for the Application of Safeguards in the United States of America (the “Additional Protocol”). The Additional Protocol is an agreement between the United States and the IAEA to allow monitoring and reporting of certain civil nuclear fuel cycle-related activities.
The Department of Commerce's Bureau of Industry and Security (BIS) is proposing these Additional Protocol Regulations (APR) to implement the provisions of the Additional Protocol affecting U.S. industry and other U.S. persons engaged in certain civil nuclear fuel cycle-related activities, which are not regulated by the U.S. Nuclear Regulatory Commission (NRC) or its domestic Agreement States and are not located on certain U.S. government locations. The proposed APR describe the requirement to report such activities to BIS, the scope and conduct of IAEA complementary access to locations at which such civil nuclear fuel cycle-related activities take place, and the role of BIS in implementing the Additional Protocol in the United States. The impact of the APR on U.S. industry and other U.S. persons will involve the submission of initial reports, annual update reports, and other reporting requirements, as well as on-site activities in conjunction with complementary access. Other U.S. government agencies issuing regulations implementing other provisions of the Additional Protocol include the Nuclear Regulatory Commission, the Department of Energy, and the Department of Defense.
DATES:
Comments must be received by August 25, 2008.
ADDRESSES:
You may submit comments, identified by RIN 0694-AD26, by any of the following methods:
•
Federal eRulemaking Portal: http://www.regulations.gov.
Follow the on-line instructions for submitting comments.
•
E-mail: publiccomments@bis.doc.gov.
Include “RIN 0694-AD26” in the subject line of the message.
•
Fax:
(202) 482-3355. Please alert the Regulatory Policy Division, by calling (202) 482-2440, if you are faxing comments.
•
Mail or Hand Delivery/Courier:
Willard Fisher, U.S. Department of Commerce, Bureau of Industry and Security, Regulatory Policy Division, 14th St. & Pennsylvania Avenue, NW., Room 2705, Washington, DC 20230,
Attn:
RIN 0694-AD26.
FOR FURTHER INFORMATION CONTACT:
For questions of a general or regulatory nature, contact the Regulatory Policy Division, telephone: (202) 482-2440. For program information on reports and complementary access, contact Jill Shepherd, Treaty Compliance Division, Office of Nonproliferation and Treaty Compliance,
telephone:
(202) 482-1001. For legal questions, contact Rochelle Woodard, Office of the Chief Counsel for Industry and Security,
telephone:
(202) 482-5301.
SUPPLEMENTARY INFORMATION:
Background
I. Origins and Overview of the Additional Protocol
The requirement for a comprehensive international safeguards system to prevent the spread of nuclear weapons was first established by the Treaty on the Non-Proliferation of Nuclear Weapons (NPT). The NPT was signed by the United States on July 1, 1968, and entered into force on March 5, 1970. The treaty banned nuclear weapon states (NWS) from transferring nuclear weapons to non-nuclear weapon states (NNWS) or assisting NNWS in acquiring such weapons. It also banned NNWS from manufacturing or acquiring nuclear weapons and stipulated that each NNWS Party to the NPT would undertake to accept safeguards, as set forth in an agreement to be negotiated and concluded with the International Atomic Energy Agency (IAEA), which serves as the official international verification authority for the implementation of safeguards agreements concluded pursuant to the NPT. Although NWS, including the United States, are not obligated under the NPT to accept IAEA safeguards, all have voluntarily offered to accept safeguards on certain activities to encourage NNWS to meet their obligations. The IAEA completed formulation of detailed provisions for a model NPT Safeguards Agreement in 1971. The safeguards system, as embodied in the comprehensive safeguards agreements concluded between the IAEA and individual NNWS States Parties to the NPT, consists of nuclear material accountancy and nuclear material verification measures by which the IAEA independently verifies declarations made by individual States Parties about their nuclear material and activities to ensure that nuclear material inventories and flows have been accurately declared and are not being used to further any proscribed purpose.
During deliberations on the NPT, several major industrialized nations expressed concern that the absence of requirements for IAEA safeguards in NWS would place NNWS at a commercial and industrial disadvantage in developing nuclear energy for peaceful purposes. Specifically, the NNWS were concerned that application of safeguards would interfere with the efficient operations of their commercial activities and would possibly compromise industrial and trade secrets as a result of access by IAEA inspectors to their facilities and records. In order to allay these concerns, the United States voluntarily offered in 1967 to permit the IAEA to apply safeguards to civil nuclear facilities in the United States. The U.S. “Voluntary Offer” is set forth in the “Agreement Between the United States of America and the International Atomic Energy Agency for the Application of Safeguards in the United States of America” (also known as the “U.S.-IAEA Safeguards Agreement”). Since then, the other four NWS recognized under the NPT (China, France, the Russian Federation, and the United Kingdom) also agreed to make all or part of their civil nuclear activities eligible for IAEA safeguards.
The U.S.-IAEA Safeguards Agreement was signed on November 18, 1977, and entered into force on December 9, 1980. At that time, the United States submitted to the IAEA a list of more than 200 eligible facilities for which safeguards could be applied if selected by the IAEA. This list included facilities licensed by the U.S. Nuclear Regulatory Commission (NRC), as well as eligible Department of Energy facilities. The United States has added additional facilities to the eligible facilities list since that time. Under the U.S.-IAEA Safeguards Agreement, approximately eighteen facilities have been selected for safeguards inspection and/or monitoring since 1981.
Although the U.S.-IAEA Safeguards Agreement is based on the model safeguards agreement developed by the
IAEA, the terms of the U.S.-IAEA Safeguards Agreement and the obligations of NNWS parties to the NPT differ in several respects. First, the U.S.-IAEA Safeguards Agreement excludes nuclear facilities associated with activities of direct national security significance. Also, the United States decides which civil nuclear facilities are eligible for the full program of safeguards procedures (including routine inspections) and the IAEA decides which eligible facilities will be selected for the application of safeguards, although the IAEA need not select any. Furthermore, the United States has made separate commitments to provide to the IAEA, for safeguards purposes, information on exports of nuclear material and nuclear-related equipment and materials.
In the aftermath of the 1991 Persian Gulf War, the IAEA determined that Iraq had been engaged in a clandestine nuclear weapons development program at locations not directly subject to routine IAEA safeguards inspections. The international community determined that the safeguards system needed to be strengthened, and negotiated a Model Additional Protocol to amend existing bilateral safeguards agreements (i.e., the “Model Protocol Additional to the Agreement(s) Between State(s) and the International Atomic Energy Agency for the Application of Safeguards,” INFCIRC/540 (Corrected) September 1997). The Model Additional Protocol requires enhanced information collection and access to sites and other locations involved in nuclear fuel cycle-related activities and covers almost all of a state's nuclear fuel cycle, thereby providing IAEA inspectors with greater ability to detect clandestine nuclear activities in NNWS facilities, sites, and locations that are involved in nuclear fuel cycle activities. In an effort to encourage adoption of the Additional Protocol among NNWS, the United States signed the Additional Protocol on June 12, 1998. In the Additional Protocol, the United States accepts all of the measures of the Model Additional Protocol, except where their application would result in access by the IAEA to activities of direct national security significance to the United States or to locations or information associated with such activities. By subjecting itself to the same safeguards on all of its civil nuclear activities that NNWS are subject to (with the exception of those activities of direct national security significance), the United States intends to encourage widespread adherence to the Model Additional Protocol and demonstrate that adherence does not place other countries at a commercial disadvantage.
The Additional Protocol will enter into force when the United States notifies the IAEA that the statutory and constitutional requirements for entry into force have been met. These requirements include: (1) Ratification, to which the Senate provided advice and consent with certain conditions and understandings on March 31, 2004; (2) enactment of implementing legislation, which was signed by the President on December 18, 2006 (The U.S. Additional Protocol Implementation Act of 2006 (Pub. L. 109-401, 120 Stat. 2726 (2006)); (3) issuance of an Executive Order, which was issued on February 5, 2008; (4) issuance of agency regulations by the Departments of Commerce, Defense, and Energy, and by the Nuclear Regulatory Commission (DOC, DOD, DOE, and NRC); and (5) certification by the President that certain Senate conditions have been met. The United States' instrument of ratification may be deposited with the IAEA only after the President has certified that two Senate conditions, which address the application of the national security exclusion in Articles 1.b and 1.c of the Additional Protocol (i.e., managed access, security and counter-intelligence training, and preparation at locations of direct national security significance) and the completion of site vulnerability assessments concerning activities, locations, and information of direct national security significance, will be met within 180 days after deposit of the United States' instrument of ratification.
The Additional Protocol consists of the following articles and annexes:
Article 1: Relationship between the Additional Protocol and the U.S.-IAEA Safeguards Agreement
Articles 2 and 3: Provision of information
Articles 4 through 10: Complementary access
Article 11: Designation of IAEA inspectors
Article 12: Visas
Article 13: Subsidiary arrangements
Article 14: Communications systems
Article 15: Protection of confidential information
Article 16: Annexes
Article 17: Entry into force
Article 18: Definitions
Annex I: List of activities referred to in the Additional Protocol
Annex II: List of specified equipment and non-nuclear material for reporting of exports and imports
The Additional Protocol requires the United States to declare to the IAEA a number of nuclear fuel cycle-related items, materials, and activities that may be used for peaceful nuclear purposes, but that also could be necessary elements for a nuclear weapons program. In order to obtain the information necessary to complete the U.S. declaration to the IAEA, the U.S. Government must collect reports from U.S. industry and other U.S. persons. U.S. declarations submitted under the Additional Protocol would provide the IAEA with information about additional aspects of the U.S. civil nuclear fuel cycle, including: mining and concentration of nuclear ores; nuclear-related equipment manufacturing, assembly, or construction; imports, exports, and other activities involving certain source material (i.e., source material that has not reached the composition and purity suitable for fuel fabrication or for being isotopically enriched); imports and exports of specified nuclear equipment and non-nuclear material; nuclear fuel cycle-related research and development activities not involving nuclear material; and other activities involving nuclear material not currently subject to the U.S.-IAEA Safeguards Agreement.
Within 180 days after deposit of the United States' instrument of ratification of the Additional Protocol, the United States must submit to the IAEA a declaration containing information compiled from the
Initial Reports
submitted to BIS in accordance with the proposed requirements of Section 783.1(a) of the APR. Thereafter, by May 15th of each succeeding year, the United States must submit to the IAEA a declaration containing an annual update to the information contained in previous U.S. declarations to the IAEA. The U.S. annual declaration to the IAEA will contain information compiled, for the most part, from the
Annual Update Reports
submitted to BIS in accordance with the proposed requirements of Section 783.1(b) of the APR.
The Additional Protocol provides that there shall be no mechanistic or systematic verification of information contained in the U.S. declaration (e.g., there is no provision for routine inspections). However, the United States would be required to provide the IAEA with access (referred to as “complementary access”) to civil nuclear fuel cycle-related locations and activities, under certain circumstances, as defined in the Additional Protocol. Such access would be designed to ensure the absence of undeclared nuclear material and activities at declared sites where nuclear facilities or materials are located or to address a question about the completeness or correctness of the U.S. declaration or an inconsistency related to the information contained therein. In the latter instance, access generally would be requested only if a question or inconsistency in the U.S. declaration could not be
resolved through consultation between the United States and the IAEA. The APR contain requirements administered by the Department of Commerce's Bureau of Industry and Security to implement the Additional Protocol. Additional U.S. obligations under the Additional Protocol are administered by other U.S. government agencies as designated by the President of the United States.
A. Part 781—General Information and Overview of the APR
The Additional Protocol Regulations (15 CFR chapter VII, subchapter D), or APR, would implement certain obligations of the United States under the Additional Protocol. Part 781 contains definitions of terms used in the APR, describes the purpose and scope of the APR, and provides an overview of the activities regulated under the APR.
B. Part 782—General Information Regarding Reporting Requirements and Procedures
The Additional Protocol augments the existing U.S.-IAEA Safeguards Agreement by requiring the United States to provide the IAEA with information on civil nuclear and nuclear-related items, materials, and activities not presently covered by the U.S.-IAEA Safeguards Agreement. The items, materials, and activities that must be declared include the following: mining and milling activities involving the production or processing of materials that could serve as feed material for the civil nuclear fuel cycle (i.e., uranium and thorium); nuclear-related equipment manufacturing; exports and imports of nuclear-related equipment and nuclear-related non-nuclear material; and civil nuclear fuel cycle-related research and development (R&D) activities not involving nuclear material. To enable the United States to collect the information necessary to prepare the U.S. declaration to the IAEA, BIS is publishing the APR to establish reporting requirements for U.S. industry and other U.S. persons concerning civil nuclear and nuclear-related items, materials, and activities that must be declared under the Additional Protocol.
Part 782 of the APR contains a brief overview of the reporting and compliance review requirements in the APR, identifies who is responsible for submitting the reports required under the APR, and provides information on how to determine which activities would be subject to the APR reporting requirements, including instructions on where and how to submit activity determination requests to BIS. Part 782 also explains how to obtain the forms needed to submit reports required by the APR and where to submit the reports.
C. Part 783—Reporting Requirements for Nuclear Fuel Cycle-Related Activities Not Involving Nuclear Materials
Part 783 contains a comprehensive description of the reporting requirements under the APR, including which activities must be reported, who must submit reports, the types of reports that must be submitted (e.g.,
Initial Report, Annual Update Report, Export Report, Import Confirmation Report, Supplemental Information Report
—the latter would be submitted in response to BIS notification of an IAEA request for amplification or clarification of information), the types of changes that would require the submission of an
Amended Report
to BIS, when a
No Changes Report
may be submitted in lieu of an
Annual Update Report
, the APR forms required and the procedures that must be followed to prepare and submit these reports, and the deadlines for submitting these reports to BIS.
Section 783.1(a) of the APR would establish initial reporting requirements under the APR. You must submit an
Initial Report
to BIS, no later than 30 calendar days following the date of publication of the rule that establishes the APR, if you are engaged in any of the civil nuclear fuel cycle-related activities described in Section 783.1(a) of the APR on the date of publication. In this instance, your Initial Report must describe only those activities in which you are engaged as of the date of publication, except that the description of activities involving uranium hard-rock mines must include any such mines that were closed down during the calendar year in which the rule establishing the APR was published (up to and including the date of publication) as well as mines that were in either operating or suspended status on the date of publication. The period of time covered by your
Initial Report
must include the calendar year in which the APR are promulgated (up to and including the date of publication).
For any calendar year that follows the year in which the rule establishing the APR is published, you must submit an
Initial Report
to BIS if you commenced civil nuclear fuel cycle-related activities described in Section 783.1(a) of the APR at your location, during the previous calendar year, and have not previously reported such activities to BIS. You may include such activities in your
Annual Update Report,
in lieu of submitting a separate
Initial Report,
if you also have an
Annual Update Report
requirement for the same location that covers the same reporting period (
Annual Update Report
requirements are addressed in the discussion of Section 783.1(b), below).
Section 783.1(a)(1) of the APR contains two separate reporting requirements that apply to civil nuclear fuel cycle-related research and development activities, as defined in Section 781.1 of the APR, that do not involve nuclear material. Section 783.1(a)(1)(i) of the APR describes the initial reporting requirement for any such civil activities that were funded, specifically authorized or controlled by, or carried out on behalf of, the United States. Section 783.1(a)(1)(ii) of the APR describes the initial reporting requirement for any such activities that were specifically related to civil enrichment, reprocessing of nuclear fuel, or the processing of intermediate or high-level waste containing plutonium, high enriched uranium or uranium-233 and that were not funded, specifically authorized or controlled by, or carried out on behalf of the United States. Reports on these activities must include a general activity description and location information. The provisions of Section 783.1(a)(1)(i) and (a)(1)(ii) are intended to address the information requirements described in Articles 2.a(i) and 2.b(i), respectively, of the Additional Protocol.
Section 783.1(a)(2) of the APR describes the initial reporting requirement for civil nuclear-related manufacturing, assembly, and construction activities (e.g., the manufacture of centrifuge rotor tubes, diffusion barriers, zirconium tubes, nuclear grade graphite, and reactor control rods). The specific activities subject to this APR reporting requirement are listed in detail in Supplement No. 2 to Part 783 of the APR, which corresponds to Annex I of the Additional Protocol. For these locations, the APR require a description of the scale of operations for each location engaged in any of the activities described in Supplement No. 2 to Part 783. This information need not be detailed, but should include the organization's name, location, a brief description of operations, and the estimated current annual production. The provisions of Section 783.1(a)(2) are intended to address the information requirements described in Article 2.a(iv) of the Additional Protocol.
Section 783.1(a)(3) of the APR describes the initial reporting requirement for U.S. uranium hard-rock mining activities, consistent with information requirements described in Article 2.a(v) of the Additional Protocol.
Uranium hard-rock mines are required to report to BIS their location, operational status, estimated annual production capacity, and current annual production. For
Initial Reports
submitted during the calendar year in which the APR are promulgated, this reporting requirement applies to any mines that were closed down during that calendar year (up to and including the date of publication of the APR), as well as mines in either operating or suspended status on the date that the rule establishing the APR is published. Mines that were closed down prior to the calendar year in which the APR are promulgated do not have a reporting obligation.
Section 783.1(b) of the APR would establish annual reporting requirements under the APR. If you submit an
Initial Report
to BIS, in accordance with Section 783.1(a) of the APR, and your
Initial Report
does not indicate that all civil nuclear fuel cycle-related activities described therein have ceased at your location, Section 783.1(b) of the APR would require that you submit an
Annual Update Report
to BIS for each calendar year that follows the year covered by your
Initial Report
. This
Annual Update Report
requirement will continue to apply for as long as you engage in activities subject to the APR reporting requirements. If your location subsequently ceases to engage in activities subject to the APR reporting requirements, you would still be required to submit an
Annual Update Report
covering the calendar year in which you ceased to engage in such activities. Section 783.1(b)(2) of the APR provides that a
No Changes Report
may be submitted, in lieu of an
Annual Update Report,
when there are no changes with respect to your location and civil nuclear fuel cycle-related activities during the previous calendar year. If your
Initial Report
or most recent
Annual Update Report
indicates that all civil nuclear fuel cycle-related activities described therein have ceased at your location, and no other reportable activities have occurred during the previous calendar year, then you would not have a reporting requirement under Section 783.1(a) or (b) of the APR.
Initial Reports
describing reportable civil nuclear fuel cycle-related activities identified in Section 783.1(a) of the APR would need to be submitted to BIS no later than 30 calendar days following the date of publication of the rule establishing the APR, if you are engaged in any such civil nuclear fuel cycle-related activities on the date of publication. Any such activities that commence after the date of publication of the rule establishing the APR must be reported to BIS no later than January 31 of the year following the calendar year in which the activities took place. If you are subject to an
Annual Update Report
requirement for the same location and covering the same reporting period, you may include these additional activities in your
Annual Update Report,
in lieu of submitting a separate
Initial Report.
Annual Update Reports
must be submitted to BIS by January 31st of the year following any calendar year in which reportable fuel cycle-related activities took place.
No Changes Reports
must be submitted to BIS by January 31st of the year following any calendar year in which reportable nuclear fuel cycle-related activities took place.
Section 783.1(c) and (d), respectively, of the APR describe the reporting requirements that would apply to exports and imports of equipment or non-nuclear material identified in Supplement No. 3 to Part 783 of the APR. The equipment and non-nuclear material in Supplement No. 3 are derived from the Zangger Committee Trigger List (IAEA INFCIRC/254/Rev.8/Part 1, Annex B)—the Trigger List defines goods specially designed for nuclear use that, along with nuclear-related dual-use materials, equipment, software and related technology, are subject to export controls administered by member states of the Nuclear Suppliers Group (NSG). If you export any of the items listed in Supplement No. 3 to Part 783, you must submit an
Export Report
to BIS no later than 15 days following the end of the calendar quarter in which the items were exported—therefore,
Export Reports
must be submitted to BIS no later than January 15th, April 15th, July 15th, and/or October 15th each year. You will be notified by BIS if an
Import Confirmation Report
is required under the APR. BIS will provide such notification only upon receipt of a request from the IAEA for information to verify imports. For each import of equipment or non-nuclear material listed in Supplement No. 3 to Part 783, you must submit an
Import Confirmation Report
to BIS no later than 30 calendar days following the date that you receive notification of this requirement. The provisions of Section 783.1(c) and (d) are intended to address the information requirements described in Article 2.a(ix)(b) of the Additional Protocol.
Section 783.1(e) of the APR describes the requirements that would apply to a
Supplemental Information Report.
If the IAEA specifically requests amplification or clarification concerning any information provided in the U.S. declaration that is based on your report(s), BIS will send you written notification requiring that you report to BIS additional information concerning the activities that you previously reported and any other activities conducted at your location or building that would be relevant for the purpose of addressing the IAEA's request for amplification or clarification of information.
Section 783.2 of the APR describes the circumstances under which an
Amended Report
would need to be submitted to BIS. Section 783.2(a) of the APR would require that an
Amended Report
be submitted to BIS no later than 30 calendar days following the date that you discover an error or omission in your most recent report that involves information concerning an activity subject to the reporting requirements in Section 783.1(a) or (b) of the APR. Section 783.2(b) of the APR would require that an
Amended Report
be submitted to BIS no later than 30 calendar days after any changes to company and location information, such as the company's designated contact person (for reporting and complementary access purposes), the name or mailing address of the company, the owner/operator of the location, or the owner of the company. Section 783.2(d) of the APR would require that an
Amended Report
be submitted to BIS no later than 30 calendar days following the date that you received written notification from BIS to provide information requested by the IAEA following complementary access to the location.
D. Part 784—Complementary Access
Part 784 of the APR describes the purpose of complementary access by the IAEA and identifies the types of locations that may be subject to complementary access under the APR. Any location that would be required to submit an
Initial Report, Annual Update Report,
or
No Changes Report
to BIS, pursuant to Part 783 of the APR, is a reportable location and may be subject to complementary access by the IAEA. The fact that a location would be required to submit a report to BIS does not automatically trigger complementary access by the IAEA, although it may provide the basis for complementary access. Information that has been reported to BIS and included in the U.S. declaration will be analyzed by the IAEA before the IAEA makes a decision on whether or not to request complementary access to a particular location. In addition to providing the IAEA with complementary access to reportable locations, Part 784 of the APR
provides that other locations specified by the IAEA may be subject to complementary access.
The specific purpose of complementary access will be location dependent. In the case of uranium hard-rock mine locations, the purpose of complementary access is limited to enabling the IAEA to verify, on a selective basis, the absence of undeclared nuclear material and nuclear related activities. For all other locations subject to the APR (e.g., locations involved in reportable civil nuclear fuel cycle-related research and development or manufacturing activities, other locations specified by the IAEA), the purpose of complementary access is limited to allowing the IAEA to resolve questions relating to the correctness and completeness of the information provided in the U.S. declaration or to resolve inconsistencies relating to that information. Complementary access normally will not be scheduled for the latter type of location until after the IAEA has provided the United States with an opportunity to clarify or resolve the question or inconsistency in the U.S. declaration.
Part 784 of the APR defines the role of BIS in notifying locations that will be subject to complementary access and acting as host to the IAEA Team during complementary access. A BIS Host team (augmented by other agency representatives, as appropriate) will accompany the IAEA inspectors during their activities at the location. In addition, a BIS Advance Team, upon receiving advance notice from the IAEA of complementary access, may deploy to the location to assist in preparing personnel and implementing appropriate measures to protect confidential business and other critical information.
Part 784 also provides specific information on the scope and conduct of complementary access, such as the kinds of activities that may be carried out by the IAEA Team (e.g., the circumstances under which the IAEA Team will be granted physical access to records and visual access to facilities). In addition, Part 784 describes the circumstances under which the Host Team will implement managed access measures during IAEA complementary access. Managed access will protect activities of direct national security significance to the United States, as well as locations or information associated with such activities. It is also designed to prevent the dissemination of proliferation sensitive information, to meet safety or physical protection requirements, and to protect proprietary or commercially sensitive information.
E. Part 785—Enforcement
Part 785 contains definitions of enforcement-related terms and describes the scope of the enforcement activities that would be authorized under the APR, including the types of violations subject to the APR, administrative and criminal proceedings, hearings, representation, paperwork, summary decisions, discovery, subpoenas, matters protected against disclosure, procedural stipulations, extensions, post-hearing submissions, decisions, settlements, payment of assessments, and how to report a violation.
F. Part 786—Records and Recordkeeping
Part 786 describes the APR recordkeeping requirements, including the types of records that would need to be retained, required retention periods, acceptable media for record storage, records inspection procedures, accessibility of records, and disposal of records.
G. Part 787—Interpretations
Part 787 is reserved for future interpretations of parts 781 through 786 of the APR and also for Subsidiary Arrangements to the Additional Protocol.
Rulemaking Requirements
1. This proposed rule has been determined to be significant for purposes of Executive Order 12866.
2. Notwithstanding any other provision of law, no person is required to, nor shall any person be subject to a penalty for failure to comply with a collection of information, subject to the Paperwork Reduction Act (PRA), unless that collection of information displays a currently valid OMB Control Number. This rule proposes a collection of information subject to the requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501
et seq.
). The information collection contained in this proposed rule is part of a joint information collection by the Bureau of Industry and Security (BIS) of the Department of Commerce (DOC), in accordance with the proposed Additional Protocol Regulations (APR) (15 CFR parts 781-799), and the Nuclear Regulatory Commission (NRC), in accordance with amendments to its regulations in 10 CFR part 75 and 10 CFR part 110. BIS has submitted this proposed collection to the Office of Management and Budget for approval. A total of approximately 129 respondents are expected to be subject to the information collection requirements set forth in these BIS and NRC rules. These information collection requirements are expected to involve an estimated 3,357 total burden hours per annum at a total estimated cost of $139,142 per annum. The estimated total burden hours per annum include the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Public comment is sought regarding: Whether this proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; the accuracy of the burden estimate; ways to enhance the quality, utility, and clarity of the information to be collected; and ways to minimize the burden of the collection of information, including through the use of automated collection techniques or other forms of information technology. Send comments regarding this burden estimate or any other aspects of this collection of information, including suggestions for reducing the burden, to David Rostker, Office of Management and Budget (OMB), by e-mail to
David_Rostker@omb.eop.gov
or by fax to (202) 395-7285, and to Willard Fisher, Regulatory Policy Division, Bureau of Industry and Security, Department of Commerce, as indicated in the
ADDRESSES
section of this rule.
The DOC's Office of Strategic Industries and Economic Security (SIES) conducted a study in order to obtain an estimate of the number of U.S. companies, organizations, and other U.S. persons that would be subject to reporting requirements under the BIS and NRC rules. This study, along with reviews conducted by the NRC on activities conducted by its licensees, indicated that potentially 119 locations and 10 sites at International Atomic Energy Agency (IAEA) Selected Facilities from the U.S. Eligible Facilities List licensed by the NRC (an estimated total of 129 respondents) would have reporting requirements pursuant to DOC and NRC regulations under the Additional Protocol.
The information collection requirements in the BIS and/or NRC rules consist of the following activities: (1) Additional Protocol (AP)-related reporting activities (e.g., activities involving the completion and submission of AP-related reports using forms contained in handbooks described below), (2) complementary access activities (e.g., activities involving IAEA inspection team access to locations and sites subject to AP-related reporting requirements), and (3) compliance review activities (e.g., activities involving BIS requests for information
from persons and locations subject to the APR to determine compliance with APR reporting and recordkeeping requirements).
The estimated information collection burden associated with the proposed AP-related reporting activities is expected to total 2,161 burden hours per year, at a total cost to respondents of $96,467 per annum, as follows: 2,161 burden hours × $37.20/hour (employee salaries) × 1.2 (20% overhead) = $96,467 estimated annual cost.
The estimated information collection burden associated with the proposed complementary access activities is expected to total 1,153 burden hours per year, at a total cost to respondents of $32,070 per annum, as follows: First, 576.33 (burden hours per complementary access) × 2 (locations per calendar year) = 1,153 total burden hours and, second, $16,035 (estimated cost per complementary access) × 2 (locations per calendar year) = $32,070 estimated annual cost.
The estimated information collection burden associated with the proposed compliance review activities is expected to total 43 burden hours per year, at a total cost to respondents of $1,897 per annum, as follows: 42.5 burden hours × $37.20/hour (employee salaries) × 1.2 (20% overhead) = $1,897.20 annual estimated cost.
In addition, this proposed rule contains a recordkeeping requirement of 3 years, which would involve a total estimated recordkeeping cost of $8,707.50 per annum, as follows: 1.5 square feet (average office space occupied by storage cabinet containing AP-related records) × $45/square foot (average cost of office space utilized for storage) × 129 reports (estimated number of locations required to submit AP-related reports) = $8,707.50 annual estimated cost.
Based on the estimates provided above, the annual burden hours of this information collection are expected to total 3,357 burden hours, as follows: 2,161 (estimated annual burden hours for AP-related reporting activities) + 1,153 (estimated annual burden hours for complementary access activities) + 43 (estimated annual burden hours for compliance review activities) = 3,357 total estimated annual burden hours for all AP-related information collection activities. (Note: The AP-related recordkeeping burden estimate is based upon cost of storage space rather than burden hours.)
Based on the estimates provided above, the annual cost of this information collection is expected to total $139,142, as follows: $96,467 (estimated annual cost for AP-related reporting activities) + $32,070 (estimated annual cost for complementary access activities) + $1,897.20 (estimated annual cost for compliance review activities) + $8,707.50 (estimated annual cost of AP-related recordkeeping requirements) = $139,142 total estimated annual cost for all AP-related information collection activities.
The AP requires the United States to declare to the IAEA a number of commercial nuclear and nuclear-related items, materials, and activities that may be used for peaceful nuclear purposes, but that also would be necessary elements for a nuclear weapons program. Executive Order (E.O.) 13458 of February 5, 2008, designates the DOC as the lead agency responsible for collecting data required under the AP from the commercial nuclear industry and other U.S. persons, except for data involving activities or locations subject to the licensing jurisdiction of the NRC. The E.O. designates the NRC as the lead agency responsible for collecting data required under the AP from those persons, locations, and sites subject to its licensing jurisdiction. In addition, National Security Policy Directive 57 (February 4, 2008) designated DOC as the lead agency responsible for managing the collection and aggregation of all data reported to the U.S. Government for the purpose of preparing the U.S. AP declaration for submission to the IAEA.
BIS has developed two separate handbooks (one for locations and the other for sites of IAEA-selected facilities) that will provide guidance on how to complete and submit the forms required under the APR. These handbooks identify the specific forms that must be included in each type of report package that must be submitted to BIS or the NRC. The specific forms in each handbook are identified below.
List of Forms Contained in Report Handbook for Locations
Form
Description of information collected on form
AP-1
Certification.
AP-2
Contact Information.
AP-3
Research and Development with U.S. Government (USG) Involvement.
AP-4
Research and Development without U.S. Government Involvement.
AP-5
Nuclear-related manufacturing, assembly and construction activities.
AP-6
Information on uranium hard rock mines.
AP-7
Information on concentration plants.
AP-8
Holdings of impure source materials.
AP-9
Imports and exports of impure source materials.
AP-10
Holdings of safeguards-exempted materials.
AP-11
Location of safeguards-terminated materials.
AP-12
Processing of safeguards-terminated waste materials.
AP-13
Exports of specified equipment and non-nuclear material.
AP-14
Imports of specified equipment and non-nuclear material.
AP-15
Supplemental information report.
AP-16
Continuation.
AP-17
No Changes Report.
List of Forms Contained in Report Handbook for Sites
Form
Description of information collected on form
AP-A
Certification.
AP-B
Contact Information.
AP-C
Building information.
AP-D
Research and Development with U.S. Government Involvement.
AP-E
Research and Development without U.S. Government Involvement.
AP-F
Nuclear-related manufacturing, assembly and construction activities.
AP-G
Information on concentration plants.
AP-H
Holdings of impure source materials.
AP-I
Imports and exports of impure source materials.
AP-J
Holdings of safeguards-exempted materials.
AP-K
Location of safeguards-terminated materials.
AP-L
Processing of safeguards-terminated waste materials.
AP-M
Exports of specified equipment and non-nuclear material.
AP-N
Imports of specified equipment and non-nuclear material.
AP-O
Supplemental information report.
AP-P
Continuation.
AP-Q
No Changes Report.
3. This rule does not contain policies with Federalism implications as that
term is defined in Executive Order 13132.
4. The Regulatory Flexibility Act (RFA), as amended by the Small Business Regulatory Enforcement Fairness Act of 1996 (SBREFA), 5 U.S.C. 601
et seq.
, generally requires an agency to prepare a regulatory flexibility analysis of any rule subject to the notice and comment rulemaking requirements under the Administrative Procedure Act (5 U.S.C. 553) or any other statute, unless the agency certifies that the rule will not have a significant economic impact on a substantial number of small entities. Under section 605(b) of the RFA, however, if the head of an agency certifies that a rule will not have a significant economic impact on a substantial number of small entities, the statute does not require the agency to prepare a regulatory flexibility analysis. Pursuant to section 605(b), the Chief Counsel for Regulations, Department of Commerce, certified to the Chief Counsel for Advocacy, Small Business Administration, that this proposed rule, if promulgated, will not have a significant economic impact on a substantial number of small entities for the reasons explained below. Consequently, BIS has not prepared a regulatory flexibility analysis.
Small entities include small businesses, small organizations and small governmental jurisdictions. For purposes of assessing the impacts of this proposed rule on small entities, small entity is defined as: (1) A small business according to RFA default definitions for small business (based on SBA size standards), (2) a small governmental jurisdiction that is a government of a city, county, town, school district or special district with a population of less than 50,000, and (3) a small organization that is any not-for-profit enterprise which is independently owned and operated and is not dominant in its field. BIS has determined that this final rule would affect only the first and third categories of small entities (i.e., small businesses and small organizations).
The DOC's Office of Strategic Industries and Economic Security (SIES) conducted a study to obtain an estimate of the number of U.S. businesses, organizations, and other U.S. persons that would be subject to the information collection and recordkeeping requirements that BIS and the NRC would have to establish in order to meet U.S. obligations under the AP. This study, along with reviews conducted by the NRC on activities conducted by its licensees, indicated that potentially 119 locations and 10 sites at IAEA-Selected Facilities from the U.S. Eligible Facilities List licensed by the NRC (an estimated total of 129 respondents) would have reporting requirements pursuant to DOC and NRC regulations under the AP. The study indicated that the majority of the businesses or organizations most likely to be impacted by the entry-into-force of the AP would fall into the following categories: (1) Colleges and universities, (2) nuclear fuel manufacturers and utility companies, (3) mining and milling companies, and (4) corporate entities and contractors involved in research and development, manufacturing, assembly and construction activities. Although BIS estimates that the majority of these businesses and organizations are substantially sized entities, having more than 500 employees, BIS does not have sufficient information on these businesses and organizations to definitively characterize them as large entities.
The Small Business Administration (SBA) has established standards for what constitutes a small business, with respect to each of the Standard Industrial Classification (SIC) code categories. For example, a business in the uranium mining industry (NAICS Code: 212291, SIC Code: 1094) is considered by SBA to be a small business if it is independently owned and operated and not dominant in its field of operation and it employs 500 or fewer persons on a full-time basis, part-time, temporary, or other basis. The Mine Safety and Health Administration (MSHA) estimates that approximately 99.8% of the metal/non-metal mining industry would qualify as small businesses. However, many of the uranium mining and milling entities in the United States appear to be subsidiaries of large companies and BIS estimates that most of the small entities likely to be impacted by the entry-into-force of the AP will fall within the other categories of businesses and organizations identified in the SIES survey. In addition, BIS is not able to determine which SIC code categories apply to the other categories of businesses or organizations that are likely to be impacted by the entry-into-force of the AP. Therefore, for the purpose of assessing the impact of this proposed rule, BIS assumes that all of the 129 businesses and organizations likely to be affected are small entities.
Although this proposed rule, if promulgated, would affect a substantial number of small entities (i.e., 129 businesses and organizations), the reporting, on-site verification (i.e., complementary access), compliance review, and recordkeeping requirements that would be imposed by this rule would not have a significant economic impact on these entities.
First, this rule proposes to establish reporting requirements in Part 783 of the APR that would require U.S. industry and U.S. persons to submit data needed to prepare U.S. declarations to the IAEA in accordance with U.S. obligations under the AP. The U.S. declarations submitted under the AP would provide the IAEA with information about additional aspects of the U.S. civil nuclear fuel cycle, including the following: mining and concentration of nuclear ores; nuclear-related equipment manufacturing, assembly, or construction; imports, exports, and other activities involving certain source material (i.e., source material that has not reached the composition and purity suitable for fuel fabrication or for being isotopically enriched); imports and exports of specified nuclear equipment and non-nuclear material; nuclear fuel cycle-related research and development activities not involving nuclear material; and other activities involving nuclear material not currently subject to the U.S.-IAEA Safeguards Agreement. The total estimated annual burden hours for these proposed reporting requirements would be 2,161 hours and the total estimated annual cost would be $96,467, or $747.81 per respondent.
Second, this rule proposes to establish on-site verification (i.e., complementary access) requirements in Part 784 of the APR. Any location that would be required to submit an
Initial Report, Annual Update Report,
or
No Changes Report
to BIS, pursuant to Part 783 of the APR, would be treated as a reportable location under the APR and, as such, might be subject to complementary access by the IAEA. The fact that a location would be required to submit a report to BIS would not automatically trigger complementary access by the IAEA, although it might provide the basis for complementary access. Information reported to BIS and included in the U.S. declaration would be analyzed by the IAEA before the IAEA would decide whether or not to request complementary access to a particular location. In addition to providing the IAEA with complementary access to reportable locations, Part 784 of the APR would provide that other locations specified by the IAEA might be subject to complementary access. The specific purpose of complementary access would be location dependent. Complementary access to uranium hard-rock mine locations would be limited to enabling the IAEA to verify, on a selective basis, the absence of
undeclared nuclear material and nuclear related activities. For all other locations subject to the APR, the purpose of complementary access would be limited to allowing the IAEA to resolve questions relating to the correctness and completeness of the information provided in the U.S. declaration or to resolve inconsistencies relating to that information. The total estimated annual burden hours for these proposed complementary access requirements would be 1,153 hours and the total estimated annual cost would be $32,070, or $248 per respondent.
Third, this rule proposes to establish compliance review requirements in Section 782.3 of the APR that would authorize BIS to request information, periodically, from persons and locations subject to the APR to determine compliance with the APR reporting and recordkeeping requirements. Information requested may relate to nuclear fuel cycle research and development activities not involving nuclear material, nuclear-related manufacturing, assembly or construction activities, or uranium hard-rock mining activities as described in Part 783 of the APR. Any person or location subject to the APR and receiving such a request for information would be required to submit a response to BIS within 30 calendar days of receipt of the request. The total estimated annual burden hours for these proposed compliance review requirements would be 43 hours and the total estimated annual cost would be $1,897.20, or $14.70 per respondent.
Fourth, this rule proposes to establish recordkeeping provisions in Part 786 of the APR in accordance with which each person or location required to submit a report or correspondence under Parts 782 through 784 of the APR would have to retain all supporting materials and documentation used to prepare the report or correspondence. All such supporting materials and documentation would have to be retained by the person or location for three years from the due date of the applicable report or for three years from the date of submission of the applicable report, whichever would be later. Upon request by BIS, the person or location also would be required to permit access to and copying of any records related to compliance with the requirements of the APR. The total estimated annual cost for these proposed APR recordkeeping requirements would be $8,707.50. (
Note:
Since the AP-related recordkeeping burden estimate is based upon the cost of storage space rather than the number of burden hours, this estimate does not include the total annual burden hours associated with the APR recordkeeping requirements.)
The total estimated annual burden hours required to implement the reporting, complementary access, compliance review, and recordkeeping requirements described above would be 3,357 burden hours and the total estimated annual cost would be $139,142. Although the primary impact of these new requirements would affect a substantial number of small entities (
i.e.
, 129 businesses and organizations), the total economic impact on the affected entities (i.e., $139,142, per annum, for all of the affected entities) would not be significant. The average impact per entity would be $1,079 (i.e., $139,142 ÷ 129) per annum, which represents a small percentage of the net annual revenue of a typical small business. Since the requirements that this rule proposes to establish would not impose a significant economic impact on a substantial number of small entities, BIS did not prepare a regulatory flexibility analysis for this rule.
Finally, the changes proposed by this rule should be viewed in light of the fact that BIS's discretion in formulating the reporting, complementary access, compliance review, and recordkeeping requirements of the APR is limited by the necessity of meeting U.S. obligations under the AP. The AP specifies the information that the United States must declare to the IAEA. In drafting the requirements and the forms for U.S. locations and U.S. persons to use, BIS has attempted to minimize the recordkeeping and reporting burden to ensure that only information that the United States must declare to the IAEA would have to be submitted to BIS.
List of Subjects
15 CFR Part 781
Nuclear fuel cycle-related activities, Imports, Treaties.
15 CFR Part 782
Nuclear fuel cycle-related activities, Reporting and recordkeeping requirements.
15 CFR Part 783
Nuclear fuel cycle-related activities, Exports, Imports, Reporting and recordkeeping requirements.
15 CFR Part 784
Nuclear fuel cycle-related activities, Imports, Reporting and recordkeeping requirements.
15 CFR Part 785
Enforcement.
15 CFR Part 786
Reporting and recordkeeping requirements.
Accordingly, in 15 CFR Chapter VII, new Subchapter D, titled “Additional Protocol Regulations” and consisting of Parts 781 through 799, is proposed to be added to read as follows:
Subchapter D—Additional Protocol Regulations
PART 781—GENERAL INFORMATION AND OVERVIEW OF THE ADDITIONAL PROTOCOL REGULATIONS (APR)
Sec.
781.1
Definitions of terms used in the Additional Protocol Regulations (APR).
781.2
Purposes of the Additional Protocol and APR.
781.3
Scope of the APR.
781.4
U.S. Government requests for information needed to satisfy the requirements of the APR or the Act.
781.5
Authority.
Authority:
Public Law 109-401, 120 Stat. 2726 (December 18, 2006); Executive Order 13458 (February 4, 2008).
§ 781.1
Definitions of terms used in the Additional Protocol Regulations (APR).
The following are definitions of terms used in parts 781 through 799 of this subchapter (collectively known as the APR), unless otherwise noted:
Access Point of Contact (A-POC).
The individual at a location who will be notified by BIS immediately upon receipt of an IAEA request for complementary access to a location. BIS must be able to contact either the A-POC or alternate A-POC on a 24-hour basis. All interactions with the location for permitting and planning an IAEA complementary access will be conducted through the A-POC or the alternate A-POC, if the A-POC is unavailable.
Act (The).
The United States Additional Protocol Implementation Act of 2006 (Pub. L. 109-401).
Additional Protocol.
The Protocol Additional to the Agreement between the United States of America and the International Atomic Energy Agency for the Application of Safeguards in the United States of America, with Annexes, signed at Vienna on June 12, 1998 (T. Doc. 107-097), known as the Additional Protocol.
Additional Protocol Regulations (APR).
Those regulations contained in 15 CFR parts 781 to 799 that were promulgated by the Department of Commerce to implement and enforce the Additional Protocol.
Agreement State.
Any State of the United States with which the U.S. Nuclear Regulatory Commission (NRC)
has entered into an effective agreement under Subsection 274b of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011
et seq.
).
Beneficiation.
The concentration of nuclear ores through physical or any other non-chemical methods.
Bureau of Industry and Security (BIS).
The Bureau of Industry and Security of the United States Department of Commerce, including Export Administration and Export Enforcement.
Complementary Access.
The exercise of the IAEA's access rights as set forth in Articles 4 to 6 of the Additional Protocol (see part 784 of the APR for requirements concerning the scope and conduct of complementary access).
Complementary Access Notification.
A written announcement issued by BIS to a person who is subject to the APR (e.g., the owner, operator, occupant, or agent in charge of a location that is subject to the APR as specified in § 781.3(a) of the APR) that informs this person about an impending complementary access in accordance with the requirements of Part 784 of the APR.
Host Team.
The U.S. Government team that accompanies the International Atomic Energy Agency (IAEA) inspectors during complementary access, as provided for in the Additional Protocol and conducted in accordance with the provisions of the APR.
Host Team Leader.
The representative from the Department of Commerce who leads the Host Team during complementary access.
International Atomic Energy Agency (IAEA).
The United Nations organization, headquartered in Vienna, Austria, that serves as the official international verification authority for the implementation of safeguards agreements concluded pursuant to the Treaty on the Non-Proliferation of Nuclear Weapons (NPT).
ITAR.
The International Traffic in Arms Regulations (22 CFR parts 120-130), which are administered by the Directorate of Defense Trade Controls, U.S. Department of State.
Location.
Any geographical point or area declared or identified by the United States or specified by the IAEA (see “location specified by the IAEA,” as defined in this section).
Location-specific environmental sampling.
The collection of environmental samples (e.g., air, water, vegetation, soil, smears) at, and in the immediate vicinity of, a location specified by the IAEA for the purpose of assisting the IAEA to draw conclusions about the absence of undeclared nuclear material or nuclear activities at the specified location.
Location-specific subsidiary arrangement.
An agreement that sets forth procedures, which have been mutually agreed upon by the United States and the IAEA, for conducting complementary access at a specific reportable location. (Also see definition of “subsidiary arrangement” in this section.)
Location specified by the IAEA.
A location that is selected by the IAEA to:
(1) Verify the absence of undeclared nuclear material or nuclear activities; or
(2) Obtain information that the IAEA needs to amplify or clarify information contained in the U.S. declaration.
Managed access.
Procedures implemented by the Host Team during complementary access to prevent the dissemination of proliferation sensitive information, to meet safety or physical protection requirements, to protect proprietary or commercially sensitive information, or to protect activities of direct national security significance to the United States, including information associated with such activities, in accordance with the Additional Protocol.
National Security Exclusion (NSE).
The right of the United States, as specified under Article 1.b of the Additional Protocol, to exclude the application of the Additional Protocol when the United States Government determines that its application would result in access by the IAEA to activities of direct national security significance to the United States or to locations or information associated with such activities.
NRC.
The U.S. Nuclear Regulatory Commission.
Nuclear fuel cycle-related research and development.
Those activities that are specifically related to any process or system development aspect of any of the following:
(1) Conversion of nuclear material;
(2) Enrichment of nuclear material;
(3) Nuclear fuel fabrication;
(4) Reactors;
(5) Critical facilities;
(6) Reprocessing of nuclear fuel; or
(7) Processing (not including repackaging or conditioning not involving the separation of elements, for storage or disposal) of intermediate or high-level waste containing plutonium, high enriched uranium or uranium-233.
Nuclear Material.
Any source material or special fissionable material, as follows.
(1)
Source material
means uranium containing the mixture of isotopes occurring in nature; uranium depleted in the isotope 235; thorium; any of the foregoing in the form of metal, alloy, chemical, or concentrate. The term source material shall not be interpreted as applying to ore or ore residue.
(2)
Special fissionable material
means plutonium 239; uranium 233; uranium enriched in the isotopes 235 or 233; any material containing one or more of the foregoing, but the term special fissionable material does not include source material.
Person.
Any individual, corporation, partnership, firm, association, trust, estate, public or private institution, any State or any political subdivision thereof, or any political entity within a State, any foreign government or nation or any agency, instrumentality or political subdivision of any such government or nation, or other entity located in the United States.
Report Point of Contact (R-POC).
A person whom BIS may contact for the purposes of clarification of information provided in report(s) and for general information. The R-POC need not be the person who prepares the forms or certifies the report(s) for submission to BIS, but should be familiar with the content of the reports.
Reportable Location.
A location that must submit an
Initial Report, Annual Update Report,
or
No Changes Report
to BIS, in accordance with the provisions of the APR, is considered to be a “reportable location” with reportable activities (see § 783.1(a) and (b) of the APR for nuclear fuel cycle-related activities subject to these reporting requirements).
Reporting Code.
A unique identification used for identifying a location where one or more nuclear fuel cycle-related activities subject to the reporting requirements of the APR are located.
Subsidiary Arrangement (or General Subsidiary Arrangement).
An agreement that sets forth procedures, which have been mutually agreed upon by the United States and the IAEA, for implementing the Additional Protocol, irrespective of the location. (Also see the definition of “location-specific subsidiary arrangement” in this section.)
United States.
Means the several States of the United States, the District of Columbia, and the commonwealths, territories, and possessions of the United States, and includes all places under the jurisdiction or control of the United States, including any of the places within the provisions of paragraph (41) of section 40102 of Title 49 of the United States Code, any civil aircraft of the United States or public aircraft, as such terms are defined in paragraphs (1) and (37), respectively, of
section 40102 of Title 49 of the United States Code, and any vessel of the United States, as such term is defined in section 3(b) of the Maritime Drug Enforcement Act, as amended (section 1903(b) of Title 46 App. of the United States Code).
Uranium Hard-Rock Mine.
Means any of the following:
(1) An area of land from which uranium is extracted in non-liquid form;
(2) Private ways and roads appurtenant to such an area; and
(3) Lands, excavations, underground passageways, shafts, slopes, tunnels and workings, structures, facilities, equipment, machines, tools, or other property including impoundments, retention dams, and tailings ponds, on the surface or underground, used in, or to be used in, or resulting from, the work of extracting such uranium ore from its natural deposits in non-liquid form, or if in liquid form, with workers underground, or used in, or to be used in, the concentration of such uranium ore, or the work of the uranium ore.
Uranium Hard-Rock Mine (Closed-down).
A uranium hard-rock mine where ore production has ceased and the mine or its infrastructure is not capable of further operation.
Uranium Hard-Rock Mine (Operating).
A uranium hard-rock mine where ore is produced on a routine basis.
Uranium Hard-Rock Mine (Suspended).
A uranium hard-rock mine where ore production has ceased, but the mine and its infrastructure are capable of further operation.
U.S. declaration.
The information submitted by the United States to the IAEA in fulfillment of U.S. obligations under the Additional Protocol.
United States Government locations.
Those locations owned and operated by a U.S. Government agency (including those operated by contractors to the agency), and those locations leased to and operated by a U.S. Government agency (including those operated by contractors to the agency). United States Government locations do not include locations owned by a U.S. Government agency and leased to a private organization or other entity such that the private organization or entity may independently decide the purposes for which the locations will be used.
Wide-area environmental sampling.
The collection of environmental samples (e.g., air, water, vegetation, soil, smears) at a set of locations specified by the IAEA for the purpose of assisting the IAEA to draw conclusions about the absence of undeclared nuclear material or nuclear activities over a wide area.
You.
The term “you” or “your” means any person. With regard to the reporting requirements of the APR, “you” refers to persons that have an obligation to report certain activities under the provisions of the APR. (Also see the definition of
“person”
in this section.)
§ 781.2
Purposes of the Additional Protocol and APR.
(a)
General.
The Additional Protocol is a supplement to the existing U.S.-IAEA Safeguards Agreement, which entered into force in 1980. It provides the IAEA with access to additional information about civil nuclear and nuclear-related items, materials, and activities and with physical access to reportable locations where nuclear facilities, materials, or ores are located (to ensure the absence of undeclared nuclear material and activities) and to other reportable locations and locations specified by the IAEA (to resolve questions or inconsistencies related to the U.S. Declaration). The Additional Protocol is based upon and is virtually identical to the IAEA Model Additional Protocol (see IAEA Information Circular, INFCIRC/540, at
www.iaea.org/Publications/Documents/Infcircs/index.html
), except that it excludes IAEA access to activities with direct national security significance to the United States, or to locations or information associated with such activities, and provides for managed access in connection with those same activities and to locations or information associated with those activities.
(b)
Purposes of the Additional Protocol.
The Additional Protocol is designed to enhance the effectiveness of the U.S.-IAEA Safeguards Agreement by providing the IAEA with information about aspects of the U.S. civil nuclear fuel cycle, including: mining and concentration of nuclear ores; nuclear-related equipment manufacturing, assembly, or construction; imports, exports, and other activities involving certain source material (i.e., source material that has not reached the composition and purity suitable for fuel fabrication or for being isotopically enriched); imports and exports of specified nuclear equipment and non-nuclear material; nuclear fuel cycle-related research and development activities not involving nuclear material; and other activities involving nuclear material not currently subject to the U.S.-IAEA Safeguards Agreement (e.g., nuclear material that has been exempted from safeguards pursuant to paragraph 37 of INFCIRC/153 (Corrected) June 1972).
(c)
Purposes of the Additional Protocol Regulations.
To fulfill certain obligations of the United States under the Additional Protocol, BIS has established the APR, which require the reporting of information to BIS (as described in Parts 783 and 784 of the APR) from all persons and locations in the United States (as described in § 781.3(a) of the APR) with reportable activities. This information, together with information reported to other U.S. Government agencies and less any information to which the U. S. Government applies the national security exclusion, is aggregated into a U.S. declaration, which is submitted annually to the IAEA. The APR also provide for complementary access at such locations in accordance with the provisions in Part 784 of the APR.
§ 781.3
Scope of the APR.
The Additional Protocol Regulations or APR implement certain obligations of the United States under the Protocol Additional to the Agreement Between the United States of America and the International Atomic Energy Agency Concerning the Application of Safeguards in the United States of America, known as the Additional Protocol.
(a)
Persons and locations subject to the APR.
The APR, promulgated by the Department of Commerce, shall apply to all persons and locations in the United States, except:
(1) Locations that are subject to the regulatory authority of the Nuclear Regulatory Commission (NRC), pursuant to the NRC's regulatory jurisdiction under the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011
et seq.
); and
(2) The following
United States Government locations
(see definition in § 781.1 of the APR):
(i) Department of Energy locations;
(ii) Department of Defense locations;
(iii) Central Intelligence Agency locations; and
(iv) Department of State locations.
(b)
Activities subject to the APR.
The activities that are subject to the recordkeeping and reporting requirements described in the APR are found in Parts 783 and 784 of this subchapter (APR).
§ 781.4
U.S. Government requests for information needed to satisfy the requirements of the APR or the Act.
From time to time, one or more U.S. Government agencies (i.e., the Department of Defense, the Department of Energy, the NRC, or BIS) may contact a location to request information that the U.S. Government has determined to be necessary to satisfy certain
requirements of the APR or the Act (e.g., clarification requests or vulnerability assessments). If the manner of providing such information is not specified in the APR, the agency in question will provide the location with appropriate instructions.
§ 781.5
Authority.
The APR implement certain provisions of the Additional Protocol under the authority of the Additional Protocol Implementation Act of 2006 (Pub. L. 109-401, 120 Stat. 2726 (December 18, 2006)). In Executive Order 13458 of February 4, 2008, the President delegated authority to the Department of Commerce to promulgate regulations to implement the Act, and consistent with the Act, to carry out appropriate functions not otherwise assigned in the Act, but necessary to implement certain declaration and complementary access requirements of the Additional Protocol and the Act.
PART 782—GENERAL INFORMATION REGARDING REPORTING REQUIREMENTS AND PROCEDURES
Sec.
782.1
Overview of reporting requirements under the APR.
782.2
Persons responsible for submitting reports required under the APR.
782.3
Compliance review.
782.4
Assistance in determining your obligations.
782.5
Where to obtain APR report forms.
782.6
Where to submit reports.
Authority:
Public Law 109-401, 120 Stat. 2726 (December 18, 2006); Executive Order 13458 (February 4, 2008).
§ 782.1
Overview of reporting requirements under the APR.
Part 783 of the APR describes the reporting requirements for certain activities specified in the APR. For each activity specified in Part 783, BIS may require that an
Initial Report,
an
Annual Update Report,
a
No Changes Report,
an
Export Report,
an
Import Confirmation Report,
a
Supplemental Information Report,
or an
Amended Report
be submitted to BIS. In addition, persons subject to the APR may be required to provide BIS with information needed to assist the IAEA in clarifying or verifying information specified in the U.S. declaration or in clarifying or amplifying information concerning the nature of the activities conducted at a location (see §§ 783.1(d) and 784.1(b)(2) of the APR for requirements concerning a
Supplementary Information Report
). If, after reviewing Part 783 of the APR, you determine that you are subject to one or more APR reporting requirements, you may obtain the appropriate forms by contacting BIS (see § 782.5 of the APR). In addition, forms may be downloaded from the Internet at
www.ap.gov.
§ 782.2
Persons responsible for submitting reports required under the APR.
The owner, operator, or senior management official of a location subject to the reporting requirements in Part 783 of the APR is responsible for the submission of all required reports and documents in accordance with all applicable provisions of the APR.
§ 782.3
Compliance review.
Periodically, BIS will request information from persons and locations subject to the APR to determine compliance with the reporting and recordkeeping requirements set forth herein. Information requested may relate to nuclear fuel cycle research and development activities not involving nuclear material, nuclear-related manufacturing, assembly or construction activities, or uranium hard-rock mining activities as described in Part 783 of the APR. Any person or location subject to the APR and receiving such a request for information must submit a response to BIS within 30 calendar days of receipt of the request. If the requested information cannot be provided to BIS, the response must fully explain the reason why such information cannot be provided. If additional time is needed to collect the requested information, the person or location should request an extension of the submission deadline, before the expiration of the 30-day time period set by BIS, and include an explanation for why an extension is needed. BIS will grant only one extension of the submission deadline. The maximum period of time for which BIS will grant an extension will be 30 days. Failure to respond to this request could lead to an investigation of the person's or location's reporting and recordkeeping procedures under the APR.
§ 782.4
Assistance in determining your obligations.
(a)
Determining if your activity is subject to reporting requirements.
(1) If you need assistance in determining whether or not your activity is subject to the APR's reporting requirements, submit your written request for an activity determination to BIS. Such requests may be sent via facsimile to (202) 482-1731, e-mailed to
apdr@ap.gov
, or hand delivered or submitted by courier to the Treaty Compliance Division, Bureau of Industry and Security, U.S. Department of Commerce, Attn: AP Activity Determination, 14th Street and Pennsylvania Avenue, NW., Room 4515, Washington, DC 20230. Your activity determination request should include the information indicated in paragraph (a)(2) of this section to ensure an accurate determination. Also include any additional information that would be relevant to the activity described in your request. If you are unable to provide all of the information required in paragraph (a)(2) of this section, you should include an explanation identifying the reasons or deficiencies that preclude you from supplying the information. If BIS cannot make a determination based upon the information submitted, BIS will return the request to you and identify the additional information that is necessary to complete an activity determination. BIS will provide a written response to your activity determination request within 10 business days of receipt of the request.
(2) You must include the following information when submitting an activity determination request to BIS:
(i) Date of your request;
(ii) Name of your organization and complete street address;
(iii) Point of contact for your organization;
(iv) Phone and facsimile number for your point of contact;
(v) E-mail address for your point of contact, if you want BIS to provide an acknowledgment of receipt via e-mail; and
(vi) Description of your activity in sufficient detail as to allow BIS to make an accurate determination.
(b)
Other inquiries.
If you need assistance in interpreting the provisions of the APR or need assistance with APR report forms or complementary access issues, contact BIS's Treaty Compliance Division by phone at (202) 482-1001. If you require a written response from BIS, submit a detailed request to BIS that explains your question, issue, or request. Send the request to the address or facsimile included in paragraph (a) of this section, or e-mail the request to
apqa@ap.gov.
To ensure that your request is properly routed, include the notation, “
Attention:
APR Advisory Request,” on your submission to BIS.
§ 782.5
Where to obtain APR report forms.
Report forms required by the APR may be downloaded from the Internet at
www.ap.gov.
You also may obtain these forms by contacting: Treaty Compliance Division, Bureau of Industry and Security, U.S. Department of Commerce,
Attn:
Forms Request, 14th Street and Pennsylvania Avenue, NW., Room 4515, Washington, DC 20230,
Telephone:
(202) 482-1001.
§ 782.6
Where to submit reports.
Reports required by the APR must be sent via facsimile to (202) 482-1731, e-mailed to
aprp@ap.gov
, or hand delivered or submitted by courier to BIS, in hard copy, to the following address: Treaty Compliance Division, Bureau of Industry and Security, U.S. Department of Commerce,
Attn:
AP Reports, 14th Street and Pennsylvania Avenue, NW., Room 4515, Washington, DC 20230,
Telephone:
(202) 482-1001. Specific types of reports and due dates are outlined in Supplement No. 1 to Part 783 of the APR.
PART 783—CIVIL NUCLEAR FUEL CYCLE-RELATED ACTIVITIES NOT INVOLVING NUCLEAR MATERIALS
Sec.
783.1
Reporting requirements.
783.2
Amended reports.
783.3
Reports containing information determined by BIS not to be required by the APR.
783.4
Deadlines for submission of reports and amendments.
Supplement No. 1 to Part 783—Deadlines for Submission of Reports and Amendments
Supplement No. 2 to Part 783—Manufacturing Activities
Supplement No. 3 to Part 783—List of Specified Equipment and Non-Nuclear Material for the Reporting of Exports and Imports
Authority:
Public Law 109-401, 120 Stat. 2726 (December 18, 2006); Executive Order 13458 (February 4, 2008).
§ 783.1
Reporting requirements.
(a)
Initial report.
You must submit an
Initial Report
to BIS, no later than [30 calendar days following the date of publication of the final rule that establishes the APR] (see Supplement No. 1 to this Part), if you are engaged in any of the civil nuclear fuel cycle-related activities described in this paragraph (a) on [the date of publication of the final rule that establishes the APR]. The
Initial Report
must include any activities involving uranium hard-rock mines that were closed down during the calendar year in which the APR were promulgated (up to and including the date of publication). For any year that follows the year in which the APR were promulgated, you must submit an
Initial Report
to BIS if you commenced any of the civil nuclear fuel cycle-related activities described in this paragraph (a) during the previous calendar year and have not reported such activities to BIS. Reportable nuclear fuel-cycle activities that commence after the date of publication of the rule establishing the APR must be reported to BIS no later than January 31 of the year following the calendar year in which the activities took place (see Supplement No. 1 to this Part). You may report these activities as part of your
Annual Update Report
, in lieu of submitting a separate
Initial Report
, if you also have an
Annual Update Report
requirement that applies to the same location and covers the same reporting period (see paragraph (b) of this section). In order to satisfy the
Initial Report
requirements under this paragraph (a), you must complete and submit to BIS Form AP-1, Form AP-2, and other appropriate forms, as provided in this paragraph (a).
(1)
Research and development activities not involving nuclear material.
You must report to BIS any of the civil nuclear fuel cycle-related research and development activities identified in paragraphs (a)(1)(i) and (a)(1)(ii) of this section. Activities subject to these APR reporting requirements include research and development activities related to safe equipment operations for a nuclear fuel cycle-related activity, but do not include activities related to theoretical or basic scientific research or to research and development on industrial radioisotope applications, medical, hydrological and agricultural applications, health and environmental effects and improved maintenance.
(i) You must complete Form AP-3 and submit it to BIS, as provided in § 782.6 of the APR, if you conducted any civil nuclear fuel cycle-related research and development activities defined in § 781.1 of the APR that:
(A) Did not involve nuclear material; and
(B) Were funded, specifically authorized or controlled by, or conducted on behalf of, the United States.
(ii) You must complete Form AP-4 and submit it to BIS, as provided in § 782.6 of the APR, if you conducted any civil nuclear fuel cycle-related research and development activities defined in § 781.1 of the APR that:
(A) Did not involve nuclear material;
(B) Were specifically related to enrichment, reprocessing of nuclear fuel, or the processing of intermediate or high-level waste containing plutonium, high enriched uranium or uranium-233 (where “processing” involves the separation of elements); and
(C) Were not funded, specifically authorized or controlled by, or conducted on behalf of, the United States.
(2)
Civil nuclear-related manufacturing, assembly or construction activities.
You must complete Form AP-5 and submit it to BIS, as provided in § 782.6 of the APR, if you engaged in any of the activities specified in Supplement No. 2 to this part.
(3)
Uranium hard-rock mining and ore beneficiation activities.
You must complete Form AP-6 and submit it to BIS, as provided in § 782.6 of the APR, if your location is either a uranium hard-rock mine or an ore beneficiation plant that was in operating or suspended status (see § 781.1 of the APR for the definitions of “uranium hard-rock mine” and uranium hard-rock mines in “operating,” “suspended,” or “closed-down” status).
(i) The
Initial Report
requirement for the calendar year in which the APR are promulgated applies to:
(A) Uranium hard-rock mines or ore beneficiation plants that are in operating or suspended status on the date that the rule establishing the APR is published; and
(B) Uranium hard-rock mines that have changed from operating or suspended status to closed-down status during the calendar year in which the rule establishing the APR is published (up to and including the date of publication of the rule). Mines that were closed down prior to the calendar year in which the APR are promulgated and that remain in closed-down status do not have a reporting requirement.
(ii) For any calendar year that follows the year in which the APR are promulgated, you are required to submit an
Initial Report
to BIS only if you commenced operations at a uranium hard-rock mine or an ore beneficiation plant during the previous calendar year (e.g., the commencement of operations would include, but not be limited to, the resumption of operations at a mine that was previously in “closed-down” status). Otherwise, see the
Annual Update Report
and
No Changes Report
requirements in paragraphs (b)(1) or (b)(2) of this section. For example, you must submit an
Annual Update Report
to indicate the closed-down status of any uranium hard-rock mine that was indicated in your most recent report to be in either operating or suspended status, but at which you ceased operations during the previous calendar year.
(b)
Annual reporting requirements.
You must submit either an
Annual Update Report
or a
No Changes Report
to BIS, as provided in § 782.6 of the APR, if, during the previous calendar year, you continued to engage in civil nuclear fuel cycle-related activities at a location for which you submitted an
Initial Report
to BIS in accordance with the APR reporting requirements described in paragraph (a) of this section.
(1)
Annual Update Report.
You must submit an
Annual Update Report
to BIS if you have updates or changes to report concerning your location's activities during the previous calendar year. When preparing your
Annual Update Report
, you must complete the same report forms that you used for submitting your
Initial Report
on these activities. However, additional report forms will be required if your location engaged in any civil nuclear fuel cycle-related activities described in paragraph (a) of this section that you did not previously report to BIS. The appropriate report forms for each type of activity that must be reported under the APR are identified in paragraphs (a)(1) through (a)(3) of this section. You must submit your
Annual Update Report
to BIS no later than January 31 of the year following any calendar year in which the activities took place or there were changes to previously “reported” activities (see Supplement No. 1 to this Part).
(2)
No Changes Report.
You may submit a
No Changes Report
, in lieu of an
Annual Update Report
, if you have no updates or changes concerning your location's activities (except the certifying official and dates signed and submitted) since your most recent report of activities to BIS. In order to satisfy the reporting requirements under this paragraph (b)(2), you must complete Form AP-16 and submit it to BIS, as provided in § 782.6 of the APR, no later than January 31 of the year following any calendar year in which there were no changes to previously “reported” activities or location information (see Supplement No. 1 to this Part).
(3)
Additional guidance on annual reporting requirements.
(i) If your
Initial Report
or your most recent
Annual Update Report
for a location indicates that all civil nuclear fuel cycle-related activities described therein have ceased at that location, and no other reportable activities have occurred during the previous calendar year, then you do not have a reporting requirement for the location under paragraph (b) of this section.
(ii) If your location ceases to engage in activities subject to the APR reporting requirements described in paragraph (a) of this section, and you have not previously reported this to BIS, you must submit an
Annual Update Report
covering the calendar year in which you ceased to engage in such activities.
(iii) Closed-down mines should be reported only once.
(c)
Export Report.
You must complete Forms AP-1, AP-2, and AP-13 for each export of specified equipment or non-nuclear material identified in Supplement No. 3 to this Part and submit these Forms to BIS, as provided in § 782.6 of the APR. These Forms must be submitted to BIS no later than 15 days after the end of each calendar quarter (see Supplement No. 1 to this Part). For example, the
Export Report
for the calendar quarter beginning on January 1st and ending on March 31st must be submitted to BIS by April 15th and the
Export Reports
for the remainder of the calendar year would have to be submitted to BIS by July 15th, October 15th, and January 15th, respectively.
(d)
Import Confirmation Report.
You must complete Forms AP-1, AP-2 and AP-14 for each import of equipment or non-nuclear material identified in Supplement No. 3 to this Part and submit these forms to BIS, as provided in § 782.6 of the APR, if BIS sends you written notification requiring that you provide information concerning imports of such equipment and non-nuclear material. These Forms must be submitted within 30 calendar days of the date that you receive written notification of this requirement from BIS (see Supplement No. 1 to this Part). BIS will provide such notification when it receives a request from the IAEA for information concerning imports of this type of equipment or non-nuclear material. The IAEA may request this information to verify that you received specified equipment or non-nuclear material that was shipped to you by a person, organization, or government from a foreign country.
(e)
Supplemental Information Report.
You must complete Forms AP-1, AP-2 and AP-15 and submit them to BIS, as provided in § 782.6 of the APR, if BIS sends you written notification requiring that you provide information about the activities conducted at your location, insofar as relevant for the purpose of safeguards. These Forms must be submitted within 15 calendar days of the date that you receive written notification of this requirement from BIS (see Supplement No. 1 to this Part). BIS will provide such notification only if the IAEA specifically requests amplification or clarification concerning any information provided in the U.S. Declaration based on your report(s).
(f)
Reportable location.
A location that must submit an
Initial Report
,
Annual Update Report
, or
No Changes Report
to BIS, pursuant to the requirements of this section, is considered to be a reportable location with declared activities.
§ 783.2
Amended reports.
In order for BIS to maintain accurate information on previously submitted reports, including information necessary for BIS to facilitate complementary access notifications or to communicate reporting requirements under the APR,
Amended Reports
are required under the circumstances described in paragraphs (a), (b), and (d) of this section. This section applies only to changes affecting
Initial Reports
and
Annual Update Reports
that were submitted to BIS in accordance with the requirements of § 783.1(a) and (b) of the APR. The specific report forms that you must use to prepare and submit an
Amended Report
will depend upon the type of information that you are required to provide, pursuant to this section.
(a)
Changes to activity information.
You must submit an
Amended Report
to BIS within 30 calendar days of the time that you discover an error or omission in your most recent
Initial Report
or
Annual Update Report
that involves information concerning an activity subject to the reporting requirements described in § 783.1(a) or (b) of the APR. Use Form AP-1, and any applicable report forms indicated for the activities identified in § 783.1(a) of the APR, to prepare your
Amended Report.
Submit your
Amended Report
to BIS, as provided in § 782.6 of the APR.
(b)
Changes to organization and location information that must be maintained by BIS.
(1)
Internal organization changes.
You must submit an
Amended Report
to BIS within 30 calendar days of any change in the following information (use Form AP-1 to prepare your
Amended Report
and submit it to BIS, as provided in § 782.6 of the APR):
(i) Name of report point of contact (R-POC), including telephone number, facsimile number, and e-mail address;
(ii) Name(s) of complementary access point(s) of contact (A-POC), including telephone number(s), facsimile number(s) and e-mail address(es);
(iii) Organization name;
(iv) Organization mailing address;
(v) Location owner, including telephone number, and facsimile number; or
(vi) Location operator, including telephone number, and facsimile number.
(2)
Change in ownership of organization.
You must submit an
Amended Report
to BIS if you sold a reportable location or if your reportable location went out of business since submitting your most recent
Initial Report
,
Annual Update Report
, or
No Changes Report
to BIS. You must also submit an
Amended Report
to BIS if you purchased a reportable location that submitted an
Initial Report
,
Annual Update Report
, or
No Changes Report
to
BIS for the most recent reporting period, as specified in § 783.1(a) and (b) of the APR. Submit your
Amended Report
to BIS, as provided in § 782.6 of the APR, either before the effective date of the change in ownership or within 30 calendar days after the effective date of the change.
(i) The following information must be included in an
Amended Report
submitted to BIS by an organization that is selling or that has sold a reportable location (use Forms AP-1 and AP-16 to prepare your
Amended Report
—address specific details regarding the sale of a reportable location in Form AP-16):
(A) Name of seller (i.e., name of the organization selling a reportable location);
(B) Reporting Code (this code will be assigned to your location and reported to you by BIS or the NRC after receipt of your
Initial Report
);
(C) Name of purchaser (i.e., name of the new organization/owner purchasing a reportable location) and name and address of contact person for the purchaser, if known;
(D) Date of ownership transfer or change;
(E) Additional details on the sale of the reportable location relevant to ownership or operational control over any portion of the reportable location (
e.g.
, whether the entire location or only a portion of the reportable location has been sold to a new owner); and
(F) Details regarding whether the new owner of a reportable location will submit the next report for the entire calendar year in which the ownership change occurred, or whether the previous owner and new owner will submit separate reports for the periods of the calendar year during which each owned the reportable location.
(ii) The following information must be included in an
Amended Report
submitted to BIS by an organization that is purchasing or that has purchased a reportable location (use Forms AP-1 and AP-2 to prepare your
Amended Report
):
(A) Name of purchaser (i.e., name of the new organization/owner purchasing a reportable location) and name and address of contact person for the purchaser;
(B) Details on the purchase of the reportable location relevant to ownership or operational control over any portion of the reportable location (e.g., whether the purchaser intends to purchase and to maintain operational control over the entire location or only a portion of the reportable location); and
(C) Details on whether the purchaser intends to continue existing civil nuclear fuel cycle-related activities at the reportable location or to cease such activities during the current reporting period.
(iii) If the new owner of a reportable location is responsible for submitting a report that covers the entire calendar year in which the ownership change occurred, the new owner must obtain and maintain possession of the location's records covering the entire year, including those records for the period of the year during which the previous owner still owned the property.
Note 1 to § 783.2(b):
Amended Reports
that are submitted to identify changes involving internal organization information or changes in ownership are used only for internal U.S. Government purposes and are not forwarded to the IAEA. BIS uses the information it obtains from
Amended Reports
to update contact information for internal oversight purposes and for IAEA complementary access notifications.
Note 2 to § 783.2(b):
For ownership changes, the reportable location will maintain its original Reporting Code, unless the location is sold to multiple owners, at which time BIS will assign a new Reporting Code.
(c)
Non-substantive changes.
If you discover one or more non-substantive typographical errors in your
Initial Report
or
Annual Update Report
, after submitting the report to BIS, you are not required to submit an
Amended Report
to BIS. Instead, you may correct these errors when you submit your next
Annual Update Report
to BIS.
(d)
Amendments related to complementary access.
If you are required to submit an
Amended Report
to BIS following the completion of complementary access (see part 784 of the APR), BIS will notify you, in writing, of the information that must be amended pursuant to § 784.6 of the APR. Complete and submit Form AP-1 (organization information) and/or the specific report forms required by Section 783.1(a) or (b) of the APR, according to the type(s) of activities for which information is being requested. You must submit your
Amended Report
to BIS, as provided in § 782.6 of the APR, no later than 30 calendar days following your receipt of BIS's post complementary access letter.
(e)
Option for submitting amended reports in letter form.
If you are required to submit an
Amended Report
to BIS, pursuant to paragraph (a), (b), or (d) of this section, BIS may permit you to submit your report in the form of a letter that contains all of the corrected information required under this section. Your letter must be submitted to BIS, at the address indicated in § 782.6 of the APR, no later than the applicable due date(s) indicated in this section (also see Supplement No. 1 to this part).
§ 783.3
Reports containing information determined by BIS not to be required by the APR.
If you submit a report and BIS determines that none of the information contained therein is required by the APR, BIS will not process the report and will notify you, either electronically or in writing, explaining the basis for its decision. BIS will not maintain any record of the report. However, BIS will maintain a copy of the notification.
§ 783.4
Deadlines for submission of reports and amendments.
Reports and amendments required under this part must be postmarked by the appropriate date identified in Supplement No. 1 to this part 783. Required reports and amendments include those identified in paragraphs (a) through (g) of this section.
(a)
Initial Report:
Submitted by a location that commenced one or more of the civil nuclear fuel cycle-related activities described in § 783.1(a) of the APR during the previous calendar year, but that has not yet reported such activities to BIS. However,
Initial Reports
that are submitted to BIS during the calendar year in which the APR are promulgated must describe only those activities in which you are engaged as of the date of publication of the rule establishing the APR, except that the description of activities involving uranium hard-rock mines must include any such mines that were closed down during the calendar year in which the rule establishing the APR was published (up to and including the date of publication), as well as mines that were in either operating or suspended status on the date of publication (see § 783.1(a)(3)(i) of the APR).
(b)
Annual Update Report:
Submitted by a reportable location—this report describes changes to previously reported (i.e., declared) activities and any other reportable civil nuclear fuel cycle-related activities that took place at the location during the previous calendar year.
(c)
No Changes Report:
Submitted by a reportable location, in lieu of an
Annual Update Report
, when there are no updates or changes to any information, excluding the certifying official and dates signed and submitted, since the previous report submitted by that location.
(d)
Export Report:
Submitted following the end of any calendar quarter in which a person exports an item listed in Supplement No. 3 to this part.
(e)
Import Confirmation Report:
Submitted in response to a written notification from BIS, following a specific request by the IAEA.
(f)
Supplemental Information Report:
Submitted in response to a written notification from BIS, following a specific request by the IAEA.
(g)
Amended Report:
Submitted by a reportable location to report certain changes affecting the location's most recent
Initial Report
or
Annual Update Report.
Supplement No. 1 to Part 783
Deadlines for Submission of Reports and Amendments
Reports
Applicable forms
Due dates
Initial Report
Forms AP-1 and AP-2 and:
—AP-3 or AP-4 for R&D activities;
—AP-5 for civil nuclear-related manufacturing, assembly or construction; and
—AP-6 for mining and ore beneficiation.
[30 calendar days after promulgation of the final rule establishing the APR] for: (1) Any activities in which you were engaged on the date of publication of that rule and (2) uranium hard-rock mines that have changed from operating or suspended status to closed-down status during the calendar year in which the rule establishing the APR is published (up to and including the date of publication of the rule).
For activities commencing after promulgation of the rule establishing the APR,
Initial Reports
must be submitted no later than January 31 of the year following any calendar year in which the activities began,
unless
you are required to submit an
Annual Update Report
because of on-going previously “reported” activities at the same location—in that case, you may include the new activities in your
Annual Update Report
, instead of submitting a separate
Initial Report
.
Annual Update Report
Forms AP-1 and AP-2 and:
—AP-3 or AP-4 for R&D activities;
—AP-5 for civil nuclear-related manufacturing, assembly or construction; and
—AP-6 for mining and ore beneficiation.
January 31 of the year following any calendar year in which the activities took place or there were changes to previously “reported” activities.
No Changes Report
Form AP-17
January 31 of the year following any calendar year in which there were no changes to previously “reported” activities or location information.
Export Report
Forms AP-1, AP-2, and AP-13
Within 15 calendar days following the end of any calendar quarter in which a person exports an item listed in Supplement No. 3 to this Part.
Import Confirmation Report
Forms AP-1, AP-2, and AP-14
Within 30 calendar days of receiving notification from BIS.
Supplemental Information Report
Forms AP-1, AP-2, and AP-15
Within 15 calendar days of receiving notification from BIS.
Amended Report:
—Report information.
—Organization and location information.
—Complementary access letter.
Form AP-1 and appropriate forms, as specified in § 783.1 of the APR, for the type of report being amended
Amended report due:
—30 calendar days after you discover an error or omission in activity information contained in your most recent report.
—30 calendar days after a change in company information or ownership of a location.
—30 calendar days after receipt of a post-complementary access letter from BIS.
Supplement No. 2 to Part 783—Manufacturing Activities
The following constitute manufacturing activities that would require the submission of a report to BIS, pursuant to § 783.1(a)(2) of the APR.
(1) The manufacture of centrifuge rotor tubes or the assembly of
gas centrifuges
.
Centrifuge rotor tubes
means thin-walled cylinders as described in Section 5.1.1(b) of Supplement No. 3 to this Part.
Gas centrifuges
means centrifuges as described in the
INTRODUCTORY NOTE
to Section 5.1 of Supplement No. 3 to this Part.
(2) The manufacture of
diffusion barriers
.
Diffusion barriers
means thin, porous filters as described in Section 5.3.1(a) of Supplement No. 3 to this Part.
(3) The manufacture or assembly of
laser-based systems
.
Laser-based systems
means systems incorporating those items as described in Section 5.7 of Supplement No. 3 to this Part.
(4) The manufacture or assembly of
electromagnetic isotope separators
.
Electromagnetic isotope separators
means those items referred to in Section 5.9.1 of Supplement No. 3 to this Part containing ion sources as described in Section 5.9.1(a) of Supplement No. 3 to this Part.
(5) The manufacture or assembly of
columns or extraction equipment
.
Columns or extraction equipment
means those items as described in Sections 5.6.1, 5.6.2, 5.6.3, 5.6.5, 5.6.6, 5.6.7, and 5.6.8 of Supplement No. 3 to this Part.
(6) The manufacture of
aerodynamic separation nozzles
or
vortex tubes
.
Aerodynamic separation nozzles
or
vortex tubes
means separation nozzles and vortex tubes as described, respectively, in Sections 5.5.1 and 5.5.2 of Supplement No. 3 to this Part.
(7) The manufacture or assembly of
uranium plasma generation systems
.
Uranium plasma generation systems
means systems for the generation of uranium plasma as described in Section 5.8.3 of Supplement No. 3 to this Part.
(8) The manufacture of
zirconium tubes
.
Zirconium tubes
means tubes as described in Section 1.6 of Supplement No. 3 to this Part.
(9) The manufacture or upgrading of
heavy water
or
deuterium
.
Heavy water
or
deuterium
means deuterium, heavy water (deuterium oxide) and any other deuterium compound in which the ratio of deuterium to hydrogen atoms exceeds 1:5,000.
(10) The manufacture of
nuclear grade graphite
.
Nuclear grade graphite
means graphite having a purity level better than 5 parts per million boron equivalent and with a density greater than 1.50 g/cm
3
;
(11) The manufacture of flasks for
irradiated fuel
. A
flask for irradiated fuel
means a vessel for the transportation and/or storage of irradiated fuel that provides chemical, thermal and radiological protection, and dissipates decay heat during handling, transportation and storage.
(12) The manufacture of
reactor control rods
.
Reactor control rods
means rods as described in Section 1.4 of Supplement No. 3 to this Part.
(13) The manufacture of
critically safe tanks
and
vessels
.
Critically safe tanks and vessels
means those items as described in Sections 3.2 and 3.4 of Supplement No. 3 to this Part.
(14) The manufacture of
irradiated fuel element chopping machines
.
Irradiated fuel element chopping machines
means equipment as described in Section 3.1 of Supplement No. 3 to this Part.
(15) The construction of
hot cells
.
Hot cells
means a cell or interconnected cells totaling at least 6 cubic meters in volume with shielding equal to or greater than the equivalent of 0.5 meters of concrete, with a density of 3.2 g/cm
3
or greater, outfitted with equipment for remote operations.
Supplement No. 3 to Part 783 List of Specified Equipment and Non-Nuclear Material for the Reporting of Exports and Imports
1. Reactors and Equipment Therefor
1.1. Complete Nuclear Reactors
Nuclear reactors capable of operation so as to maintain a controlled self-sustaining fission chain reaction, excluding zero energy reactors, the latter being defined as reactors with a designed maximum rate of production of plutonium not exceeding 100 grams per year.
Explanatory Note:
A “nuclear reactor” basically includes the items within or attached directly to the reactor vessel, the equipment which controls the level of power in the core, and the components which normally contain or come in direct contact with or control the primary coolant of the reactor core. It is not intended to exclude reactors which could reasonably be capable of modification to produce significantly more than 100 grams of plutonium per year. Reactors designed for sustained operation at significant power levels, regardless of their capacity for plutonium production, are not considered as “zero energy reactors.”
1.2. Reactor Pressure Vessels
Metal vessels, as complete units or as major shop-fabricated parts therefor, which are specially designed or prepared to contain the core of a nuclear reactor, as defined in Section 1.1, and are capable of withstanding the operating pressure of the primary coolant.
Explanatory Note:
This is the list that the IAEA Board of Governors agreed at its meeting on 24 February 1993 would be used for the purpose of the voluntary reporting scheme, as subsequently amended by the Board. A top plate for a reactor pressure vessel is covered by this Section 1.2 as a major shop-fabricated part of a pressure vessel. Reactor internals (e.g., support columns and plates for the core and other vessel internals, control rod guide tubes, thermal shields, baffles, core grid plates, diffuser plates, etc.) are normally supplied by the reactor supplier. In some cases, certain internal support components are included in the fabrication of the pressure vessel. These items are sufficiently critical to the safety and reliability of the operation of the reactor (and, therefore, to the guarantees and liability of the reactor supplier), so that their supply, outside the basic supply arrangement for the reactor itself, would not be common practice. Therefore, although the separate supply of these unique, specially designed and prepared, critical, large and expensive items would not necessarily be considered as falling outside the area of concern, such a mode of supply is considered unlikely.
1.3. Reactor Fuel Charging and Discharging Machines
Manipulative equipment specially designed or prepared for inserting or removing fuel in a nuclear reactor, as defined in Section 1.1 of this Supplement, capable of on-load operation or employing technically sophisticated positioning or alignment features to allow complex off-load fueling operations such as those in which direct viewing of or access to the fuel is not normally available.
1.4. Reactor Control Rods
Rods specially designed or prepared for the control of the reaction rate in a nuclear reactor as defined in Section 1.1 of this Supplement.
Explanatory Note:
This item includes, in addition to the neutron absorbing part, the support or suspension structures therefor if supplied separately.
1.5. Reactor Pressure Tubes
Tubes which are specially designed or prepared to contain fuel elements and the primary coolant in a reactor, as defined in Section 1.1 of this Supplement, at an operating pressure in excess of 5.1 MPa (740 psi).
1.6. Zirconium Tubes
Zirconium metal and alloys in the form of tubes or assemblies of tubes, and in quantities exceeding 500 kg in any period of 12 months, specially designed or prepared for use in a reactor, as defined in Section 1.1 of this Supplement, and in which the relation of hafnium to zirconium is less than 1:500 parts by weight.
1.7. Primary Coolant Pumps
Pumps specially designed or prepared for circulating the primary coolant for nuclear reactors, as defined in Section 1.1 of this Supplement.
Explanatory Note:
Specially designed or prepared pumps may include elaborate sealed or multi-sealed systems to prevent leakage of primary coolant, canned-driven pumps, and pumps with inertial mass systems. This definition encompasses pumps certified to NC-1 or equivalent standards.
2. Non-Nuclear Materials for Reactors
2.1. Deuterium and Heavy Water
Deuterium, heavy water (deuterium oxide) and any other deuterium compound in which the ratio of deuterium to hydrogen atoms exceeds 1:5,000 for use in a nuclear reactor, as defined in Section 1.1 of this Supplement, in quantities exceeding 200 kg of deuterium atoms for any one recipient country in any period of 12 months.
2.2. Nuclear Grade Graphite
Graphite having a purity level better than 5 parts per million boron equivalent and with a density greater than 1.50 g/cm
3
for use in a nuclear reactor, as defined in Section 1.1 of this Supplement, in quantities exceeding 3 × 10
4
kg (30 metric tons) for any one recipient country in any period of 12 months.
Note:
For the purpose of reporting, the Government will determine whether or not the exports of graphite meeting the specifications of this Section 2.2 are for nuclear reactor use.
3. Plants for the Reprocessing of Irradiated Fuel Elements, and Equipment Specially Designed or Prepared Therefor
Introductory Note:
Reprocessing irradiated nuclear fuel separates plutonium and uranium from intensely radioactive fission products and other transuranic elements. Different technical processes can accomplish this separation. However, over the years Purex has become the most commonly used and accepted process. Purex involves the dissolution of irradiated nuclear fuel in nitric acid, followed by separation of the uranium, plutonium, and fission products by solvent extraction using a mixture of tributyl phosphate in an organic diluent. Purex facilities have process functions similar to each other, including: irradiated fuel element chopping, fuel dissolution, solvent extraction, and process liquor storage. There may also be equipment for thermal denitration of uranium nitrate, conversion of plutonium nitrate to oxide or metal, and treatment of fission product waste liquor to a form suitable for long term storage or disposal. However, the specific type and configuration of the equipment performing these functions may differ between Purex
facilities for several reasons, including the type and quantity of irradiated nuclear fuel to be reprocessed and the intended disposition of the recovered materials, and the safety and maintenance philosophy incorporated into the design of the facility. A “plant for the reprocessing of irradiated fuel elements” includes the equipment and components which normally come in direct contact with and directly control the irradiated fuel and the major nuclear material and fission product processing streams. These processes, including the complete systems for plutonium conversion and plutonium metal production, may be identified by the measures taken to avoid criticality (
e.g.
, by geometry), radiation exposure (
e.g.
, by shielding), and toxicity hazards (
e.g.
, by containment). Items of equipment that are considered to fall within the meaning of the phrase “and equipment specially designed or prepared” for the reprocessing of irradiated fuel elements include:
3.1. Irradiated Fuel Element Chopping Machines
Introductory Note:
This equipment breaches the cladding of the fuel to expose the irradiated nuclear material to dissolution. Specially designed metal cutting shears are the most commonly employed, although advanced equipment, such as lasers, may be used. Remotely operated equipment specially designed or prepared for use in a reprocessing plant, as identified in the introductory paragraph of this section, and intended to cut, chop or shear irradiated nuclear fuel assemblies, bundles or rods.
3.2. Dissolvers
Introductory Note:
Dissolvers normally receive the chopped-up spent fuel. In these critically safe vessels, the irradiated nuclear material is dissolved in nitric acid and the remaining hulls removed from the process stream. Critically safe tanks (e.g., small diameter, annular or slab tanks) specially designed or prepared for use in a reprocessing plant, as identified in the introductory paragraph of this section, intended for dissolution of irradiated nuclear fuel and which are capable of withstanding hot, highly corrosive liquid, and which can be remotely loaded and maintained.
3.3. Solvent Extractors and Solvent Extraction Equipment
Introductory Note:
Solvent extractors both receive the solution of irradiated fuel from the dissolvers and the organic solution which separates the uranium, plutonium, and fission products. Solvent extraction equipment is normally designed to meet strict operating parameters, such as long operating lifetimes with no maintenance requirements or adaptability to easy replacement, simplicity of operation and control, and flexibility for variations in process conditions. Specially designed or prepared solvent extractors such as packed or pulse columns, mixer settlers or centrifugal contactors for use in a plant for the reprocessing of irradiated fuel. Solvent extractors must be resistant to the corrosive effect of nitric acid. Solvent extractors are normally fabricated to extremely high standards (including special welding and inspection and quality assurance and quality control techniques) out of low carbon stainless steels, titanium, zirconium, or other high quality materials.
3.4. Chemical Holding or Storage Vessels
Introductory Note:
Three main process liquor streams result from the solvent extraction step. Holding or storage vessels are used in the further processing of all three streams, as follows:
(a) The pure uranium nitrate solution is concentrated by evaporation and passed to a denitration process where it is converted to uranium oxide. This oxide is re-used in the nuclear fuel cycle.
(b) The intensely radioactive fission products solution is normally concentrated by evaporation and stored as a liquor concentrate. This concentrate may be subsequently evaporated and converted to a form suitable for storage or disposal.
(c) The pure plutonium nitrate solution is concentrated and stored pending its transfer to further process steps. In particular, holding or storage vessels for plutonium solutions are designed to avoid criticality problems resulting from changes in concentration and form of this stream. Specially designed or prepared holding or storage vessels for use in a plant for the reprocessing of irradiated fuel. The holding or storage vessels must be resistant to the corrosive effect of nitric acid. The holding or storage vessels are normally fabricated of materials such as low carbon stainless steels, titanium or zirconium, or other high quality materials. Holding or storage vessels may be designed for remote operation and maintenance and may have the following features for control of nuclear criticality: (1) Walls or internal structures with a boron equivalent of at least two percent; (2) a maximum diameter of 175 mm (7 in) for cylindrical vessels; or (3) a maximum width of 75 mm (3 in) for either a slab or annular vessel.
3.5. Plutonium Nitrate to Oxide Conversion System
Introductory Note:
In most reprocessing facilities, this final process involves the conversion of the plutonium nitrate solution to plutonium dioxide. The main functions involved in this process are: Process feed storage and adjustment, precipitation and solid/liquor separation, calcination, product handling, ventilation, waste management, and process control. Complete systems specially designed or prepared for the conversion of plutonium nitrate to plutonium oxide, in particular adapted so as to avoid criticality and radiation effects and to minimize toxicity hazards.
3.6. Plutonium Oxide to Metal Production System
Introductory Note:
This process, which could be related to a reprocessing facility, involves the fluorination of plutonium dioxide, normally with highly corrosive hydrogen fluoride, to produce plutonium fluoride which is subsequently reduced using high purity calcium metal to produce metallic plutonium and a calcium fluoride slag. The main functions involved in this process are: Fluorination (e.g., involving equipment fabricated or lined with a precious metal), metal reduction (e.g., employing ceramic crucibles), slag recovery, product handling, ventilation, waste management and process control. Complete systems specially designed or prepared for the production of plutonium metal, in particular adapted so as to avoid criticality and radiation effects and to minimize toxicity hazards.
4. Plants for the Fabrication of Fuel Elements
A “plant for the fabrication of fuel elements” includes the equipment:
(a) Which normally comes in direct contact with, or directly processes, or controls, the production flow of nuclear material, or
(b) Which seals the nuclear material within the cladding.
5. Plants for the Separation of Isotopes of Uranium and Equipment, Other Than Analytical Instruments, Specially Designed or Prepared Therefor
Items of equipment that are considered to fall within the meaning of the phrase “equipment, other than analytical instruments, specially designed or prepared” for the separation of isotopes of uranium include:
5.1. Gas Centrifuges and Assemblies and Components Specially Designed or Prepared for Use in Gas Centrifuges
Introductory Note:
The gas centrifuge normally consists of a thin-walled cylinder(s) of between 75 mm (3 in) and 400 mm (16 in) diameter contained in a vacuum environment and spun at high peripheral speed of the order of 300 m/s or more with its central axis vertical. In order to achieve high speed the materials of construction for the rotating components have to be of a high strength to density ratio and the rotor assembly, and hence its individual components, have to be manufactured to very close tolerances in order to minimize the unbalance. In contrast to other centrifuges, the gas centrifuge for uranium enrichment is characterized by having within the rotor chamber a rotating disc-shaped baffle(s) and a stationary tube arrangement for feeding and extracting the UF
6
gas and featuring at least 3 separate channels, of which 2 are connected to scoops extending from the rotor axis towards the periphery of the rotor chamber. Also contained within the vacuum environment are a number of critical items which do not rotate and which although they are specially designed are not difficult to fabricate nor are they fabricated out of unique materials. A centrifuge facility however requires a large number of these components, so that quantities can provide an important indication of end use.
5.1.1. Rotating Components
(a) Complete rotor assemblies: Thin-walled cylinders, or a number of interconnected thin-walled cylinders, manufactured from one or more of the high strength to density ratio materials described in the
Explanatory Note
to Section 5.1.1 of this Supplement. If interconnected, the cylinders are joined together by flexible bellows or rings as described in Section 5.1.1(c) of this
Supplement. The rotor is fitted with an internal baffle(s) and end caps, as described in Section 5.1.1(d) and (e) of this Supplement, if in final form. However the complete assembly may be delivered only partly assembled.
(b) Rotor tubes: Specially designed or prepared thin-walled cylinders with thickness of 12 mm (0.5 in) or less, a diameter of between 75 mm (3 in) and 400 mm (16 in), and manufactured from one or more of the high strength to density ratio materials described in the
Explanatory Note
to Section 5.1.1 of this Supplement.
(c) Rings or Bellows: Components specially designed or prepared to give localized support to the rotor tube or to join together a number of rotor tubes. The bellows is a short cylinder of wall thickness 3 mm (0.12 in) or less, a diameter of between 75 mm (3 in) and 400 mm (16 in), having a convolute, and manufactured from one of the high strength to density ratio materials described in the
Explanatory Note
to Section 5.1.1 of this Supplement.
(d) Baffles: Disc-shaped components of between 75 mm (3 in) and 400 mm (16 in) diameter specially designed or prepared to be mounted inside the centrifuge rotor tube, in order to isolate the take-off chamber from the main separation chamber and, in some cases, to assist the UF
6
gas circulation within the main separation chamber of the rotor tube, and manufactured from one of the high strength to density ratio materials described in the
Explanatory Not
e to Section 5.1.1 of this Supplement.
(e) Top caps/Bottom caps: Disc-shaped components of between 75 mm (3 in) and 400 mm (16 in) diameter specially designed or prepared to fit to the ends of the rotor tube, and so contain the UF
6
within the rotor tube, and in some cases to support, retain or contain as an integrated part an element of the upper bearing (top cap) or to carry the rotating elements of the motor and lower bearing (bottom cap), and manufactured from one of the high strength to density ratio materials described in the
Explanatory Note
to Section 5.1.1 of this Supplement.
Explanatory Note:
The materials used for centrifuge rotating components are:
(a) Maraging steel capable of an ultimate tensile strength of 2.05 × 10
9
N/m
2
(300,000 psi) or more;
(b) Aluminum alloys capable of an ultimate tensile strength of 0.46 × 10
9
N/m
2
(67,000 psi) or more;
(c) Filamentary materials suitable for use in composite structures and having a specific modulus of 12.3 × 10
6
m or greater and a specific ultimate tensile strength of 0.3 x 10
6
m or greater (“Specific Modulus” is the Young's Modulus in N/m
2
divided by the specific weight in N/m
3
; “Specific Ultimate Tensile Strength” is the ultimate tensile strength in N/m
2
divided by the specific weight in N/m
3
).
5.1.2. Static Components
(a)
Magnetic suspension bearings:
Specially designed or prepared bearing assemblies consisting of an annular magnet suspended within a housing containing a damping medium. The housing will be manufactured from a UF
6
-resistant material (
see Explanatory Note
to Section 5.2 of this Supplement.). The magnet couples with a pole piece or a second magnet fitted to the top cap described in Section 5.1.1(e) of this Supplement. The magnet may be ring-shaped with a relation between outer and inner diameter smaller or equal to 1.6:1. The magnet may be in a form having an initial permeability of 0.15 H/m (120,000 in CGS units) or more, or a remanence of 98.5% or more, or an energy product of greater than 80 kJ/m
3
(10
7
gauss-oersteds). In addition to the usual material properties, it is a prerequisite that the deviation of the magnetic axes from the geometrical axes is limited to very small tolerances (lower than 0.1 mm or 0.004 in) or that homogeneity of the material of the magnet is specially called for.
(b)
Bearings/Dampers:
Specially designed or prepared bearings comprising a pivot/cup assembly mounted on a damper. The pivot is normally a hardened steel shaft with a hemisphere at one end with a means of attachment to the bottom cap, described in Section 5.1.1(e) of this Supplement, at the other. The shaft may however have a hydrodynamic bearing attached. The cup is pellet-shaped with a hemispherical indentation in one surface. These components are often supplied separately to the damper.
(c)
Molecular pumps:
Specially designed or prepared cylinders having internally machined or extruded helical grooves and internally machined bores. Typical dimensions are as follows: 75 mm (3 in) to 400 mm (16 in) internal diameter, 10 mm (0.4 in) or more wall thickness, with the length equal to or greater than the diameter. The grooves are typically rectangular in cross-section and 2 mm (0.08 in) or more in depth.
(d)
Motor stators:
Specially designed or prepared ring-shaped stators for high speed multiphase AC hysteresis (or reluctance) motors for synchronous operation within a vacuum in the frequency range of 600-2,000 Hz and a power range of 50-1,000 VA. The stators consist of multi-phase windings on a laminated low loss iron core comprised of thin layers typically 2.0 mm (0.08 in) thick or less.
(e)
Centrifuge housing/recipients:
Components specially designed or prepared to contain the rotor tube assembly of a gas centrifuge. The housing consists of a rigid cylinder of wall thickness up to 30 mm (1.2 in) with precision machined ends to locate the bearings and with one or more flanges for mounting. The machined ends are parallel to each other and perpendicular to the cylinder's longitudinal axis to within 0.05 degrees or less. The housing may also be a honeycomb type structure to accommodate several rotor tubes. The housings are made of or protected by materials resistant to corrosion by UF
6
.
(f)
Scoops:
Specially designed or prepared tubes of up to 12 mm (0.5 in) internal diameter for the extraction of UF
6
gas from within the rotor tube by a Pitot tube action (that is, with an aperture facing into the circumferential gas flow within the rotor tube, for example by bending the end of a radially disposed tube) and capable of being fixed to the central gas extraction system. The tubes are made of or protected by materials resistant to corrosion by UF
6
.
5.2. Specially Designed or Prepared Auxiliary Systems, Equipment and Components for Gas Centrifuge Enrichment Plants
Introductory Note:
The auxiliary systems, equipment and components for a gas centrifuge enrichment plant are the systems of plant needed to feed UF
6
to the centrifuges, to link the individual centrifuges to each other to form cascades (or stages) to allow for progressively higher enrichments and to extract the “product” and “tails” UF
6
from the centrifuges, together with the equipment required to drive the centrifuges or to control the plant. Normally UF
6
is evaporated from the solid using heated autoclaves and is distributed in gaseous form to the centrifuges by way of cascade header pipework. The “product” and “tails” UF
6
gaseous streams flowing from the centrifuges are also passed by way of cascade header pipework to cold traps (operating at about 203 K (−70 °C)) where they are condensed prior to onward transfer into suitable containers for transportation or storage. Because an enrichment plant consists of many thousands of centrifuges arranged in cascades there are many kilometers of cascade header pipework, incorporating thousands of welds with a substantial amount of repetition of layout. The equipment, components and piping systems are fabricated to very high vacuum and cleanliness standards.
5.2.1. Feed Systems/Product and Tails Withdrawal Systems
Specially designed or prepared process systems including: Feed autoclaves (or stations), used for passing UF
6
to the centrifuge cascades at up to 100 kPa (15 psi) and at a rate of 1 kg/h or more; desublimers (or cold traps) used to remove UF
6
from the cascades at up to 3 kPa (0.5 psi) pressure. The desublimers are capable of being chilled to 203 K (−70 °C) and heated to 343 K (70 °C); “Product” and “Tails” stations used for trapping UF
6
into containers. This plant, equipment and pipework is wholly made of or lined with UF
6
-resistant materials (
see Explanatory Note
to Section 5.2 of this Supplement) and is fabricated to very high vacuum and cleanliness standards.
5.2.2. Machine Header Piping Systems
Specially designed or prepared piping systems and header systems for handling UF
6
within the centrifuge cascades. The piping network is normally of the “triple” header system with each centrifuge connected to each of the headers. There is thus a substantial amount of repetition in its form. It is wholly made of UF
6
-resistant materials (
see Explanatory Note
to Section 5.2 of this Supplement) and is fabricated to very high vacuum and cleanliness standards.
5.2.3. UF
6
Mass Spectrometers/Ion Sources
Specially designed or prepared magnetic or quadrupole mass spectrometers capable of taking “on-line” samples of feed, product or tails, from UF
6
gas streams and having all of the following characteristics:
(a) Unit resolution for atomic mass unit greater than 320;
(b) Ion sources constructed of or lined with nichrome or monel or nickel plated;
(c) Electron bombardment ionization sources;
(d) Having a collector system suitable for isotopic analysis.
5.2.4. Frequency Changers
Frequency changers (also known as converters or invertors) specially designed or prepared to supply motor stators (as defined under Section 5.1.2(d) of this Supplement), or parts, components and sub-assemblies of such frequency changers having all of the following characteristics:
(a) A multiphase output of 600 to 2,000 Hz;
(b) High stability (with frequency control better than 0.1%);
(c) Low harmonic distortion (less than 2%); and
(d) An efficiency of greater than 80%.
Explanatory Note:
The items listed in this Section 5.2 either come into direct contact with the UF
6
process gas or directly control the centrifuges and the passage of the gas from centrifuge to centrifuge and cascade to cascade. Materials resistant to corrosion by UF
6
include stainless steel, aluminum, aluminum alloys, nickel or alloys containing 60% or more nickel.
5.3. Specially Designed or Prepared Assemblies and Components for Use in Gaseous Diffusion Enrichment
Introductory Note:
In the gaseous diffusion method of uranium isotope separation, the main technological assembly is a special porous gaseous diffusion barrier, heat exchanger for cooling the gas (which is heated by the process of compression), seal valves and control valves, and pipelines. Inasmuch as gaseous diffusion technology uses uranium hexafluoride (UF
6
), all equipment, pipeline and instrumentation surfaces (that come in contact with the gas) must be made of materials that remain stable in contact with UF
6
. A gaseous diffusion facility requires a number of these assemblies, so that quantities can provide an important indication of end use.
5.3.1. Gaseous Diffusion Barriers
(a) Specially designed or prepared thin, porous filters, with a pore size of 100-1,000 Å (angstroms), a thickness of 5 mm (0.2 in) or less, and for tubular forms, a diameter of 25 mm (1 in) or less, made of metallic, polymer or ceramic materials resistant to corrosion by UF
6
, and
(b) Specially prepared compounds or powders for the manufacture of such filters. Such compounds and powders include nickel or alloys containing 60 percent or more nickel, aluminum oxide, or UF
6
-resistant fully fluorinated hydrocarbon polymers having a purity of 99.9 percent or more, a particle size less than 10 microns, and a high degree of particle size uniformity, which are specially prepared for the manufacture of gaseous diffusion barriers.
5.3.2. Diffuser Housings
Specially designed or prepared hermetically sealed cylindrical vessels greater than 300 mm (12 in) in diameter and greater than 900 mm (35 in) in length, or rectangular vessels of comparable dimensions, which have an inlet connection and two outlet connections all of which are greater than 50 mm (2 in) in diameter, for containing the gaseous diffusion barrier, made of or lined with UF
6
-resistant materials and designed for horizontal or vertical installation.
5.3.3. Compressors and Gas Blowers
Specially designed or prepared axial, centrifugal, or positive displacement compressors, or gas blowers with a suction volume capacity of 1 m
3
/min or more of UF
6
, and with a discharge pressure of up to several hundred kPa (100 psi), designed for long-term operation in the UF
6
environment with or without an electrical motor of appropriate power, as well as separate assemblies of such compressors and gas blowers. These compressors and gas blowers have a pressure ratio between 2:1 and 6:1 and are made of, or lined with, materials resistant to UF
6
.
5.3.4. Rotary Shaft Seals
Specially designed or prepared vacuum seals, with seal feed and seal exhaust connections, for sealing the shaft connecting the compressor or the gas blower rotor with the driver motor so as to ensure a reliable seal against in-leaking of air into the inner chamber of the compressor or gas blower which is filled with UF
6
. Such seals are normally designed for a buffer gas in-leakage rate of less than 1,000 cm
3
/min (60 in
3
/min).
5.3.5. Heat Exchangers for Cooling UF
6
Specially designed or prepared heat exchangers made of or lined with UF
6
-resistant materials (except stainless steel) or with copper or any combination of those metals, and intended for a leakage pressure change rate of less than 10 Pa (0.0015 psi) per hour under a pressure difference of 100 kPa (15 psi).
5.4. Specially Designed or Prepared Auxiliary Systems, Equipment and Components for Use in Gaseous Diffusion Enrichment
Introductory Note:
The auxiliary systems, equipment and components for gaseous diffusion enrichment plants are the systems of plant needed to feed UF
6
to the gaseous diffusion assembly, to link the individual assemblies to each other to form cascades (or stages) to allow for progressively higher enrichments and to extract the “product” and “tails” UF
6
from the diffusion cascades. Because of the high inertial properties of diffusion cascades, any interruption in their operation, and especially their shut-down, leads to serious consequences. Therefore, a strict and constant maintenance of vacuum in all technological systems, automatic protection from accidents, and precise automated regulation of the gas flow is of importance in a gaseous diffusion plant. All this leads to a need to equip the plant with a large number of special measuring, regulating and controlling systems. Normally UF
6
is evaporated from cylinders placed within autoclaves and is distributed in gaseous form to the entry point by way of cascade header pipework. The “product” and “tails” UF
6
gaseous streams flowing from exit points are passed by way of cascade header pipework to either cold traps or to compression stations where the UF
6
gas is liquefied prior to onward transfer into suitable containers for transportation or storage. Because a gaseous diffusion enrichment plant consists of a large number of gaseous diffusion assemblies arranged in cascades, there are many kilometers of cascade header pipework, incorporating thousands of welds with substantial amounts of repetition of layout. The equipment, components and piping systems are fabricated to very high vacuum and cleanliness standards.
5.4.1. Feed Systems/Product and Tails Withdrawal Systems
Specially designed or prepared process systems, capable of operating at pressures of 300 kPa (45 psi) or less, including:
(a) Feed autoclaves (or systems), used for passing UF
6
to the gaseous diffusion cascades;
(b) Desublimers (or cold traps) used to remove UF
6
from diffusion cascades;
(c) Liquefaction stations where UF
6
gas from the cascade is compressed and cooled to form liquid UF
6
;
(d) “Product” or “tails” stations used for transferring UF
6
into containers.
5.4.2. Header Piping Systems
Specially designed or prepared piping systems and header systems for handling UF
6
within the gaseous diffusion cascades. This piping network is normally of the “double” header system with each cell connected to each of the headers.
5.4.3. Vacuum Systems
(a) Specially designed or prepared large vacuum manifolds, vacuum headers and vacuum pumps having a suction capacity of 5 m
3
/min (175 ft
3
/min) or more.
(b) Vacuum pumps specially designed for service in UF
6
-bearing atmospheres made of, or lined with, aluminum, nickel, or alloys bearing more than 60% nickel. These pumps may be either rotary or positive, may have displacement and fluorocarbon seals, and may have special working fluids present.
5.4.4. Special Shut-Off and Control Valves
Specially designed or prepared manual or automated shut-off and control bellows valves made of UF
6
-resistant materials with a diameter of 40 to 1,500 mm (1.5 to 59 in) for installation in main and auxiliary systems of gaseous diffusion enrichment plants.
5.4.5. UF
6
Mass Spectrometers/Ion Sources
Specially designed or prepared magnetic or quadrupole mass spectrometers capable of taking “on-line” samples of feed, product or tails, from UF
6
gas streams and having all of the following characteristics:
(a) Unit resolution for atomic mass unit greater than 320;
(b) Ion sources constructed of or lined with nichrome or monel or nickel plated;
(c) Electron bombardment ionization sources;
(d) Collector system suitable for isotopic analysis.
Explanatory Note:
The items listed in this Section 5.4 either come into direct contact with the UF
6
process gas or directly control the flow within the cascade. All surfaces which come into contact with the process gas
are wholly made of, or lined with, UF
6
-resistant materials. For the purposes of the Sections in this Supplement relating to gaseous diffusion items, the materials resistant to corrosion by UF
6
include stainless steel, aluminum, aluminum alloys, aluminum oxide, nickel or alloys containing 60% or more nickel and UF
6
-resistant fully fluorinated hydrocarbon polymers.
5.5. Specially Designed or Prepared Systems, Equipment and Components for Use in Aerodynamic Enrichment Plants
Introductory Note:
In aerodynamic enrichment processes, a mixture of gaseous UF
6
and light gas (hydrogen or helium) is compressed and then passed through separating elements wherein isotopic separation is accomplished by the generation of high centrifugal forces over a curved-wall geometry. Two processes of this type have been successfully developed: the separation nozzle process and the vortex tube process. For both processes the main components of a separation stage include cylindrical vessels housing the special separation elements (nozzles or vortex tubes), gas compressors and heat exchangers to remove the heat of compression. An aerodynamic plant requires a number of these stages, so that quantities can provide an important indication of end use. Since aerodynamic processes use UF
6
, all equipment, pipeline and instrumentation surfaces (that come in contact with the gas) must be made of materials that remain stable in contact with UF
6
.
Explanatory Note:
The items listed in Section 5.5 of this Supplement either come into direct contact with the UF
6
process gas or directly control the flow within the cascade. All surfaces which come into contact with the process gas are wholly made of or protected by UF
6
-resistant materials. For the purposes of the provisions of Section 5.5 of this Supplement that relate to aerodynamic enrichment items, the materials resistant to corrosion by UF
6
include copper, stainless steel, aluminum, aluminum alloys, nickel or alloys containing 60% or more nickel and UF
6
-resistant fully fluorinated hydrocarbon polymers.
5.5.1. Separation Nozzles
Specially designed or prepared separation nozzles and assemblies thereof. The separation nozzles consist of slit-shaped, curved channels having a radius of curvature less than 1 mm (typically 0.1 to 0.05 mm), resistant to corrosion by UF
6
and having a knife-edge within the nozzle that separates the gas flowing through the nozzle into two fractions.
5.5.2. Vortex Tubes
Specially designed or prepared vortex tubes and assemblies thereof. The vortex tubes are cylindrical or tapered, made of or protected by materials resistant to corrosion by UF
6
, having a diameter of between 0.5 cm and 4 cm, a length to diameter ratio of 20:1 or less and with one or more tangential inlets. The tubes may be equipped with nozzle-type appendages at either or both ends.
Explanatory Note:
The feed gas enters the vortex tube tangentially at one end or through swirl vanes or at numerous tangential positions along the periphery of the tube.
5.5.3. Compressors and Gas Blowers
Specially designed or prepared axial, centrifugal or positive displacement compressors or gas blowers made of or protected by materials resistant to corrosion by UF
6
and with a suction volume capacity of 2 m
3
/min or more of UF
6
/carrier gas (hydrogen or helium) mixture.
Explanatory Note:
These compressors and gas blowers typically have a pressure ratio between 1.2:1 and 6:1.
5.5.4. Rotary Shaft Seals
Specially designed or prepared rotary shaft seals, with seal feed and seal exhaust connections, for sealing the shaft connecting the compressor rotor or the gas blower rotor with the driver motor so as to ensure a reliable seal against out-leakage of process gas or in-leakage of air or seal gas into the inner chamber of the compressor or gas blower which is filled with a UF
6
/carrier gas mixture.
5.5.5. Heat Exchangers for Gas Cooling
Specially designed or prepared heat exchangers made of or protected by materials resistant to corrosion by UF
6
.
5.5.6. Separation Element Housings
Specially designed or prepared separation element housings, made of or protected by materials resistant to corrosion by UF
6
, for containing vortex tubes or separation nozzles.
Explanatory Note:
These housings may be cylindrical vessels greater than 300 mm in diameter and greater than 900 mm in length, or may be rectangular vessels of comparable dimensions, and may be designed for horizontal or vertical installation.
5.5.7. Feed Systems/Product and Tails Withdrawal Systems
Specially designed or prepared process systems or equipment for enrichment plants made of or protected by materials resistant to corrosion by UF
6
, including:
(a) Feed autoclaves, ovens, or systems used for passing UF
6
to the enrichment process;
(b) Desublimers (or cold traps) used to remove UF
6
from the enrichment process for subsequent transfer upon heating;
(c) Solidification or liquefaction stations used to remove UF
6
from the enrichment process by compressing and converting UF
6
to a liquid or solid form;
(d) “Product” or “tails” stations used for transferring UF
6
into containers.
5.5.8. Header Piping Systems
Specially designed or prepared header piping systems, made of or protected by materials resistant to corrosion by UF
6
, for handling UF
6
within the aerodynamic cascades. This piping network is normally of the “double” header design with each stage or group of stages connected to each of the headers.
5.5.9. Vacuum Systems and Pumps
(a) Specially designed or prepared vacuum systems having a suction capacity of 5 m
3
/min or more, consisting of vacuum manifolds, vacuum headers and vacuum pumps, and designed for service in UF
6
-bearing atmospheres;
(b) Vacuum pumps specially designed or prepared for service in UF
6
-bearing atmospheres and made of or protected by materials resistant to corrosion by UF
6
. These pumps may use fluorocarbon seals and special working fluids.
5.5.10. Special Shut-off and Control Valves
Specially designed or prepared manual or automated shut-off and control bellows valves made of or protected by materials resistant to corrosion by UF
6
with a diameter of 40 to 1500 mm for installation in main and auxiliary systems of aerodynamic enrichment plants.
5.5.11. UF
6
Mass Spectrometers/Ion Sources
Specially designed or prepared magnetic or quadrupole mass spectrometers capable of taking “on-line” samples of feed, “product” or “tails,” from UF
6
gas streams and having all of the following characteristics:
(a) Unit resolution for mass greater than 320;
(b) Ion sources constructed of or lined with nichrome or monel or nickel plated;
(c) Electron bombardment ionization sources;
(d) Collector system suitable for isotopic analysis.
5.5.12. UF
6
/Carrier Gas Separation Systems
Specially designed or prepared process systems for separating UF
6
from carrier gas (hydrogen or helium).
Explanatory Note:
These systems are designed to reduce the UF
6
content in the carrier gas to 1 ppm or less and may incorporate equipment such as:
(a) Cryogenic heat exchangers and cryoseparators capable of temperatures of −120 °C or less, or
(b) Cryogenic refrigeration units capable of temperatures of −120 °C or less, or
(c) Separation nozzle or vortex tube units for the separation of UF
6
from carrier gas, or
(d) UF
6
cold traps capable of temperatures of −20 °C or less.
5.6. Specially Designed or Prepared Systems, Equipment and Components for Use in Chemical Exchange or Ion Exchange Enrichment Plants
Introductory Note:
The slight difference in mass between the isotopes of uranium causes small changes in chemical reaction equilibria that can be used as a basis for separation of the isotopes. Two processes have been successfully developed: Liquid-liquid chemical exchange and solid-liquid ion exchange. In the liquid-liquid chemical exchange process, immiscible liquid phases (aqueous and organic) are countercurrently contacted to give the cascading effect of thousands of separation stages. The aqueous phase consists of uranium chloride in hydrochloric acid solution; the organic phase consists of an extractant containing uranium chloride in an organic solvent. The contactors employed in the separation cascade can be liquid-liquid exchange columns (such as pulsed columns with sieve plates) or liquid centrifugal contactors. Chemical conversions (oxidation and
reduction) are required at both ends of the separation cascade in order to provide for the reflux requirements at each end. A major design concern is to avoid contamination of the process streams with certain metal ions. Plastic, plastic-lined (including use of fluorocarbon polymers) and/or glass-lined columns and piping are therefore used. In the solid-liquid ion-exchange process, enrichment is accomplished by uranium adsorption/desorption on a special, very fast-acting, ion-exchange resin or adsorbent. A solution of uranium in hydrochloric acid and other chemical agents is passed through cylindrical enrichment columns containing packed beds of the adsorbent. For a continuous process, a reflux system is necessary to release the uranium from the adsorbent back into the liquid flow so that “product” and “tails” can be collected. This is accomplished with the use of suitable reduction/oxidation chemical agents that are fully regenerated in separate external circuits and that may be partially regenerated within the isotopic separation columns themselves. The presence of hot concentrated hydrochloric acid solutions in the process requires that the equipment be made of or protected by special corrosion-resistant materials.
5.6.1. Liquid-Liquid Exchange Columns (Chemical Exchange)
Countercurrent liquid-liquid exchange columns having mechanical power input (i.e., pulsed columns with sieve plates, reciprocating plate columns, and columns with internal turbine mixers), specially designed or prepared for uranium enrichment using the chemical exchange process. For corrosion resistance to concentrated hydrochloric acid solutions, these columns and their internals are made of or protected by suitable plastic materials (such as fluorocarbon polymers) or glass. The stage residence time of the columns is designed to be short (30 seconds or less).
5.6.2. Liquid-Liquid Centrifugal Contactors (Chemical Exchange)
Liquid-liquid centrifugal contactors specially designed or prepared for uranium enrichment using the chemical exchange process. Such contactors use rotation to achieve dispersion of the organic and aqueous streams and then centrifugal force to separate the phases. For corrosion resistance to concentrated hydrochloric acid solutions, the contactors are made of or are lined with suitable plastic materials (such as fluorocarbon polymers) or are lined with glass. The stage residence time of the centrifugal contactors is designed to be short (30 seconds or less).
5.6.3. Uranium Reduction Systems and Equipment (Chemical Exchange)
(a) Specially designed or prepared electrochemical reduction cells to reduce uranium from one valence state to another for uranium enrichment using the chemical exchange process. The cell materials in contact with process solutions must be corrosion resistant to concentrated hydrochloric acid solutions.
Explanatory Note:
The cell cathodic compartment must be designed to prevent re-oxidation of uranium to its higher valence state. To keep the uranium in the cathodic compartment, the cell may have an impervious diaphragm membrane constructed of special cation exchange material. The cathode consists of a suitable solid conductor such as graphite.
(b) Specially designed or prepared systems at the product end of the cascade for taking the U
4+
out of the organic stream, adjusting the acid concentration and feeding to the electrochemical reduction cells.
Explanatory Note:
These systems consist of solvent extraction equipment for stripping the U
4+
from the organic stream into an aqueous solution, evaporation and/or other equipment to accomplish solution pH adjustment and control, and pumps or other transfer devices for feeding to the electrochemical reduction cells. A major design concern is to avoid contamination of the aqueous stream with certain metal ions. Consequently, for those parts in contact with the process stream, the system is constructed of equipment made of or protected by suitable materials (such as glass, fluorocarbon polymers, polyphenyl sulfate, polyether sulfone, and resin-impregnated graphite).
5.6.4. Feed Preparation Systems (Chemical Exchange)
Specially designed or prepared systems for producing high-purity uranium chloride feed solutions for chemical exchange uranium isotope separation plants.
Explanatory Note:
These systems consist of dissolution, solvent extraction and/or ion exchange equipment for purification and electrolytic cells for reducing the uranium U
6+
or U
4+
to U
3+
. These systems produce uranium chloride solutions having only a few parts per million of metallic impurities such as chromium, iron, vanadium, molybdenum and other bivalent or higher multi-valent cations. Materials of construction for portions of the system processing high-purity U
3+
include glass, fluorocarbon polymers, polyphenyl sulfate or polyether sulfone plastic-lined and resin-impregnated graphite.
5.6.5. Uranium Oxidation Systems (Chemical Exchange)
Specially designed or prepared systems for oxidation of U
3+
to U
4+
for return to the uranium isotope separation cascade in the chemical exchange enrichment process.
Explanatory Note:
These systems may incorporate equipment such as:
(a) Equipment for contacting chlorine and oxygen with the aqueous effluent from the isotope separation equipment and extracting the resultant U
4+
into the stripped organic stream returning from the product end of the cascade;
(b) Equipment that separates water from hydrochloric acid so that the water and the concentrated hydrochloric acid may be reintroduced to the process at the proper locations.
5.6.6. Fast-Reacting Ion Exchange Resins/Adsorbents (Ion Exchange)
Fast-reacting ion-exchange resins or adsorbents specially designed or prepared for uranium enrichment using the ion exchange process, including porous macroreticular resins, and/or pellicular structures in which the active chemical exchange groups are limited to a coating on the surface of an inactive porous support structure, and other composite structures in any suitable form including particles or fibers. These ion exchange resins/adsorbents have diameters of 0.2 mm or less and must be chemically resistant to concentrated hydrochloric acid solutions as well as physically strong enough so as not to degrade in the exchange columns. The resins/adsorbents are specially designed to achieve very fast uranium isotope exchange kinetics (exchange rate half-time of less than 10 seconds) and are capable of operating at a temperature in the range of 100 °C to 200 °C.
5.6.7. Ion Exchange Columns (Ion Exchange)
Cylindrical columns greater than 1000 mm in diameter for containing and supporting packed beds of ion exchange resin/adsorbent, specially designed or prepared for uranium enrichment using the ion exchange process. These columns are made of or protected by materials (such as titanium or fluorocarbon plastics) resistant to corrosion by concentrated hydrochloric acid solutions and are capable of operating at a temperature in the range of 100 °C to 200 °C and pressures above 0.7 MPa (102 psia).
5.6.8. Ion Exchange Reflux Systems (Ion Exchange)
(a) Specially designed or prepared chemical or electrochemical reduction systems for regeneration of the chemical reducing agent(s) used in ion exchange uranium enrichment cascades.
(b) Specially designed or prepared chemical or electrochemical oxidation systems for regeneration of the chemical oxidizing agent(s) used in ion exchange uranium enrichment cascades.
Explanatory Note:
The ion exchange enrichment process may use, for example, trivalent titanium (Ti
3+
) as a reducing cation in which case the reduction system would regenerate Ti
3+
by reducing Ti
4+
. The process may use, for example, trivalent iron (Fe
3+
) as an oxidant in which case the oxidation system would regenerate Fe
3+
by oxidizing Fe
2+
.
5.7. Specially Designed or Prepared Systems, Equipment and Components for Use in Laser-Based Enrichment Plants
Introductory Note:
Present systems for enrichment processes using lasers fall into two categories: Those in which the process medium is atomic uranium vapor and those in which the process medium is the vapor of a uranium compound. Common nomenclature for such processes include: First category—atomic vapor laser isotope separation (AVLIS or SILVA); second category—molecular laser isotope separation (MLIS or MOLIS) and chemical reaction by isotope selective laser activation (CRISLA). The systems, equipment and components for laser enrichment plants embrace:
(a) Devices to feed
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.