Draft Supplemental Watershed Plan No. 1 and Environmental Assessment Plum Creek Watershed, Rehabilitation of Flood Retarding Structure (FRS) #18

Federal RegisterSep 27, 2006

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF AGRICULTURE

Natural Resources Conservation Service

Draft Supplemental Watershed Plan No. 1 and Environmental Assessment Plum Creek Watershed, Rehabilitation of Flood Retarding Structure (FRS) #18

AGENCY:

Natural Resources Conservation Service, U.S. Department of Agriculture.

ACTION:

Notice of Availability (NOA) of the Plum Creek FRS #18 Draft Supplemental Watershed Plan and Environmental Assessment.

SUMMARY:

The Natural Resources Conservation Service, U.S. Department of Agriculture, Kentucky State Office, gives notice that a draft supplemental watershed plan/environmental assessment for the rehabilitation of Plum Creek FRS #18 is now available for public review and comment.

FOR FURTHER INFORMATION CONTACT:

Jacob Kuhn, Acting State Conservationist, Natural Resource Conservation Service, 771 Corporate Drive, Suite 210, Lexington, KY 40503-5479, telephone (859) 224-7350.

SUPPLEMENTARY INFORMATION:

This project was initiated due to the Kentucky Division of Water (KDOW) Office of Dam Safety issuance of a notice of violation (NOV) to the Plum Creek Watershed Conservancy District for Plum Creek FRS #18. Construction of FRS#18 was completed in 1957 under the Pilot Watershed Program and authorized by the Watershed Protection and Flood Prevention Act (PL 83-566). Due to changes in KDOW dam safety regulations and a pre-existing home below the dam, the KDOW is now requiring the dam to be upgraded to meet class C criteria (high hazard) or to remove the threat of flooding to the downstream home. The preferred alternative for this project is Alternative #2—demolition of the existing home and construction of a new elevated home on the same site. The proposed alternative would upgrade the dam to meet NRCS and KDOW current standards and criteria for a “Significant” or “Moderate” hazard (class B) dam and would replace the concrete riser and add a supplemental toe drain system to the dam.

FOR FURTHER INFORMATION CONTACT:

Basic data developed during the environmental assessment are on file and may be reviewed by contacting Anita Arends, Resource Conservationist, telephone (859) 224-7354. Copies of the draft Plan/EA are available upon request. The public comment period will end 45-days after the date of this publication in the

Federal Register

.

Dated: September 20, 2006.

Jacob Kuhn,

Acting State Conservationist.

[FR Doc. E6-15776 Filed 9-26-06; 8:45 am]

BILLING CODE 3410-16-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.