NUCLEAR REGULATORY COMMISSION
[Docket No. 50-483]
Union Electric Company; Callaway Plant, Unit 1 Environmental
Assessment and Finding of No Significant Impact
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Facility Operating License No.
NPF-30, issued to Union Electric Company (the licensee), for operation
of the Callaway Plant, Unit 1 located in Callaway County, Missouri.
Environmental Assessment
Identification of the Proposed Action
The proposed action would revise the Callaway Plant, Unit 1
technical specifications to allow an increase in the Callaway Plant,
Unit 1 spent fuel pool (SFP) storage capacity and to allow storage of
an additional 279 fuel assemblies in the cask loading pit.
The proposed action is in accordance with the licensee's
application for amendment dated February 24, 1998, as supplemented by
letters dated May 27, June 25, August 25, September 3, November 3, and
December 4, 1998.
The Need for the Proposed Action
The licensee received its low power operating license on June 11,
1984. At that time, the SFP was authorized to store no more than 1344
fuel assemblies. The licensee's current projections, based on expected
future spent fuel discharges, indicate that loss of full-core discharge
capability will occur at the end of Cycle 14 in 2004. Operation of
Callaway Plant, Unit 1 beyond loss of full-core discharge capability is
possible for Cycles 15 and 16 to provide an additional three years of
operation until 2007. The licensee has evaluated spent fuel storage
alternatives that have been licensed by the NRC and that are currently
feasible for use at the Callaway site. The evaluation concludes that
reracking is currently the most cost-effective alternative. Reracking
would provide an increase in storage capacity to 2642 fuel assemblies,
which would maintain the plant's capability to accommodate a full-core
discharge, through the end of the current plant license in 2024.
Environmental Impacts of the Proposed Action
Radiological Impacts
Callaway Plant, Unit 1 uses waste treatment systems designed to
collect and process gaseous, liquid, and solid waste that might contain
radioactive material. These radioactive waste treatment systems were
evaluated in the Final Environmental Statement (FES) dated January
1982. The proposed SFP expansion will not involve any change in the
waste treatment systems described in the FES.
Radioactive Material Released to the Atmosphere
The storage of additional spent fuel assemblies in the SFP is not
expected to affect the releases of radioactive gases from the SFP.
Gaseous fission products such as Krypton-85 and Iodine-131 are produced
by the fuel in the core during reactor operation. A small percentage of
these fission gases is released to the reactor coolant from the small
number of fuel assemblies that are expected to develop leaks during
reactor operation. During refueling operations, some of these fission
products enter the SFP and are subsequently released into the air.
Since the frequency of refuelings (and therefore the number of freshly
offloaded spent fuel assemblies stored in the SFP at any one time) will
not increase, there will be no increase in the amounts of these types
of fission products released to the atmosphere as a result of the
increased SFP fuel storage capacity.
The increased heat load on the SFP from the storage of additional
spent fuel assemblies could potentially result in an increase in the
SFP evaporation rate, which may result in a slight increase in the
amount of gaseous tritium released from the pool. However, the overall
release of radioactive gases from Callaway Plant, Unit 1 will remain a
small fraction of the limits of 10 CFR 20.1301.
Solid Radioactive Wastes
Spent resins, which are generated by the processing of SFP water
through the SFP purification system, are changed about once a year at
Callaway Plant, Unit 1. These spent resins are disposed of as solid
radioactive waste. The water turbulence caused by the SFP reracking may
result in some resuspension of particulate matter in the SFP. This
could result in a temporary increase in the resin changeout frequency
of the SFP purification system during the SFP reracking operation. The
licensee will use a Tri-Nuke underwater filtration unit to clean the
floor of the SFP following removal of the old SFP rack modules.
Vacuuming of the SFP floor will remove any extraneous debris and crud
and ensure visual clarity in the SFP (to facilitate diving operations).
Debris and crud will be filtered and stored underwater in special
handling baskets purchased for this operation. Additional solid
radwaste will consist of the old SFP rack modules themselves as well as
any interferences or SFP hardware that may have to be removed from the
SFP to permit installation of the new SFP rack modules. Other than the
radwaste generated during the actual raracking operation, the staff
does not expect that the additional fuel storage made possible by the
increased SFP storage capacity will result in a significant change in
the generation of solid radwaste at Callaway Plant, Unit 1.
Liquid Radioactive Waste
The release of radioactive liquids will not be affected directly as
a result of the SFP modifications. The SFP ion exchanger resins remove
soluble radioactive materials from the SFP water. When the resins are
changed out, the small amount of resin sluice water that is released is
processed by the radwaste system. As stated above, the frequency of
resin changeout may increase slightly during the installation of the
new racks. However, the amount of liquid radioactivity released to the
environment as a result of the proposed SFP expansion is expected to be
negligible.
Occupational Doses
Radiation protection personnel will constantly monitor the doses to
the workers during the SFP expansion operation. If it becomes necessary
to utilize divers for the SFP reracking operation, the licensee will
equip each diver with electronic dosimeters with remote, above surface,
readouts, which will be continuously monitored by Health Physics
personnel. The total occupational dose to plant workers as a result of
the SFP expansion operation is estimated to be between 6 and 12 person-
rem. This dose estimate is comparable to doses for similar SFP
modifications performed at other plants. The upcoming SFP rack
installation will follow detailed procedures prepared with full
consideration of as low as is reasonably achievable (ALARA) principles.
On the basis of the review of the licensee proposal, the staff
concludes that the Callaway Plant, Unit 1 SFP rack installation can be
performed in a manner that will ensure that doses to workers will be
maintained ALARA. The estimated dose of 6 to 12 person-rem to perform
the proposed SFP rack installation is a small fraction of the annual
collective dose accrued at Callaway Plant, Unit 1.
[[Page 2688]]
Accident Considerations
In its application, the licensee evaluated the possible
consequences of a fuel handling accident to determine the thyroid and
whole-body doses at the exclusion area boundary (EAB), low population
zone (LPZ), and control room. The proposed SFP rack installation at the
Callaway Plant, Unit 1 will not affect any of the assumptions or inputs
used in evaluating the dose consequences of a fuel handling accident
and therefore will not result in an increase in the doses from a
postulated fuel handling accident.
The Commission has completed its evaluation of the proposed action
and concludes that the proposed action will not increase the
probability or consequences of accidents, no changes are being made in
the amount or types of any effluents that may be released off site, and
there is no significant increase in occupational or public radiation
exposure. Therefore, there are no significant radiological
environmental impacts associated with the proposed action.
With regard to potential non-radiological impacts, the proposed
action does not involve any historical sites. It does not affect non-
radiological plant effluents and has no other environmental impact.
Therefore, there are no significant non-radiological environmental
impacts associated with the proposed action.
Accordingly, the Commission concludes that there are no significant
environmental impacts associated with the proposed action.
Alternatives to the Proposed Action
Shipment of Fuel to a Permanent Federal Fuel Storage/Disposal Facility
Shipment of spent fuel to a high-level radioactive storage facility
is an alternative to increasing the onsite spent fuel storage capacity.
However, the U.S. Department of Energy's (DOE's) high-level radioactive
waste repository is not expected to begin receiving spent fuel until
approximately 2010, at the earliest. In October 1996, the
Administration did commit DOE to begin storing wastes at a centralized
location by January 31, 1998. However, no location has been identified
and an interim federal storage facility has yet to be identified in
advance of a decision on a permanent repository. Therefore, shipping
spent fuel to the DOE repository is not considered an alternative to
increased onsite spent fuel storage capacity at this time.
Shipment of Fuel to a Reprocessing Facility
Reprocessing of spent fuel from Callaway Plant, Unit 1 is not a
viable alternative since there are no operating commercial reprocessing
facilities in the United States. Therefore, spent fuel would have to be
shipped to an overseas facility for reprocessing. However, this
approach has never been used and it would require approval by the
Department of State as well as other entities. Additionally, the cost
of spent fuel reprocessing is not offset by the salvage value of the
residual uranium; reprocessing represents an added cost. The shipment
of spent fuel to a reprocessing facility is not an acceptable
alternative because of increased fuel handling risks and additional
occupational exposure.
Shipment of Fuel to Another Utility or Site for Storage
The shipment of fuel to another utility for storage would provide
short-term relief from the storage problem at Callaway Plant, Unit 1.
The Nuclear Waste Policy Act and 10 CFR Part 53, however, clearly place
the responsibility for the interim storage of spent fuel with each
owner or operator of a nuclear plant. The shipment of fuel to another
source is not an acceptable alternative because of increased fuel
handling risks and additional occupational radiation exposure, as well
as the fact that no additional storage capacity would be created.
Reduction of Spent Fuel Generation
Operation at a reduced power level would decrease the amount of
fuel being stored in the pool and thus increase the amount of time
before full core off-load capacity is lost. However, operating the
plant at a reduced power level would not make effective use of
available resources, and would cause unnecessary economic hardship on
Union Electric Company and its customers. Therefore, reducing the
amount of spent fuel generated by reducing power is not considered a
practical alternative.
Development of Onsite Storage Facility
An independent spent fuel storage installation (ISFSI) is licensed
under 10 CFR Part 72. It is a passive storage system which stores spent
fuel in dry casks on a concrete platform in a secured area. There are
no commercial ISFSIs operating in the United States. Although use of an
ISFSI provides benefits, the site-specific development of an
independent dry fuel storage facility at Callaway Plant, Unit 1 was
deemed undesirable by the licensee compared to the use of the higher
density spent fuel racks. Furthermore, construction of such a facility
would not use the existing expansion capacity of the existing Callaway
Plant, Unit 1 SFP and would have the potential to cause additional and
different environmental impacts due to activities related to
construction and operation. Development of a site-specific ISFSI at
this time and in response to the licensee's current needs would waste
available resources.
The staff also considered denial of the proposed action (no-action
alternative). Denial of the application would result in no change in
current environmental impacts.
Alternative Use of Resources
This action does not involve the use of any resources not
previously considered in the Final Environmental Statement for the
Callaway Plant, Unit 1 dated January 1982.
Agencies and Persons Consulted
In accordance with its stated policy, on January 11, 1999, the
staff consulted with the Missouri State official, Mr. Tom Lange of the
Missouri Department of Natural Resources, regarding the environmental
impact of the proposed action. The State official had no comments.
Finding of No Significant Impact
On the basis of the environmental assessment, the Commission
concludes that the proposed action will not have a significant effect
on the quality of the human environment. Accordingly, the Commission
has determined not to prepare an environmental impact statement for the
proposed action.
For further details with respect to the proposed action, see the
licensee's letter dated February 24, 1998, as supplemented by letters
dated May 27, 1998, June 25, 1998, August 25, 1998, September 3, 1998,
November 3, 1998, and December 4, 1998, which are available for public
inspection at the Commission's Public Document Room, The Gelman
Building, 2120 L Street, NW., Washington, DC, and at the local public
document room located at the University of Missouri--Columbia, Elmer
Ellis Library, Columbia, Missouri, 65201-5149.
Dated at Rockville, Maryland, this 11th day of January 1999.
For the Nuclear Regulatory Commission.
Mel Gray,
Project Manager, Project Directorate IV-2, Division of Reactor
Projects--III/IV, Office of Nuclear Reactor Regulation.
[FR Doc. 99-967 Filed 1-14-99; 8:45 am]
BILLING CODE 7590-01-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.