Environmental Impact Statements and Regulations; Availability of EPA Comments
Federal RegisterApr 9, 1999
Ask Donna
What actually matters in this document.
Text
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6241-6]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared March 15, 1999 Through March
19, 1999 pursuant to the Environmental Review Process (ERP), under
Section 309 of the Clean Air Act
[[Page 17363]]
and Section 102(2)(c) of the National Environmental Policy Act as
amended. Requests for copies of EPA comments can be directed to the
Office of FEDERAL ACTIVITIES AT (202) 564-7167.
Summary of Rating Definitions Environmental Impact of the Action
LO--Lack of Objections
The EPA review has not identified any potential environmental
impacts requiring substantive changes to the proposal. The review may
have disclosed opportunities for application of mitigation measures
that could be accomplished with no more than minor changes to the
proposal.
EC--Environmental Concerns
The EPA review has identified environmental impacts that should be
avoided in order to fully protect the environment. Corrective measures
may require changes to the preferred alternative or application of
mitigation measures that can reduce the environmental impact. EPA would
like to work with the lead agency to reduce these impacts.
EO--Environmental Objections
The EPA review has identified significant environmental impacts
that must be avoided in order to provide adequate protection for the
environment. Corrective measures may require substantial changes to the
preferred alternative or consideration of some other project
alternative (including the no action alternative or a new alternative).
EPA intends to work with the lead agency to reduce these impacts.
EU--Environmentally Unsatisfactory
The EPA review has identified adverse environmental impacts that
are of sufficient magnitude that they are unsatisfactory from the
standpoint of public health or welfare or environmental quality. EPA
intends to work with the lead agency to reduce these impacts. If the
potentially unsatisfactory impacts are not corrected at the final EIS
stage, this proposal will be recommended for referral to the CEQ.
Adequacy of the Impact Statement
Category 1--Adequate
EPA believes the draft EIS adequately sets forth the environmental
impact(s) of the preferred alternative and those of the alternatives
reasonably available to the project or action. No further analysis or
data collection is necessary, but the reviewer may suggest the addition
of clarifying language or information.
Category 2--Insufficient Information
The draft EIS does not contain sufficient information for EPA to
fully assess environmental impacts that should be avoided in order to
fully protect the environment, or the EPA reviewer has identified new
reasonably available alternatives that are within the spectrum of
alternatives analyzed in the draft EIS, which could reduce the
environmental impacts of the action. The identified additional
information, data, analyses, or discussion should be included in the
final EIS.
Category 3--Inadequate
EPA does not believe that the draft EIS adequately assesses
potentially significant environmental impacts of the action, or the EPA
reviewer has identified new, reasonably available alternatives that are
outside of the spectrum of alternatives analyzed in the draft EIS,
which should be analyzed in order to reduce the potentially significant
environmental impacts. EPA believes that the identified additional
information, data, analyses, or discussions are of such a magnitude
that they should have full public review at a draft stage. EPA does not
believe that the draft EIS is adequate for the purposes of the NEPA
and/or Section 309 review, and thus should be formally revised and made
available for public comment in a supplemental or revised draft EIS.
On the basis of the potential significant impacts involved, this
proposal could be a candidate for referral to the CEQ.
Draft EISs
ERP No. D-AFS-J65290-UT Rating EC2, Snowbird Ski and Summer Resort
Master Development Plan, Implementation, Special-Use-Permit and COE
Section 404 Permit, Salt Lake and Lake Counties, Salt Lake City, UT.
Summary: EPA expressed environmental concerns over potential
adverse impacts to water quality, especially increased metal
concentrations, and to air quality from the proposed action.
ERP No. D-AFS-J65292-WY Rating EC2, Cold Springs Ecosystem
Management Project, Implementation, Enhancement of Tree Harvesting and
Sale, Medicine Bow-Routt National Forests, Douglas Ranger District,
Converse and Albany Counties, WY.
Summary: EPA expressed environmental concerns over potential
adverse impacts to water quality.
ERP No. D-BLM-K65204-AZ Rating EC2, Hualapai Mountain Land
Exchange/Plan Amendment, Implementation, Kingman and Dutch Flat, Mohave
County, AZ.
Summary: EPA expressed environmental concerns regarding potential
impacts to wildlife, air quality, and water resources from future
development.
ERP No. D-NPS-B65007-VT Rating LO1, Marsh-Billings National
Historical Park, General Management Plan, Implementation, Woodstock,
VT.
Summary: EPA had no objections to the proposed project.
ERP No. D-NPS-D61050-MD Rating EO2, National Harbor Project,
Construction and Operation along the Potomac River on a 534 acre site
adjacent to the Capital Beltway and Oxon Hill Manor, COE Section 10 and
404 Permits, Prince George's County, MD.
Summary: EPA expressed environmental objections about potential
adverse impacts to aquatic resources, especially fin fish and aquatic
plants and wetlands. EPA suggests that the final EIS include a broader
range of alterative.
ERP No. D-NPS-J61101-MT Rating EC2, Glacier National Park, General
Management Plan, Implementation, Waterton Glacier International Peace
Park, Lake National Park, Flathead and Glacier, MT.
Summary: EPA expressed environmental concerns about adverse impacts
to water quality and wetland and requested a full air quality impact
analysis be included in the final EIS.
ERP No. D-NPS-K61221-CA Rating LO, Fort Baker Site, Golden Gate
National Recreation Area, Comprehensive Management Plan,
Implementation, Marin County, CA.
Summary: EPA expressed a lack of objection for the proposed action.
Final EISs
ERP No. F-AFS-B65006-VT Sugarbush Ski Resort Project, Improvements
and Development, Special-Use-Permit, Green Mountain National Forest,
Rochester Range District, Fayston and Warren, Washington County, VT.
Summary: EPA's concerns about impacts to water quality and wildlife
habitate were adequately addressed.
ERP No. F-NOA-A91065-00 Atlantic Tunas, Swordfish and Sharks,
Highly Migratory Species Fishery Management Plan.
Summary: Review of the Final EIS/Regulation was not deemed
necessary. No formal comment letter was sent to the preparing agency.
[[Page 17364]]
Dated: April 06, 1999.
William D. Dickerson,
Office of Federal Activities.
[FR Doc. 99-8935 Filed 4-8-99; 8:45 am]
BILLING CODE 6560-50-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.