DEPARTMENT OF AGRICULTURE

Forest Service

Stimson ANILCA Access Easement, Colville National Forest, Pend

Oreille County, WA

ACTION: Notice of intent to prepare environmental impact statement.

-----------------------------------------------------------------------

SUMMARY: The Forest Service, USDA, will prepare an environmental impact

statement (EIS) on a site-specific proposal to grant an easement and

authorize construction and reconstruction of specific roads across

National Forest System (NFS) lands as requested by Stimson Lumber

Company to access their lands. This request seeks legal access to

approximately 2,480 acres in five separate sections of non-Federal land

located within the Forest Boundary on the Sullivan Lake Ranger

District. The proposed action is located approximately six miles south

of Ione, Washington, within the LeClerc Creek watershed. The Proposed

Action will be in compliance with the 1988 Colville National Forest

Land and Resource Management Plan (Forest Plan) as amended, which

provides the overall guidance for management of this area. The Colville

National Forest invites written comments and suggestions on the scope

of the analysis. The agency gives notice of the full environmental

analysis and decision making process so that interested and affected

people may be able to participate and contribute in the final decision.

[[Page 17145]]

DATES: Comments concerning the scope of this proposal should be

received in writing by May 15, 1999.

ADDRESSES: Send written comments and suggestions to Fred C. Gonzalez,

District Ranger, 12641 Sullivan Lake Road, Metaline Falls, Washington

99153.

FOR FURTHER INFORMATION CONTACT: Questions about this EIS should be

directed to Tim Bertram, Interdisciplinary Team Leader, 12641 Sullivan

Lake Road, Metaline Falls, Washington 99153 (phone: 509-446-7500).

SUPPLEMENTARY INFORMATION: The Proposed Action is to grant an easement

to Stimson Lumber Company authorizing the construction, reconstruction,

and use of seven segments of road, totaling approximately 2.69 miles,

to access their property. Sections of land to be accessed are

surrounded by NFS lands and no legal road access to the sections

currently exists. Stimson Lumber Company seeks access pursuant to the

Alaska National Interest Lands Conservation Act, (ANILCA). The ANILCA

directs the Forest Service to grant access to inholdings of non-Federal

land within the National Forest boundary for the reasonable use and

enjoyment of those lands by the landowner. Stimson has stated that it

intends to manage the lands to be accessed for long-term timber

production utilizing conventional ground based logging systems. The

applicant intends to build roads on the easement sufficient to support

the intended use of the land.

The proposed Action may result in an amendment to the Forest Plan

to provide additional standards and guidelines for the LeClerc Grizzley

Bear Management Unit. The standards and guidelines would be based upon

recommendations provided in the Interagency Grizzly Bear committee Task

Force Report (as revised July 29, 1998).

This analysis will evaluate a range of alternatives for granting

access for Stimson's inholdings. The access involves approximately 2.69

miles of road on 22 acres of NFS lands.

Analysis of effects will include both the project area on NFS lands

as well as affects on non-federal Stimson lands accessed by the roads.

Analysis areas will differ based on resource being assessed (watershed

boundaries, grizzly bear management units, etc.).

The Draft EIS will be tiered to the Colville National Forest Land

and Resource Management Plan. The Land and Resource Management Plan's

Management Area direction for this project area is approximately 3

percent Old Growth Dependent Species Habitat (Management Area 1), 30

percent Wood/Forage Emphasis (Management Area 7), and 67 percent Winter

Range (Management Area 8).

Preliminary issues include: (1) Under ANILCA and its implementing

regulations, what would constitute reasonable access to Stimson land;

(2) What would be the effects of granting access to Stimson land on

natural resources including proposed, threatened, and endangered

species habitat; and (3) Where is access mutually needed by both

Stimson and the Forest Service to meet both economic concerns and

natural resource objectives?

A range of alternatives will be considered, including a no-action

alternative. Initial scoping began in May 1992 with notice and mailings

to interested parties. An Interdisciplinary team was assigned on May

28, 1992 to identify and clarify issues, to explore and develop

alternatives based on key issues, and to review and analyze potential

environmental effects. An Environmental Assessment (EA), called the

Stimson Cost-Share EA, was issued to the public for comment from July

16, 1997 to August 15, 1997. A Decision Notice/Finding of No

Significant Impact was issued on March 6, 1998. The decision document

was appealed and reversed by the Appeal Deciding Officer on June 15,

1998. comments from the EA comment period and the appeals have been

incorporated in the preparation of this Notice and the Proposed Action.

The Environmental Protection Agency (EPA) will publish a Notice of

Availability of the draft EIS in the Federal Register. The draft EIS is

expected to be available by June, 1999. The comment period on the draft

EIS will be 45 days from the date the EPA notice appears in the Federal

Register. It is important that those interested in the management of

the Colville National forest participate at that time.

The Forest Service believes it is important to give reviewers

notice at this early stage of several court rulings related to public

participation in the environmental review process.

First, reviewers of the draft EIS must structure their

participation in the environmental review of the proposal so that it is

meaningful and alerts an agency to the reviewer's position and

contentions. Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S.

519,553 (1978). Also, environmental objections that could be raised at

the draft EIS stage but that are not raised until after completion of

the final EIS may be waived or dismissed by the courts. City of Angoon

v. Hodel, 803 f. 2d 1016, 1022 (9th Cir., 1986) and Wisconsin

Heritages. Inc. v. Harris, 490 F. Supp. 1334, 1338 (E.D. Wis. 1980).

Because of these court rulings, it is very important that those

interested in this Proposed Action participate by the close of the 45

day comment period so that substantive comments and objections are made

available to the Forest Service at a time when it can meaningfully

consider them and respond to them in the final EIS.

To assist the Forest Service in identifying and considering issues

and concerns on the proposed action, comments on the draft EIS should

be as specific as possible. It is also helpful if comments refer to

specific pages or chapters of the draft EIS. Comments may also address

the adequacy of the draft EIS or the merits of the alternatives

formulated and discussed in the Statement. Reviewers may wish to refer

to the Council on Environmental Quality Regulations for implementing

the procedural provisions of the National Environmental Policy Act at

40 CFR 1503.3 in addressing these points.

The final EIS is scheduled to be available by September 1999. In

the final EIS, the Forest Service is required to respond to substantive

comments received during the comment period for the draft EIS. The Lead

Agency is the USDA Forest Service. The responsible official is Colville

National Forest Supervisor, Robert L. Vaught, 765 South Main, Colville,

WA 99114. The responsible official will decide which, if any, of the

alternatives will be implemented. The decision and the rationale for

the decision will be documented in the record of Decision, which will

be subject to Forest Service Appeal Regulations (36 CFR Part 215).

Dated: March 30, 1999.

Robert L. Vaught,

Forest Supervisor.

[FR Doc. 99-8726 Filed 4-7-99; 8:45 am]

BILLING CODE 3410-11-M

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Stimson ANILCA Access Easement, Colville National Forest, Pend Oreille County, WA · 64 FR 17144 | Frix