Wolf Creek Nuclear Operating Corporation (Wolf Creek Generating Station); Environmental Assessment and Finding of No Significant Impact

Federal RegisterMar 23, 1999

Ask Donna

What actually matters in this document.

Text

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-482]

Wolf Creek Nuclear Operating Corporation (Wolf Creek Generating

Station); Environmental Assessment and Finding of No Significant Impact

The U.S. Nuclear Regulatory Commission (the Commission) is

considering issuance of an amendment to Facility Operating License No.

NPF-42, issued to Wolf Creek Nuclear Operating Corporation (the

licensee), for operation of the Wolf Creek Generating Station located

in Coffey County, Kansas.

Environmental Assessment

Identification of the Proposed Action

The amendment would revise Technical Specification (TS) 4.7.3b,

``Plant Systems--Component Cooling Water System--Surveillance

Requirements,'' by deleting the requirement to perform the specified

surveillances during shutdown. A change to the applicable Bases would

also be included.

The proposed action is in accordance with the licensee's

application for amendment dated May 15, 1997, as supplemented by

letters dated June 30, August 5, August 28, September 24, October 16,

October 23, November 24, December 2, December 17, and December 21,

1998, and January 15, 1999.

Need for the Proposed Action

By letter dated May 15, 1997, Wolf Creek Nuclear Operating

Corporation (the licensee) proposed a conversion of the current TSs for

Wolf Creek to the Improved Technical Specifications (ITSs). When the

TS-required 18-month testing (during shutdown) of the component cooling

water system (CCWS) was last conducted, a portion of the required

testing was not completed for one pump in each train of the CCWS. The

proposed action, an amendment to modify the TSs to allow testing during

power operations, would avert a plant shutdown to complete this

testing.

Environmental Impacts of the Proposed Action

With regard to potential radiological impacts to the general

public, the amendment under consideration involves features located

entirely within the restricted area as defined in 10 CFR part 20. It

does not affect the potential for radiological accidents and does not

affect radiological plant effluents. No safety limits will be changed

or setpoints altered as a result of the TS revision. The proposed

action will not increase the probability or consequences of accidents,

no changes are being made in the types of any effluents that may be

released offsite, and there is no significant increase in occupational

or public radiation exposure. Therefore, there are no significant

radiological environmental impacts associated with the proposed action.

With regard to potential nonradiological impacts, the proposed

action does not involve any historic sites. It does not affect

nonradiological plant effluents and would have no other environmental

impact. Therefore, there are no significant nonradiological

environmental impacts associated with the proposed action.

Accordingly, the Commission concludes that there are no significant

environmental impacts associated with the proposed action.

Alternative to the Proposed Action

As an alternative to the proposed action, the staff considered

denial of the proposed action (i.e., the ``no-action'' alternative).

Denial of the application would result in no change in current

environmental impacts. The environmental impacts of the proposed action

and the alternative action are similar.

[[Page 14019]]

Alternative Use of Resources

This action does not involve the use of any resources not

previously considered in the ``Final Environmental Statement Related to

the Operation of Wolf Creek Generating Station, Unit No. 1'' dated June

1982.

Agencies and Persons Contacted

In accordance with its stated policy, on March 8, 1999, the staff

consulted with the Kansas State official, Mr. Vick Cooper, of the

Kansas Department of Health and Environment, regarding the

environmental impact of the proposed action. The State official had no

comments.

Finding of No Significant Impact

On the basis of the environmental assessment, the Commission

concludes that the proposed action will not have a significant effect

on the quality of the human environment. Accordingly, the Commission

has determined not to prepare an environmental impact statement for the

proposed action.

For further details with respect to the proposed action, see the

licensee's application for amendment dated May 15, 1997, as

supplemented by letters dated June 30, August 5, August 28, September

24, October 16, October 23, November 24, December 2, December 17, and

December 21, 1998, and January 15, 1999, which are available for public

inspection at the Commission's Public Document Room, the Gelman

Building, 2120 L Street, NW., Washington, DC, and at the local public

document rooms located at Emporia State University, William Allen White

Library, 1200 Commercial Street, Emporia, Kansas 66801, and Washburn

University School of Law Library, Topeka, Kansas 66621.

Dated at Rockville, Maryland, this 17th day of March 1999.

For the Nuclear Regulatory Commission.

Kristine M. Thomas,

Project Management, Project Directorate IV-2, Division of Licensing

Project Management, Office of Nuclear Reactor Regulation.

[FR Doc. 99-7031 Filed 3-22-99; 8:45 am]

BILLING CODE 7590-01-P