NUCLEAR REGULATORY COMMISSION
Public Workshop To Provide Information on the Pilot Plant
Performance Indicators
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of meeting.
-----------------------------------------------------------------------
SUMMARY: The Nuclear Regulatory Commission (NRC) will hold a public
workshop to provide information to selected NRC inspectors and licensee
staff of the Reactor Oversight Process Pilot Program. This meeting is
open to the public.
DATES: The workshop will be held from 8:00 a.m. to 5:00 p.m. April 12
through April 15, 1999. The first two hours of the workshop on April 12
will be dedicated to check-in procedures.
ADDRESSES: The workshop will be held at the Holiday Inn, 1250 Roosevelt
road, Glen Ellyn, IL 60137
FOR FURTHER INFORMATION CONTACT: August Spector at 301-415-2140 or Lee
Miller at 423-855-6510, Mail Stop: O-5H4, Inspection Program Branch,
Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
Background
On January 8, 1999, the staff issued SECY-99-007, forwarding the
staff's recommendations for a new reactor oversight process. On January
20, 1999, the staff briefed the Commission on the staff's proposal
described in SECY-99-007. The following issues represent a brief
summary of the concepts presented in SECY-99-007.
Over the last 10 years, commercial nuclear power plants have been
operated safely and overall plant performance has improved. This
improvement in plant performance can be attributed, in part, to
successful regulatory oversight. Despite this success, the agency has
noted that the current reactor oversight process (1) is at times not
clearly focused on the most safety important issues, (2) consists of
redundant actions and outputs, and (3) is frequently subjective, with
NRC action taken in a manner that is at times neither scrutable nor
predictable.
In the new regulatory oversight process:
There will be a risk-informed baseline inspection program
that establishes the minimum direct inspection effort for all
licensees.
Thresholds will be established for licensee safety
performance, below which increased NRC interaction would be warranted.
Adequate assurance of licensee performance will require
assessment of both performance indicators (PIs) and inspection
findings.
Both PIs and inspection findings will be evaluated against
risk-informed thresholds, where feasible.
Crossing a PI threshold and an inspection threshold will
have the same meaning with respect to safety significance and required
NRC interaction.
The baseline inspection program will cover those risk-
significant attributes of licensee performance not adequately covered
by PIs.
The baseline inspection program will also verify the
accuracy of PI data collection and analysis and provide for event
response, as appropriate.
Enforcement actions will be focused on issues that are
risk significant.
Guidelines will be established for identifying and
responding to unacceptable licensee performance.
Additionally, the staff will pilot the new reactor oversight
process during a 6-month period beginning in June 1999. The purpose of
the pilot program is to exercise the new processes (PI reporting,
inspection, assessment, and enforcement), to identify process and
procedure problems and make appropriate changes and, to the maximum
extent possible, evaluate the effectiveness of the new process. Full
implementation of the new oversight process will commence pending
successful completion of the pilot program, as measured against pre-
established success criteria. A notable feature of the pilot program is
the use of the Pilot Program Evaluation Panel, consisting of NRC, NEI,
industry, public, and State representatives, to aid in evaluating the
effectiveness of the pilot program. This workshop will focus on the
pilot plant participants and specifically address performance indicator
reporting requirements.
Scope of the Public Workshops
The NRC will hold a four day workshop from April 12-15, 1999 to
provide information on the new performance indicator reporting
requirements to selected NRC inspectors and licensee staff
participating in the Reactor Oversight Process Pilot Program. In order
to meet the objectives of the workshop, active participants will be
limited to 48 NRC and licensee personnel who will be participating in
the pilot program. Other interested parties may observe, up to a total
of 150 additional individuals. NRC and licensee staff may choose to
rotate cognizant individuals into the active participant ranks as
applicable. 18 slots will be reserved for the nine pilot plants, 25 for
the regional offices, and five seats reserved for NRC Headquarters and
Regional Senior Reactor Analysts. The pilot plants are: Hope Creek,
Salem Units 1 and 2, Fitzpatrick, Prairie Island Units 1 and 2, Quad
Cities Units 1 and 2, Shearon Harris, Sequoyah Units 1 And 2, Ft.
Calhoun, and Cooper.
The agenda for the workshop will consist of the following:
[[Page 14020]]
--Day 1: registration and check-in, opening remarks, and initiating
events performance indicators
--Day 2: mitigating systems and barrier performance indicators.
--Day 3: barrier performance indicators (continued) and Emergency
Preparedness performance indicators.
--Day 4: occupational exposure, public exposure, and physical
protection performance indicators.
Note: Each day will end with a question and answer session.
Workshop Pre-Registration
Active participants and observers at the workshop are requested to
pre-register with the NRC approximately two weeks before the workshop.
Attendees may pre-register in either of the following ways:
(1) Fax to Elaine Toro at (301) 415-3707
(2) Mail to: U.S. Nuclear Regulatory Commission, Attn: Elaine Toro,
Office of Nuclear Reactor Regulation, Mailstop O5H4, Washington, D.C.
20555-0001
Dated at Rockville, Maryland, this 17th day of March, 1999.
For the Nuclear Regulatory Commission.
William M. Dean,
Chief Inspection Program Branch, Division of Inspection Program
Management, Office of Nuclear Reactor Regulation.
Cornerstone Performance Indicator Workshop Registration, Holiday
Inn, Glen Ellyn, IL, April 12--15, 1999
(Please Print)
Name:------------------------------------------------------------------
(last) (first)
Title:-----------------------------------------------------------------
Address:---------------------------------------------------------------
(department, division or unit)
----------------------------------------------------------------------
(street or P.O. box)
----------------------------------------------------------------------
(city) (state) (zip code)
Pilot Plant (Yes/No)---------------------------------------------------
Telephone (home):------------------------------------------------------
Telephone (business): (ext)--------------------------------------------
E-mail:----------------------------------------------------------------
Name (for name badge):-------------------------------------------------
Mail your registration form to: Elaine Toro, Nuclear Regulatory
Commission, Office of Nuclear Reactor Regulation, Mail Stop O-5H2,
Washington, DC 20555.
Fax your registration form to: 301-415-3707 Attention: Elaine
Toro.
THIS REGISTRATION FORM IS FOR THE WORKSHOP ONLY. PLEASE MAKE
HOTEL RESERVATIONS SEPARATELY.
[FR Doc. 99-7030 Filed 3-22-99; 8:45 am]