Outer Continental Shelf (OCS) Civil Penalties
Federal RegisterMar 22, 1999
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF THE INTERIOR
Minerals Management Service
Outer Continental Shelf (OCS) Civil Penalties
AGENCY: Minerals Management Service (MMS).
ACTION: Notice Summarizing OCS Civil Penalties Paid, January 1, 1998--
December 31, 1998.
-----------------------------------------------------------------------
SUMMARY: This notice provides a listing of civil penalties paid January
1, 1998, through December 31, 1998, for violations of the OCS Lands
Act. The goal of the MMS OCS Civil Penalties Program is to ensure safe
and clean operations on the OCS. Through the pursuit, assessment, and
collection of civil penalties and referrals for the consideration of
criminal penalties, we designed the program to encourage compliance
with OCS statutes and regulations. The purpose of publishing the
penalties summary is to provide information to the public on violations
of special concern in OCS operations and to provide an additional
incentive for safe and environmentally sound operations.
FOR FURTHER INFORMATION CONTACT: Greg Gould, Program Coordinator, at
(703) 787-1591.
SUPPLEMENTARY INFORMATION: The Oil Pollution Act (OPA 90) strengthened
section 24 of the OCS Lands Act Amendments of 1978. Subtitle B of OPA
90, titled ``Penalties,'' increased the amount of the civil penalty
from a maximum of $10,000 to a maximum of $20,000 per violation for
each day of noncompliance. More important, in cases where a failure to
comply with applicable regulations constitutes or constituted a threat
of serious, irreparable, or immediate harm or damage to life (including
fish and other aquatic life); property; any mineral deposit; or the
marine, coastal, or human environment; OPA 90 provided the Secretary of
the Interior (Secretary) with the authority to assess a civil penalty
without regard to the requirement of expiration of a period of time
allowed for corrective action.
On August 8, 1997, we published new regulations implementing the
civil penalty provisions of the OCS Lands Act. Written in ``plain
language,'' the new question-and-answer format provides a better
understanding of the OCS civil penalty process. In addition, the
provisions of OPA 90 require the Secretary to adjust the maximum civil
penalty to reflect any increases in the Consumer Price Index. The new
rule increased the maximum civil penalty to $25,000 per day, per
violation.
Between August 18, 1990, and December 31, 1998, we initiated 250
civil penalty reviews, assessed 151 civil penalties, and collected
$2,678,020 in fines. We dismissed 24 cases, and 75 are under review.
On September 1, 1997, the Associate Director for Offshore Minerals
Management issued a notice informing lessees and operators of Federal
oil, gas, and sulphur leases on the OCS that we will publish an annual
summary of OCS civil penalties paid. The annual
[[Page 13812]]
summary will highlight the identity of the party, the regulation
violated, and the amount paid. The following table provides a listing
of the penalties paid between January 1, 1998, and December 31, 1998.
Please note, we published a direct final rule (5/29/98, 63 FR 29477)
that renumbers each section in 30
CFR part 250. The regulations cited in the table are the citation
numbers that were current at the time of the violation and do not
reflect the redesignation.
A quarterly update of this list, along with additional information
related to the renumbering of the regulations, is posted on the MMS
worldwide web home page, http://www.mms.gov.
OCS Civil Penalties Paid--Calendar Year 1998
----------------------------------------------------------------------------------------------------------------
Penalty
Operator name and case No. Violation summary and violation paid and Regulation(s) violated 30 CFR
date(s) date paid
----------------------------------------------------------------------------------------------------------------
Exxon Corp, PAC-96-01............ The failure to close pig $25,000 250.40(a)
launcher drain valves allowed 3/24/98
oil to flow into the Pacific
Ocean. 5/1/96.
Union Pacific Resource, GOM-96-37 Sump Pump found to be $9,000 250.123(c)(1), 250.40(b)(4)
inoperable; pressure safety 1/14/98
high level (PSHL) for the sump
pump bypassed; PSHL for the
platform fuel gas filter
bypassed. 5/7/95.
Shell Offshore Inc, GOM-97-05.... The gas and fire detection $18,000 250.124(a)(8)
systems for three platforms 2/12/98
were not tested within the
required timeframes. 02/26/96-
02/27/96.
Shell Offshore Inc, GOM-97-06A... A breaker used to conduct an $75,0000 250.20(a)
emergency shut down (ESD) test 5/07/98
had a bad transformer. On
numerous occasions when the ESD
test was performed, the
operator would have to excite
the transformer by pulling a
480 volt cable out of the
breaker and then be repowered
with the 480 volt cable
removed. The operator would
then stab the 480 volt cable
back into the breaker causing
an arc. 05/27/96-07/10/96.
SOCO Offshore Inc, GOM-97-07..... Burner safety low for heater $40,000 250.122(b)
treater inoperable. 07/30/96-11/ 04/16/98
12/96.
CNG Producing Company, GOM-97-08. Wells A-2, A-4, A-9, A-10, and A- $40,000 250.123(c)(1)
14 surface controlled 05/19/98
subsurface safety valves
(SCSSV) were bypassed with the
wells hydraulic control lines
isolation vales closed. The
wells were not attended or
flagged. 11/03/96-11/04/96.
Conoco Inc, GOM-97-13............ ESD was bypassed on Subsea Well $5,000 250.20(a) 250.53(c)
No. 5. 09/20/95. 01/26/98
Union Pacific Resource, GOM-97-15 The level safety high (LSH) and $5,000 250.123(c)(1)
level safety low (LSL) were 02/18/98
bypassed on the fuel gas
scrubber. 12/10/96.
Phillips Petroleum Company, GOM- Multiple safety devices were not $72,500 250.124(a)(3)(i), 250.124
97-17. tested within the required time 03/26/98 (a)(3)(ii), 250.124(a) (4),
frame. 11/20/96. 250.124(a) (5), 250.124(a)
(10)
Century Offshore Management, GOM- The total safety system $66,000 250.123(c)(1)
97-18. shutdown, the performax, and 01/15/98
the LSH on the skimmer sump
tank were bypassed. 01/16/97-01/
19/97.
Walter Oil & Gas Corp, GOM-97-19. Well A-1 hydraulic control line $5,000 250.123(c)(1)
to SCSSV closed and not flagged 02/18/98
or monitored. 02/12/97.
Walter Oil & Gas Corp, GOM-97-25. Multiple safety devices were $17,000 250.123(c)(1)
bypassed on the pipeline pumps, 06/23/98
oil surge tank, and sump tank.
03/22/97.
Shell Offshore Inc, GOM-97-28.... A flash fire occurred when using $12,000 250.123(b)(10)
a standard electric drill to 06/04/98
drill holes in the floatation
cell. 06/08/97.
Chevron USA Inc, GOM-97-29....... There was not an operable $162,000 250.123(b)(8)(i)
firewater system or approved 02/23/98
chemical firefighting system on
the platform. 07/3/96-07/29/96.
Conoco Inc, GOM-97-31............ There were 2 openings on the $5,000 250.20(a)
production deck where grating 05/27/98
had been removed. There were no
barricades or flagging
indicating the holes; there was
no one monitoring the hole. 05/
08/97.
Chevron USA Inc, GOM-97-32....... During the positioning of a lift $10,000 250.20(a)
barge, the legs of the barge 06/04/98
ruptured a high pressure gas
pipeline. The pipelines were
not marked nor was the captain
of the vessel made aware of the
pipelines location. 02/02/97.
Chevron USA Inc, GOM-97-33....... ESD stations were bypassed at $10,000 250.123(c)(1)
the supply control panel. ESD 04/02/98
station switches in the
wellbay, compressor, blowcase,
and +10-foot deck level areas
did not activate the ESD. 09/06/
96.
Taylor Energy Company, GOM-97-34. SCSSV was blocked out of service $6,500 250.123(c)(1),
on Well E-17; tubing plug was 05/15/98 250.124(a)(1)(iii)
not tested within the required
time period for Well E-5. 07/03/
96.
Chevron USA Inc, GOM-97-36....... An employee was injured when he $15,000 250.20(a)
fell through open grating with 03/4/98
no barrier. 03/13/97.
Chevron USA Inc, GOM-97-38....... Two workers did not have fall $10,000 250.20(a)
protection secured while 05/06/98
working near an open hole. 02/
05/97.
Coastal Oil & Gas Corp, GOM-97-41 Numerous safety devices blocked $135,000 250.123(c)(1)
out of service at the main 08/3/98
control panel. 04/2/97.
Shell Offshore Inc, GOM-97-42.... The gas and fire detection $10,000 250.124(a)(8)
systems were not tested within 06/15/98
the required timeframes. 06/24/
97.
Walter Oil & Gas Corp, GOM-97-44. The LSL sensor for the $10,000 250.123(b)(7)(i)
Compressor Suction Scrubber 06/11/98
failed to operate. The
adjustment screw was set in
such a manner that the sensor
would not activate (bypassed).
06/01/97.
Ocean Energy Inc, GOM-97-45...... A pollution incident occurred $15,000 250.40(a), 250.123(c)(1)
because the shutdown relay on 10/9/98
floatation cell was blocked out
of service (bypassed). 03/4/97.
[[Page 13813]]
Norcen Explorer Inc, GOM-97-46... Safety devices on 7 vessels were $103,200, 250.40(a), 250.121(e)(3),
found bypassed. Pollution 12/29/98 250.123(c)(1)
occurred when the LSH on the
bad oil tank was bypassed. Well
A-10 produced for 32 days
without a subsurface safety
valve. 01/14/97--06/29/97.
Ocean Energy Inc, GOM-97-48...... Three open holes were not $15,000 250.20(a)
properly barricaded or flagged. 07/09/98
06/19/97.
Burlington Resources, GOM-97-49.. LSH on Vent Scrubber was $5,000 250.123(c)(1)
inoperable. 07/09/97. 05/05/98
Panaco Inc, GOM-97-50............ Platform sump system was $64,000 250.40(b)(4), 250.122(b)
inoperable; sump tank LSH was 08/6/98
not tested within the required
time period. 04/25/96.
Apache Corporation, GOM-97-51.... The safety system for the $8,000 250.123(c)(1)
compressor was bypassed at the 08/19/98
master panel. 03/12/96.
Conoco Inc, GOM-97-52............ LSH for the platform sump tank $8,000 250.123(c)(1)
was bypassed. 02/22/97. 05/18/98
Callon Petroleum Oper, GOM-97-54. SCSSV for Well A-1 was bypassed $10,000 250.123(c)(1)
at the wellhead; isolation 05/06/98
valve was closed during testing
and remained closed for 2 days
until discovered during
inspection. 07/10/97-07/11/97.
Seneca Resources Corp, GOM-97-58. The SCSSV was detected in the by- $6,000 250.123(c)(1)
pass mode for Well E016. 02/03/ 06/22/98
97.
Marathon Oil Company, GOM-97-59.. The air supply valves to the air $26,000 250.56(d)(2)
pumps that operate the blowout 06/04/98
preventer accumulator charging
system were detected in the by-
passed position during the
inspection. 07/18/97-07/25/97.
Norcen Explorer Inc, GOM-97-60... PSHL bypassed on Well 16 A; $12,000 250.123(c)(1), 250.123(c)(4)
SCSSV bypassed on Well 32. 09/ 04/17/98
07/97.
Nuevo Energy Company, PAC-98-01.. Failure to have a qualified $35,000 250.20(a), 250.20(c),
crane operator, exceeding 07/30/98 250.40(a)
dynamic rating for crane, and
failure to prevent pollution.
01/15/98.
Conoco Inc, GOM-98-02............ When Plug and Abandon operations $9,000 250.20(a)&(b)
were being conducted, a small 05/18/98
fire flashed from a pneumatic
saw that was being powered by
instrument gas to cut casing.
The fire burned an employee
standing next to the operator
of the saw. 08/06/97.
Nuevo Energy Company, PAC-98-02.. Failure to perform pre-use $18,000 250.20(c)
inspection on a crane. 04/4/98. 09/10/98
Taylor Energy Company, GOM-98-03. Taylor did not test the safety $7,000 250.124(a)(3), 250.124(a)(5),
devices within the required 6- 03/19/98 250.124(a)(6), 250.20 (a)&(b)
week interval. 08/20/97.
Panaco Inc, GOM-98-05............ The fire watch did not have a $15,000 250.52(a)(4), 250.52(d)(2),
portable gas detector while 06/05/98 250.123(c)(1)
conducting welding operations.
Production equipment within 35
feet of the welding did not
have flame-proof covers. The
platform sump's LSH was pinned
out of service. 08/18/97--09/02/
97.
Ocean Energy Inc, GOM-98-06...... The hydraulic line for Well 9 $6,000 250.123(c)(1)
was found isolated in the 06/12/98
hydraulic panel (manual
override) in a closed position.
The valve was not flagged or
being monitored. 07/21/97.
Shell Deepwater Development, GOM- An employee was observed working $15,000 250.20(a)(b)
98-07. near an unflagged open hole 09/1/98
that did not have a barrier
around it. The employee was not
wearing full protection gear.
09/19/97.
Samedan Oil Corporation, GOM-98- The PSHL was locked in open $24,000 250.123(b)(1)(i),
08. position, no fire detection 07/8/98 250.123(b)(9), 250.123(c),
system, pressure safety element 250.123(c)(1)
set higher than allowed, and
the LSH was bypassed. 08/10/96--
10/8/96.
Gulfstar Energy Inc, GOM-98-09... Failure to test pressure safety $15,000 250.124(a)(2)
valves. 03/15/96--01/15/97. 07/17/98
Aviva America Inc, GOM-98-16..... The SCSSV was found bypassed for $42,000 250.123(c)(1)
6 wells. 12/18/97. 09/10/98
OXY USA Inc, GOM-98-18........... Rig personnel were working in a 5,00 250.20(a)
hazardous area without wearing 06/22/98
full protection gear. 09/18/97.
Ocean Energy Inc, GOM-98-24...... The hydraulic line for well 11-D $6,000 250.123(c)(1)
ball valve (SCSSV) found 12/21/98
isolated at the tree. Valve was
not flagged or being monitored.
07/21/97.
Chevron USA Inc, GOM-98-25....... ESD system remote on the boat $15,000 250.123(c)(1)
landing was bypassed. 11/24/97. 06/09/98
Chevron USA Inc, GOM-98-32....... An injury occurred when the $23,000 250.20(a)
break-out tong was rigged up 06/17/98
and used without hanging the
tong off from an air hoist line
and without securing the tong
with a snub line. 11/11/97.
Unocal Exploration Corp, GOM-98- The LSH on the sump was $3,000 250.40(a), 250.123(c)(1)
33. bypassed. 09/27/97. 09/15/98
Flextrend Development, GOM-98-34. The SCSSV was bypassed for Wells $24,000 250.123(c)(1)
A-2, A-4, and A-5. 11/16/97--11/ 08/12/98
17/97.
Total Penalties Paid 1/1/98-12/31/98; 50 Cases: $1,297,200
----------------------------------------------------------------------------------------------------------------
[[Page 13814]]
Dated: March 16, 1999.
Carolita U. Kallaur,
Associate Director for Offshore Minerals Management.
[FR Doc. 99-6868 Filed 3-19-99; 8:45 am]
BILLING CODE 4310-MR-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.