Tennessee Gas Pipeline Company, et al.; Electric Rate and Corporate Regulation Filings

Federal RegisterNov 16, 1999

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EC99-73-001, et al.]

Tennessee Gas Pipeline Company, et al.; Electric Rate and

Corporate Regulation Filings

November 9, 1999.

Take notice that the following filings have been made with the

Commission:

1. Tennessee Gas Pipeline Company

[Docket No. EC99-73-001]

Take notice that on October 29, 1999, Tennessee Gas Pipeline

Company (Tennessee), P.O. Box 2511, Houston, Texas 77252, tendered for

acceptance a compliance filing in the above-captioned docket.

Tennessee states that it is making this filing in compliance with

the Commission's September 29, 1999 ``Order Approving Disposition of

Jurisdictional Facilities'' in Docket No. EC99-73. El Paso Energy

Corporation and Sonat Inc., 88 FERC 61,302 (1999) (hereinafter, the

September 29th Order). In the September 29th Order, the Commission

approved the application of El Paso Energy Corporation and Sonat Inc.

requesting Commission approval of the proposed merger between the two

companies. Tennessee further states that in their application, the

respective companies committed to file tariff sheets, for each of their

jurisdictional pipeline companies that serve the Southeast, committing

that future pipeline expansion capacity will be offered to all shippers

on a non-discriminatory basis. Upon further review of its Tariff,

Tennessee notes that its currently effective tariff provisions already

provide that expansions of its system will be offered on a non-

discriminatory basis. Specifically, Article XVII (Construction of

Receipt and Delivery Facilities) of the General Terms and Conditions of

Tennessee's Tariff sets forth Tennessee's generally applicable policy

for the construction, modification and rearrangement of facilities and

that Tennessee will handle all requests for construction of facilities

``in a manner which is not unduly discriminatory.''

Comment date: November 29, 1999, in accordance with Standard

Paragraph E at the end of this notice.

2. Jones Black River Services, Inc.

[Docket No. EG00-13-000]

Take notice that on October 29, 1999, as amended on November 5,

1999, Jones Black River Services, Inc. (Applicant)

[[Page 62188]]

filed with the Federal Energy Regulatory Commission an Application for

Determination of Exempt Wholesale Generator Status pursuant to Part 365

of the Commission's Regulations and Section 32 of the Public Utility

Holding Company Act of 1935, as amended.

Applicant is a wholly-owned special purpose subsidiary of Jones

Capital Corporation, a Delaware corporation. Following the purchase by

an unrelated third party of the Fort Drum Cogeneration Project (the

Facility) from its current owner, Black River Limited Partnership

(BRLP), Applicant will lease the Facility from the third party

purchaser and will be the sole operator of the Facility. Applicant will

also sell at wholesale the electric energy that the Facility generates.

BRLP will transfer to JBRSI all operating rights, permits, easements

and a ground lease.

The Facility, a topping-cycle cogeneration project located at the

Fort Drum Army Base in Fort Drum, New York, is currently a Commission-

certified qualifying cogeneration facility. The Facility consists of

three multi-fuel (coal, petroleum coke, wood chip) fired circulating

fluidized bed boilers, and an extraction/condensing turbine generator

of approximately 50 MW net capacity. The Facility also will include

three diesel engine generators, rated at one MW each, and associated

transmission components interconnecting the project with the grid. The

Facility's total net electrical capacity will be approximately 53 MW.

Due to termination of the thermal energy contract by the U.S. Army, the

Facility will cease to be a QF after December 31, 1999.

Applicant requests that the Commission issue its determination of

EWG status to the Applicant as expeditiously as possible so that

Applicant is able to engage in permitted transactions as an EWG on Jan.

1, 2000.

Copies of the application have been served upon the New York Public

Service Commission, and the Securities and Exchange Commission.

Comment date: November 30, 1999, in accordance with Standard

Paragraph E at the end of this notice. The Commission will limit its

consideration of comments to those that concern the adequacy or

accuracy of the application.

3. Progress Power Marketing, Inc

[Docket No. ER96-1618-015]

Take notice that on October 22, 1999, Progress Power Marketing,

Inc. filed their quarterly report for the quarter ending September 30,

1999, for information only.

4. California Power Exchange Corporation

[Docket No. ER99-2229-002]

Take notice that on October 18, 1999, California Power Exchange

Corporation (CalPX) submitted a compliance filing in response to the

Commission's September 17, 1999 order in this proceeding. The

compliance filing addresses the allocation of costs between CalPX and

its division known as CalPX Trading Services (CTS).

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

5. New England Power Company, Massachusetts Electric Company, The

Narragansett Electric Company, New England Electric Transmission

Corporation, New England Hydro-Transmission Corporation, New

England Hydro-Transmission, Electric Company, Inc., AllEnergy

Marketing Company, L.L.C., Montaup Electric Company, Blackstone

Valley Electric Company, Eastern Edison Company, Newport Electric

Corporation and Research Drive LLC, New England Power Company,

Montaup Electric Company

[Docket No. ER99-2832-002]

Take notice that on October 29, 1999, in compliance with the

Commission's September 29, 1999 order in the above-referenced

proceeding authorizing the merger New England Electric System and

Eastern Utilities Associates (New England Power Company, et al., 88

FERC para. 61,292 (1999)), New England Power Company and its affiliates

(Massachusetts Electric Company, Narragansett Electric Company, New

England Electric Transmission Corporation, New England Hydro-

Transmission Corporation, New England Hydro-Transmission Electric

Company, Inc., AllEnergy Marketing Company, L.L.C., and Research Drive

LLC), and Montaup Electric Company and its affiliates holding

jurisdictional assets (Blackstone Valley Electric Company, Eastern

Edison Company, Newport Electric Corporation) submitted for filing

their proposed rate mechanism to maintain the status quo in the New

England Power Pool.

Comment date: November 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

6. Sunbury Generation, LLC

[Docket No. ER99-3420-002]

Take notice that on October 29, 1999, Sunbury Generation, LLC

(Sunbury) filed a notification with the Commission that service will

commence under the Transition Power Purchase Agreement between Sunbury

and PP&L, Inc. (TPPA) on November 1, 1999, the date of the closing for

Sunbury's purchase of the Sunbury generating facilities. The

Commission's order accepting the TPPA required Sunbury to file this

notification when service will commence. Illinova Power Marketing,

Inc., et al., 88 FERC para. 61,189 (1999).

Comment date: November 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

7. Commonwealth Edison Company, Commonwealth Edison Company of

Indiana

[Docket No. ER99-3886-001]

Take notice that on October 29, 1999, Commonwealth Edison Company

and Commonwealth Edison Company of Indiana filed tariff sheet changes

in compliance with the Commission's order of September 29, 1999 in this

proceeding.

Comment date: November 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

8. Central Illinois Light Company

[Docket No. ER00-341-000]

Take notice that on October 29, 1999, Central Illinois Light

Company (CILCO), 300 Liberty Street, Peoria, Illinois 61202, tendered

for filing with the Commission a substitute Index of Customers under

its Coordination Sales Tariff and two service agreements with two new

customers, Illinova Power Marketing, Inc. and TXU Energy Trading

Company a name change for one customer from Strategic Energy Ltd. to

Strategic Energy L.L.C.

CILCO requested an effective date of October 4, 1999 for the new

service agreements.

Copies of the filing were served on the affected customers and the

Illinois Commerce Commission.

Comment date: November 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

[[Page 62189]]

9. American Electric Power Service, Corporation on behalf of:

Appalachian Power Company, Columbus Southern Power Company, Indiana

Michigan Power Company, Kentucky Power Company, Kingsport Power

Company, Ohio Power Company, Wheeling Power Company, Consumers

Energy Company, Detroit Edison Company, FirstEnergy Corporation on

behalf of: The Cleveland Electric, Illuminating Company, Ohio

Edison Company, Pennsylvania Power Company, The Toledo Edison

Company, Virginia Electric and Power Company

[Docket No. ES99-62-000]

Take notice that on June 3, 1999, American Electric Power Service

Corporation on behalf of the public utility operating company

subsidiaries of the AEP system (Appalachian Power Company, Columbus

Southern Power Company, Indiana Michigan Power Company, Kentucky Power

Company, Kingsport Power Company, Ohio Power Company, and Wheeling

Power Company), Consumers Energy Company, Detroit Edison Company,

FirstEnergy Corp. on behalf of the transmission-owning FirstEnergy

Operating Companies (The Cleveland Electric Illuminating Company, Ohio

Edison Company, Pennsylvania Power Company, and The Toledo Edison

Company), and Virginia Electric and Power Company (collectively, the

Alliance Companies) filed an application for authorization under

Section 204 of the Federal Power Act for Alliance Publico to issue

securities in the form of an initial public offering.

All comments filed should be limited to the subject of the

requested authorization of the securities.

Comment date: November 26, 1999, in accordance with Standard

Paragraph E at the end of this notice.

10. Ogden Martin Systems of Union, Inc.

[Docket No. ER00-446-000]

Take notice that on November 1, 1999, Ogden Martin Systems of

Union, Inc., tendered for filing a rate schedule to engage in sales at

market-based rates.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

11. ARCO CQC Kiln, Inc.

[Docket No. ER00-443-000]

Take notice that on November 1, 1999, ARCO CQC Kiln, Inc.,

(Applicant) a Delaware Corporation which owns and operates an electric

generating facility at its industrial facility known as a calciner

(which converts petroleum coke to anode-grade coke) in Wilmington,

California, has applied before the Commission for an order accepting

its proposed FERC Electric Rate Schedule No. 1, under which it proposes

to make sales of electric capacity and energy to wholesale customers at

market-based rates, as well as sales of certain ancillary services at

market-based rates.

Applicant further requests that the Commission: (1) Accept the rate

schedule for filing, (2) grant waivers of certain of the Commission's

Regulations, and (3) grant blanket authorizations of certain other

actions under the Commission's Regulations.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

12. New York State Electric & Gas Corporation

[Docket No. ER00-442-000]

Take notice that on November 1, 1999, New York State Electric & Gas

Corporation (NYSEG), tendered for filing pursuant to Section 205 of the

Federal Power Act and Section 35.13 of the Federal Energy Regulatory

Commission's (FERC or Commission) Regulations, an amendment to Rate

Schedule 194 filed with FERC corresponding to an Agreement with the

Steuben Rural Electric Cooperative (the Cooperative). The proposed

amendment would increase revenues by $1,218.50 based on the twelve

month period ending December 31, 2000.

This rate filing is made pursuant to Article IV, Section B of the

February 26, 1999 Facilities Agreement between NYSEG and the

Cooperative, filed with FERC. The annual charges for routine operation

and maintenance and general expenses, as well as revenue and property

taxes are revised based on data taken from NYSEG's Annual Report to the

Federal Energy Regulatory Commission (FERC Form 1) for the twelve month

ended December 31, 1998. The revised facilities charge is levied on the

cost of the tap of NYSEG's South Addison to Presho 34.5 kV transmission

line. Such tap of NYSEG's transmission line connects to the

Cooperative's Sullivan Road Substation and is for the sole use of the

Cooperative.

NYSEG requests an effective date of January 1, 2000.

Copies of the filing were served upon the Steuben Rural Electric

Cooperative , Inc. and the Public Service Commission of the State of

New York.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

13. New York State Electric & Gas Corporation

[Docket No. ER00-441-000]

Take notice that on November 1, 1999, New York State Electric & Gas

Corporation (NYSEG), tendered for filing pursuant to Section 205 of the

Federal Power Act and Section 35.13 of the Federal Energy Regulatory

Commission's (FERC or Commission) Regulations, an amendment to Rate

Schedule 117 filed with FERC corresponding to an Agreement with the

Delaware County Electric Cooperative (the Cooperative). The proposed

amendment would increase revenues by $505.59 based on the twelve month

period ending December 31, 2000.

This rate filing is made pursuant to Section 1 (c) and Section 3

(a) through (c) of Article IV of the June 1, 1977 Facilities Agreement

between NYSEG and the Cooperative, filed with FERC. The annual charges

for routine operation and maintenance and general expenses, as well as

revenue and property taxes are revised based on data taken from NYSEG's

Annual Report to the Federal Energy Regulatory Commission (FERC Form 1)

for the twelve month ended December 31, 1998. The revised facilities

charge is levied on the cost of the 34.5 kV tie line from Taylor Road

to the Jefferson Substation, constructed by NYSEG for the sole use of

the Cooperative.

NYSEG requests an effective date of January 1, 2000.

Copies of the filing were served upon the Delaware County Electric

Cooperative , Inc. and the Public Service Commission of the State of

New York.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

14. New York State Electric & Gas Corporation

[Docket No. ER00-440-000]

Take notice that on November 1, 1999, New York State Electric & Gas

Corporation (NYSEG), tendered for filing pursuant to Section 205 of the

Federal Power Act and Section 35.13 of the Federal Energy Regulatory

Commission's (FERC or Commission) Regulations, an amendment to Rate

Schedule 72 filed with FERC corresponding to an Agreement with the

Municipal Board of the Village of Bath (the Village). The proposed

amendment would increase revenues by $681.80 based on the twelve month

period ending December 31, 2000.

This rate filing is made pursuant to Section 2 (a) through (c) of

Article IV of the December 1, 1977 Facilities Agreement between NYSEG

and the

[[Page 62190]]

Village, filed with FERC. The annual charges for routine operation and

maintenance and general expenses, as well as revenue and property taxes

are revised based on data taken from NYSEG's Annual Report to the

Federal Energy Regulatory Commission (FERC Form 1) for the twelve month

period ending December 31, 1998. The revised facilities charge is

levied on the cost of the tap facility constructed and owned by NYSEG

to connect its 34.5 kV transmission line located in the Village to the

Village's Fairview Drive Substation.

NYSEG requests an effective date of January 1, 2000.

Copies of the filing were served upon the Municipal Board of the

Village of Bath and the Public Service Commission of the State of New

York.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

15. Northern States Power Company (Minnesota) Northern States Power

Company (Wisconsin)

[Docket No. ER00-439-000]

Take notice that on October 28, 1999, Northern States Power Company

(Minnesota) and Northern States Power Company (Wisconsin) (jointly

NSP), tendered for filing a Firm Point-to-Point Transmission Service

Agreement between NSP and North Central Power Co., Inc.

NSP requests that the Commission accept the Agreements effective

November 1, 1999, and requests waiver of the Commission's notice

requirements in order for the agreements to be accepted for filing on

the date requested.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

16. Duke Energy Oakland LLC

[Docket No. ER00-437-000]

Take notice that on November 1, 1999, Duke Energy Oakland LLC,

tendered for filing revised tariff sheets in the above referenced

docket to restate schedules to its Must-Run Schedule.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

17. Duke Energy Moss Landing LLC

[Docket No. ER00-436-000]

Take notice that on November 1, 1999, Duke Energy Moss Landing LLC,

tendered for filing revised tariff sheets in the above referenced

docket to restate schedules to its Must-Run Schedule.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

18. Duke Energy South Bay LLC

[Docket No. ER00-435-000]

Take notice that on November 1, 1999, Duke Energy South Bay LLC,

tendered for filing revised tariff sheets in the above-referenced

docket to restate schedules to its Must-Run Schedule.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

19. CoEnergy Trading Company

[Docket No. ER00-434-000]

Take notice that on November 1, 1999, CoEnergy Trading Company (Co-

Energy), tendered for filing a Notice of Cancellation of CoEnergy's

Rate Schedule FERC No. 1, effective as of September 30, 1999.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

20. Entergy Services, Inc.

[Docket No. ER00-432-000]

Take notice that on November 1, 1999, Entergy Services, Inc., on

behalf of Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy

Louisiana, Inc., Entergy Mississippi, Inc., and Entergy New Orleans,

Inc. (together Entergy), tendered for filing an Amendment to the System

Agreement to include the cost of any sulfur dioxide emission allowances

used to generate energy exchanged among the Operating Companies.

Entergy has served a copy of this filing on its state and local

regulatory commissions.

Entergy requests an effective date of January 1, 2000, for the

Amendment, to coincide with the commencement of Phase II of the Title

IV (the acid rain control title) of the Clean Air Act Amendments.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

21. Illinova Power Marketing, Inc.

[Docket No. ER00-431-000]

Take notice that on November 1, 1999, Illinova Power Marketing,

Inc. tendered for filing an Electric Power Transaction Service

Agreements under which certain customers will take service pursuant to

IPMI's power sales tariff, Rate Schedule FERC No. 1.

IPMI has requested an effective date of October 1, 1999, for each

service agreement.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

22. Duke Energy Corporation

[Docket No. ER00-426-000]

Take notice that on November 1, 1999, Duke Energy Corporation

(Duke), tendered for filing a Service Agreement with TXU Energy Trading

Company, for Firm Transmission Service under Duke's Open Access

Transmission Tariff.

Duke requests that the proposed Service Agreement be permitted to

become effective September 20, 1999 or upon acceptance by the

Commission.

Duke states that this filing is in accordance with Part 35 of the

Commission's Regulations and a copy has been served on the North

Carolina Utilities Commission.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

23. Montana Power Company

[Docket No. ER00-425-000]

Take notice that on November 1, 1999, The Montana Power Company

(Montana), tendered for filing with the Federal Energy Regulatory

Commission pursuant to 18 CFR 35.13 an unexecuted Firm Point-To-Point

Transmission Service Agreement and executed Non-Firm Point-to-Point

Service Agreement with PacifiCorp Power Marketing, Inc. under Montana's

FERC Electric Tariff, Fourth Revised Volume No. 5 (Open Access

Transmission Tariff).

A copy of the filing was served upon PacifiCorp Power Marketing,

Inc.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

24. Northern States Power Company (Minnesota), Northern States

Power Company (Wisconsin)

[Docket No. ER00-422-000]

Take notice that on November 1, 1999, Northern States Power Company

(Minnesota) and Northern States Power Company (Wisconsin) jointly

tendered for filing the existing Exhibit VII and revised Exhibits VIII

and IX to the Agreement to Coordinate Planning and Operations and

Interchange Power and Energy Between Northern States Power Company

(Minnesota) and Northern States Power Company (Wisconsin) (Interchange

Agreement). The Interchange Agreement is NSP (Minnesota) FERC Rate

Schedule No. 437 and NSP (Wisconsin) FERC Rate Schedule No. 73.

The NSP Companies request an effective date of January 1, 2000, 60-

days after filing, without suspension.

Copies of the filing letter and Exhibits VII, VIII and IX have been

served upon the State Commissions of Michigan,

[[Page 62191]]

Minnesota, North Dakota, South Dakota and Wisconsin.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

25. MidAmerican Energy Company

[Docket No. ER00-421-000]

Take notice that on November 1, 1999, MidAmerican Energy Company

tendered for filing a proposed change in its Rate Schedule for Power

Sales, FERC Electric Rate Schedule, Original Volume No. 5. The proposed

change consists of certain reused tariff sheets consistent with the

quarterly filing requirement.

MidAmerican states that it is submitting these tariff sheets for

the purpose of complying with the requirements set forth in Southern

Company Services, Inc., 75 FERC para.61,130 (1996), relating to

quarterly filings by public utilities of summaries of short-term

market-based power transactions. The tariff sheets contain summaries of

such transactions under the Rate Schedule for Power Sales for the

applicable quarter.

MidAmerican proposes an effective date of the first day of the

applicable quarter for the rate schedule change. Accordingly,

MidAmerican requests a waiver of the 60-day notice requirement for this

filing. MidAmerican states that this date is consistent with the

requirements of the Southern Company Services, Inc., order and the

effective date authorized in Docket No. ER96-2459-000.

Copies of the filing were served upon MidAmerican's customers under

the Rate Schedule for Power Sales and the Iowa Utilities Board, the

Illinois Commerce Commission and the South Dakota Public Utilities

Commission.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

26. Pacific Gas and Electric Company

[Docket No. ER00-418-000]

Take notice that on November 1, 1999, Pacific Gas and Electric

Company (PG&E) tendered for filing a request for termination of the

Power Sale Agreement between Pacific Gas and Electric Company and

Sacramento Municipal Utility District (SMUD), dated July 28, 1988,

initially accepted by the Commission on December 7, 1988 and designated

as PG&E Rate Schedule FERC No. 122. PG&E also tendered for filing a

request for termination of the Transmission Rate Schedule, dated

November 1, 1988, as accepted by the Commission on June 17, 1991 and

designated as PG&E Rate Schedule FERC No. 138.

Copies of this filing have been served upon SMUD and the California

Public Utilities Commission.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

27. Duke Energy Corporation

[Docket No. ER00-415-000]

Take notice that on November 1, 1999, Duke Energy Corporation

(Duke) tendered for filing a Service Agreement with TXU Energy Trading

Company for Non-Firm Transmission Service under Duke's Open Access

Transmission Tariff.

Duke requests that the proposed Service Agreement be permitted to

become effective on September 20, 1999 or upon acceptance by the

Commission.

Duke states that this filing is in accordance with Part 35 of the

Commission's Regulations and a copy has been served on the North

Carolina Utilities Commission.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

28. Montana Power Company

[Docket No. ER00-414-000]

Take notice that on November 1, 1999, The Montana Power Company

(Montana) tendered for filing with the Federal Energy Regulatory

Commission pursuant to 18 CFR 35.13 an unexecuted Network Integration

Transmission Service Agreement and Network Operating Agreement with

Smurfit-Stone Container Corporation under Montana's FERC Electric

Tariff, Fourth Revised Volume No. 5 (Open Access Transmission Tariff).

A copy of the filing was served upon Smurfit-Stone Container

Corporation.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

29. Northern States Power Company (Minnesota), Northern States

Power Company (Wisconsin)

[Docket No. ER00-413-000]

Take notice that on November 1, 1999, Northern States Power Company

(Minnesota) and Northern States Power Company (Wisconsin) (jointly NSP)

tendered for filing a Firm Point-to-Point Transmission Service

Agreement between NSP and Northwestern Wisconsin Electric Company.

NSP requests that the Commission accept the Agreements effective

November 1, 1999, and requests waiver of the Commission's notice

requirements in order for the agreements to be accepted for filing on

the date requested.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

30. ISO New England Inc.

[Docket No. ER00-395-000]

Take notice that on November 1, 1999, ISO New England Inc. (ISO)

tendered for filing proposed rates under Section 205 of the Federal

Power Act for its FERC Tariff for Transmission Dispatch and Power

Administration Services (the Tariff).

Pursuant to Section 35.13(a)(1) of the Commission's Regulations, 18

CFR 35.13(a)(1), the ISO seeks approval of the rates set forth in its

Tariff and accompanying rate schedules.

The ISO requests that these rates be allowed to go into effect on

January 1, 2000.

Copies of the filing were served upon all Participants in the New

England Power Pool (NEPOOL) and all non-Participant entities that are

customers under the NEPOOL Open Access Transmission Tariff, as well as

on the utility regulatory agencies of the six New England States.

Comment date: November 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

Standard Paragraph

E. Any person desiring to be heard or to protest such filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,

in accordance with Rules 211 and 214 of the Commission's Rules of

Practice and Procedure (18 CFR 385.211 and 385.214). All such motions

or protests should be filed on or before the comment date. Protests

will be considered by the Commission in determining the appropriate

action to be taken, but will not serve to make protestants parties to

the proceeding. Any person wishing to become a party must file a motion

to intervene. Copies of these filings are on file with the Commission

and are available for public inspection. This filing may also be viewed

on the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-

208-2222 for assistance).

David P. Boergers,

Secretary.

[FR Doc. 99-29835 Filed 11-15-99; 8:45 am]

BILLING CODE 6717-10-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.