Northeast Nuclear Energy Company, et al.; Millstone Nuclear Power Station, Unit No. 3 Environmental Assessment and Finding of No Significant Impact

Federal RegisterNov 5, 1999

Ask Donna

What actually matters in this document.

Text

NUCLEAR REGULATORY COMMISSION

Northeast Nuclear Energy Company, et al.; Millstone Nuclear Power

Station, Unit No. 3 Environmental Assessment and Finding of No

Significant Impact

[Docket No. 50-423]

The U.S. Nuclear Regulatory Commission (the Commission) is

considering issuance of an amendment to Facility Operating License No.

NPF-49, issued to Northeast Nuclear Energy Company (NNECO or the

licensee), for operation of the Millstone Nuclear Power Station, Unit

No. 3 (MP3), located in New London County, Connecticut.

Environmental Assessment

Identification of the Proposed Action:

The proposed action would correct existing editorial and

typographical errors in the Technical Specifications (TS). Each

proposed change has been verified to meet the intent of what was

originally proposed by NNECO and approved by the NRC in previously

processed amendments to the TS. These changes are purely administrative

and do not impact the operation of the facility. The proposed changes

are summarized below.

1. TS 3.8.3.2--Change 3.8.3.2.b.4.1 to 3.8.3.2.b.4.a.

2. TS 4.6.2.1.a.1 and TS 4.6.2.2.a--Add the word ``that'' after the

words ``flow path.''

3. TS 4.8.1.1.2.i--Change TS 4.8.1.1.2.i.1 to TS 4.8.1.1.2.i.

4. TS 4.9.12--Change TS 4.9.12 to TS 4.9.12.1.

The proposed action is in accordance with the licensee's

application for amendment dated August 5, 1999.

The Need for the Proposed Action

Changes to TS 3.8.3.2 and TS 4.9.12 are needed to correct

sequential numbering in the TS. Changes to TS

[[Page 60464]]

4.6.2.1.a.1 and TS 4.6.2.2.a are needed to address a TS modification

that was previously approved by the NRC in Amendment 50. The word

``that'' was inadvertently omitted from these TS Sections when

Amendments 100 and 122 were approved. The change to TS 4.9.12 is needed

to clarify that there is only one surveillance requirement in this

paragraph.

Environmental Impacts of the Proposed Action

The Commission has completed its evaluation of the proposed action

and concludes that the modifications to the TS are administrative in

nature.

The proposed action will not increase the probability or

consequences of accidents, no changes are being made in the types of

any effluents that may be released off site, and there is no

significant increase in occupational or public radiation exposure.

Therefore, there are no significant radiological environmental impacts

associated with the proposed action.

With regard to potential non-radiological impacts, the proposed

action does not involve any historic sites. It does not affect non-

radiological plant effluents and has no other environmental impact.

Therefore, there are no significant non-radiological environmental

impacts associated with the proposed action.

Accordingly, the Commission concludes that there are no significant

environmental impacts associated with the proposed action.

Alternatives to the Proposed Action

As an alternative to the proposed action, the staff considered

denial of the proposed action (i.e., the ``no-action'' alternative).

Denial of the application would result in no change in current

environmental impacts. The environmental impacts of the proposed action

and the alternative action are similar.

Alternative Use of Resources

This action does not involve the use of any resources not

previously considered in the ``Final Environmental Statement Related to

the Operation of Millstone Nuclear Power Station, Unit No. 3,'' dated

December 1984 (NUREG-1064).

Agencies and Persons Consulted

In accordance with its stated policy, on August 19, 1999, the staff

consulted with the Connecticut State official, Mr. Denny Galloway of

the Department of Environmental Protection, regarding the environmental

impact of the proposed action. The State official had no comments.

Finding of No Significant Impact

On the basis of the environmental assessment, the Commission

concludes that the proposed action will not have a significant effect

on the quality of the human environment. Accordingly, the Commission

has determined not to prepare an environmental impact statement for the

proposed action.

For further details with respect to the proposed action, see the

licensee's letter dated August 5, 1999, which is available for public

inspection at the Commission's Public Document Room, The Gelman

Building, 2120 L Street, NW., Washington, DC, and at the local public

document rooms located at the Learning Resources Center, Three Rivers

Community-Technical College, 574 New London Turnpike, Norwich,

Connecticut, and the Waterford Library, 49 Rope Ferry Road, Waterford,

Connecticut.

Dated at Rockville, Maryland, this 1st day of November 1999.

For the Nuclear Regulatory Commission.

John A. Nakoski, Sr.

Project Manager, Section 2, Project Directorate I, Division of

Licensing Project Management, Office of Nuclear Reactor Regulation.

[FR Doc. 99-29050 Filed 11-4-99; 8:45 am]

BILLING CODE 7590-01-U

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.