Environmental Impact Statements and Regulations; Availability of EPA Comments
Federal RegisterOct 8, 1999
Ask Donna
What actually matters in this document.
Text
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6246-9]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared September 20, 1999 Through
September 24, 1999 pursuant to the Environmental Review Process (ERP),
under section 309 of the Clean Air Act and section 102(2)(c) of the
National Environmental Policy Act as amended. Requests for copies of
EPA comments can be directed to the Office of Federal Activities at
(202) 564-7167. An explanation of the ratings assigned to draft
environmental impact statements (EISs) was published in FR dated April
10, 1999 (63 FR 17856).
Draft EISs
ERP No. D-AFS-J65311-MT Rating EC2, Good Creek Resource Management
Project, Implementation, Vegetation Treatments and Other Activities to
Restore Watershed, Flathead National Forest, Tally Lake Ranger
District, Flathead County, MT.
Summary: EPA expressed environmental concerns regarding increased
water yield, channel erosion, and water quality impacts. EPA
recommended that the Forest Service pick and chose and combine
treatment methods and units from among alternatives to create a new
modified preferred alternative to better optimize and balance resource
and environmental trade offs. EPA requested additional information to
help assess and mitigate potential impacts of the management actions.
ERP No. D-COE-E39050-FL Rating EC2, Herbert Hoover Dike Major
Rehabilitation Evaluation Study, Improvements to the Breach of Reach
One, Lake Okeechobee, FL.
Summary: EPA expressed concern regarding impacts to recreation/
infrastructure features, erosion control and loss of project
effectiveness during heavy rain/or backpumping. EPA requested that
these issues be addressed in the final document.
ERP No. D-FHW-E40779-NC Rating EO2, Fayetteville Outer Loop
Corridor Study, Transportation Improvement Program (TIP) Cape Fear
River, Cumberland, Hoke and Robeson Counties, NC.
Summary: EPA expressed objections due to substantial impacts to
water/wetland resources and social impacts (relocations, noise and
community disruption). EPA is requesting further analysis of secondary
project impacts, reconsideration of each interchange location and is
requesting additional data on potential impacts to minority and low
income neighborhood.
ERP No. DR-BIA-K61146-CA Rating EC2, Programmatic--Cabazon Resource
Recovery Park Section 6 General Plan, Cabazon Indian Reservation,
Implementation, Approval of Master Lease and NPDES Permit, the City of
Mecca, Riverside County, CA.
Summary: EPA expressed environmental concerns regarding potential
cumulative impacts associated with component facilities at the resource
recovery park that may contaminate groundwater, emit hazardous air
pollutants and/or generate hazardous waste. EPA requested a clear
commitment that future site-specific facilities and projects raising
these concerns are subject to subsequent environmental documentation
under the National Environmental Policy Act.
ERP No. DS-IBR-K39045-CA Rating LO, Programmatic EIS--Central
Valley Project Improvement Act (CVPIA) of 1992 Implementation,
Additional Information for the Project Simulation Model (PROSIM)
Hydrology, Central Valley, Trinity Contra Costa, Alamenda, Santa Clara
and San Benito Counties, CA.
Summary: Because of the limited scope of the Supplemental DPEIS and
the good description of implications of the revised PROSIM analysis, we
have
[[Page 54883]]
not identified any potential environmental impacts and have no
objections to the revised PROSIM analysis. This lack of objections does
not extend to the Environmental Concerns expressed on the broader DPEIS
CVPIA which evaluated potential effects of various CVPIA Alternatives.
Final EISs
ERP No. F-BLM-J65298-CO Yankee Gulch Sodium Minerals Project, To
Produce Sodium Products, Piceance Basin, Right-of-Way Permit and COE
Section 404 Permit, Rio Blanch County, CO.
Summary: EPA continues to express concern regarding the need to
protect ground water from spills and to ensure adequate reclamation
bonding coverage.
ERP No. F-COE-K67041-CA Morrison Creek Mining Reach Downstream
(South) of Jackson Highway, Mining and Reclamation Project, COE Section
404 Permit Issuance, Sacramento County, CA.
Summary: EPA continues to object to the preferred alternative since
it has not been demonstrated that the preferred alternative is the
least damaging practicable alternative. EPA believes that other
alternatives would have fewer impacts on waters of the United States
ERP No. F-GSA-E11044-TN Volunteer Army Ammunition Plant, Disposal
and Transfer Ownership of Property to Other Federal Agencies and
Private Entities, City of Chattanooga's, Hamilton County, TN.
Summary: EPA continues to be concerned that all environmental
impacts were not fully addressed. To this end, EPA looks forward to
working with GSA in the future to help identify project-specific
impacts and the avoidance, minimization and mitigation during the
scoping and NEPA review process.
ERP No. F-NPS-A61319-00 Oregon, California, Mormon Pioneer and Pony
Express National Historic Trails, Implementation, Comprehensive
Management and Use Plan, OR, CA, MO, IA, IL, KS, NB, CO, WY, ID, WA, UT
and NV.
Summary: EPA supports the preferred alternative.
Dated: October 5, 1999.
William D. Dickerson,
Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 99-26411 Filed 10-7-99; 8:45 am]
BILLING CODE 6560-50-U
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.