Airworthiness Directives; Boeing Model 747 Series Airplanes
Federal RegisterOct 1, 1999
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 99-NM-22-AD]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 747 Series Airplanes
AGENCY: Federal Aviation Administration, DOT.
ACTION: Notice of proposed rulemaking (NPRM).
-----------------------------------------------------------------------
SUMMARY: This document proposes the adoption of a new airworthiness
directive (AD) that is applicable to certain Boeing Model 747 series
airplanes. This proposal would require repetitive inspections to detect
discrepancies of the cables, fittings, and pulleys of the engine thrust
control cable installation, and replacement, if necessary. This
proposal would also require certain preventative actions on the engine
thrust control cable installation for certain airplanes. This proposal
is prompted by reports of failure of engine thrust control cables. The
actions specified by the proposed AD are intended to prevent such
failures, which could result in a severe asymmetric thrust condition
during landing, and consequent reduced controllability of the airplane.
DATES: Comments must be received by November 15, 1999.
ADDRESSES: Submit comments in triplicate to the Federal Aviation
Administration (FAA), Transport Airplane Directorate, ANM-114,
Attention: Rules Docket No. 99-NM-22-AD, 1601 Lind Avenue, SW., Renton,
Washington 98055-4056. Comments may be inspected at this location
between 9:00 a.m. and 3:00
[[Page 53276]]
p.m., Monday through Friday, except Federal holidays.
The service information referenced in the proposed rule may be
obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle,
Washington 98124-2207. This information may be examined at the FAA,
Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton,
Washington.
FOR FURTHER INFORMATION CONTACT: Dionne M. Stanley, Aerospace Engineer,
Propulsion Branch, ANM-140S, FAA, Transport Airplane Directorate,
Seattle Aircraft Certification Office, 1601 Lind Avenue, SW., Renton,
Washington 98055-4056; telephone (425) 227-2250; fax (425) 227-1181.
SUPPLEMENTARY INFORMATION:
Comments Invited
Interested persons are invited to participate in the making of the
proposed rule by submitting such written data, views, or arguments as
they may desire. Communications shall identify the Rules Docket number
and be submitted in triplicate to the address specified above. All
communications received on or before the closing date for comments,
specified above, will be considered before taking action on the
proposed rule. The proposals contained in this notice may be changed in
light of the comments received.
Comments are specifically invited on the overall regulatory,
economic, environmental, and energy aspects of the proposed rule. All
comments submitted will be available, both before and after the closing
date for comments, in the Rules Docket for examination by interested
persons. A report summarizing each FAA-public contact concerned with
the substance of this proposal will be filed in the Rules Docket.
Commenters wishing the FAA to acknowledge receipt of their comments
submitted in response to this notice must submit a self-addressed,
stamped postcard on which the following statement is made: ``Comments
to Docket Number 99-NM-22-AD.'' The postcard will be date stamped and
returned to the commenter.
Availability of NPRMs
Any person may obtain a copy of this NPRM by submitting a request
to the FAA, Transport Airplane Directorate, ANM-114, Attention: Rules
Docket No. 99-NM-22-AD, 1601 Lind Avenue, SW., Renton, Washington
98055-4056.
Discussion
In 1985, the FAA received a report indicating that an engine thrust
control cable had failed following application of reverse thrust during
landing on a Boeing Model 747-200B series airplane. This failure caused
engine number 1 to advance to full forward thrust while engine numbers
2, 3, and 4 remained in full reverse thrust. The airplane exited the
runway and eventually slid to a stop with consequent hull damage.
In addition, engine thrust control cables have failed on other
Boeing airplane models that have installations similar to those on the
Model 747 series airplane. In 1992, the FAA received a report of
uncommanded thrust increase of the right engine on a Model 767-200
series airplane during engine start. The FAA recently received two
reports of uncommanded throttle lever movement on Model 757-200 series
airplanes. In all of these events, subsequent investigation revealed
that the engine thrust control cable had severed. Such failure of a
thrust control cable could result in a severe asymmetric thrust
condition during landing, and consequent reduced controllability of the
airplane.
Other Relevant Rulemaking
As a result of the 1985 event and other problems associated with
the engine thrust control cable installation, the following AD's were
issued to address design deficiencies on Model 747 series airplanes
that could potentially result in an engine thrust control cable
failure:
AD 85-25-55, amendment 39-5326 (51 FR 20250, June 4,
1986);
AD 86-10-10, amendment 39-5318 (51 FR 18571, May 21,
1986);
AD 89-08-09, amendment 39-6188 (54 FR 14643, April 12,
1989);
AD 89-19-07, amendment 39-6322 (54 FR 38210, September 15,
1989); and
AD 93-17-06, amendment 39-8677 (58 FR 45831, August 31,
1993).
In addition, the FAA has issued two NPRM's to address this
condition on other Boeing airplane models that have an engine thrust
control cable installation similar to the Model 747 series airplane:
NPRM 98-NM-323-AD (64 FR 7822, February 17, 1999), which
applies to certain Model 757-200 series airplanes; and
NPRM 98-NM-363-AD (64 FR 18386, April 14, 1999), which
applies to certain Model 767 series airplanes.
Explanation of Relevant Service Information
The FAA has reviewed and approved the following service bulletins:
Boeing Service Bulletin 747-76-2019, dated June 9, 1971,
describes procedures for modification of the strut bulkhead assembly to
enlarge the holes through which the engine thrust control cables pass.
Boeing Service Bulletin 747-76-2067, Revision 1, dated
November 19, 1987, describes procedures for a one-time inspection of
the nacelle strut idler pulleys to determine the type of pulleys
installed, and replacement of any aluminum-type pulleys with phenolic-
type pulleys. The service bulletin also describes procedures for a
detailed inspection to detect wear of the engine thrust control cables
in any area where aluminum-type pulleys are installed, and replacement
of the cables, if necessary.
Boeing Service Bulletin 747-76A2068, Revision 3, dated
August 22, 1991; including Notice of Status Change 747-76A2068 NSC 2,
dated December 12, 1991; describes procedures for repetitive
inspections of aluminum pulley bracket assemblies and adjacent support
structure to detect cracking, and replacement of damaged parts, if
necessary. The service bulletin also describes procedures for
replacement of aluminum idler pulley brackets with steel brackets. Such
replacement would eliminate the need for the repetitive inspections.
Boeing Alert Service Bulletin 747-76A2073, Revision 1,
dated July 28, 1988, describes procedures for a detailed inspection of
the engine thrust control cables and pulley mounting bracket screws in
the area aft and above main entry door number 2 on the left and right
sides of the airplane to detect wear, and replacement of the cable, if
necessary. The alert service bulletin also describes procedures for a
modification of the pulley mounting bracket.
Boeing Service Bulletin 747-53-2327, Revision 2, dated
September 24, 1998, describes procedures for repetitive inspections of
certain upper deck floor beams to detect cracking, and repair of any
cracks found or reinforcement of those floor beams. The service
bulletin also describes procedures for a detailed inspection to measure
the clearance between the engine thrust control cables and the cable
penetration holes in that area, and modification of the holes or
replacement of the plate, if necessary.
Accomplishment of the actions specified in the service bulletins
described previously, and the repetitive inspections specified in this
proposed AD, is intended to adequately address the identified unsafe
condition.
Explanation of Requirements of Proposed Rule
Since an unsafe condition has been identified that is likely to
exist or develop on other products of this same type design, the
proposed AD would
[[Page 53277]]
require repetitive inspections to detect discrepancies of the cables,
fittings, and pulleys, and replacement of discrepant parts. This
proposal would also require certain preventative actions on the engine
thrust control cable installation for certain airplanes. The actions
would be required to be accomplished in accordance with the procedure
included in Appendix 1. of this proposed AD, the airplane maintenance
manual, and the service bulletins described previously, except as
discussed below.
Differences Between Proposed Rule and Service Bulletins
Operators should note that this proposed AD would require all of
the specified actions to be accomplished within 18 months after the
effective date of this AD. The service bulletins recommend that these
actions should be accomplished at various times, mostly ``at the
earliest opportunity where manpower and facilities are available.'' In
developing an appropriate compliance time for the proposed actions, the
FAA considered not only the degree of urgency associated with
addressing the subject unsafe condition, but also the number of
proposed requirements and the availability of required parts. The FAA
has determined that 18 months represents an appropriate interval of
time allowable wherein all of these actions can be accomplished during
scheduled airplane maintenance and an ample number of required parts
will be available for modification of the U.S. fleet within the
proposed compliance period. The FAA also finds that such a compliance
time will not adversely affect the safety of the affected airplanes.
Operators should note that Boeing Service Bulletin 747-76-2067
specifies that the inspection to detect wear of the control cables
described by that service bulletin may be accomplished in accordance
with an ``operator's comparable procedure.'' However, this proposed AD
specifies that the inspection be accomplished in accordance with the
procedures specified in Chapter 20-21-03 of the Boeing 747 Maintenance
Manual. An ``operator's comparable procedure'' may be used only if
approved as an alternative method of compliance in accordance with
paragraph (h) of this AD.
Operators also should note that Boeing Service Bulletin 747-76-2067
applies to certain Model 747 series airplanes equipped with Pratt &
Whitney Model JT9D-70A engines or General Electric Model CF6 series
engines. However, paragraph (c) of this proposed AD would apply only to
Model 747 series airplanes equipped with General Electric Model CF6
series engines identified in the service bulletin. The engine thrust
control cable installation is different on Model 747 series airplanes
equipped with Pratt & Whitney Model JT9D-70A engines, and the unsafe
condition discussed previously does not exist on those airplanes.
Boeing Service Bulletin 747-76A2068 describes procedures for
repetitive inspections of aluminum pulley bracket assemblies and
adjacent support structure to detect cracking, and replacement of
damaged parts, if necessary, as well as procedures for replacement of
aluminum idler pulley brackets with steel brackets. This proposed AD
would require only the replacement of aluminum idler pulley brackets
with steel brackets. Mandating this terminating action is based on the
FAA's determination that, in this case, long-term continued operational
safety would be better assured by a modification to remove the source
of the problem, rather than by repetitive inspections.
Although Boeing Alert Service Bulletin 747-76A2073 describes
procedures for a detailed inspection of the engine thrust control
cables and pulley mounting bracket screw in the area aft and above main
entry door number 2 on the left and right sides of the airplane to
detect wear, this AD proposes only to mandate the detailed inspection
of the engine thrust control cables in that area, and replacement of
the cable, if necessary; and the modification of the pulley mounting
bracket. The alert service bulletin also provides the option to modify
the bracket within 750 hours of the detailed inspection whereas this AD
would require both actions to be accomplished at the same time.
Operators also should note that, although Boeing Service Bulletin
747-53-2327 also describes procedures for inspection of certain upper
deck floor beams, and repair of any cracks found or reinforcement of
those floor beams, as applicable, this AD proposes to mandate only the
detailed inspection to measure the clearance between the engine thrust
control cables and the cable penetration holes in that area. The
inspection, repair, and reinforcement of certain upper deck floor beams
are mandated by AD 92-24-07, amendment 39-8412 (57 FR 53436, November
10, 1992). The detailed inspection to measure the clearance between the
engine thrust control cables and the cable penetration holes was
incorporated into the service bulletin after AD 92-24-07 was issued.
Therefore, the FAA is proposing to mandate that part of the service
bulletin in this AD. In addition, for airplanes on which insufficient
clearance is measured, the proposed AD adds an additional inspection of
the cable for wear in that area, and would require replacement of the
cable, if necessary.
Cost Impact
There are approximately 624 airplanes of the affected design in the
worldwide fleet. The FAA estimates that 182 airplanes of U.S. registry
would be affected by this proposed AD.
It would take approximately 3 work hours per airplane to accomplish
the proposed inspection to verify the engine thrust control cable
integrity, at an average labor rate of $60 per work hour. Based on
these figures, the cost impact of this proposed inspection on U.S.
operators is estimated to be $32,760, or $180 per airplane, per
inspection cycle.
For airplanes identified in Boeing Service Bulletin 747-76-2019 (30
U.S.-registered airplanes), it would take approximately 4 work hours
per airplane to accomplish the proposed modification, at an average
labor rate of $60 per work hour. No parts are required. Based on these
figures, the cost impact of this proposed modification on U.S.
operators is estimated to be $7,200, or $240 per airplane.
For airplanes identified in Boeing Service Bulletin 747-76-2067,
Revision 1 (12 U.S.-registered airplanes), it would take approximately
6 work hours per airplane to accomplish the proposed inspection of the
nacelle strut idler pulleys, at an average labor rate of $60 per work
hour. Based on these figures, the cost impact of this proposed one-time
inspection on U.S. operators is estimated to be $4,320, or $360 per
airplane.
For airplanes identified in Boeing Service Bulletin 747-76A2068,
Revision 3 (4 U.S.-registered airplanes), it would take approximately
16 work hours per airplane to accomplish the proposed replacement, at
an average labor rate of $60 per work hour.
Required parts would cost approximately $2,000 per airplane. Based
on these figures, the cost impact of this proposed replacement on U.S.
operators is estimated to be $11,840, or $2,960 per airplane.
For airplanes identified in Boeing Alert Service Bulletin 747-
76A2073, Revision 1 (12 U.S.-registered airplanes), it would take
approximately 4 work hours per airplane to accomplish the proposed
action, at an average labor rate of $60 per work hour. The cost of
required parts would be minimal. Based
[[Page 53278]]
on these figures, the cost impact of this proposed action on U.S.
operators is estimated to be $2,880, or $240 per airplane.
Currently, there are no airplanes identified in Boeing Service
Bulletin 747-53-2327, Revision 2, and subject to this AD, on the U.S.
Register. However, should an affected airplane be imported and placed
on the U.S. Register in the future, it would require approximately 1
work hour to accomplish this proposed inspection, at an average labor
rate of $60 per work hour. Based on these figures, the cost impact of
this one-time inspection would be $60 per airplane.
The cost impact figures discussed above are based on assumptions
that no operator has yet accomplished any of the proposed requirements
of this AD action, and that no operator would accomplish those actions
in the future if this AD were not adopted.
Regulatory Impact
The regulations proposed herein would not have substantial direct
effects on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, in
accordance with Executive Order 12612, it is determined that this
proposal would not have sufficient federalism implications to warrant
the preparation of a Federalism Assessment.
For the reasons discussed above, I certify that this proposed
regulation (1) is not a ``significant regulatory action'' under
Executive Order 12866; (2) is not a ``significant rule'' under the DOT
Regulatory Policies and Procedures (44 FR 11034, February 26, 1979);
and (3) if promulgated, will not have a significant economic impact,
positive or negative, on a substantial number of small entities under
the criteria of the Regulatory Flexibility Act. A copy of the draft
regulatory evaluation prepared for this action is contained in the
Rules Docket. A copy of it may be obtained by contacting the Rules
Docket at the location provided under the caption ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Safety.
The Proposed Amendment
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration proposes to amend
part 39 of the Federal Aviation Regulations (14 CFR part 39) as
follows:
PART 39--AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
2. Section 39.13 is amended by adding the following new
airworthiness directive:
Boeing: Docket 99-NM-22-AD.
Applicability: Model 747-100, -100B, -100B SUD, -200B, -200C, -
200F, -300, SR, and SP series airplanes; certificated in any
category; equipped with Pratt & Whitney Model JT9D-3 or -7 series
engines, General Electric Model CF6-45 or -50 series engines, or
Rolls-Royce Model RB211-524B, C, or D series engines.
Note 1: This AD applies to each airplane identified in the
preceding applicability provision, regardless of whether it has been
modified, altered, or repaired in the area subject to the
requirements of this AD. For airplanes that have been modified,
altered, or repaired so that the performance of the requirements of
this AD is affected, the owner/operator must request approval for an
alternative method of compliance in accordance with paragraph (h) of
this AD. The request should include an assessment of the effect of
the modification, alteration, or repair on the unsafe condition
addressed by this AD; and, if the unsafe condition has not been
eliminated, the request should include specific proposed actions to
address it.
Compliance: Required as indicated, unless accomplished
previously.
To prevent engine thrust control cable failures, which could
result in a severe asymmetric thrust condition during landing, and
consequent reduced controllability of the airplane, accomplish the
following:
Note 2: For the purposes of this AD, a detailed inspection is
defined as: ``An intensive visual examination of a specific
structural area, system, installation, or assembly to detect damage,
failure, or irregularity. Available lighting is normally
supplemented with a direct source of good lighting at intensity
deemed appropriate by the inspector. Inspection aids such as mirror,
magnifying lenses, etc., may be used. Surface cleaning and elaborate
access procedures may be required.''
Repetitive Inspections
(a) For all airplanes: Within 18 months after the effective date
of this AD, accomplish the ``Thrust Control Cable Inspection
Procedure'' specified in Appendix 1. (including Figure 1) of this AD
to verify the integrity of the engine thrust control cables. Prior
to further flight, replace any discrepant component found, in
accordance with the procedures described in the Boeing 747
Maintenance Manual. Repeat the detailed inspection thereafter at
intervals not to exceed 18 months.
Modification
(b) For airplanes identified in Boeing Service Bulletin 747-76-
2019, dated June 9, 1971: Within 18 months after the effective date
of this AD, modify the strut bulkhead assembly to enlarge the holes
(2 places in each strut) through which the engine thrust control
cables pass, in accordance with the service bulletin.
Inspection/Replacement
(c) For airplanes equipped with General Electric Model CF6
series engines and identified in Boeing Service Bulletin 747-76-
2067, Revision 1, dated November 19, 1987: Within 18 months after
the effective date of this AD, perform a one-time inspection of each
nacelle strut idler pulley to determine the type of pulley
installed, in accordance with the service bulletin.
Note 3: This paragraph does not apply to airplanes equipped with
Pratt & Whitney Model JT9D-70 engines.
(1) If no aluminum-type pulley is installed, no further action
is required by this paragraph.
(2) If any aluminum-type pulley is installed, prior to further
flight, accomplish paragraphs (c)(2)(i) and (c)(2)(ii) of this AD in
accordance with the service bulletin.
(i) Replace any aluminum-type pulley with a phenolic-type pulley
having Boeing part number BACP30F4.
(ii) Except as provided by paragraph (d) of this AD: Perform a
detailed inspection of the engine thrust control cables in any area
where an aluminum-type pulley was installed, to detect wear. If any
wear outside the criteria contained in Chapter 20-21-03 of the
Boeing 747 Maintenance Manual is found, prior to further flight,
replace the cable with a new cable, in accordance with the service
bulletin. If any wear within the criteria contained in the
maintenance manual is found, no further action is required by this
paragraph.
Note 4: Accomplishment of the actions specified in Boeing
Service Bulletin 747-76-2067, dated September 26, 1986, is
acceptable for compliance with the actions required by paragraph (c)
of this AD.
(d) Where Boeing Service Bulletin 747-76-2067, Revision 1, dated
November 19, 1987, specifies that the actions required by paragraph
(c)(2)(ii) of this AD may be accomplished in accordance with an
``operator's comparable procedure,'' the actions must be
accomplished in accordance with the applicable chapters of the
Boeing 747 Maintenance Manual, as specified in the service bulletin.
Replacement
(e) For airplanes identified in Boeing Service Bulletin 747-
76A2068, Revision 3, dated August 22, 1991; including Notice of
Status Change 747-76A2068 NSC 2, dated December 12, 1991: Within 18
months after the effective date of this AD, replace aluminum idler
pulley brackets with steel brackets, in accordance with paragraphs
E., F., G., and H. of the Accomplishment Instructions of the service
bulletin.
Inspection/Modification
(f) For airplanes identified in Boeing Alert Service Bulletin
747-76A2073, Revision 1, dated July 28, 1988: Within 18 months after
the effective date of this AD, accomplish
[[Page 53279]]
paragraphs (f)(1) and (f)(2) of this AD, in accordance with the
alert service bulletin.
(1) Perform a detailed inspection of the engine thrust control
cables and pulley mounting bracket screws in the area aft and above
main entry door number 2 on the left and right sides of the airplane
to detect damage. If any damage is found, prior to further flight,
replace the cable with a new cable.
(2) Modify the pulley mounting bracket.
Note 5: Accomplishment of the actions specified in Boeing Alert
Service Bulletin 747-76A2073, dated February 4, 1988, is acceptable
for compliance with the actions required by paragraph (f) of this
AD.
Inspection/Modification/Replacement
(g) For Model 747-100B SUD series airplanes identified in Boeing
Service Bulletin 747-53-2327, Revision 2, dated September 24, 1998,
with angle assemblies having Boeing part numbers 015U0454-63 and
015U0454-64 installed at body station 970: Within 18 months after
the effective date of this AD, perform a detailed inspection to
measure the clearance between the engine thrust control cables and
the cable penetration holes, in accordance with the Cable Chafing
Inspection of the Accomplishment Instructions of the service
bulletin. If insufficient clearance exists, as specified in the
service bulletin, prior to further flight, accomplish paragraphs
(g)(1) and (g)(2) of this AD.
(1) Modify the cable penetration holes or replace the plate, as
applicable, in accordance with Figure 7 of the service bulletin.
(2) Perform a detailed inspection of the engine thrust control
cables in any area of the plate to detect wear, in accordance with
Chapter 20-21-03 of the Boeing 747 Maintenance Manual. If any wear
outside the criteria contained in the maintenance manual is found,
prior to further flight, replace the cable with a new cable, in
accordance with the procedures described in the Boeing 747
Maintenance Manual. If any wear within the criteria contained in the
maintenance manual is found, no further action is required by this
paragraph.
Alternative Methods of Compliance
(h) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, Seattle Aircraft Certification
Office (ACO), FAA, Transport Airplane Directorate. Operators shall
submit their requests through an appropriate FAA Principal
Maintenance Inspector, who may add comments and then send it to the
Manager, Seattle ACO.
Note 6: Information concerning the existence of approved
alternative methods of compliance with this AD, if any, may be
obtained from the Seattle ACO.
Special Flight Permits
(i) Special flight permits may be issued in accordance with
sections 21.197 and 21.199 of the Federal Aviation Regulations (14
CFR 21.197 and 21.199) to operate the airplane to a location where
the requirements of this AD can be accomplished.
Appendix 1. Thrust Control Cable Inspection Procedure
1. General
A. Clean the cables, if necessary, for the inspection, in
accordance with Boeing 747 Maintenance Manual 12-21-05.
B. Use these procedures to verify the integrity of the thrust
control cable system. The procedures must be performed along the
entire cable run for each engine. To ensure verification of the
portions of the cables which are in contact with pulleys and
quadrants, the thrust control must be moved by operation of the
thrust and/or the reverse thrust levers to expose those portions of
the cables.
C. The first task is an inspection of the control cable wire
rope. The second task is an inspection of the control cable
fittings. The third task is an inspection of the pulleys.
Note: These three tasks may be performed concurrently at one
location of the cable system on the airplane, if desired, for
convenience.
2. Inspection of the Control Cable Wire Rope
A. Perform a detailed inspection to ensure that the cable does
not contact parts other than pulleys, quadrants, cable seals, or
grommets installed to control the cable routing. Look for evidence
of contact with other parts. Correct the condition if evidence of
contact is found.
B. Perform a detailed inspection of the cable runs to detect
incorrect routing, kinks in the wire rope, or other damage. Replace
the cable assembly if:
(1) One cable strand had worn wires where one wire cross section
is decreased by more than 40 percent (see Figure 1),
(2) A kink is found, or
(3) Corrosion is found.
C. Perform a detailed inspection of the cable: To check for
broken wires, rub a cloth along the length of the cable. The cloth
catches on broken wires.
(1) Replace the 7x7 cable assembly if there are two or more
broken wires in 12 continuous inches of cable or there are three or
more broken wires anywhere in the total cable assembly.
(2) Replace the 7x19 cable assembly if there are four or more
broken wires in 12 continuous inches of cable or there are six or
more broken wires anywhere in the total cable assembly.
3. Inspection of the Control Cable Fittings
A. Perform a detailed inspection to ensure that the means of
locking the joints are intact (wire locking, cotter pins, turnbuckle
clips, etc.). Install any missing parts.
B. Perform a detailed inspection of the swaged portions of
swaged end fitting to detect surface cracks or corrosion. Replace
the cable assembly if cracks or corrosion are found.
C. Perform a detailed inspection of the unswaged portion of the
end fitting. Replace the cable assembly if a crack is visible, if
corrosion is present, or if the end fitting is bent more than 2
degrees.
D. Perform a detailed inspection of the turnbuckle. Replace the
turnbuckle if a crack is visible or if corrosion is present.
4. Inspection of Pulleys
A. Perform a detailed inspection to ensure that pulleys are free
to rotate. Replace pulleys which are not free to rotate.
BILLING CODE 4910-13-U
[[Page 53280]]
[GRAPHIC] [TIFF OMITTED] TP01OC99.059
Issued in Renton, Washington, on September 27, 1999.
D.L. Riggin,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 99-25597 Filed 9-30-99; 8:45 am]
BILLING CODE 4910-13-C
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.