DEPARTMENT OF ENERGY

Western Area Power Administration

Resource Pool Size

AGENCY: Western Area Power Administration, DOE.

ACTION: Notice of public process on resource pool size and notice of

informal public information meetings.

-----------------------------------------------------------------------

SUMMARY: The Western Area Power Administration (Western) is seeking

public comment on the size of project-specific resource pools needed to

meet the fair share needs of Native American tribes in the marketing

areas served by the Central Valley Project, Washoe Project, and the

Salt Lake City Area Integrated Projects.

DATES: The consultation and comment period will end March 1, 1999. To

be assured of consideration, written comments must be received by the

end of the consultation and comment period.

Three informal public information meetings have been scheduled. The

first will be held on February 3, 1999, starting at 9 a.m. at Western's

Desert Southwest Regional Office, 615 South 43rd Avenue, Phoenix,

Arizona. The second will be held on February 5, 1999, starting at 9

a.m. at the Department of Energy's Training Center, 1401 Maxwell,

Kirtland Air Force Base NE., Albuquerque, New Mexico. The third will be

held on February 9, 1999, starting at 1:30 p.m. at Western's Sierra

Nevada Regional Office, 114 Parkshore Drive, Folsom, California. The

purpose of the informal meetings is to educate Native Americans on

Western's power allocation policies, including the resource pool that

will be the source of allocations of power to eligible Native American

tribes. Although the target audience for these workshops is Native

American tribes, these meetings are open to the public.

ADDRESSES: Written comments may be hand-delivered, mailed, emailed, or

faxed to Robert C. Fullerton, Project Manager, Corporate Services

Office, Western Area Power Administration, 1627 Cole Boulevard, P.O.

Box 3402, Golden, CO 80401-0098, telephone (303) 275-2700, fax (303)

275-1290, email: [email protected]. All documentation developed or

retained by Western during the course of this public process will be

available for inspection and copying at this address.

FOR FURTHER INFORMATION CONTACT: Robert C. Fullerton, Project Manager,

Corporate Services Office, Western Area Power Administration, 1627 Cole

Boulevard, P.O. Box 3402, Golden, CO 80401-0098, telephone (303) 275-

2700, email: [email protected].

Joel K. Bladow, Regional Manager, Rocky Mountain Region, Western

Area Power Administration, P.O. Box 3700, Loveland, CO 80539-3003,

telephone (970) 490-7201, email: [email protected].

J. Tyler Carlson, Regional Manager, Desert Southwest Region,

Western Area Power Administration, P.O. Box 6457,

[[Page 4647]]

Phoenix, AZ 85005-6457, telephone (602) 352-2453, email:

[email protected].

David Sabo, Customer Service Center Manager, Colorado River Storage

Project, Western Area Power Administration, P.O. Box 11606, Salt Lake

City, UT 84147-0606, telephone (801) 524-6372, email: [email protected].

Jerry W. Toenyes, Regional Manager, Sierra Nevada Region, Western

Area Power Administration, 114 Parkshore Drive, Folsom, CA 95630-4710,

telephone (916) 353-4418, email: [email protected].

Gerald C. Wegner, Regional Manager, Upper Great Plains Region,

Western Area Power Administration, P.O. Box 35800, Billings, MT 59107-

5800, telephone (406) 247-7405, email:[email protected].

SUPPLEMENTARY INFORMATION: Western's inquiry on the impact of electric

utility restructuring started pursuant to the publication of notice in

the Federal Register on December 1, 1998 (63 FR 66166). We sought input

on six questions to help in the consideration of the impact of electric

utility industry restructuring on the way that Western allocates power.

While the comment period for this inquiry closed on January 15, 1999, a

separate issue has been identified that must be addressed before

completion of pending marketing plans. That issue is the size of the

project-specific resource pools that are needed to meet the fair share

needs of Native American tribes. The resource pools are derived from

power that is not extended to existing long-term firm power customers.

Considerable attention was devoted to the resource pool issue

during the course of development of the Energy Planning and Management

Program (Program) (60 FR 54151). The Program, which was adopted on

October 20, 1995, established a framework for the project-specific

allocation of hydropower. Pursuant to the Program, Western signed

resource extension contracts with existing customers of the Pick-Sloan

Missouri Basin Program-Eastern Division and the Loveland Area Projects.

Resource pools of up to 6 percent of the marketable resource were set

aside to meet a fair share of the needs of new customers, including

Native American tribes, and other purposes as determined by Western.

Four percent of the marketable resource was initially made available,

and additional resource pool increments of up to 1 percent will be made

available 5 and 10 years into the 20-year contract term.

While the resource pools size for the Pick-Sloan Missouri Basin

Program-Eastern Division and the Loveland Area Projects has already

been determined, the Program anticipated that the resource pool size

for the Central Valley Project, Washoe Project, and Salt Lake City Area

Integrated Projects would be determined on a project-specific basis. In

February of 1997, Western proposed application of the Program to the

Salt Lake City Area Integrated Projects, and further proposed ``an

initial resource pool of up to 4 percent of available Federal resource

. . . for new customers to encourage customer development of new

technologies for conservation or renewable resources and for

contingencies.'' In that Federal Register notice, published on February

26, 1997 (62 FR 8709), Western also proposed potential reductions to

resource commitments 5 and 10 years into the contract term, for the

same purposes as the initial resource pool.

On that same day, Western announced its Proposed 2004 Power

Marketing Plan, which provided for marketing of power from Central

Valley Project and Washoe Project powerplants after the year 2004. In a

Federal Register notice published at 62 FR 8710, Western proposed a 4

percent initial resource pool for new allocations and an additional

incremental resource pool of up to 2 percent in the year 2014.

While there was considerable public comment on resource pool size

as a result of the publication of these two Federal Register notices in

February of 1997, there is a need to receive further public comment on

the fair share needs of eligible Native American tribes before the size

of project-specific resource pools can be decided and pending marketing

plans can be completed.

Under the Program, entities that desire to purchase power from

Western for resale to consumers, including municipalities,

cooperatives, public utility districts, and public power districts,

must have utility status. Native American tribes are not subject to

this requirement. Western has stated that we would consider

arrangements for the delivery of the benefits of cost-based Federal

power to Native American tribes without utility status.

Dated: January 22, 1999.

Michael S. Hacskaylo,

Adminstrator.

[FR Doc. 99-2178 Filed 1-28-99; 8:45 am]

BILLING CODE 6450-01-M

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Resource Pool Size · 64 FR 4646 | Frix