Approval and Promulgation of Implementation Plan; Illinois

Federal RegisterJul 14, 1999

Ask Donna

What actually matters in this document.

Text

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[IL186-1a; FRL-6374-1]

Approval and Promulgation of Implementation Plan; Illinois

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: On November 14, 1995, May 9, 1996, June 14, 1996, February 1,

1999, and May 19, 1999, the State of Illinois submitted State

Implementation Plan (SIP) revision requests to meet commitments related

to our conditional approval of Illinois' May 15, 1992, SIP submittal

for the Lake Calumet (Southeast Chicago), McCook, and Granite City,

Illinois, Particulate Matter (PM) nonattainment areas. EPA is approving

the SIP revision request as it applies to the Lake Calumet area,

including the attainment demonstration for the Lake Calumet PM

nonattainment area. The SIP revision request corrects, for the Lake

Calumet PM nonattainment area, all of the deficiencies of the May 15,

1992, submittal (as discussed in the November 18, 1994, conditional

approval notice). EPA is also removing the codification of the

conditional approval and codifying the final portions of Illinois' part

D plan for the Granite City, Lake Calumet, and McCook moderate PM

nonattainment areas. EPA is approved the Granite City PM plan,

effective May 11, 1998, and the McCook PM plan, effective November 9,

1998.

DATES: This rule is effective on September 13, 1999, unless EPA

receives written adverse comments by August 13, 1999. If written

adverse comment is received, EPA will publish a timely withdrawal of

the rule in the Federal Register informing the public that the rule

will not take effect.

ADDRESSES: You should mail written comments to: J. Elmer Bortzer,

Chief, Regulation Development Section, Air Programs Branch (AR-18J),

U.S. Environmental Protection Agency, 77 West Jackson Boulevard,

Chicago, Illinois 60604.

You may inspect copies of the revision request and EPA's analysis

at the following address: U.S. Environmental Protection Agency, Region

5, Air and Radiation Division, 77 West Jackson Boulevard, Chicago,

Illinois 60604. (It is recommended that you telephone David Pohlman at

(312) 886-3299 before visiting the Region 5 Office.)

FOR FURTHER INFORMATION CONTACT: David Pohlman at (312) 886-3299.

SUPPLEMENTARY INFORMATION: Throughout this document wherever ``we'',

``us'', or ``our'' are used we mean EPA.

Table of Contents

I. What is the background for this action?

II. How has Illinois corrected the emissions inventory?

A. Quench towers.

B. Basic oxygen furnace (BOF) roof monitors.

C. Rotary kiln incinerator at CWM Chemical Services.

III. What does the revised attainment demonstration predict about

air quality?

IV. How has Illinois addressed maintenance of the PM National

Ambient Air Quality Standards (NAAQS)?

V. What has Illinois done to provide opacity limits for coke oven

combustion stacks?

VI. How has Illinois corrected the wording problems with the State

rules?

VII. EPA rulemaking action.

VIII. Administrative requirements.

A. Executive Order 12866

B. Executive Order 12875

C. Executive Order 13045

D. Executive Order 13084

E. Regulatory Flexibility Act

F. Unfunded Mandates

G. Submission to Congress and the Comptroller General

H. Paperwork Reduction Act

I. National Technology Transfer and Advancement Act

J. Petitions for Judicial Review

I. What is the background for this action?

Under section 107(d)(4)(B) of the Clean Air Act (Act), as amended

on November 15, 1990 (amended Act), certain areas (``initial areas'')

were designated nonattainment for PM. Under section 188 of the amended

Act these initial areas were classified as ``moderate''. The initial

areas included the Lake Calumet, McCook, and Granite City, Illinois, PM

nonattainment areas.

[[Page 37848]]

The Lake Calumet PM nonattainment area is located on the Southeast side

of Chicago, and is defined as ``The area bounded on the north by 79th

Street, on the west by Interstate 57 between Sibley Boulevard and

Interstate 94 and by Interstate 94 between Interstate 57 and 79th

Street, on the south by Sibley Boulevard, and on the east by the

Illinois/Indiana State line.'' (See 40 CFR 81.314) Section 189 of the

amended Act requires State submittal of a PM SIP for the initial areas

by November 15, 1991. Illinois submitted the required SIP revision for

the Lake Calumet, Illinois, PM nonattainment area on May 15, 1992. Upon

review of Illinois' submittal, we identified several concerns. Illinois

submitted a letter on March 2, 1994, committing to satisfy all of these

concerns within one year of final conditional approval. On May 25,

1994, we proposed to conditionally approve the SIP. Final conditional

approval was published on November 18, 1994, and became effective on

December 19, 1994. The final conditional approval allowed the State

until November 20, 1995, to correct the stated deficiencies. Of the

five deficiencies, four apply to the Lake Calumet area:

1. Invalid emissions inventory and attainment demonstration, due to

underestimated emissions from the roof monitors for the BOF at Acme

Steel, the quench towers at Acme Steel and LTV Steel, and the rotary

kiln incinerator at CWM Chemical Services.

2. Failure to adequately address maintenance of the PM NAAQS for at

least 3 years beyond the applicable attainment date.

3. Lack of an opacity limit on coke oven combustion stacks at Acme

Steel and LTV Steel.

4. The following enforceability concerns:

a. Section 212.107, Measurement Methods for Visible Emissions could

be misinterpreted as requiring use of Method 22 for sources subject to

opacity limits as well as sources subject to limits on detectability of

visible emissions.

b. Inconsistencies in the measurement methods for opacity, visible

emissions, and ``PM'' in section 212.110, 212.107, 212.108, and

212.109.

c. Language in several rules which exempts from mass emissions

limits those sources having no visible emissions.

Illinois has since made submittals to correct the remaining

deficiencies. Based on Illinois' submittals, we are now fully approving

the SIP for the Lake Calumet area. At this time, we are only acting on

the portions of those submittals that pertain to the Lake Calumet PM

nonattainment area, because deficiencies concerning the other areas

have been addressed. Our approval of the Granite City PM plan became

effective on May 11, 1998 (see 63 FR 11842), and our approval of the

McCook PM plan became effective on November 9, 1998 (see 63 FR 47431).

II. How has Illinois corrected the emissions inventory?

The first deficiency was an incomplete emissions inventory and

attainment demonstration due to underestimated emissions from the roof

monitors for the BOF at Acme Steel, the quench towers at Acme Steel and

LTV Steel, and the rotary kiln incinerator at CWM Chemical Services. We

pointed out that emissions from these sources were underestimated in

the 1992 emissions inventory.

A. Quench Towers

The emissions inventory issue concerning the quench tower emissions

calculations involved the use of ``clean water'' emission factor.

(Clean water is defined as water with 1500 mg/l total

dissolved solids (TDS.) Dirty water is defined as 5000 mg/l

TDS.) We had argued that, because Illinois' rules allow weekly

averaging and the PM standard is based on 24-hour measurements,

Illinois' quench rule could allow significantly dirtier water than the

1200mg/l TDS limit suggests, and should, therefore, be modeled using

the dirty water emission factor. Illinois submitted records of quench

water TDS concentrations which show that daily concentrations rarely

approach 1500 mg/l, let alone 5000 mg/l (Appendix 2 to Attachment 17 of

Illinois' May 9, 1996, submittal). Based on the information provided by

Illinois, we agree that the use of the clean water emission factor was

appropriate.

B. BOF Roof Monitors

To correct the problem of underestimated emissions from the Acme

Steel BOF roof monitors, Illinois adopted and submitted to the EPA a

20%, 3 minute average opacity limit on the Acme Steel BOF roof monitors

(Attachment 6 of Illinois' February 1, 1999, submittal). Illinois also

submitted a revised emissions inventory, which includes emissions from

the BOF roof monitors. We agree that the revised emissions estimates

are appropriate, given the tightened opacity limit.

C. Rotary Kiln Incinerator at CWM Chemical Services

The final emissions inventory issue was underestimated emissions

from the rotary kiln incinerator at CWM Chemical Services. Illinois

indicated in the May 9, 1996, submittal that this kiln is no longer

operating. Therefore, this is no longer an issue.

III. What does the revised attainment demonstration predict about

air quality?

In the submitted modeled attainment demonstration, which uses 5

years of meteorological data, a violation of the 24-hour NAAQS is

indicated when six exceedances of the 24-hour standard are predicted.

Each receptor's predicted 6th highest 24-hour value is, therefore,

compared to the standard. The 24-hour PM standard is 150 micrograms per

cubic meter (g/m\3\). The highest, sixth highest predicted 24-

hour PM concentration at any receptor in the Lake Calumet nonattainment

area was 119.2 g/m\3\. Thus, the modeling analysis predicts

that the 24-hour NAAQS will be met.

A modeled violation of the annual PM standard is indicated when any

receptor's 5 year arithmetic mean annual PM concentration exceeds the

annual PM standard of 50 g/m\3\. The highest arithmetic mean

annual PM concentration predicted by the modeling for the Lake Calumet

area was 47.01 g/m\3\. Therefore, the modeling analysis

predicts that the annual PM NAAQS will be met.

IV. How has Illinois addressed maintenance of the PM NAAQS?

The second deficiency was Illinois' failure to adequately address

maintenance of the PM NAAQS for at least 3 years beyond the applicable

attainment date. Because of the length of time it may take to determine

whether an area has attained the standards, EPA recommends that PM

nonattainment area SIP submittals demonstrate maintenance of the PM

NAAQS for at least 3 years beyond the applicable attainment date. (See

an August 20, 1991, memorandum from Fred H. Renner, Jr. to Regional Air

Branch Chiefs titled ``Questions and Answers for Particulate Matter,

Sulfur Dioxide, and Lead'') Illinois' May 15, 1992, submittal took

growth into account in the modeling analysis, but did not adequately

address maintenance of the NAAQS for PM.

The attainment date was December 31, 1994. Therefore, Illinois

needs to show maintenance up to December 31, 1997. In the May 9, 1996,

submittal, Illinois used ambient monitoring data to show that

background concentrations of PM were no higher in 1995 than they were

in 1991, and there are no significant trends in background PM

concentrations from 1989 to 1995.

[[Page 37849]]

Illinois concluded from this analysis that the effects of growth on

ambient PM concentrations in the Lake Calumet PM nonattainment area

will continue to be negligible through the end of the maintenance

period. Since the maintenance period has passed, this issue is no

longer relevant.

V. What has Illinois done to provide opacity limits for coke oven

combustion stacks?

The third deficiency was the lack of an opacity limit on coke oven

combustion stacks at Acme Steel and LTV Steel. Because coke oven

operations are generally covered by special opacity limits, Illinois'

SIP exempts coke oven sources from the statewide 30 percent opacity

limit. We approved this State exemption on September 3, 1981. We later

realized that this exemption left coke oven combustion stacks without

an opacity limit. Coke oven combustion stacks in Illinois are subject

to grain loading limits which require stack tests for compliance

determinations. Because stack tests can take months to perform and only

last a few hours, an opacity limit, for which compliance can be

determined by visual observations, is needed to ensure continuous

compliance. We cited this deficiency in the November 18, 1994,

conditional approval of Illinois' PM nonattainment area SIP submittal.

In response to the conditional approval of Illinois' PM plan, the

State adopted a 30 percent opacity limit for coke oven combustion

stacks. However, this rule also includes an exemption for ``when a leak

between any coke oven and the oven's vertical or crossover flue(s) is

being repaired * * *'' for up to 3 hours per repair. The EPA believes

this rule is unacceptable. (See 62 FR 39199.)

In a February 1, 1999, letter, Illinois submitted a revised

construction permit for Acme Steel. The permit, which was issued on

January 11, 1999, includes a 30 percent opacity limit, and states that

coke oven combustion stacks at Acme are not covered by the repair

opacity exemption in 35 IAC 212.443(g)(2).

On May 19, 1999, Illinois submitted a revised Federally Enforceable

State Operating Permit for LTV Steel which includes a 30 percent

opacity limit, and limits the repair opacity exemption in 35 IAC

212.443(g)(2). The permit was issued on May 14, 1999. The permit limits

the exemption to a particular type of repair where the ovens are

pressurized for purposes of detecting and repairing leaks at tie-in

joints. It also limits opacity during exemption periods to 60 percent.

The permit further limits excess opacity to 3 hours per day and 20

hours per month. Mass emission limits continue to apply during repair

exemption periods. We recognize that this type of repair can cause

excess opacity, and that these repairs are necessary at the LTV

facility due to tie-in joints resulting from an end-flue

rehabilitation. The limits in the permit are stringent enough to ensure

that excess opacity during repair periods is kept to a minimum, while

still allowing the repairs to occur. We agree that the limits in the

May 14, 1999, permit correct the previously-cited deficiency. This

issue is resolved as it applies to LTV Steel.

VI. How has Illinois corrected the wording problems with the State

rules?

The final issue from the November 18, 1994, conditional approval

notice involves wording problems in several of Illinois' rules. The

State has corrected these rules, and we approved the revised rules on

March 11, 1998 (see 63 FR 11842). See the March 11, 1998, Federal

Register notice for a discussion of these corrections.

VII. EPA Rulemaking Action

Illinois has corrected all of the deficiencies listed in the

November 18, 1994, conditional approval as they relate to the Lake

Calumet PM nonattainment area. Because Illinois has met all of the

commitments of the conditional approval, we are approving the plan for

the Lake Calumet PM nonattainment area. With this approval, Illinois

has fulfilled all Clean Air Act requirements for Part D plans for the

Lake Calumet, Granite City, and McCook moderate PM nonattainment areas.

Since all issues involving the conditional approval have been

resolved, we are removing the codification of the conditional approval

from the Code of Federal Regulations, Title 40, Sec. 52.719. We are

also fully approving 5 rules which we conditionally approved in our

November 18, 1994, action. These rules, 35 Illinois Administrative Code

212.113, 212.210, 212.302, 212.309, and 212.316 were included in the

conditional approval, but no deficiencies were identified with them.

The rules were later resubmitted by Illinois on June 14, 1996.

We are publishing this rule without prior proposal because we view

this as a noncontroversial revision and anticipate no adverse comments.

However, in a separate document in this Federal Register publication,

we are proposing to approve the SIP revision should written adverse

comments be filed. This rule will become effective without further

notice unless we receive relevant adverse written comment by August 13,

1999, as indicated above. Should we receive such comments, we will

publish a final rule informing you that this rule will not take effect.

Any parties interested in commenting on this action should do so at

this time. If no such comments are received, you are advised that this

action will be effective on September 13, 1999.

VIII. Administrative Requirements

A. Executive Order 12866

The Office of Management and Budget (OMB) has exempted this

regulatory action from Executive Order (E.O.) 12866, entitled

``Regulatory Planning and Review.''

B. Executive Order 12875

Under E.O. 12875, EPA may not issue a regulation that is not

required by statute and that creates a mandate upon a state, local, or

tribal government, unless the Federal government provides the funds

necessary to pay the direct compliance costs incurred by those

governments. If the mandate is unfunded, EPA must provide to the Office

of Management and Budget a description of the extent of EPA's prior

consultation with representatives of affected state, local, and tribal

governments, the nature of their concerns, copies of written

communications from the governments, and a statement supporting the

need to issue the regulation. In addition, E.O. 12875 requires EPA to

develop an effective process permitting elected officials and other

representatives of state, local, and tribal governments ``to provide

meaningful and timely input in the development of regulatory proposals

containing significant unfunded mandates.'' Today's rule does not

create a mandate on state, local or tribal governments. The rule does

not impose any enforceable duties on these entities. Accordingly, the

requirements of section 1(a) of E.O. 12875 do not apply to this rule.

C. Executive Order 13045

Protection of Children from Environmental Health Risks and Safety

Risks (62 FR 19885, April 23, 1997), applies to any rule that: (1) is

determined to be ``economically significant'' as defined under E.O.

12866, and (2) concerns an environmental health or safety risk that EPA

has reason to believe may have a disproportionate effect on children.

If the regulatory action meets both criteria, the Agency must evaluate

the

[[Page 37850]]

environmental health or safety effects of the planned rule on children,

and explain why the planned regulation is preferable to other

potentially effective and reasonably feasible alternatives considered

by the Agency.

This rule is not subject to E.O. 13045 because it does not involve

decisions intended to mitigate environmental health or safety risks.

D. Executive Order 13084

Under E.O. 13084, EPA may not issue a regulation that is not

required by statute, that significantly affects or uniquely affects the

communities of Indian tribal governments, and that imposes substantial

direct compliance costs on those communities, unless the Federal

government provides the funds necessary to pay the direct compliance

costs incurred by the tribal governments. If the mandate is unfunded,

EPA must provide to the Office of Management and Budget, in a

separately identified section of the preamble to the rule, a

description of the extent of EPA's prior consultation with

representatives of affected tribal governments, a summary of the nature

of their concerns, and a statement supporting the need to issue the

regulation. In addition, E.O. 13084 requires EPA to develop an

effective process permitting elected and other representatives of

Indian tribal governments ``to provide meaningful and timely input in

the development of regulatory policies on matters that significantly or

uniquely affect their communities.'' Today's rule does not

significantly or uniquely affect the communities of Indian tribal

governments. Accordingly, the requirements of section 3(b) of E.O.

13084 do not apply to this rule.

E. Regulatory Flexibility Act

The Regulatory Flexibility Act (RFA) generally requires an agency

to conduct a regulatory flexibility analysis of any rule subject to

notice and comment rulemaking requirements unless the agency certifies

that the rule will not have a significant economic impact on a

substantial number of small entities. Small entities include small

businesses, small not-for-profit enterprises, and small governmental

jurisdictions. This final rule will not have a significant impact on a

substantial number of small entities because SIP approvals under

section 110 and subchapter I, part D of the Clean Air Act do not create

any new requirements but simply approve requirements that the State is

already imposing. Therefore, because the Federal SIP approval does not

create any new requirements, I certify that this action will not have a

significant economic impact on a substantial number of small entities.

Moreover, due to the nature of the Federal-State relationship under the

Clean Air Act, preparation of flexibility analysis would constitute

Federal inquiry into the economic reasonableness of state action. The

Clean Air Act forbids EPA to base its actions concerning SIPs on such

grounds. Union Electric Co., v. U.S. EPA, 427 U.S. 246, 255-66 (1976);

42 U.S.C. 7410(a)(2).

F. Unfunded Mandates

Under Section 202 of the Unfunded Mandates Reform Act of 1995

(``Unfunded Mandates Act''), signed into law on March 22, 1995, EPA

must prepare a budgetary impact statement to accompany any proposed or

final rule that includes a Federal mandate that may result in estimated

annual costs to State, local, or tribal governments in the aggregate;

or to private sector, of $100 million or more. Under Section 205, EPA

must select the most cost-effective and least burdensome alternative

that achieves the objectives of the rule and is consistent with

statutory requirements. Section 203 requires EPA to establish a plan

for informing and advising any small governments that may be

significantly or uniquely impacted by the rule.

EPA has determined that the approval action promulgated does not

include a Federal mandate that may result in estimated annual costs of

$100 million or more to either State, local, or tribal governments in

the aggregate, or to the private sector. This Federal action approves

pre-existing requirements under State or local law, and imposes no new

requirements. Accordingly, no additional costs to State, local, or

tribal governments, or to the private sector, result from this action.

G. Submission to Congress and the Comptroller General

The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the

Small Business Regulatory Enforcement Fairness Act of 1996, generally

provides that before a rule may take effect, the agency promulgating

the rule must submit a rule report, which includes a copy of the rule,

to each House of the Congress and to the Comptroller General of the

United States. EPA will submit a report containing this rule and other

required information to the U.S. Senate, the U.S. House of

Representatives, and the Comptroller General of the United States prior

to publication of the rule in the Federal Register. A major rule cannot

take effect until 60 days after it is published in the Federal

Register. This rule is not a ``major'' rule as defined by 5 U.S.C.

804(2).

H. Paperwork Reduction Act

This action does not contain any information collection

requirements which requires OMB approval under the Paperwork Reduction

Act (44 U.S.C. 3501 et seq.).

I. National Technology Transfer and Advancement Act

Section 12 of the National Technology Transfer and Advancement Act

(NTTAA) of 1995 requires Federal agencies to evaluate existing

technical standards when developing a new regulation. To comply with

NTTAA, EPA must consider and use ``voluntary consensus standards''

(VCS) if available and applicable when developing programs and policies

unless doing so would be inconsistent with applicable law or otherwise

impractical.

The EPA believes that VCS are inapplicable to this action. Today's

action does not require the public to perform activities conducive to

the use of VCS.

J. Petitions for Judicial Review

Under section 307(b)(1) of the Clean Air Act, petitions for

judicial review of this action must be filed in the United States Court

of Appeals for the appropriate circuit by September 13, 1999. Filing a

petition for reconsideration by the Administrator of this final rule

does not affect the finality of this rule for the purposes of judicial

review nor does it extend the time within which a petition for judicial

review may be filed, and shall not postpone the effectiveness of such

rule or action. This action may not be challenged later in proceedings

to enforce its requirements. (See section 307(b)(2).)

List of Subjects in 40 CFR Part 52

Environmental protection, Air pollution control, Incorporation by

reference, Particulate matter.

Dated: June 23, 1999.

Jerri-Anne Garl,

Acting Regional Administrator, Region 5.

For the reasons stated in the preamble, part 52, chapter I, title

40 of the Code of Federal Regulations is amended as follows:

PART 52--[AMENDED]

1. The authority citation for part 52 continues to read as follows:

Authority: 42 U.S.C. 7401 et seq.

[[Page 37851]]

Subpart O--Illinois

2. Section 52.719 is removed and reserved.

3. Section 52.720 is amended by adding paragraph (c)(150) to read

as follows:

Sec. 52.720 Identification of plan.

* * * * *

(c) * * *

(150) On November 14, 1995, May 9, 1996, June 14, 1996, February 1,

1999, and May 19, 1999, the State of Illinois submitted State

Implementation Plan (SIP) revision requests to meet commitments related

to the conditional approval of Illinois' May 15, 1992, SIP submittal

for the Lake Calumet (Southeast Chicago), McCook, and Granite City,

Illinois, Particulate Matter (PM) nonattainment areas. The EPA is

approving the SIP revision request as it applies to the Lake Calumet

area. The SIP revision request corrects, for the Lake Calumet PM

nonattainment area, all of the deficiencies of the May 15, 1992,

submittal.

(i) Incorporation by reference.

(A) Illinois Administrative Code Title 35: Environmental

Protection, Subtitle B: Air Pollution, Chapter I: Pollution Control

Board, Subchapter c: Emission Standards and Limitations for Stationary

Sources, Part 212: Visible and Particulate Matter Emissions, Subpart A:

General, Section 212.113; Subpart E: Particulate Matter from Fuel

Combustion Sources, Section 212.210; Subpart K: Fugitive Particulate

Matter, Sections 212.302, 212.309, and 212.316. Adopted at 20 Illinois

Register 7605, effective May 22, 1996.

(B) Federally Enforceable State Operating Permit--Special:

Application Number 98120091, Issued on May 14, 1999, to LTV Steel

Company, Inc.

4. Section 52.725 is amended by adding paragraph (g) to read as

follows:

Sec. 52.725 Control strategy: Particulates.

* * * * *

(g) Approval--On May 5, 1992, November 14, 1995, May 9, 1996, June

14, 1996, February 3, 1997, October 16, 1997, October 21, 1997,

February 1, 1999, and May 19, 1999, Illinois submitted SIP revision

requests to meet the Part D particulate matter (PM) nonattainment plan

requirements for the Lake Calumet, Granite City and McCook moderate PM

nonattainment areas. The submittals include federally enforceable

construction permit, application number 93040047, issued on January 11,

1999, to Acme Steel Company. The part D plans for these areas are

approved.

[FR Doc. 99-17766 Filed 7-13-99; 8:45 am]

BILLING CODE 6560-50-P