DEPARTMENT OF ENERGY

Western Area Power Administration

Pacific Northwest-Pacific Southwest Intertie Project--Point-to-

Point Transmission Services Rates for the 230/345-kV Transmission

System

AGENCY: Western Area Power Administration, DOE.

ACTION: Notice of proposed rate adjustments.

-----------------------------------------------------------------------

SUMMARY: The Western Area Power Administration's (Western) Desert

Southwest Region (DSW) is initiating a rate adjustment process for

point-to-point transmission services on the 230/345-kV system of the

Pacific Northwest-Pacific Southwest Intertie Project (AC Intertie).

This action is necessary to recover annual costs (including interest

expense) and capital requirements. The existing rate schedule was

placed into effect on February 1, 1996, under Rate Order WAPA-71 which

was approved on a final basis by the Federal Energy Regulatory

Commission (FERC) on July 24, 1996.

The proposed rate and its impact are explained in greater detail in

a rate brochure which will be made available to all interested parties.

Network transmission services and ancillary services which comply with

FERC Order Nos. 888 and 888a may be obtained through Western's Open

Access Tariff published on January 6, 1998 (63 FR 521).

The proposed rate is scheduled to go into effect on October 1,

1998. This Federal Register notice initiates the formal process for the

proposed rate.

DATES: Submit comments on or before July 2, 1998. The forum dates are:

1. Public information forum, May 4, 1998, 10 a.m. MST, Phoenix,

Arizona.

2. Public comment forum, June 1, 1998, 10 a.m. MST, Phoenix, Arizona.

ADDRESSES: Written comments should be sent to Mr. J. Tyler Carlson,

Regional Manager, Desert Southwest Customer Service Region, Western

Area Power Administration, P.O. Box 6457, Phoenix, AZ 85005-6457. The

public forums will be held at the Desert Southwest Regional Office, 615

South 43rd Avenue, Phoenix, Arizona.

FOR FURTHER INFORMATION CONTACT: Mr. Maher A. Nasir, Rates Team Lead,

Desert Southwest Customer Service Region, Western Area Power

Administration, P.O. Box 6457, Phoenix, AZ 85005-6457, telephone (602)

352-2768.

SUPPLEMENTARY INFORMATION:

Proposed AC Intertie Transmission Rate

The proposed firm transmission service rate for the AC Intertie

230/345-kV transmission system is $12.00 per kilowattyear (kWyr). The

existing rate is $6.58 per kWyr. The proposed rate represents an 82-

percent increase. The increase in the rate is necessary to demonstrate

repayment for the 230/345-kV transmission system and the 500-kV

transmission system. Looking at the AC Intertie as a whole, two primary

issues have prompted the proposed rate. First, costs from the planning

phase of the canceled Northwest portion of the project must be repaid.

In 1969, the Department of the Interior discontinued its funding prior

to completion. When the Pacific Northwest participants subsequently

withdrew support, a decision was made to abandon the project. The

proposed transmission rate accounts for the recovery of the abandoned

project costs.

The second issue is revenue from firm transmission service on the

500-kV transmission system is less than projected. Western has

estimated that it will take approximately 10 years for the 500-kV

transmission system to be subscribed to a level sufficient to meet

revenue repayment requirements. Western's AC Intertie Power Repayment

Study (PRS) reflects a revenue contribution for the 500-kV transmission

system equivalent to the sale of 62.5 megawatts (MW) during the first

year, increased by 100 MW each year during the 10-year period. The

study concludes that the proposed rate for firm transmission service on

the 230/345-kV AC Intertie transmission system is necessary to meet

repayment requirements of the AC Intertie Project over this 10-year

period.

Western proposes, through this rate adjustment process, to

supersede only the rate for firm point-to-point transmission service on

the 230/345-kV system placed in effect under Rate Order WAPA-71. The

rate for firm point-to-point transmission service on the 230/345-kV

system includes the cost for the scheduling, system control and

dispatch service.

Authorities

Since the proposed rates constitute a major rate adjustment as

defined in 10 CFR 903.2, both a public information forum and a public

comment forum will be held. After review of public comments, Western

will recommend the proposed rates or revised proposed rates for

approval on an interim basis by the Deputy Secretary of DOE.

[[Page 16498]]

The proposed point-to-point transmission service rates for the 230/

345-kV AC Intertie system are being established pursuant to the

Department of Energy Organization Act (42 U.S.C. 7101, et seq.) and the

Reclamation Act of 1902 (43 U.S.C. 371, et seq.), as amended and

supplemented by subsequent enactments, particularly section 9(c) of the

Reclamation Project Act of 1939 (43 U.S.C. 485h(c)) and section 8 of

the Act of August 31, 1964 (16 U.S.C. 837g).

By Amendment No. 3 to Delegation Order No. 0204-108, published

November 10, 1993 (58 FR 59716), the Secretary of Energy delegated (1)

the authority to develop long-term power and transmission rates on a

nonexclusive basis to the Administrator of Western; (2) the authority

to confirm, approve, and place such rates in effect on an interim basis

to the Deputy Secretary; and (3) the authority to confirm, approve, and

place into effect on a final basis, to remand, or to disapprove such

rates to the FERC. Existing DOE procedures for public participation in

power rate adjustments (10 CFR Part 903) became effective on September

18, 1985 (50 FR 37835).

Regulatory Procedure Requirements

Regulatory Flexibility Analysis

The Regulatory Flexibility Act of 1980, 5 U.S.C. 601-612, requires

Federal agencies to perform a regulatory flexibility analysis if a

proposed rule is likely to have a significant economic impact on a

substantial number of small entities. Western has determined that this

action relates to rates or services offered by Western and therefore,

is not a rule within the purview of the Act.

Environmental Compliance

In compliance with the National Environmental Policy Act of 1969

(NEPA), 42 U.S.C. 4321, et seq.; Council On Environmental Quality

Regulations, 40 CFR Parts 1500-1508; and DOE NEPA Regulations, 10 CFR

Part 1021, Western has determined that this action is categorically

excluded from the preparation of an environmental assessment or an

environmental impact statement.

Determination Under Executive Order 12866

Western has an exemption from centralized regulatory review under

Executive Order 12866; accordingly, no clearance of this notice by the

Office of Management and Budget is required.

Availability of Information

All brochures, studies, comments, letters, memorandums, and other

documents made or kept by Western for the purpose of developing the

proposed rates will be made available for inspection and copying at

Western's Desert Southwest Regional Office, 615 South 43rd Avenue,

Phoenix, Arizona.

Dated: March 25, 1998.

Michael S. Hacskaylo,

Acting Administrator.

[FR Doc. 98-8762 Filed 4-2-98; 8:45 am]

BILLING CODE 6450-01-P