DEPARTMENT OF ENERGY

Western Area Power Administration

Notice of Intent To Prepare an Environmental Impact Statement for

the Proposed Griffith Power Plant and Transmission Line Project, Mohave

County, AZ

AGENCY: Western Area Power Administration, DOE.

ACTION: Notice of intent to prepare an environmental impact statement.

-----------------------------------------------------------------------

SUMMARY: In accordance with Section 102(2)(c) of the National

Environmental Policy Act (NEPA) of 1969, 42 U.S.C. 4332, Western Area

Power Administration (Western) intends to prepare an environmental

impact statement (EIS) regarding the proposal by Griffith Energy (GE),

LLC, to construct an electric generating facility on private property

and to interconnect this facility with Western's system in the vicinity

of Kingman, Arizona. To facilitate this interconnection, Western

proposes to construct three 230-kilovolt (kV) transmission lines to

connect the generating facility to two existing Western transmission

lines which are part of the regional grid. Two 6-mile parallel lines

will connect the generating facility to the Davis-Prescott 230-kV line

about 6 miles north of the proposed plant site and about 5 miles

southwest of Kingman. An additional 28-mile line will connect the

facility to the Mead-Liberty 345-kV transmission line about 15 miles

east of Kingman. The three new lines will parallel existing lines or

occupy approved corridors for most of their lengths. Because

implementing this proposal would incorporate new generation into

Western's system, Western has determined that an EIS is required in

accordance with U.S. Department of Energy's (DOE) NEPA Implementing

Procedures, 10 CFR 1021, Subpart D, Appendices D5 and D6. In this

notice Western announces intentions to prepare an EIS and hold a public

scoping meeting for the proposed project. Western's scoping will

include notifying the general public and Federal, State, local, and

tribal agencies of the proposed action for identification by the public

and agencies of issues and alternatives to be considered in the EIS.

DATES: The scoping meeting will be held on April 20, 1998, beginning at

7 p.m, at the County Board of Supervisors Office, 809 East Beale

Street, Kingman, Arizona 86401. Written comments on the scope of the

EIS for the proposed Project should be received no later than May 21,

1998. Comments on the project will be accepted throughout the NEPA

process.

FOR FURTHER INFORMATION CONTACT: If you are interested in receiving

future information or wish to submit written comments, please call or

write John Holt, Environmental Manager, Western Area Power

Administration, Desert Southwest Region, P.O. Box 6457, Phoenix,

Arizona 85005-6457, (602) 352-2592, FAX: (602) 352-2630, E-mail:

[email protected]. For general information on DOE's NEPA review procedures

or status of a NEPA review, contact Carol M. Borgstrom, Director,

Office of NEPA Policy and Assistance, EH-42, U.S. Department of Energy,

1000 Independence Avenue, SW, Washington, DC 20585, (202) 586-4600 or

(800) 472-2756.

SUPPLEMENTARY INFORMATION: GE proposes to construct the Griffith Energy

Project (Project) on private land south of the City of Kingman in

Mohave County, Arizona. The Project would be a ``merchant plant,''

meaning it would not be owned by a utility or by a utility affiliate

selling power to its utility, nor is it supported by a long-term power

purchase agreement with a utility. The Project would instead sell power

on a short and mid-term basis to customers and the on-the-spot market.

Power purchases by customers would be voluntary, and all economic costs

would be borne by GE.

The Project consists of a 520-megawatt natural-gas-fired, combined-

cycle generating facility and on-site supporting infrastructure,

including an administration building, a storage warehouse, water

treatment and storage facilities, cooling towers, gas conditioning

equipment, and new access roads. The generating facility and

infrastructure would occupy less than 40 acres of a 160-acre site in

the Mohave County I-40 Industrial Corridor south of Kingman. Additional

off-site facilities would include water pipelines and buried natural

gas pipelines which would bring high-pressure gas to the generating

facility to fuel the gas-fired turbines from nearby natural gas

transmission pipelines. The Project's water requirements would be about

2,500 to 3,000 gallons per minute during peak operating periods.

Western, with funding from GE, proposes to construct three 230-kV

[[Page 16497]]

transmission lines to interconnect with two existing Western

transmission lines. Two 6-mile parallel lines will connect the plant

with the Davis-Prescott 230-kV line about 6 miles north of the proposed

plant site and about 5 miles southwest of Kingman, and a 28-mile line

would connect the plant with the Mead-Liberty 345-kV transmission line

about 15 miles east of Kingman. These interconnections would integrate

the power generated by the Project into the Western electrical grid.

Western proposes to build these lines parallel to existing transmission

lines or approved corridors. Since this would connect power from new

generation to Western's system, DOE's NEPA Implementing Procedures

require Western to prepare an EIS on the potential environmental

impacts of this proposal. Western, therefore, will be the lead Federal

Agency, as defined at 40 CFR 1501.5.

Western will carefully examine public health and safety,

environmental impacts, and engineering aspects of the proposed power

project, including all related facilities, such as the power plant and

electric transmission and natural gas lines.

The EIS will be prepared in accordance with the requirements of the

Council of Environmental Quality's NEPA Implementing Regulations (40

CFR 1500-1508) and DOE's NEPA Implementing Procedures (10 CFR 1021).

Western will invite local and State agencies with jurisdiction over the

Project to be cooperating agencies on the EIS. Full public

participation and disclosure are planned for the entire EIS process. It

is anticipated that the EIS process will take 8 months and will include

a public information and scoping meeting; consultation and involvement

with appropriate Federal, State, local, and tribal government agencies;

public review and hearings on the published draft EIS; a published

final EIS; a review period; and publication of a record of decision

(ROD). A public information and scoping meeting will be held on April

20, 1998. Publication of the ROD is anticipated in the fall of 1998.

Dated: March 23, 1998.

Michael S. Hacskaylo,

Acting Administrator.

[FR Doc. 98-8760 Filed 4-2-98; 8:45 am]

BILLING CODE 6450-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.