Environmental Impact Statements; Notice of Availability

Federal RegisterDec 18, 1998

Ask Donna

What actually matters in this document.

Text

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-5497-9]

Environmental Impact Statements; Notice of Availability

Responsible Agency: Office of Federal Activities, General

Information (202) 564-7167 or (202) 564-7153.

Weekly receipt of Environmental Impact Statements Filed December

07, 1998 Through December 11, 1998 Pursuant to 40 CFR 1506.9.

EIS No. 980499, DRAFT EIS, DOA, HI, Lower Hamakua Ditch Watershed

Plan, To Provide a Stable and Affordable Supply of Agricultural Water

to Farmer and Other Agricultural Producers, COE Section 404 Permit,

Watershed Protection and Flood Prevention, Hawaii County, HI, Due:

February 01, 1999, Contact: Kenneth Kaneshiro (808) 541-2600.

EIS No. 980500, FINAL EIS, COE, NJ, Brigantine Inlet to Great Egg

Harbor Inlet Feasibility Study, Storm Damage Reduction Project, New

Jersey Shore Protection, City of Brigantine, Brigantine Island, Along

the Atlantic Coast, NJ, Due: January 18, 1999, Contact: Ms. Susan Lucas

(215) 656-6573.

EIS No. 980501, DRAFT EIS, FHW, MN, Phalen Boulevard Project,

Construction of a new 4.3 Kilometer Roadway, from I35E to Johnson

Parkway, Funding, in the City of St. Paul, Ramsey County, MN, Due:

February 10, 1999, Contact: Bill Lohr (612) 291-6100.

EIS No. 980502, FINAL EIS, USN, MD, VA, DE, Patuxent River Complex

Project, Increased Flight and Related Ground Operations in Test Area,

Naval Air Warfare Center Aircraft Division (NAWCAD) Chesapeake Bay,

Patuxent River, several counties, MD, DE and VA, Due: January 18, 1999,

Contact: Ms. Kelly Burdick (888) 276-5201.

EIS No. 980503, FINAL EIS, AFS, MI, Perkins-Manistique 138 kV

Transmission Line Project, Wisconsin Electric/Edison Sault Electric,

Construction and Operation, Application for a Special-Use-Permit,

Hiawatha National Forest, Upper Peninsula, MI, Due: January 18, 1999,

Contact: Lee Ann Loupe (906) 786-4062.

EIS No. 980504, DRAFT SUPPLEMENT, SFW, WA, Plum Creek Timber Sale,

Issuance of a Permit to Allow Incidental Take and Habitat Conservation

Plan (HCP) for Threatened and Endangered Species, Implementation,

Updated Information on the Proposed Exchange of Private and Federal

Lands Eastern and Western Cascade Provinces in the Cascade Mountains,

King and Kittitas Counties, WA, Due: February 08, 1999, Contact:

William Vogel (360) 753-4367.

EIS No. 980505, DRAFT SUPPLEMENT, TVA, TN, Kingston Fossil Plant

Alternative Coal Receiving Systems, New Rail Spur Construction near the

Cities of Kingston and Harriman, Roane County, TN, Due:

[[Page 70125]]

February 01, 1999, Contact: Harold M. Draper (423) 632-6889.

EIS No. 980506, DRAFT EIS, COE, AZ, Alamo Lake Reoperation and

Ecosystem Restoration Feasibility Study, Implementation, Reoperation of

Alma Dam on the Bill Williams River, La Paz and Mohave Counties, AZ,

Due: February 01, 1999, Contact: Timothy Smith (213) 452-3854.

EIS No. 980507, FINAL EIS, USN, HI, Pacific Missile Range Facility

Enhanced Capabilities, To Accommodate Theater Ballistic Missile Defense

(TBMD) Training & Testing and Theater Missile Defense (TMD) Testing,

NPDES Permit, several counties, HI, Due: January 18, 1999, Contact: Ms.

Vida Mossman (808) 335-4740.

EIS No. 980508, FINAL EIS, BLM, ID, Challis Land and Resource

Management Plan, Implementation, Upper Columbus--Salmon Clearwater

Districts, Salmon River, Lemhi and Custer Counties, ID, Due: January

18, 1999, Contact: Kathe Rhodes (208) 756-5440.

EIS No. 980509, DRAFT EIS, NCP, MD, National Harbor Project,

Construction and Operation along the Potomac River on a 534 acre site

adjacent to the Capital Beltway and Oxon Hill Manor, COE Section 10 and

404 Permits, Prince George's County, MD, Due: February 01, 1999,

Contact: Eugene Keller (202) 482-7251.

Dated: December 15, 1998.

William D. Dickerson,

Director, NEPA Compliance Division, Office of Federal Activities.

[FR Doc. 98-33615 Filed 12-17-98; 8:45 am]

BILLING CODE 6560-50-U

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Environmental Impact Statements; Notice of Availability · 63 FR 70124 | Frix