Clearwater National Forest, Idaho County, Idaho; JJ Vegetation Restoration
Federal RegisterOct 9, 1998
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF AGRICULTURE
Forest Service
Clearwater National Forest, Idaho County, Idaho; JJ Vegetation
Restoration
AGENCY: Forest Service, USDA.
ACTION: Notice of Intent to Prepare an Environmental Impact Statement.
-----------------------------------------------------------------------
SUMMARY: The JJ Vegetation Restoration Planning Area is located west of
the Powell Ranger Station, Lochsa Ranger District, Clearwater National
Forest, Idaho County, Idaho. Proposed activities are located in the
Lochsa River drainage. The purpose of the project are: (1) To design
and implement vegetation treatments using ecosystem management
principles within the forest stands that are at high risk of change in
the next decade, (2) to restore forest health in timber stands being
affected by Douglas-fir bark beetles and root rot disease, and (3) to
restore and maintain aquatic ecosystem structure and function to
provide historic habitat conditions for aquatic species.
The Lochsa Ranger District (Powell Ranger Station) will begin
public scoping on the JJ Vegetation Restoration project with the
publication of this Notice. This area was identified in the Lost
Postman Watershed Analysis as a high priority for treatment to improve
the tree species composition and structure. Fire suppression over the
last fifty years has permitted shade tolerant grand fir and Douglas-fir
trees to grow into the forest under the overstory ponderous pine and
large fire resistant Douglas-fir trees. This has created an
overstocked, two-story forest that is susceptible to root rot and
Douglas-fir back beetle. The tree mortality and subsequent fuel
buildup, including ladder fuels, has created a forest condition at high
risk for catastophic change. Silvicultural action at this time can
restore the healthy productivity and natural ecologic condition of this
forest.
Therefore, the Powell Ranger Station of the Lochsa Ranger District
is proposing to prepare the JJ Vegetation Restoration Analysis to
evaluate the environmental effects of using timber harvest and
prescribed fire to reduce tree density and restore a more natural tree
species composition and structure. Timber harvest and prescribed fire
is proposed on approximately 700 acres. Helicopter logging units using
a combination of improvement cuts and shelter-wood regeneration methods
are planned. This would yield about 7 mmbf of timber for commercial
sale. No new roads would be constructed. Existing helicopter landing
sites along Highway 12 would be used. The JJ's Analysis will also
consider a reasonable range of alternatives to the proposed action.
This project will be designed to reduce the density of forest
vegetation on this overstocked, south facing hillside as outlined in
the Lost Postman Watershed Analysis. The subsequent reduction in
biomass and fuels will reduce the risk of a lethal, stand replacement
wildfire. The proposal will also be designed to reduce the effects of
Douglas-fir bark beetles and root rot disease on tree mortality. This
will have the added benefit of maintaining the scenic quality of the
forest as viewed from the Lochsa River (a Wild and Scenic River) and
Highway 12. Enhancement of wildlife habitat for species such as the
flammulated owl, black-backed woodpecker, fisher and elk is also a
benefit of the proposed action.
This project level EIS will tier to the Clearwater National Forest
Land and Resource Management Plan (Forest Plan) and Final EIS
(September 1987), which provides overall guidance of all land
management activities on the Clearwater National Forest.
Analysis will be conducted in compliance with the Clearwater Forest
Plan lawsuit Stipulation of Dismissal agreement between the Forest
Service and the Sierra Club, et al (signed September 13, 1993).
DATES: Comments in response to this Notice of Intent should be received
in writing on or before November 23, 1998 to receive timely
consideration in the preparation of the Draft EIS. The Draft EIS is
planned to be filed with the Environmental Protection Agency in March
1999. The Final EIS and Record of Decision are expected to be issued in
December 1999.
ADDRESSES: Send written comments and suggestions on the proposed action
or requests for a map of the proposed action or to be placed on the
project mailing list to Dennis Elliott, Deputy District Ranger, Powell
Ranger Station, Clearwater National Forest, Lolo, Montana 59847.
Responsible Official: James L. Caswell, Forest Supervisor,
Clearwater National Forest, will be the Responsible Official for this
project.
FOR FURTHER INFORMATION CONTACT:
Dennis Elliott, Deputy District Ranger, Powell Ranger Station,
Clearwater National Forest, (208) 942-3113.
SUPPLEMENTARY INFORMATION: In 1997, the Lost Postman Watershed
Assessment was completed. This assessment recommended a variety of
management actions designed to restore forest health. Because of the
wide range of actions and their dispersed locations, it was elected not
to propose and analyze all of the recommendations in one single
project. Instead, a logical array of smaller individual projects which
are not connected actions have been proposed. The JJ Vegetation
Restoration proposal is one of the recommended actions.
Preliminary issues include the following:
How will the proposed action and alternatives maintain or
enhance the long-term sustain-ability of these ecosystems through
vegetation management? How will they address vegetation structure and
composition, insects and diseases, maintenance of wildlife habitat and
production of wood products?
How will the proposed action and alternatives protect the
quantity and quality of water and aquatic habitat?
How will the proposed action and alternatives provide high
quality recreation opportunities, especially maintaining the use and
enjoyment of the Lolo Trail and Lochsa Wild and Scenic River Corridors?
How will the views from the Lolo Trail and the Lochsa River corridors
be protected?
How will the proposed action and alternatives be designed
to produce goods and services yet minimize impacts to other resources?
Will the
[[Page 54435]]
actions pay for themselves without resulting in a deficit timber sale?
These issues will be refined and developed in detail as scooping
proceeds. Comments on the issues and suggestions for additional issues
are welcome in response to this Notice of Intent.
Public scoping and involvement will begin with the publication of
this notice. A scoping letter that describes the proposed action and
preliminary issues will be mailed to members of the Powell NEPA mailing
list. The interdisciplinary team will be working to develop a range of
alternatives to the proposed action and to assess the environmental
effects of the alternatives. One of the alternatives will be the ``No
Action'' alternative. Other alternatives will examine varying levels
and locations for the proposed activities to achieve the proposal's
purposes, as well as to respond to the environmental issues and other
resource values. Comments concerning the range of alternatives or
possible environmental effects would be useful to the team in
completing their analysis.
The Clearwater National Forest Land Management Plan provides the
land management direction for the JJ's Planning Area. Forest Plan
Management Areas in the JJ's analysis include the following:
E1-Timber producing land managed for healthy forests and optimum
tree growth.
A7-Recreation River Corridor managed for dispersed recreation,
water quality and visual resources.
C4-Big game winter range managed for browse and timber production.
It is anticipated that the environmental analysis and preparation
of the draft and final environmental impact statements will take about
one year. The draft environmental impact statement can be expected in
March 1999 and a final environmental impact statement can be expected
in December 1999.
A 45 day comment period will be provided for the public to make
comments on the draft environmental impact statement. This comment
period will be in addition to scoping and will begin when the
Environmental Protection Agency's Notice of Availability of the Draft
EIS appears in the Federal Register. A Record of Decision will be
prepared and filed with the final environmental impact statement. A
forty-five day appeal period will be applicable.
The Forest Service believes, at this early stage, it is important
to give reviewers notice of several court rulings related to public
participation in the environmental review process. To be most helpful,
comments on the draft environmental statement should be as specific as
possible and may address the adequacy of the statement or the merits of
the alternatives discussed (see Council on Environmental Quality
Regulations for implementing the procedural provisions of the National
Environmental Policy Act at 40 CFR 1503.3).
In addition, Federal court decisions have established that
reviewers of draft environmental impact statements must structure their
participation in the environmental review of the proposal so that is
meaningful and alerts an agency to the reviewers' position and
contentions. Vermont Yankee Nuclear Power Corp. v. NRDC 435 US 519, 553
(1978). Environmental objections that could have been raised at the
draft stage may be waived if not raised until after completion of the
final environmental impact statement. City of Angoon v. Harris, 490 F.
Supp. 1334, 1338 (E.D. Wis. 1980). The reason for this is to ensure
that substantive comments and objections are made available to the
Forest Service at a time when it can meaningfully consider them and
respond to them in the final.
Comment received in response to this solicitation, including names
and address of those who comment, will be considered part of the public
record on this proposed action and will be available for public
inspection. Comments submitted anonymously will be accepted and
considered; however, those who submit anonymous comments will not have
standing to appeal the subsequent decision under 36 CFR Part 215 or
217.
I am the responsible official for this environmental impact
statement. My address is Clearwater National Forest, 12730 Highway 12,
Orofino, ID 83544.
Dated: September 29, 1998
Douglas E. Gochnour,
Acting Forest Supervisor, Clearwater National Forest.
[FR Doc. 98-27116 Filed 10-8-98; 8:45 am]
BILLING CODE 3410-11-M