Intent To Prepare an Environmental Impact Statement for the Proposed Minnesota Agri-Power Plant and Associated Facilities
Federal RegisterOct 7, 1998
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF ENERGY
Intent To Prepare an Environmental Impact Statement for the
Proposed Minnesota Agri-Power Plant and Associated Facilities
AGENCY: Department of Energy.
ACTION: Notice of intent to prepare an environmental impact statement.
-----------------------------------------------------------------------
SUMMARY: In accordance with the National Environmental Policy Act of
1969 (NEPA), and Minnesota Statutes, Ch 116D, the U.S. Department of
Energy (DOE) and the Minnesota Environmental Quality Board [MEQB, a
Minnesota State agency] announce their intent to prepare a joint
Environmental Impact Statement (EIS) regarding a proposal by the
Minnesota Valley Alfalfa Producers (MnVAP) to construct and operate a
75-103 megawatt biomass
[[Page 53886]]
fueled gasifier and electric generating facility, known as the
Minnesota Agri-Power Plant (MAPP), and associated transmission lines
and alfalfa processing facilities. The plant would be fueled with
alfalfa stems grown and processed primarily in Minnesota and South
Dakota. Two sites (preferred and alternative) for the power plant have
been proposed by MnVAP near Granite Falls, Minnesota. Depending upon
the site selected for the power plant, 115 kilovolt (kV) transmission
lines would run between two and six miles to an existing substation
owned by Northern States Power Company in Granite Falls. Alfalfa
processing facilities for separating the alfalfa leaves from stems
would be located throughout the growing region when the locations of
growers are established.
DOE proposes to partially fund the MAPP project, through a
cooperative agreement with MnVAP for a renewable energy technology
commercialization project under various provisions of the Energy Policy
Act of 1992 (Pub. L. 102-486). Under the applicable Minnesota Statutes
and Department of Energy NEPA regulations (10 CFR Part 1021), the
proposed action requires an EIS. In the spirit of the regulations of
the Council on Environmental Quality (CEQ) implementing NEPA (40 CFR
1501.5(b)) and Minnesota Rules Part 4410.3900, DOE and MEQB will be
``joint lead agencies,'' to satisfy the requirements of NEPA and the
Minnesota Environmental Policy Act (MEPA). The document will be titled
Minnesota Agri-Power Plant Project Environmental Impact Statement, DOE-
EIS/0300/MAPP-P-1.
In this notice, DOE and MEQB announce their intentions to prepare
an EIS and hold public scoping meetings for the proposed project. The
scoping process will include notification of the public and Federal,
State, Tribal, and local agencies of the proposed action, and
identification by the public and agencies of issues and reasonable
alternatives to be considered in the EIS.
DATES: The public scoping period begins with the publication of this
Notice of Intent and will continue until December 9, 1998. The purpose
of this Notice is to encourage public involvement in the EIS process
and to solicit public comments on the proposed scope and content of the
EIS. DOE and MEQB will hold public scoping meetings at the following
locations and times:
----------------------------------------------------------------------------------------------------------------
Location Address Times
----------------------------------------------------------------------------------------------------------------
St Paul, Minnesota............... Minnesota History 7-9 PM, Monday, November 16, 1998.
Center, 345 West
Kellogg Boulevard.
Granite Falls, Minnesota......... American Legion 60 7-9 PM, Tuesday, November 17, 1998.
6th Street.
Ada, Minnesota................... Ada Elementary 7-9 PM, Wednesday, November 18, 1998.
School Gym, 209 6th
Street West.
Redfield, South Dakota........... Leo's Cafe, 602 N. 7-9 PM, Thursday, November 19, 1998.
Main.
----------------------------------------------------------------------------------------------------------------
Both oral and written comments will be accepted at the meetings.
Individuals wishing to schedule a specific time to speak should call
Ms. Deborah Turner at the number listed below or the 24-hour toll-free
information line, 1-800-267-9330.
In addition to the public meetings, comments can be submitted by
calling 1-800-267-9330, or by sending them to Ms. Deborah Turner at the
address listed below. All comments on the scope of the EIS will be
shared with the MEQB and should be submitted by December 9, 1998, to
ensure consideration. Any scoping comments submitted after December 9,
1998, will be considered to the extent practicable.
ADDRESSES: Please direct comments or suggestions on the scope of the
EIS, requests to speak at public scoping meetings, requests for special
arrangements to enable participation at scoping meetings (e.g.,
interpreter for the hearing impaired), and questions concerning the
project to: Ms. Deborah Turner, Document Manager, U.S. Department of
Energy, Golden Field Office 1617 Cole Blvd., Golden, CO 80401, Phone:
303-275-4746 or 1-800-267-9330, Fax: 303-275-4788, E-mail:
[email protected].
FOR FURTHER INFORMATION CONTACT: To request information about this EIS,
or to be placed on the EIS document distribution list, please call the
24-hour toll-free information line at 1-800-267-9330. Please provide
your name, complete address, and phone number, if you are requesting to
be placed on the document distribution list so that documents can be
mailed as expeditiously as possible.
For general information on the DOE's NEPA process, please contact:
Ms. Carol Borgstrom, Director, Office of NEPA Policy and Assistance,
EH-42, U.S. Department of Energy, 1000 Independence Avenue, SW,
Washington, DC 20585-0119, Phone: 202-586-4600 or leave a message at 1-
800-472-2756.
For information regarding the MEQB process please contact: Mr. John
Wachtler, Energy Facility Siting Project Director, Minnesota
Environmental Quality Board, 300 Centennial Building, St. Paul,
Minnesota 55155, Phone: 651-296-4095, Fax: 651-292-3698, E-mail:
[email protected].
For information regarding MnVAP, please contact: Mr. David L.
Wilbur, General Manager, Minnesota Valley Alfalfa Producers, 681
Prentice Street, Granite Falls, Minnesota 56241, Phone: 320-564-2400,
Fax: 320-564-2451.
SUPPLEMENTARY INFORMATION: MnVAP is a farmer-owned cooperative,
incorporated in 1994 to increase the value of farm products grown in
and near the State of Minnesota. In response to a joint Department of
Energy and U.S. Department of Agriculture, Solicitation for Financial
Assistance for Biomass Power for Rural Development (DE-PS36-95GO10052),
MnVAP submitted a proposal to establish Minnesota Agri-Power as a
limited liability corporation, with MnVAP as the majority stock holder,
for the purposes of siting, constructing, and operating a 75-103
megawatt power plant fueled with gasified alfalfa stems. DOE selected
the MnVAP project as one of several promising efforts to meet the goals
of the Energy Policy Act of 1992 to develop and ultimately
commercialize biomass energy systems for the purposes of positively
affecting global climate change and the revitalization of rural
America. (The U.S. Department of Agriculture has declined to
participate as a cooperating agency in preparing this EIS). Under the
terms of the solicitation, MnVAP and DOE would share the financial
burden of taking a biomass gasification technology from the
demonstration phase to full commercial production.
The proposed project would also serve in part to meet the Minnesota
``Biomass Power Mandate,'' Minnesota State Law, 216B.2424, which
requires that:
A public utility * * * that operates a nuclear-powered electric
generating plant within this state must construct and operate,
purchase, or contract to construct and
[[Page 53887]]
operate (1) by December 31, 1998, 50 megawatts of electric energy
installed capacity generated by farm-grown closed-loop biomass
scheduled to be operational by December 31, 2001; and (2) by
December 31, 1998, an additional 75 megawatts of installed capacity
so generated scheduled to be operational by December 31, 2002.
Northern States Power, the sole producer of nuclear power in
Minnesota, has entered into a power purchase agreement with MnVAP to
buy power if the proposed plant becomes operational under the governing
provisions of the Minnesota Statutes.
MEQB is responsible under the MEPA (Minnesota Statutes, Ch 116D and
Minnesota Rules, Part 4410) and the Minnesota Power Plant Siting Act
(Minnesota Statutes, Ch 116.51 to 116.69, and Minnesota Rules, Part
4400) for reviewing the proposed action in response to an Application
for Site Designation and Certificate of Site Compatibility submitted by
MnVAP on August 12, 1998, and accepted by MEQB on September 30, 1998.
Copies of the Application are available to the public by contacting DOE
or MEQB.
Proposed Action: The MAPP project would use an ``integrated
gasification combined-cycle'' or IGCC system. The gasifier would be
sized to process approximately 1,100 tons of alfalfa stems per day
which is approximately 750 million British thermal units per hour. In
the gasifier, the alfalfa stems would be rapidly heated to gasification
temperatures at approximately 1,650 degrees Fahrenheit while in contact
with air and steam at a pressure of 300 pounds per square inch gage.
The gas would then be cooled to 1,020 degrees Fahrenheit and cleaned to
meet air quality standards and requirements for the combustion turbine.
Since the biomass gasification technology proposed for MAPP has yet to
be successfully demonstrated at full commercial scale, DOE is proposing
to fund $44 million (up to 30%) of the cost of construction of the
plant and associated facilities (approximately $140 to $200 million) as
part of the Department's mission to support biomass technology
commercialization.
The combustion turbine would be designed to operate efficiently on
the low energy biomass fuel produced by the gasifier unit with a gross
electric power output of 66 megawatts. The alfalfa gas would be
supplemented with natural gas as needed. The usable heat remaining in
hot combustion gases leaving the combustion turbine would be recovered
in the form of super-heated, high pressure steam. The steam would be
used to produce an additional 37 megawatts of gross electrical output
in a steam turbine generator. The gross output of the power plant could
be as high as 103 megawatts.
Construction of the proposed facility would involve extension of
existing water, gas and electric utilities to either of two alternative
sites. Depending on the site, the proposed facility would either
utilize existing city sanitary capacity or an onsite septic system.
Facility cooling may either use conventional mechanical draft cooling
towers or air cooling systems. Make-up water for cooling would be
obtained from the Minnesota River. Blowdown discharges would go into
the Minnesota River after meeting required discharge permit levels.
Construction of the facility would require approximately two years and
involve 100-300 workers onsite, while operations would require
approximately 25 full-time employees.
In addition, the proposed action will require the siting,
construction, and operation of four or five alfalfa processing
facilities. Construction of these alfalfa processing facilities is
likely even if the MAPP is not built. These alfalfa processing
facilities would be strategically located in MnVAP's alfalfa production
area, which encompasses western Minnesota and eastern South Dakota, in
order to minimize total transportation, storage, and handling costs.
The exact location of the new processing facilities is not known at
this time and will not be decided on the basis of this EIS. The siting
and permitting of such facilities would be the subject of environmental
review consistent with State requirements when their locations are
determined. However, for the purpose of evaluating transportation
impacts to and from the proposed MAPP, the operation of processing
facilities at regional, non-site-specific locations will be evaluated
in this EIS.
Alternative Sites: A preferred and an alternative site near Granite
Falls, Minnesota for the power plant have been proposed by MnVAP. The
preferred site is located in the Granite Falls Industrial Park (Section
35 & 36, Township 116 & Range 39); the alternative site is located
approximately 3.5 miles south of Granite Falls (Section 20, Township
115 & Range 39).
No Action Alternative: Under CEQ and DOE NEPA regulations, and
MEPA, the No Action alternative must be analyzed to provide a basis for
comparison to the proposed action. Under the No Action alternative in
this EIS, it will be assumed, for the comparative purposes set forth in
Federal and State regulations, that the proposed MAPP would not be
constructed. However, even under the No Action alternative, MnVAP's
development of alfalfa production and processing capability would
continue because such action is not dependent upon a decision to
proceed with funding the MAPP project.
Preliminary Identification of EIS Issues: DOE and MEQB have
tentatively identified the following issues for analysis in the EIS.
This list is neither intended to be all inclusive nor is it a
predetermination of potential environmental impacts. The list is
presented to facilitate comments on the scope of the EIS. Additions to
or deletions from the list may occur as a result of the public scoping
process.
Comparison of alternative sites;
Potential impacts of air emissions from the power plant
and the alfalfa processing facilities;
Potential impacts resulting from the use of Minnesota
River or ground water;
Potential traffic impacts resulting from alfalfa shipments
to processing facilities and fuel transport to the power plant;
Potential socioeconomic impacts, especially from the
construction work force, which may exceed local housing capacity;
Potential socioeconomic impacts from long-term operations;
Potential impacts on cultural, historical and
archaeological resources;
Potential disproportionately high and adverse impacts on
minority or low income populations;
Potential impacts from ash application onto agricultural
fields or disposal in landfills;
Potential impacts on local terrestrial and aquatic flora
and fauna, especially endangered species, from facility construction
and operations;
Potential impacts resulting from modification of existing
infrastructure;
Potential noise and visual impacts on neighbors of the
proposed MAPP, transmission lines, and alfalfa processing plants;
Potential agricultural impacts, such as erosion and
fertilizer demand, resulting from introduction of alfalfa into existing
crop rotations.
Scoping Meetings: DOE and MEQB personnel will be available at the
scoping meetings to explain the proposal to the public and answer
questions. DOE and MEQB will designate a facilitator for the scoping
meetings. At the opening of each meeting, the facilitator will
establish the order of speakers and will announce any additional
procedures necessary for conducting the meetings. To ensure that all
persons wishing to make a presentation are given the opportunity, each
speaker may be limited to 5-
[[Page 53888]]
minutes, except for public officials and representatives of groups, who
will be allotted ten minutes each. DOE encourages those providing oral
comments to also submit them in writing. Comment cards will also be
available for those who prefer to submit their comments in written
form. Speakers may be asked clarifying questions, but the scoping
meetings will not be conducted as evidentiary hearings.
Upon close of the scoping period, DOE and MEQB will review all
comments and prepare a draft Scope Statement that will identify the
proposed scope of the EIS and be issued to all interested parties. The
issuance of the draft Scope Statement will be accompanied by a notice
of an MEQB/DOE public meeting on the Statement at which the Agencies
will finalize the Scope Statement. The final Scope Statement will be
distributed to interested parties.
DOE and MEQB will make the final Scope Statement, transcripts of
the scoping meetings, the draft EIS and final EIS when issued, and
project-related materials available for public review in the following
reading rooms:
U.S. Department of Energy, Freedom of Information Public Reading Room,
Forrestal Building, Room 1E-190, 1000 Independence Avenue, SW.,
Washington, DC 20585, Telephone: (202) 586-3142
U.S. Department of Energy, Golden Field Office, Public Reading Room,
15013 Denver West Parkway, Golden, CO 80401, Telephone: (303) 384-6565
Region 6, Willmar Public Library, 410 Fifth Street, SW., Willmar, MN
56201-3298, Telephone: (320) 235-3162
Minnesota Office of Strategic and Long Range Planning Library, 658
Cedar Street, 300 Centennial Office Building, St. Paul, MN 55155,
Telephone: (651) 296-3985
Legislative Reference Library, 645 State Office Building, St. Paul, MN
55155, Telephone: (651) 296-3398
Granite Falls Public Library, 155 Seventh Avenue, Granite Falls, MN
56241, Telephone: (320) 564-3738
NEPA/MEPA Process: The EIS will be prepared in accordance with the
requirements of the CEQ's NEPA implementing regulations (40 CFR Parts
1500-1508), DOE's NEPA implementing procedures (10 CFR Part 1021), and
Minnesota's MEPA and implementing rules (Minnesota Statutes Ch 116D and
Minnesota Rules, Part 4410).
After the completion of the public scoping process, a draft EIS
will be prepared. Interested persons, the public, and agencies will be
notified when the draft is available through a Notice of Availability
published in the Federal Register, the EQB Monitor, and local media.
The draft EIS will be distributed to individuals and agencies that
request a copy and will also be placed in the reading rooms listed
above. A 45-day comment period on the draft EIS is planned, and public
hearings to receive comments will be held approximately four weeks
after distribution of the draft EIS. In addition, under the Minnesota
Power Plant Siting Act procedures, a Minnesota administrative law judge
will hold a formal hearing on the Application for Site Designation and
Certificate of Site Compatibility, which will include a review of
information in the draft EIS. The draft EIS public comment hearings and
the formal siting hearing may be combined. The locations and times for
comment hearings will be included in the Notice of Availability. The
draft EIS is scheduled to be issued during spring 1999.
The final EIS, which will consider the public comments received on
the draft EIS, is scheduled to be published during summer 1999. DOE and
MEQB will coordinate their decision processes, but each agency will
document its decision according to its specific governing statutes. No
sooner than 30 days after the U.S. Environmental Protection Agency's
Notice of Availability of the final EIS is published in the Federal
Register, DOE will issue its Record of Decision and publish it in the
Federal Register. Minnesota State Statutes require that the MEQB issue
a decision as to the adequacy of the EIS and if it is deemed adequate,
issue a Site Designation and Certificate of Site Compatibility. MEQB
will issue its decisions in the EQB Monitor. It is currently planned to
issue simultaneous DOE/MEQB decision documents during summer/fall 1999.
Signed in St. Paul, Minnesota, this 30th day of September 1998.
Rod Sando,
Chairman, MEQB, State of Minnesota.
Signed in Washington, DC, this 1st day of October 1998.
Peter N. Brush,
Acting Assistant Secretary, Environment, Safety and Health, U.S.
Department of Energy.
[FR Doc. 98-26874 Filed 10-6-98; 8:45 am]
BILLING CODE 6450-01-P