NUCLEAR REGULATORY COMMISSION

10 CFR Parts 50 and 140

RIN 3150-AF79

Financial Protection Requirements for Permanently Shutdown

Nuclear Power Reactors

AGENCY: Nuclear Regulatory Commission.

ACTION: Proposed rule: request to solicit additional public comment.

-----------------------------------------------------------------------

SUMMARY: On October 30, 1997, the Nuclear Regulatory Commission (NRC)

published for comment proposed amendments to its regulations to allow

licensees of permanently shutdown nuclear power reactors to reduce

onsite and offsite insurance coverage under certain conditions (62 FR

58690). In a late comment letter submitted on April 17, 1998, the

Nuclear Energy Institute (NEI) argued that the required level of onsite

insurance coverage should be lowered to $25 million. In NEI's view, $25

million would be adequate for on-site cleanup costs for radioactive

liquid spills. The NRC proposed rulemaking would require $50 million

insurance coverage. The NRC used a postulated rupture of a 450,000

gallon borated water storage tank as the defining event for determining

the required insurance coverage. NEI also proposed that the requirement

for onsite insurance be eliminated if less than 1000 gallons of

contaminated liquid were onsite.

NEI based its recommendation on a model that apportioned the

removal of the contaminated soil to various disposal facilities

according to the degree of contamination. Hence, under the NEI's model,

some soil would be sent to a Barnwell type facility, some to a lower

cost facility like Envirocare, and some soil could be left on site

under the Commission's decommissioning regulation. NEI stated that

under this type of parceling of contaminated soil, $25 million of

onsite insurance coverage would be more than adequate to cover cleanup

of any postulated radioactive spill. NEI further stated that there has

never been a spill in the operating history of commercial nuclear power

plants that resulted in remediation costs of $50 million. However, NEI

did not provide any specific cost figures, estimates of the amount or

degree of soil contamination, or analyses, to support its

recommendation to lower the onsite insurance coverage to $25 million.

The NRC is requesting public comment on the potential cost of

cleanup of the on-site spill from a large vessel (>1000 gal) containing

radioactive liquid and the appropriate level of insurance coverage. The

NRC also has requested NEI to provide further information supporting

its assessment of the costs of cleaning up a large (>1000 gal) on-site

spill of radioactive material and its basis for recommending that

onsite coverage should be reduced to zero when there is less than 1000

gallons of radioactive liquid on site.

DATES: The comment period expires November 9, 1998.

ADDRESSES: Send comments by mail addressed to the Secretary, U.S.

Nuclear Regulatory Commission, Attention: Rulemakings and Adjudications

Staff, Washington, DC 20555-0001.

Hand deliver comments to 11555 Rockville Pike, Rockville, Maryland,

between 7:30 a.m. and 4:15 p.m. on Federal workdays.

You may also provide comments by way of the NRC's interactive

rulemaking web site through the NRC home page (http://www.nrc.gov).

This site provides the capability to upload comments as files (any

format) if your web browser supports that function. For information

about the interactive rulemaking site, contact Ms. Carol Gallagher,

301-415-5905, e-mail [email protected]

Certain documents related to this rulemaking, including NEI's

comments, may be examined at the NRC Public Document Room, 2120 L

Street NW. (Lower Level), Washington, DC. These documents also may be

viewed and downloaded electronically through the interactive rulemaking

website established by NRC for this rulemaking.

FOR FURTHER INFORMATION CONTACT: George J. Mencinsky, Office of Nuclear

Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC

20555-0001, telephone: (301) 415-3093, e-mail [email protected]

Dated at Rockville, Maryland, this 15th day of September, 1998.

For the Nuclear Regulatory Commission.

Jack W. Roe,

Acting Director, Division of Reactor Program Management, Office of

Nuclear Reactor Regulation.

[FR Doc. 98-25414 Filed 9-22-98; 8:45 am]

BILLING CODE 7590-01-P