DEPARTMENT OF LABOR

Mine Safety and Health Administration

Summary of Decisions Granting in Whole or in Part Petitions for

Modification

AGENCY: Mine Safety and Health Administration (MSHA), Labor.

ACTION: Notice of affirmative decisions issued by the Administrators

for Coal Mine Safety and Health and Metal and Nonmetal Mine Safety and

Health on petitions for modification of the application of mandatory

safety standards.

-----------------------------------------------------------------------

SUMMARY: Under section 101(c) of the Federal Mine Safety and Health Act

of 1977, the Secretary of Labor may modify the application of a

mandatory safety standard to a mine if the Secretary determines either

that an alternate method exists at a specific mine that will guarantee

no less protection for the miners affected than that provided by the

standard, or that the application of the standard at a specific mine

will result in a diminution of safety to the affected miners.

Summaries of petitions received by the Secretary appear

periodically in the Federal Register. Final decisions on these

petitions are based upon the petitioner's statements, comments and

information submitted by interested persons, and a field investigation

of the conditions at the mine. MSHA has granted or partially granted

the requests for modification submitted by the petitioners listed

below. In some instances, the decisions are conditioned upon compliance

with stipulations stated in the decision.

FOR FURTHER INFORMATION CONTACT: Petitions and copies of the final

decisions are available for examination by the public in the Office of

Standards, Regulations, and Variances, MSHA, Room 627, 4015 Wilson

Boulevard, Arlington, Virginia 22203. Contact Barbara Barron at 703-

235-1910.

Patricia W. Silvey,

Director, Office of Standards, Regulations and Variances.

Affirmative Decisions on Petitions for Modification

Docket No.: M-97-001-C.

FR Notice: 62 FR 11926.

Petitioner: Consolidation Coal Company.

Reg Affected: 30 CFR 75.1002.

Summary of Findings: Petitioner's proposal to use high-voltage

(4,160 volt) cables inby the last open crosscut considered acceptable

alternative method. Granted for the Shoemaker Mine with conditions for

the 4,160-volt longwall equipment.

Docket No.: M-97-002-C.

FR Notice: 62 FR 11926.

Petitioner: Eastern Associated Coal Corporation.

Reg Affected: 30 CFR 75.364.

Summary of Findings: Petitioner's proposal states that a portion of

the mine has been sealed thus eliminating the need for certain

checkpoints; that checkpoints 3, 4, 7, and 8 are now

[[Page 44928]]

behind seals and, therefore, are no longer necessary; and that

checkpoints 5 and 6 that were used to evaluate a return air course from

2 West Mains will be eliminated due to rehabilitation and ventilation

changes in the seal project which is now being examined as required

considered acceptable alternative method. Granted for the Federal No. 2

Mine with conditions for the monitoring and evaluation of the unsafe-

to-travel segment of the designated return aircourse in Miracle Run

Shaft Bottom area.

Docket No.: M-97-003-C.

FR Notice: 62 FR 11926.

Petitioner: CONSOL of Kentucky, Inc.

Reg Affected: 30 CFR 75.1101-8.

Summary of Findings: Petitioner's proposal to use a single overhead

pipe system with \1/2\-inch orifice automatic sprinklers located on 10-

foot centers, to cover 50 feet of fire-resistant belt or 150 feet of

non-fire resistant belt, with actuation temperatures between 200 and

230 degrees Fahrenheit and with water pressure equal to or greater than

10 psi; and to have the sprinklers located not more than 10 feet apart

so that the discharge of water will extend over the belt drive, belt

take-up, electrical control, and gear reducing unit considered

acceptable alternative method. Granted for the Jones Fork 13A-H4 Mine

with conditions for a single overhead pipe sprinkler system.

Docket No.: M-97-004.

FR Notice: 62 FR 11926.

Petitioner: Marrowbone Development Company.

Reg Affected: 30 CFR 75.1002.

Summary of Findings: Petitioner's proposal to use 2,400-volt a.c.

electricity to power continuous mining equipment considered acceptable

alternative method. Granted for the Big Branch Mine with conditions for

the 2,400-volt continuous miner.

Docket No.: M-97-005-C.

FR Notice: 62 FR 11926.

Petitioner: Powderhorn Coal Company.

Reg Affected: 30 CFR 75.350.

Summary of Findings: Petitioner's proposal to use belt air to

ventilate active working places and to install a low-level carbon

monoxide detection system as an early warning fire detection system in

all belt entries used as intake air courses considered acceptable

alternative method. Granted for the Roadside Mine with conditions to

allow air coursed through conveyor belt entries to be used to ventilate

working places.

Docket No.: M-97-006-C.

FR Notice: 62 FR 11926.

Petitioner: Philippi Development, Inc.

Reg Affected: 30 CFR 75.364(b)(2).

Summary of Findings: Petitioner's proposal to establish an inlet

evaluation point along with an outlet evaluation point at which every

seven days a certified person would measure methane and oxygen

concentrations, air quantity, make tests to determine if the air is

moving in its proper direction and record the results in a book

provided on the surface considered acceptable alternative method.

Granted for the Sentinel Mine with conditions for the evaluation of

airflow through an approximately 600-foot long, unsafe-to-travel

segment of common return aircourse entries.

Docket No.: M-97-007-C.

FR Notice: 62 FR 11926.

Petitioner: Laurel Coal Company.

Reg Affected: 30 CFR 75.503 (18.41(f) of Part 18).

Summary of Findings: Petitioner's proposal to replace a padlock on

battery plug connectors on mobile battery-powered machines with a

threaded ring and a spring loaded device to prevent the plug connector

from accidently disengaging while under load considered acceptable

alternative method. Granted for the Coalburg 7A Mine with conditions

for the use of permanently installed spring-loaded locking devices in

lieu of padlocks on battery plugs.

Docket No.: M-97-008-C.

FR Notice: 62 FR 11927.

Petitioner: Laurel Coal Corporation.

Reg Affected: 30 CFR 75.503 (18.41(f) of Part 18).

Summary of Findings: Petitioner's proposal to replace a padlock on

battery plug connectors on mobile battery-powered machines with a

threaded ring and a spring loaded device to prevent the plug connector

from accidently disengaging while under load considered acceptable

alternative method. Granted for the Coalburg 9A Mine with conditions

for the use of permanently installed spring-loaded locking devices in

lieu of padlocks on battery plugs.

Docket No.: M-97-012-C.

FR Notice: 62 FR 11927.

Petitioner: Paramont Coal Corporation.

Reg Affected: 30 CFR 77.214(a).

Summary of Findings: Petitioner's proposal to backfill the existing

highwall with scalp rock in an area containing abandoned mine openings

considered acceptable alternative method. Granted for the Deep Mine No.

24 Mine with conditions for the modification of 30 CFR 77.214(a).

Docket No.: M-97-019-C.

FR Notice: 62 FR 23797.

Petitioner: C & H Mining Company.

Reg Affected: 30 CFR 75.342.

Summary of Findings: Petitioner's proposal to use hand-held

continuous-duty methane and oxygen indicators instead of machine

mounted methane monitoring systems on permissible three-wheel tractors

with drag bottom buckets considered acceptable alternative method.

Granted for the No. 8 Mine with conditions for the Mescher permissible

three-wheel battery-powered tractors used to load coal.

Docket No.: M-97-022-C.

FR Notice: 62 FR 23797.

Petitioner: Brookside Coal Company.

Reg Affected: 30 CFR 75.1405.

Summary of Findings: Petitioner's proposal to use bar and pin or

link and pin couplers on its underground haulage equipment considered

acceptable alternative method. Granted for the Diamond Vein Slope Mine

with conditions.

Docket No.: M-97-025-C.

FR Notice: 62 FR 23798.

Petitioner: CONSOL of Kentucky, Inc.

Reg Affected: 30 CFR 75.1101-8.

Summary of Findings: Petitioner's proposal to use a single overhead

pipe system with \1/2\-inch orifice automatic sprinklers located on 10-

foot centers, to cover 50 feet of fire-resistant belt or 150 feet of

non-fire resistant belt, with actuation temperatures between 200

degrees and 230 degrees fahrenheit and with water pressure equal to or

greater than 10 psi, so that the discharge of water would extend over

the belt drive, belt take-up, electrical control, and gear reducing

unit considered acceptable alternative method. Granted for the E3RF

Mine with conditions for a single overhead pipe sprinkler system.

Docket No.: M-97-028-C.

FR Notice: 62 FR 23798.

Petitioner: Maple Meadow Mining Company.

Reg Affected: 30 CFR 75.503.

Summary of Findings: Petitioner's proposal to replace a padlock on

battery plug connectors on mobile battery-powered machines with a

threaded ring and a spring loaded device to prevent the plug connector

from accidently disengaging while under load considered acceptable

alternative method. Granted for the Maple Meadow Mine with conditions

for the use of permanently installed spring-loaded locking devices in

lieu of padlocks on battery plugs.

Docket No.: M-97-033-C.

FR Notice: 62 FR 23799.

Petitioner: Peabody Coal Company.

Reg Affected: 30 CFR 75.1002.

Summary of Findings: Petitioner's proposal to use high-voltage

trailing

[[Page 44929]]

cables (2,400-volt) inby the last open crosscut at the sections where

continuous miners are working considered acceptable alternative method.

Granted for the Marissa Mine with conditions for the 2,400-volt

continuous miner used at the Marissa Mine.

Docket No.: M-97-036-C.

FR Notice: 62 FR 23799.

Petitioner: Long Branch Energy.

Reg Affected: 30 CFR 75.503(18.41)(f).

Summary of Findings: Petitioner's proposal to replace a padlock on

battery plug connectors on mobile battery-powered machines with a

threaded ring and a spring loaded device to prevent the plug connector

from accidently disengaging while under load considered acceptable

alternative method. Granted for the No. 22 Mine with conditions for the

use of permanently installed spring-loaded locking devices in lieu of

padlocks on battery plugs.

Docket No.: M-97-040-C.

FR Notice: 62 FR 29370.

Petitioner: G & P Contractors, Inc.

Reg Affected: 30 CFR 75.342.

Summary of Findings: Petitioner's proposal to use hand-held

continuous-duty methane and oxygen indicators on permissible three-

wheel tractors instead of machine-mounted methane monitors considered

acceptable alternative method. Granted for Stoney Fork No. 2 Mine with

conditions for the Mescher permissible three-wheel battery-powered

tractors used to load coal.

Docket No.: M-97-050-C.

FR Notice: 62 FR 29372.

Petitioner: Canyon Fuel Company, LLC.

Reg Affected: 30 CFR 75.1002.

Summary of Findings: Petitioner's proposal to use high-voltage

(4,160-volt) cables to supply power to longwall equipment used inby the

last open crosscut considered acceptable alternative method. Granted

for the SUFCO Mine with conditions for the 4,160-volt longwall

equipment.

Docket No.: M-97-057-C.

FR Notice: 62 FR 29373.

Petitioner: Headache Coal Company, Inc.

Reg Affected: 30 CFR 75.380(f)(4)(i).

Summary of Findings: Petitioner's proposal to install two 5-pound

or one 10-pound portable chemical fire extinguisher in the operator's

deck of each Mescher tractor and to have the fire extinguisher readily

accessible to the operator; to have the fire extinguisher inspected

daily by the equipment operator prior to entering the escapeway; to

have the operator make daily inspections of the fire extinguisher and

keep the records at the mine site; and to have a sufficient number of

spare fire extinguishers maintained at the mine in case an extinguisher

becomes defective considered acceptable alternative method. Granted for

the Mine No. 7 with conditions for Mescher three wheel tractors to be

operated in the primary intake escapeway.

Docket No.: M-97-058-C.

FR Notice: 62 FR 34311.

Petitioner: Clark Elkhorn Mining Company.

Reg Affected: 30 CFR 75.900.

Summary of Findings: Petitioner's proposal to use contactors to

obtain undervoltage protection instead of using circuits breakers

considered acceptable alternative method. Granted for the Sunset Mine

No. 2 Mine with conditions to allow the use of vacuum contactors to

provide undervoltage, grounded phase, and overload protection and

monitor the grounding conductors for 480-volt belt conveyor drive

motors and water pump motors greater than 5 horsepower.

Docket No.: M-97-059-C.

FR Notice: 62 FR 34311.

Petitioner: B & B Anthracite Coal.

Reg Affected: 30 CFR 75.360.

Summary of Findings: Petitioner's proposal to visually examine each

seal for physical damage from the slope gunboat during the preshift

examination after an air quantity reading is taken inby the intake

portal and to test for the quantity and quality of air at the intake

air split locations off the slope in the gangway portion of the working

section considered acceptable alternative method. Granted for the Rock

Ridge No. 1 Slope Mine with conditions for examinations of seals

(conducted from the gunboat) in the intake air haulage slope of this

mine.

Docket No.: M-97-061-C.

FR Notice: 62 FR 34311.

Petitioner: B & B Anthracite Coal.

Reg Affected: 30 CFR 75.1100.

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for the Rock Ridge Slope with

conditions for firefighting equipment in the working section.

Docket No.: M-97-063-C.

FR Notice: 62 FR 34311.

Petitioner: Ambrose Branch Coal Company, Inc.

Reg Affected: 30 CFR 77.214.

Summary of Findings: Petitioner's proposal to fill seven (7) drift

openings with refuse material at the abandoned Fleetwood Energy, Inc.,

Mine No. 2 considered acceptable alternative method. Granted for the

Preparation Plant with conditions for modification of 30 CFR 77.214(a).

Docket No.: M-97-065-C.

FR Notice: 62 FR 34313.

Petitioner: Monterey Coal Company.

Reg Affected: 30 CFR 75.1700.

Summary of Findings: Petitioner's proposal to mine through oil and

gas wells with the longwall system after they have been properly

plugged considered acceptable alternative method. Granted for the No. 1

Mine with conditions for mining through or near plugged oil or gas

wells penetrating the Illinois No. 6 Coal Seam.

Docket No.: M-97-066-C.

FR Notice: 62 FR 34312.

Petitioner: Turris Coal Company.

Reg Affected: 30 CFR 75.1100-2(i)(1).

Summary of Findings: Petitioner's proposal to use the following

materials at its Elkhart Mine: 160 Kennedy Metal Stopping Panels 32

Kennedy Stopping Rib Angles; 3 rolls of tape; 3 twist tools; 2 rolls of

brattice cloth; 3 stopping jacks; 3 dutch heads; 3 shovels; 12 buckets

of Celtite 10-12 Airtite (or equivalent material for stopping); and 5

tons of rock dust considered acceptable alternative method. Granted for

the Elkhart Mine with conditions for emergency materials readily

available at locations not exceeding 2 miles from each working section.

Docket No.: M-97-068-C.

FR Notice: 62 FR 34312.

Petitioner: Drummond Company, Inc.

Reg Affected: 30 CFR 75.350.

Summary of Findings: Petitioner's request for an amendment to the

final Decision and Order dated April 1, 1995 was granted for the Shoal

Creek Mine with conditions for the use of belt air to ventilate active

workings.

Docket No.: M-97-080-C.

FR Notice: 62 FR 38124.

Petitioner: Little Buck Coal Company.

Reg Affected: 30 CFR 75.1100.

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for the No. 3 Slope Buck Mt.

Vein with conditions for firefighting equipment in the working section.

Docket No.: M-97-088-C.

FR Notice: 62 FR 44723.

Petitioner: Eastern Associated Coal Corporation.

Reg Affected: 30 CFR 75.380(g).

Summary of Findings: Petitioner's proposal to change the longwall

panel

[[Page 44930]]

development to a three-entry system considered acceptable alternative

method. Granted for the Federal No. 2 Mine with conditions for the use

of trolley track haulage entries as primary escapeways on longwall

development panels.

Docket No.: M-96-015-C.

FR Notice: 61 FR 17733.

Petitioner: Roberts Brothers Coal Company.

Reg Affected: 30 CFR 75.1103-4.

Summary of Findings: Petitioner's proposal to use two belt flights

to be monitored by one identification line considered acceptable

alternative method. Granted for the Cardinal No. 2 Mine with conditions

to allow the extension of the Pyott--Boone Electronics Inc. point type

heat sensor fire detection system installed in panels from which rooms

are driven, to be extended to provide fire detection for a secondary

in-panel belt conveyor without identifying such as separate belt flight

during retreat of the panel by room development.

Docket No.: M-96-018-C.

FR Notice: 61 FR 17733.

Petitioner: Eagle Nest, Inc.

Reg Affected: 30 CFR 75.503(18.41).

Summary of Findings: Petitioner's proposal to replace a padlock on

battery plug connectors on mobile battery-powered machines used inby

the last open crosscut with a threaded ring and a spring loaded device

to prevent the plug connector from accidently disengaging while under

load; to have a tag that states ``DO NOT DISENGAGE PLUGS UNDER LOAD''

on all battery plug connectors used on the machines; and to provide

instructions in the safe practices and provisions to all persons who

are required to operate or maintain the machines considered acceptable

alternative method. Granted for the Eagle Nest Inc. Mine with

conditions for the use of permanently installed spring-loaded locking

devices in lieu of padlocks on battery plugs.

Docket No.: M-96-019-C.

FR Notice: 61 FR 17733.

Petitioner: Consolidation Coal Company.

Reg Affected: 30 CFR 75.364(b)(1).

Summary of Findings: Petitioner's proposal to establish check

points to monitor methane and to ensure passage of air; to maintain the

check points in safe condition at all times; to have a certified person

test for methane and the quantity of air at each check point on a

weekly basis; and to have the certified person making the examinations

and tests place their initials, date, and time in a record book kept on

the surface and made available for inspection by interested persons

considered acceptable alternative method. Granted for the Robinson Run

No. 95 Mine with conditions for the ``North Mains'' aircourse

ventilating eight 1-East seals, two 26-Block seals and six of eighteen

3-Block seals.

Docket No.: M-96-040-C.

FR Notice: 61 FR 33141.

Petitioner: Pontiki Coal Corporation.

Reg Affected: 30 CFR 75.388.

Summary of Findings: Petitioner's proposal to drill boreholes when

working places advance to within 30 feet of certain surveyed areas in

the mine unless those areas have been preshift examined considered

acceptable alternative method. Granted for the Pontiki No. 1 Mine with

conditions for the use of administration and engineering controls in

lieu of drilling boreholes when the working place approaches to within

25 feet of an adjacent panel that cannot be preshift examined.

Docket No.: M-96-041-C.

FR Notice: 61 FR 33141.

Petitioner: Pontiki Coal Corporation.

Reg Affected: 30 CFR 75.388.

Summary of Findings: Petitioner's proposal to drill boreholes when

working places advance to within 30 feet of certain surveyed areas in

the mine unless those areas have been preshift examined considered

acceptable alternative method. Granted for the Pontiki No. 1 Mine with

conditions for the use of administration and engineering controls in

lieu of drilling boreholes when the working place approaches to within

25 feet of an adjacent panel that cannot be preshift examined.

Docket No.: M-96-062-C.

FR Notice: 61 FR 38787.

Petitioner: Cyprus Cumberland Resources Corp.

Reg Affected: 30 CFR 75.350.

Summary of Findings: Petitioner's proposal to permit the velocity

of air in the belt conveyor entries to be increased above 300 feet per

minute (fpm) considered acceptable alternate method. Granted for the

Cumberland Mine with conditions to allow air coursed through conveyor

belt entries to be used to ventilate working places.

Docket No.: M-96-064-C.

FR Notice: 61 FR 38787.

Petitioner: West Cameron Mining.

Reg Affected: 30 CFR 75.1100.

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for the Lenig Tunnel Mine with

conditions for firefighting equipment in the working section.

Docket No.: M-96-075-C.

FR Notice: 61 FR 47192.

Petitioner: Cumberland Resources Corporation.

Reg Affected: 30 CFR 75.1103-4(a).

Summary of Findings: Petitioner's proposal to install a low-level

carbon monoxide detection system as an early warning fire detection

system in all belt entries used as intake air courses considered

acceptable alternative method. Granted for the Cumberland Mine with

conditions for the use of a carbon monoxide monitoring system that

identifies the location of sensors in lieu of identifying belt flights.

Docket No.: M-96-092-C.

FR Notice: 61 FR 47194.

Petitioner: Eastern Mingo Coal Company.

Reg Affected: 30 CFR 75.503(18.41)(f).

Summary of Findings: Petitioner's proposal to replace a padlock on

battery plug connectors on mobile battery-powered machines with a

threaded ring and a spring loaded device to prevent the plug connector

from accidentally disengaging while under load considered acceptable

alternative method. Granted for the Big Branch Mine with conditions for

the use of permanently installed spring-loaded locking devices in lieu

of padlocks on battery plugs.

Docket No.: M-96-093-C.

FR Notice: 61 FR 47194.

Petitioner: Western Mingo Coal Company.

Reg Affected: 30 CFR 75.503(18.41)(f).

Summary of Findings: Petitioner's proposal to replace a padlock on

battery plug connectors on mobile battery-powered machines with a

threaded ring and a spring loaded device to prevent the plug connector

from accidently disengaging while under load considered acceptable

alternative method. Granted for the Northern Mingo No. 1 Mine with

conditions for the use of permanently installed spring-loaded locking

devices in lieu of padlocks on battery plugs.

Docket No.: M-96-094-C.

FR Notice: 61 FR 47194.

Petitioner: Western Mingo Coal Company.

Reg Affected: 30 CFR 75.503(18.41)(f).

Summary of Findings: Petitioner's proposal to replace a padlock on

battery plug connectors on mobile battery-powered machines with a

threaded ring and a spring loaded device to prevent the plug connector

from accidently disengaging while under load considered acceptable

alternative

[[Page 44931]]

method. Granted for the Northern Mingo No. 2 Mine with conditions for

the use of permanently installed spring-loaded locking devices in lieu

of padlocks on battery plugs.

Docket No.: M-96-097-C.

FR Notice: 62 FR 47194.

Petitioner: Arch of Illinois.

Reg Affected: 30 CFR 75.1107-4(a)(1).

Summary of Findings: Petitioner's proposal to use an operator/

technician, the Archveyor mining system's Program Logic Controlled

(PLC) computer, and the continuous monitoring of the Archveyor mining

system while energized, as a fire suppression device, during secondary

mining considered acceptable alternative method. Granted for the Conant

Mine with conditions for the Archveyor Mining System.

Docket No.: M-96-098-C.

FR Notice: 61 FR 57458.

Petitioner: Sidney Coal Company, Inc. and its subsidiaries.

Reg Affected: 30 CFR 75.901(a).

Summary of Findings: Petitioner's proposal to use a diesel

generator to move equipment in and out of its underground mines

considered acceptable alternative method. Granted for Freedom Energy

Mine No. 1; Solid Energy Mine No. 1; Clean Energy Mine No. 1; Black

Diamond Mine no. 1 and Rockhouse Mine Energy No. 1 with conditions for

the 480-volt, three-phase, 150 KW/187.5 KVA diesel powered generator

set.

Docket No.: M-96-104-C.

FR Notice: 62 FR 420.

Petitioner: Mountain Coal Company.

Reg Affected: 30 CFR 75.503.

Summary of Findings: Petitioner's proposal to use 1,100 feet of 2/

0, type SHD-GC cable on continuous miners, 1,000 feet of #2, type GC

cable on roof bolters, and 1,000 feet of #2, type SHD-GC cable on

auxiliary face fans considered acceptable alternative method. Granted

for the West Elk Mine with conditions for the three-phase, 995-volt

continuous mining machine, 995-volt roof bolting machine, 995-volt

auxiliary fan, 575-volt roof bolting machine, and 575-volt auxiliary

fan.

Docket No.: M-96-105-C.

FR Notice: 61 FR 57459.

Petitioner: Little Buck Coal Company.

Reg Affected: 30 CFR 75.1400.

Summary of Findings: Petitioner's proposal to permit the use of the

slope conveyance (gunboat) in transporting persons without installing

safety catches or other no less effective devices, but instead use an

increased rope strength/safety factor and secondary safety rope

connection in place of such devices considered acceptable alternative

method. Granted for the No. 3 Slope Buck Mountain Mine with conditions

for the use of the gunboat without safety catches.

Docket No.: M-96-107-C.

FR Notice: 61 FR 57459.

Petitioner: Old Ben Coal Company.

Reg Affected: 30 CFR 75.350.

Summary of Findings: Petitioner's proposal to use the split-tail

system of face ventilation allowing the belt to be blended with the air

to the faces from the intake entries and to install a low-level carbon

monoxide detection system as an early warning fire detection system in

all belt entries used as intake air courses considered acceptable

alternative method. Granted for the Ziegler No. 11 Mine with conditions

to allow air coursed through conveyer belt entries to be used to

ventilate working places.

Docket No.: M-96-109-C.

FR Notice: 61 FR 57459.

Petitioner: The Ohio Valley Coal Company.

Reg Affected: 30 CFR 75.364.

Summary of Findings: Petitioner's proposal to establish evaluation

stations to monitor the affected area; to have a certified person to:

(1) test the evaluation stations on a weekly basis to determine the

volume of air, and methane and oxygen concentrations; and (2) record on

a date board located at each checkpoint the initials of the examiner

and the date and time of the examination; and to maintain the air

measurement stations in a safe and travelable condition considered

acceptable alternative method. Granted for the Powhatan No. 6 Mine with

conditions for the unsafe-to-travel aircourses rended inaccessible by

roof falls and roof deterioration known as MAIN EAST and LOADED SIDE.

Docket No.: M-96-111-C.

FR Notice: 61 FR 57459.

Petitioner: CONSOL of Kentucky, Inc.

Reg Affected: 30 CFR 75.1101-8.

Summary of Findings: Petitioner's proposal to use a single overhead

pipe system with \1/2\-inch orifice automatic sprinklers located on 10-

foot centers, to cover 50 feet of fire-resistant belt or 150 feet of

nonfire-resistant belt, with actuation temperatures between 200 and 230

degrees Fahrenheit, and with water pressure equal to or greater than 10

psi and the sprinklers would be located to discharge water over the

belt drive, belt take-up, electrical control, and gear reducing unit

considered acceptable alternative method. Granted for the Loves Branch

H-4 Mine with conditions for a single overhead pipe sprinkler.

Docket No.: M-96-112-C.

FR Notice: 61 FR 57459.

Petitioner: K & M Coal Company, Inc.

Reg Affected: 30 CFR 75.342.

Summary of Findings: Petitioner's proposal to use hand-held

continuous-duty methane and oxygen indicators instead of machine

mounted methane monitors on permissible three-wheel tractors with drag

type buckets considered acceptable alternative method. Granted for the

No. 18 Mine with conditions for the Mescher permissible three-wheel

battery-powered tractors used to load coal.

Docket No.: M-96-113-C.

FR Notice: 61 FR 57460.

Petitioner: Jackstone Coal Company.

Reg Affected: 30 CFR 75.335(a)(1).

Summary of Findings: Petitioner's proposal to permit alternative

methods of construction using wooden materials of moderate size and

weight due to the difficulty in accessing previously driven headings

and breasts containing the inaccessible abandoned workings; to accept a

design criteria in the 10 psi range; and to permit the water trap to be

installed in the gangway seal and sampling tube in the monkey seal for

seals installed in pairs considered acceptable alternative method.

Granted for the Buck Mountain Slope with conditions for seals installed

in this mine.

Docket No.: M-96-114-C.

FR Notice: 61 FR 57460.

Petitioner: Jackstone Coal Company.

Reg Affected: 30 CFR 75.360.

Summary of Findings: Petitioner's proposal to visually examine each

seal for physical damage from the slope gunboat during the preshift

examination after an air quantity reading is taken inby the intake

portal and to test for the quantity and quality of air at the intake

air split locations off the slope in the gangway portion of the working

section considered acceptable alternative method. Granted for the Buck

Mountain Slope Mine with conditions for examination of seals (conducted

from the gunboat) in the intake air haulage slope of this mine.

Docket No.: M-96-116-C.

FR Notice: 61 FR 57460.

Petitioner: Jackstone Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for Buck Mountain Slope Mine

with conditions for firefighting equipment in the working section.

Docket No.: M-96-117-C.

FR Notice: 61 FR 57460.

Petitioner: Jackstone Coal Company.

[[Page 44932]]

Reg Affected: 30 CFR 75.1200(d) and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000-foot intervals of

advance from the intake slope; and to limit the required mapping of the

mine workings above and below to those present within 100 feet of the

veins being mined except when veins are interconnected to other veins

beyond the 100-foot limit through rock tunnels considered acceptable

alternative method. Granted for Buck Mountain Slope Mine with

conditions for the use of cross-sections, in lieu of contour lines,

limiting the mapping of mines above or below this mine to those within

100 feet of the vein being mined.

Docket No.: M-96-118-C.

FR Notice: 61 FR 57460.

Petitioner: Jackstone Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps annually instead of every 6 months, as required, and to

update maps daily by hand notations considered acceptable alternative

method. Granted for Buck Mountain Slope Mine with conditions for annual

revisions and supplements of the mine map.

Docket No.: M-96-122-C.

FR Notice: 61 FR 57480.

Petitioner: Keystone Coal Mining Corporation.

Reg Affected: 30 CFR 75.364(b)(1).

Summary of Findings: Petitioner's proposal to establish two

monitoring stations to evaluate the affected area; to post a sign in an

adjacent travel entry indicating the safe travel route to each

monitoring station; to have a certified person conduct weekly

examinations at each monitoring station to measure the quantity and

quality of air entering or exiting the monitoring station; to post at

each monitoring station a diagram showing the normal quantity and

quality of methane, oxygen measurements, and the direction of the air

flow; to have the examiner record their initials, date and time of

examinations on a date board provided at the monitoring stations; and

to record the results of the tests in a weekly examination book kept on

the surface and made available to all interested parties considered

acceptable alternative method. Granted for the Urling No. 1 Mine with

conditions for the evaluation of airflow through an approximately 800-

feet long, unsafe to travel, segment of three common intake aircourse

entries of the West Extension area.

Docket No.: M-96-130-C.

FR Notice: 61 FR 64372.

Petitioner: Yellow Creek Corporation.

Reg Affected: 30 CFR 75.380(f)(4)(i).

Summary of Findings: Petitioner's proposal to install two 5-pound

or one 10-pound portable chemical fire extinguisher in the operator

deck of each Mescher Tractor operated at the mine; to have the fire

extinguisher readily accessible to the operator; to have the equipment

operator inspect each fire extinguisher daily and keep records of the

inspections; and to replace the fire extinguisher if found to be

defective considered acceptable alternative method. Granted for the No.

2 Mine with conditions for Mescher three wheel tractors to be operated

in the primary intake escapeway.

Docket No.: M-96-131-C.

FR Notice: 61 FR 64373.

Petitioner: Hut Coal Company, Inc.

Reg Affected: 30 CFR 75.380(f)(4)(i).

Summary of Findings: Petitioner's proposal to install two 5-pound

or one 10-pound portable chemical fire extinguisher in the operator's

deck of each Mescher tractor operated at the mine; to have the fire

extinguisher readily accessible to the operator; to have the equipment

operator inspect each fire extinguisher daily and keep records of the

inspection; and to replace the fire extinguisher if found to be

defective considered acceptable alternative method. Granted for the No.

1 Mine with conditions for Mescher three wheel tractors to be operated

in the primary intake escapeway.

Docket No.: M-96-132-C.

FR Notice: 61 FR 64373.

Petitioner: Canfield Energy, Inc.

Reg Affected: 30 CFR 75.380(f)(4)(i).

Summary of Findings: Petitioner's proposal to install two 5-pound

or one 10-pound portable chemical fire extinguisher in the operator's

deck of each Mescher tractor operated at the mine; to have the fire

extinguisher readily accessible to the operator; to have the equipment

operator inspect each fire extinguisher daily and keep records of the

inspections and to maintain a sufficient number of spare fire

extinguishers at the mine in case a defective fire extinguisher needs

to be replaced considered acceptable alternative method. Granted for

the No. 3 Mine with conditions for Mescher three wheel tractors to be

operated in the primary intake escapeway.

Docket No.: M-96-133-C.

FR Notice: 61 FR 64373.

Petitioner: Summit Anthracite, Inc.

Reg Affected: 30 CFR 75.340.

Summary of Findings: Petitioner's proposal to permit battery

charging of the mine's locomotive during idle periods when all miners

are out of the mine; and to permit the intake air used to ventilate the

charging station located at the No. 1 Chute of the active gangway level

to continue through its normal route to the last open crosscut and into

the monkey airway (return) considered acceptable alternative method.

Granted for the Tracey Vein Slope Mine with conditions for an

underground battery charging station in the intake (gangway) entry.

Docket No.: M-96-134-C.

FR Notice: 61 FR 64373.

Petitioner: Canfield Energy, Inc.

Reg Affected: 30 CFR 75.380(f)(4)(i).

Summary of Findings: Petitioner's proposal to install two 5-pound

or one 10-pound portable chemical fire extinguisher in the operator's

deck of each Mescher tractor operated at the mine; to have the fire

extinguisher readily accessible to the operator; to have the equipment

operator inspect each fire extinguisher daily and keep records of the

inspections and to maintain a sufficient number of spare fire

extinguishers at the mine in case a defective fire extinguisher needs

to be replaced considered acceptable alternative method. Granted for

the No. 4 Mine with conditions for Mescher three wheel tractors to be

operated in the primary intake escapeway.

Docket No.: M-96-146-C.

FR Notice: 62 FR 421.

Petitioner: F-M Coal Company.

Reg Affected: 30 CFR 75.380(f)(4)(i).

Summary of Findings: Petitioner's proposal to install two 5-pound

or one 10-pound portable chemical fire extinguisher in the operator's

deck of each Mescher tractor operated at the mine; to have the fire

extinguisher readily accessible to the operator; to have the equipment

operator inspect each fire extinguisher daily and keep records of the

inspections and to maintain a sufficient number of spare fire

extinguishers at the mine in case a defective fire extinguisher needs

to be replaced considered acceptable alternative method. Granted for

the No. 2 Mine with conditions for Mescher three wheel tractors to be

operated in the primary intake escapeway.

Docket No.: M-96-153-C.

FR Notice: 62 FR 422.

Petitioner: Boone Resources, Inc.

Reg Affected: 30 CFR 75.350.

Summary of Findings: Petitioner's proposal to use belt air to

provide ventilation for the sections and possibly a longwall system;

and to install a carbon monoxide monitoring system as an early warning

fire detection system in all belt entries used as intake

[[Page 44933]]

aircourses considered acceptable alternative method. Granted for the

Boone No. 1 Mine with conditions to allow air coursed through conveyor

belt entries to be used to ventilate working places.

Docket No.: M-96-155-C.

FR Notice: 62 FR 422.

Petitioner: Road Fork Development Company.

Reg Affected: 30 CFR 75.901.

Summary of Findings: Petitioner's proposal to use a diesel

generator to power mobile equipment in and out of the mines considered

acceptable alternative method. Granted for the Calloway Mine; Pegs

Branch Mine; Burnwell Energy Mine; and Extra Energy Mine with

conditions for the 480-volt, three-phase, 150 KW/187.5 KVA diesel

powered generator set.

Docket No.: M-96-156-C.

FR Notice: 62 FR 422.

Petitioner: Rawl Sales and Processing.

Reg Affected: 30 CFR 75.901(a).

Summary of Findings: Petitioner's proposal to use a diesel

generator to power mobile equipment in and out of the mine considered

acceptable alternative method. Granted for the Tall Timber Mine with

conditions for the 480-volt, three-phase, 150 KW/187.5 KVA diesel

powered generator set.

Docket No.: M-96-157-C.

FR Notice: 62 FR 422.

Petitioner: Crystal Fuels Company.

Reg Affected: 30 CFR 75.503.

Summary of Findings: Petitioner' proposal to use permanently

installed, spring-loaded locking device to secure battery plugs on

mobile equipment to prevent unintentional loosening of the battery

plugs from battery receptacles and to eliminate the hazards associated

with difficult removal of padlocks during emergency situations

considered acceptable alternative method. Granted for the Mine No. 1

with conditions for the use of permanently installed, spring-loaded

locking devices in lieu of padlocks on battery plugs.

Docket No.: M-96-158-C.

FR Notice: 62 FR 422

Petitioner: Vantage Mining Company.

Reg Affected: 30 CFR 75.503.

Summary of Findings: Petitioner's proposal to use permanently

installed, spring-loaded locking device to secure battery plugs on

mobile equipment to prevent unintentional loosening of the battery

plugs from battery receptacles and to eliminate the hazards associated

with difficult removal of padlocks during emergency situations

considered acceptable alternative method. Granted for the Mine No. 1

with conditions for the use of permanently installed, spring-loaded

locking devices in lieu of padlocks on battery plugs.

Docket No.: M-96-159-C.

FR Notice: 62 FR 423.

Petitioner: Rawl Sales and Processing Company.

Reg Affected: 30 CFR 75.503.

Summary of Findings: Petitioner's proposal to use permanently

installed spring-loaded locking devices to secure battery plugs on

mobile equipment to prevent unintentional loosening of the battery

plugs from battery receptacles and to eliminate the hazards associated

with difficult removal of padlocks during emergency situations

considered acceptable alternative method. Granted for the Tall Timber

Mine with conditions for the use of permanently installed, spring-

loaded locking devices in lieu of padlocks on battery plugs.

Docket No.: M-96-160-C.

FR Notice: 62 FR 423.

Petitioner: Sycamore Fuels, Inc.

Reg Affected: 30 CFR 75.503.

Summary of Findings: Petitioner's proposal to use permanently

installed, spring-loaded locking device to secure battery plugs on

mobile equipment to prevent unintentional loosening of the battery

plugs from battery receptacles and to eliminate the hazards associated

with difficult removal of padlocks during emergency situations

considered acceptable alternative method. Granted for the Mine No. 1

with conditions for the use of permanently installed, spring-loaded

locking devices in lieu of padlocks on battery plugs.

Docket No.: M-96-161-C.

FR Notice: 62 FR 423.

Petitioner: Rawl Sales and Processing Company.

Reg Affected: 30 CFR 75.503.

Summary of Findings: Petitioner's proposal to use permanently

installed, spring-loaded locking device to secure battery plugs on

mobile equipment to prevent unintentional loosening of the battery

plugs from battery receptacles and to eliminate the hazards associated

with difficult removal of padlocks during emergency situations

considered acceptable alternative method. Granted for Rocky Hollow Mine

with conditions for the use of permanently installed, spring-loaded

locking devices in lieu of padlocks on battery plugs.

Docket No.: M-96-166-C.

FR Notice: 62 FR 4331.

Petitioner: D & D Coal Company.

Reg Affected: 30 CFR 75.335.

Summary of Findings: Petitioner's proposal to permit construction

of seals using wooden materials of moderate size and weight due to the

difficulty in accessing previously driven headings and breasts

containing inaccessible abandoned workings; to accept a design criteria

in the 10 psi range; and to permit the water trap to be installed in

the gangway seal and sampling tube in the monkey seal for seals

installed in pairs considered acceptable alternative method. Granted

for 7 Foot Drift Mine with conditions for seals installed in this mine.

Docket No.: M-96-167.

FR Notice: 62 FR 4331.

Petitioner: D & D Coal Company.

Reg Affected: 30 CFR 75.1100.

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for the 7 Foot Drift Mine with

conditions for firefighting equipment in the working section.

Docket No.: M-96-170-C.

FR Notice: 62 FR 4331.

Petitioner: Burnrite Slope Coal Company.

Reg Affected: 30 CFR 75.1200(d) & (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000-foot intervals of

advance from the intake slope and to limit the required mapping of the

mine workings above and below to those present within 100 feet of the

veins being mined except when veins are interconnected to other veins

beyond the 100-foot limit through rock tunnels considered acceptable

alternative method. Granted for the Burnrite Slope Mine with conditions

for the use of cross-sections, in lieu of contour lines, limiting the

mapping of mines above or below this mine to those within 100 feet of

the vein being mined.

Docket No.: M-96-171-C.

FR Notice: 62 FR 4331.

Petitioner: Burnrite Slope Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's request to revise and supplement

mine maps annually instead of every 6 months, as required, and to

update maps daily by hand notations considered acceptable alternative

method. Granted for the Burnrite Slope Mine with conditions for annual

revisions and supplements of the mine map.

Docket No.: M-96-172-C.

FR Notice: 62 FR 4332.

Petitioner: Burnrite Slope Coal Company.

Reg Affected: 30 CFR 75.1400.

Summary of Findings: Petitioner's proposal to use a slope

conveyance (gunboat) in transporting persons

[[Page 44934]]

without installing safety catches or other no less effective devices

but instead use an increased rope strength/safety factor and secondary

safety rope connection in place of such devices considered acceptable

alternative method. Granted for the Burnrite Slope Mine with conditions

for the use of the gunboat without safety catches.

Docket No.: M-96-175-C.

FR Notice: 62 FR 4332.

Petitioner: Apex Minerals, Inc.

Reg Affected: 30 CFR 75.503.

Summary of Findings: Petitioner's proposal to use permanently

installed, spring-loaded locking device to secure battery plugs on

mobile equipment to prevent unintentional loosening of the battery

plugs from battery receptacles and to eliminate the hazards associated

with difficult removal of padlocks during emergency situations

considered acceptable alternative method. Granted for the Mine No. 1

with conditions for the use of permanently installed, spring-loaded

locking devices in lieu of padlocks on battery plugs.

Docket No.: M-96-176-C.

FR Notice: 62 FR 4332.

Petitioner: Rawls Sales and Processing Co.

Reg Affected: 30 CFR 75.701.

Summary of Findings: Petitioner's proposal to use diesel generator

to power mobile equipment in and out of its mine, considered acceptable

alternative method. Granted for the Tall Timber Mine with conditions

for the 480-volt, three-phase, 150 KW/187.5 KVA diesel powered

generator set.

Docket No.: M-96-177-C.

FR Notice: 62 FR 4332.

Petitioner: Road Fork Development Company.

Reg Affected: 30 CFR 75.701.

Summary of Findings: Petitioner's proposal to use diesel generator

to power mobile equipment in and out of the mines, considered

acceptable alternative method. Granted for the Calloway Mine; Pegs

Branch Mine; Burnwell Energy Mine; and Extra Energy Mine with

conditions for the 480-volt, three-phase, 150 KW/187.5 KVA diesel

powered generator set.

Docket No.: M-96-178-C.

FR Notice: 62 FR 4332.

Petitioner: Dry Fork Energy, Inc.

Reg Affected: 30 CFR 75.503.

Summary of Findings: Petitioner's proposal to use permanently

installed, spring-loaded locking devices to secure battery plugs on

mobile equipment to prevent unintentional loosening of the battery

plugs from battery receptacles and to eliminate the hazards associated

with difficult removal of padlocks during emergency situations

considered acceptable alternative method. Granted for the Mine No. 1

with conditions for the use of permanently installed, spring-loaded

locking devices in lieu of padlocks on battery plugs.

Docket No.: M-96-179-C.

FR Notice: 62 FR 4332.

Petitioner: Dry Fork Energy, Inc.

Reg Affected: 30 CFR 75.701.

Summary of Findings: Petitioner's proposal to use diesel generator

to power mobile equipment in and out of its mine, considered acceptable

alternative method. Granted for the Mine No. 1 with conditions for the

480-volt, three-phase, 150 KW/187.5 KVA diesel powered generator set.

Docket No.: M-96-180-C.

FR Notice: 62 FR 4333.

Petitioner: Dry Fork Energy, Inc.

Reg Affected: 30 CFR 75.901(a).

Summary of Findings: Petitioner's proposal to use a diesel

generator to power mobile equipment in and out of the mine considered

acceptable alternative method. Granted for the Mine No. 1 with

conditions for the 480-volt, three-phase, 150 KW/187.5 KVA diesel

powered generator set.

Docket No.: M-96-181-C.

FR Notice: 62 FR 4333.

Petitioner: Apex Minerals, Inc.

Reg Affected: 30 CFR 75.701.

Summary of Findings: Petitioner's proposal to use diesel generator

to power mobile equipment in and out of its mine, considered acceptable

alternative method. Granted for the Mine No. 1 with conditions for the

480-volt, three-phase, 150 KW/187.5 KVA diesel powered generator set.

Docket No.: M-96-182-C.

FR Notice: 62 FR 4333.

Petitioner: Apex Minerals, Inc.

Reg Affected: 30 CFR 75.901(a).

Summary of Findings: Petitioner's proposal to use a diesel

generator to power mobile equipment in and out of the mine considered

acceptable alternative method. Granted for the Mine No. 1 with

conditions for the 480-volt, three-phase, 150 KW/187.5 KVA diesel

powered generator set.

Docket No.: M-96-184-C.

FR Notice: 62 FR 4333.

Petitioner: M & H Coal Company.

Reg Affected: 30 CFR 75.1200(d)&(i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000-foot intervals of

advance from the intake slope and to limit the required mapping of the

mine workings above and below to those present within 100 feet of the

veins being mined except when veins are interconnected to other veins

beyond the 100-foot limit through rock tunnels considered acceptable

alternative method. Granted for the Mercury Slope Mine with conditions

for the use of cross sections, in lieu of contour lines, limiting the

mapping of mines above or below this mine to those within 100 feet of

the vein being mined.

Docket No.: M-96-185-C.

FR Notice: 62 FR 4333.

Petitioner: M & H Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps annually instead of every 6 months, as required, and to

update maps daily by hand notations considered acceptable alternative

method. Granted for the Mercury Slope Mine with conditions for annual

revisions and supplements of the mine map.

Docket No.: M-96-186-C.

FR Notice: 62 FR 4333.

Petitioner: M & H Coal Company.

Reg Affected: 30 CFR 75.335.

Summary of Findings: Petitioner's proposal to permit the use of

construction of seals using wooden materials of moderate size and

weight due to the difficulty in accessing previously driven headings

and breasts containing inaccessible abandoned workings; to accept a

design criteria in the 10 psi range; and to permit the water trap to be

installed in the gangway seal and sampling tube in the monkey seal for

seals installed in pairs considered acceptable alternative method.

Granted for the Mercury Slope Mine with conditions for seals installed

in this mine.

Docket No.: M-96-187-C.

FR Notice: 62 FR 4333.

Petitioner: Sheldon Derck.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps annually instead of every 6 months, as required, and to

update maps daily by hand notations considered acceptable alternative

method. Granted for the Slope No. 1 Mine with conditions for annual

revisions and supplements of the mine map.

Docket No.: M-96-188-C.

FR Notice: 62 FR 4334.

Petitioner: Sheldon Derck.

Reg Affected: 30 CFR 75.1200(d)&(i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000-foot intervals of

advance from the intake slope and to limit the required mapping of the

mine workings above and below

[[Page 44935]]

to those present within 100 feet of the veins being mined except when

veins are interconnected to other veins beyond the 100-foot limit

through rock tunnels considered acceptable alternative method. Granted

for the Slope No. 1 Mine with conditions for the use of cross sections,

in lieu of contour lines, limiting the mapping of mines above or below

this mine to those within 100 feet of the vein being mined.

Docket No.: M-96-189-C.

FR Notice: 62 FR 4334.

Petitioner: Sheldon Derck.

Reg Affected: 30 CFR 75.1100.

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for the Slope No. 1 Mine with

conditions for firefighting equipment in the working section.

Docket No.: M-96-190-C.

FR Notice: 62 FR 4334.

Petitioner: Jordan Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps annually instead of every 6 months, as required, and to

update maps daily by hand notations considered acceptable alternative

method. Granted for the Jordan No. 1 Slope Mine with conditions for

annual revisions and supplements of the mine map.

Docket No.: M-96-191-C.

FR Notice: 62 FR 4334.

Petitioner: Jordan Coal Company.

Reg Affected: 30 CFR 75.1200 (d)&(i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000-foot intervals of

advance from the intake slope and to limit the required mapping of the

mine workings above and below to those present within 100 feet of the

veins being mined except when veins are interconnected to other veins

beyond the 100-foot limit through rock tunnels considered acceptable

alternative method. Granted for the Jordan No. 1 Slope Mine with

conditions for the use of cross sections, in lieu of contour lines,

limiting the mapping of mines above or below this mine to those within

100 feet of the vein being mined.

Docket No.: M-96-192-C.

FR Notice: 62 FR 4334.

Petitioner: Jordan Coal Company.

Reg Affected: 30 CFR 75.1100.

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for Jordan No. 1 Slope Mine with

conditions for firefighting equipment in the working section.

Docket No.: M-96-193-C.

FR Notice: 62 FR 4334.

Petitioner: Consolidation Coal Company.

Reg Affected: 30 CFR 75.364(b)(2).

Summary of Findings: Petitioner's proposal to establish two check

points to monitor the affected area; to maintain these check points in

a safe condition; to have a certified person test for methane and the

quantity of air on a weekly basis at each check point; and to have the

person making examinations and tests record their initials, date, and

time in a record book kept on the surface and made available for

inspection by interested persons considered acceptable alternative

method. Granted for Shoemaker Mine with conditions for the unsafe-to-

travel 4025-foot segment of the Main East Returns near Seabright Air

Shaft.

Docket No.: M-96-200-C.

FR Notice: 62 FR 4335.

Petitioner: Sidney Coal Company, Inc. and its subsidiaries.

Reg Affected: 30 CFR 75.701.

Summary of Findings: Petitioner's proposal to use diesel generator

to power mobile equipment in and out of its mine, considered acceptable

alternative method. Granted for the Freedom Energy Mine No. 1; Solid

Energy Mine No. 1; Clean Energy Mine No. 1; Black Diamond Mine No. 1;

and Rockhouse Energy Mine No. 1 with conditions for the 480-volt,

three-phase, 150 KW/187.5 KVA diesel powered generator set.

Docket No.: M-96-203-C.

FR Notice: 62 FR 4335.

Petitioner: Elk Run Coal Company, Inc.

Reg Affected: 30 CFR 75.1002.

Summary of Findings: Petitioner's proposal to use 2,300-volt cables

to power longwall equipment in the active pillar workings; to implement

additional safety procedures devices; and to provide training to all

mining personnel considered acceptable alternative method. Granted for

the Black Knight II Mine with conditions for the 2,400-volt continuous

miner.

Docket No.: M-96-205-C.

FR Notice: 62 FR 11925.

Petitioner: Brookside Coal Company.

Reg Affected: 30 CFR 75.1200(d)&(i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000-foot intervals of

advance from the intake slope and to limit the required mapping of the

mine workings above and below to those present within 100 feet of the

veins being mined except when veins are interconnected to other veins

beyond the 100-foot limit through rock tunnels considered acceptable

alternative method. Granted for the Diamond Vein Slope Mine with

conditions for the use of cross sections, in lieu of contour lines,

limiting the mapping of mines above or below this mine to those within

100 feet of the vein being mined.

Docket No.: M-96-206-C.

FR Notice: 62 FR 11925.

Petitioner: Brookside Coal Company.

Reg Affected: 30 CFR 75.360.

Summary of Findings: Petitioner's proposal to visually examine each

seal for physical damage from the slope gunboat during the preshift

examination after an air quantity reading is taken in by the intake

portal and to test for the quantity and quality of air at the intake

air split locations off the slope in the gangway portion of the

workings; and physically examine the entire length of the slope once a

month considered acceptable alternative method. Granted for the Diamond

Vein Slope Mine with conditions for examinations of seals (conducted

from the gunboat) in the intake air haulage slope of this mine.

Docket No.: M-96-209-C.

FR Notice: 62 FR 11925.

Petitioner: Brookside Coal Company.

Reg Affected: 30 CFR 75.1100.

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for the Diamond Vein Slope Mine

with conditions for firefighting equipment in the working section.

Docket No.: M-96-210-C.

FR Notice: 62 FR 11925.

Petitioner: Brookside Coal Company.

Reg Affected: 30 CFR 75.1201-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps annually instead of every 6 months, as required, and to

update maps daily by hand notations considered acceptable alternative

method. Granted for the Diamond Vein Slope Mine with conditions for

annual revisions and supplements of the mine map.

Docket No.: M-96-211-C.

FR Notice: 62 FR 11926.

[[Page 44936]]

Petitioner: Brookside Coal Company.

Reg Affected: 30 CFR 75.335.

Summary of Findings: Petitioner's proposal to permit the use of

construction of seals using wooden materials of moderate size and

weight due to the difficulty in accessing previously driven headings

and breasts containing inaccessible abandoned workings; to accept a

design criteria in the 10 psi range; and to permit the water trap to be

installed in the gangway seal and sampling tube in the monkey seal for

seals installed in pairs considered acceptable alternative method.

Granted for the Diamond Vein Slope Mine with conditions for seals

installed in this mine.

Docket No.: M-95-047-C.

FR Notice: 60 FR 18148.

Petitioner: Jordan Coal Company.

Reg Affected: 30 CFR 75.335(a)(1).

Summary of Findings: Petitioner's proposal to permit seals of

construction using wooden materials of moderate size and weight due to

the difficulty in accessing previously driven headings and breasts

containing inaccessible abandoned workings; to accept a design

criterion in the 10 psi range; and the water trap to be installed in

the gangway seal and sampling tube in the monkey seal for seals

installed in pairs considered acceptable alternative method. Granted

for the Jordan No. 1 Slope Mine with conditions for seals installed in

this mine.

Docket No.: M-95-165-C.

FR Notice: 60 FR 64080.

Petitioner: Elk Run Coal Company, Inc.

Reg Affected: 30 CFR 75.333(d)(1).

Summary of Findings: Petitioner's proposal to use electronically

operated Roll-Down Doors constructed of rubber material similar to

those used in conveyor belts to control ventilation within the air

course in the main entries instead of heavy Metal Doors considered

acceptable alternative method. Granted for the White Knight Mine;

Bishop 2 Mine; Laurel Eagle Mine; and Laurel Alma Mine with conditions

for the installation of flame resistant rubber roll-down doors

installed in the same framing structure with fuse link controlled,

automatic closing steel roll-down fire doors.

Docket No.: M-95-182-C.

FR Notice: 61 FR 8306.

Petitioner: Jacks Branch Coal Company.

Reg Affected: 30 CFR 75.333(d)(1).

Summary of Findings: Petitioner's proposal to use electronically

operated Roll-Down Doors constructed of rubber material similar to

those used in conveyor belts to control ventilation within the air

course in the main entries instead of using heavy Metal Doors

considered acceptable alternative method. Granted for the Mine No. 1

with conditions for the installation of flame resistant rubber roll-

down doors installed in the same framing structure with fuse link

controlled, automatic closing steel roll-down fire doors.

Docket No.: M-93-004-C.

FR Notice: 58 FR 8065.

Petitioner: Cyprus Mountain Coals Corporation.

Reg Affected: 30 CFR 77.1304(a).

Summary of Findings: Petitioner's proposal to use recycled waste

oil and diesel fuel to form a blasting agent considered acceptable

alternative method. Granted for the Star Fire Mine with conditions.

Docket No.: M-93-029-C.

FR Notice: 58 FR 16553.

Petitioner: Consolidation Coal Company.

Reg Affected: 30 CFR 75.364(b)(2).

Summary of Findings: Petitioner's proposal to establish airway

check points to monitor the quantity and quality of air entering and

leaving the affected area considered acceptable alternative method.

Granted for the Loveridge No. 22 Mine with conditions for the intake

aircourse on the south side of Main West and for the intake aircourse

at the Sugar Run Portal Motor Barn.

Docket No.: M-86-167-C.

FR Notice: 52 FR 46133.

Petitioner: Clinchfield Coal Company.

Reg Affected: 30 CFR 75.326.

Summary of Findings: Petitioner's proposal to use the velocity of

air in the belt conveyor of 50 feet a minute, or greater, and have a

definite and distinct movement in the designated direction considered

acceptable alternative method. Granted for the McClure No. 1 Mine with

conditions.

Docket No.: M-85-184-C.

FR Notice: 52 FR 46134.

Petitioner: Clinchfield Coal Company.

Reg Affected: 30 CFR 75.1105.

Summary of Findings: Petitioner's proposal is amended to read: the

velocity of air in the belt conveyor will be 50 feet a minute, or

greater, and have a definite and distinct movement in the designated

direction considered acceptable alternative method. Granted for the

McClure No. 1 Mine with conditions.

[FR Doc. 98-22534 Filed 8-20-98; 8:45 am]

BILLING CODE 4510-34-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.