Nicore Mining Plan of Operation, Siskiyou National Forest,
Josephine County, OR
AGENCY: Forest Service, USDA.
ACTION: Notice of intend to supplement a draft environmental impact
statement.
-----------------------------------------------------------------------
SUMMARY: The USDA, Forest Service, in cooperation with the Bureau of
Land Management, will prepare a supplement to a draft environmental
impact statement (SDEIS) for the Nicore Mining Plan of Operation on the
Illinois Valley Ranger District of the Siskiyou National Forest. The
draft environmental impact statement (DEIS) was released January 1998.
A SDEIS is needed because of changed conditions, including the recent
closure of a nickel smelter in Riddle, Oregon; new issues raised during
the DEIS comment period; the presence of a plant species now listed
under the Endangered Species Act, and a need to broaden the range of
alternatives considered.
ADDRESSES: Submit written comments regarding the SDEIS to Joel King,
District Ranger, Illinois Valley Ranger District, 26568 Redwood
Highway, Cave Junction, Oregon, 97523.
FOR FURTHER INFORMATION CONTACT:
Rochelle Desser, Interdisciplinary Team Leader, Illinois Valley Ranger
District, 26568 Redwood Highway, Cave Junction, Oregon, 97523 (541)
592-2166.
SUPPLEMENTARY INFORMATION: The Nicore Plan of Operations (POO) includes
mining 4 sites for a total of 35 acres. The mine sites would be
accessed by an existing low-standard road system that would need to be
upgraded. Ore would be stockpiled for later smelting.
The Nicore DEIS considered the Proposed Plan of Operations and four
alternatives. Many issues were considered in the DEIS, including risk
of sediment delivery; botanical diversity and sensitive plants; costs
of road development; effects on residents; visual quality, recreation,
and interpretive development; impacts on the character of the South
Kalmiopsis Roadless Area, noxious weeds, Port-Orford-cedar root
disease; risk of hazardous fuel spills; effects on fish habitat,
especially species listed under the Endangered Species Act; Aquatic
Conservation Strategy and Riparian Reserve Standards and Guidelines;
and Wild and Scenic River Eligibility. The SDEIS will consider
additional issues and alternatives based on new information and public
comment.
Substantial uncertainty exists related to the economic viability of
the mining POO. Since the release of the Nicore DEIS, the only nickel
smelter in the United States closed, due to low nickel prices
worldwide. Public comment continues to raise issues with the
reasonableness of the mining plan, given the smelter closure. In
addition, reports provided by the public indicate that the plan is not
currently economically viable.
Since the release of the DEIS, a plant found on the ore haul route
was listed as endangered under the Endangered Species Act. The Forest
Service has initiated consultation about the plant with the US Fish and
Wildlife Service.
Additional alternatives are being considered for the SDEIS. The
DEIS consider the Proposed Action and five alternatives. Many people
commented that the range of alternatives was too limited for a full
consideration of impacts. The SDEIS will consider additional access
routes, additional mitigation measures, and a scaled-back operation.
The SDEIS is expected to be filed with the Environmental Protection
Agency (EPA) and be available for review in November 1998. At that
time, EPA will publish a Notice of Availability in the Federal
Register.
A 45-day comment period for the SDEIS will commence following the
Notice of Availability. Those interested in the project should
participate at that time. Several recent court rulings related to
public participation are pertinent to this process. Reviewers of a
Draft EIS must structure their participation in the environmental
review process of the Proposed Action so that it is specific,
meaningful, and alerts an agency to the Reviewer's position and
contentions. Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519,
553 (1978).
Also, environmental objections that could be raised early-on in the
environmental review process, but that are not raised until after
completion of the Final EIS, may be waived or dismissed by the courts.
City of Angoon v. Hodel, 803 F.2d. 1016, 1022 (9th Cir. 1986) and
Wisconsin Heritages, Inc. v. Harris, 490 F. Supp. 1334, 1338 (E.D. Wis.
1980).
These court rulings reinforce the citizen's responsibility for
timely participation. Comments on the SDEIS should be as specific as
possible; page number citations or other references to the SDEIS within
comments are most helpful.
Comments should address the adequacy of the EIS, and/or the merits
of the alternatives (see the Council on Environmental Quality
Regulations for implementing the procedural provisions of the National
Environmental Policy Act at 40 CFR 1503.3 for further guidance).
After the SDEIS comment period, comments on both the DEIS and SDEIS
will be considered. Comments and Agency responses will be included in
the Final EIS. The Final EIS is scheduled to be completed August 1999.
The Responsible Official is the Siskiyou National Forest
Supervisor. He will consider the Final EIS; applicable laws,
regulations, policies; and analysis files and document his decision and
rationale in the Record of Decision. That decision will be subject to
appeal by the general public under 36 CFR 215 and by the miner under 36
CFR 251.
Dated: July 28, 1998.
Robert Ettner,
Acting Forest Supervisor.
[FR Doc. 98-21434 Filed 8-10-98; 8:45 am]