Blowout Preventer (BOP) Testing Requirements for Drilling and Completion Operations

Federal RegisterJun 1, 1998

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF THE INTERIOR

Minerals Management Service

30 CFR Part 250

RIN 1010-AC37

Blowout Preventer (BOP) Testing Requirements for Drilling and

Completion Operations

AGENCY: Minerals Management Service (MMS), Interior.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This rule amends the regulations governing the testing

requirements for BOP systems used in drilling and completion operations

on the Outer Continental Shelf (OCS). The rule allows a lessee up to 14

days between BOP pressure tests. MMS based this rule on a study of BOP

performance which concluded that no statistical difference exists in

failure rates for BOP's tested between 0- and 7-day intervals and

between 8- and 14-day intervals. MMS estimates that the 14-day testing

requirement could save industry $35 to $46 million a year without

compromising safety.

EFFECTIVE DATE: The rule is effective on June 30, 1998.

FOR FURTHER INFORMATION CONTACT: Bill Hauser, Engineering and Research

Branch, at (703) 787-1613.

[[Page 29605]]

SUPPLEMENTARY INFORMATION: MMS proposed revising the regulations for

BOP testing in a notice of proposed rulemaking published in the Federal

Register (62 FR 37819) on July 15, 1997. We received five sets of

comments during the 60-day comment period, which closed on September

15, 1997. This final rule amends the regulations found at 30 CFR

250.407 and 250.516 and becomes effective on June 30, 1998. On that

date, MMS will rescind Notice to Lessees and Operators (NTL) 97-1N

because the new rule will be in effect. MMS issued NTL 97-1N on January

31, 1997, to inform lessees that they could begin testing BOP systems

on intervals up to 14 days.

Comments on the Rule

The five commenters consisted of four large oil companies and a

drilling contractor. All five commenters supported the proposed

revision to allow lessees up to 14 days between BOP pressures tests. In

addition, they commented on the following parts of the proposed rule:

testing frequency for workovers; testing of blind-shear rams; test

duration; and use of maximum anticipated surface pressure (MASP) for

determining BOP test pressures. Those comments and MMS'' responses are

discussed below.

BOP Testing Frequency During Workovers

Comment--One company stated that many workovers include completion

or re-completion operations and asked if the amended regulations apply

to the completion phase of a workover.

Response--The revised BOP testing requirements do not apply to the

completion phase of workover operations. According to the definition in

Sec. 250.601, workover operations mean the work conducted on wells

after the initial completion for the purpose of maintaining or

restoring the productivity of the well. After the initial completion,

you must test your BOP equipment according to the requirements of

subpart F, Oil and Gas Well-Workover Operations.

Comment--Another commenter asked MMS to consider similar changes in

testing frequency for workover operations after gathering necessary

data.

Response--MMS will consider similar changes to the regulations

after the completion of an appropriate study.

Testing of the Blind or Blind-Shear Ram

Comment--One commenter recommended that the requirement to test the

blind or blind-shear ram at least once every 30 days

(Sec. 250.407(d)(4)) should include an exclusion if the ram was tested

during a routine test.

Response--The intent of this requirement is to ensure that the

blind or blind-shear ram is tested at least once every 30 days. We

revised the second sentence in this paragraph to now read as follows:

``Additionally, the interval between any blind or blind-shear ram tests

may not exceed 30 days.'' The 30-day interval begins with any test.

Testing of a Casing Safety Valve

Comment--One commenter asked MMS to define what was meant by a

``casing safety valve.'' The commenter interpreted ``casing safety

valve'' as a valve installed on a casing swage to facilitate

circulation while running casing.

Response--We removed the term ``casing safety valve'' and have

revised the wording of the final rule to be closer to the current rule.

The new wording is ``You must actuate safety valves assembled with

proper casing connections prior to running casing.''

Weekly Crew Drills

Comment--One company commented that the new regulations required

weekly drills to familiarize personnel engaged in completion operations

but there was not a similar requirement for drilling personnel.

Response--MMS continues to require well-controls drills for each

drilling crew. The requirements for well-control drills during drilling

are found in Sec. 250.408. That section requires the lessee to conduct

a well-control drill for each drilling crew.

Test Duration

Comment--One company thought that MMS should require a 5-minute

test for large blowout preventers because of the larger fluid volumes

needed for testing and leak detection.

Response--MMS requires a 5-minute test for subsea BOP equipment

because of the larger volume of fluid in the system. MMS believes that

a 3-minute test is appropriate for surface blowout preventer equipment

provided the lessee measures the test pressures on the outermost half

of a 4-hour chart, on a 1-hour chart, or on a digital recorder.

Use of MASP in Determining Test Pressures

Comment--Three companies commented on the use of MASP for

determining test pressures for BOP equipment. One recommended using

MASP because it was more consistent with current industry practices and

would reduce undue stress, wear, and tear on BOP components. The

company recommended using a conservative method of determining MASP.

Another company recommended that MMS not use MASP for determining the

required BOP test pressure due to the variety of methods used by

operators to calculate MASP. The third company did not feel that

changing the test pressures to MASP will improve the reliability of BOP

equipment if the common definition of MASP is used. However that

company said that testing to the rated working pressure can be

excessive and that test pressures should be related to the design of

the well.

Response--MMS believes that these comments show industry's interest

in using MASP in determining BOP test pressures. They also show that

MMS and industry must reach a common methodology for determining MASP.

Therefore, MMS has decided not to require the use of MASP for

establishing BOP test pressures in this rule. The rule continues to

require the lessee to test BOP components at their rated working

pressures (70 percent for an annular preventer) or as otherwise

approved by the District Supervisor.

As discussed in the preamble of the proposed rule, District

Supervisors base the approval of alternate test pressures on a

comparison of the anticipated surface pressure calculations submitted

with the application for permit to drill (APD) to MASP calculations

made by MMS drilling engineers. If the two calculations compare

favorably, the District Supervisor approves the requested test

pressures. If the calculations for anticipated surface pressure are

less than those calculated by MMS, the District Supervisor advises the

lessee of any necessary revisions to the APD.

We are currently rewriting the regulations for Subpart D, Oil and

Gas Drilling Operations, so we will continue to examine the use of MASP

in determining BOP test pressures. We plan to publish the Notice of

Proposed Rulemaking for subpart D by the end of the summer.

Testing at Casing and Liner Points

MMS acknowledged in the preamble to the proposed rule that there

was at least one situation where it may not be necessary to test the

BOP system. MMS has added two sentences to Sec. 250.407(a)(3) that

explain when a lessee will be allowed to omit a test of the BOP system

at some casing and liner points. This addition is intended to clearly

describe in the regulatory text the circumstance when MMS will allow a

lessee to not test the BOP system. That circumstance occurs when a

lessee doesn't remove the BOP stack to run

[[Page 29606]]

casing or a liner, and the required BOP-test pressures for the next

section of the hole are not greater than the test pressures for the

previous BOP test. The lessee must clearly indicate in its APD which

casing strings and liners meet these criteria.

Recently, MMS published a final rule redesignating 30 CFR part 250.

The new numbering is used here as follows: Sec. 250.406 replaces

Sec. 250.56; Sec. 250.407 replaces Sec. 250.57; Sec. 250.408 replaces

Sec. 250.58; Sec. 250.516 replaces Sec. 250.86; and Sec. 250.601

replaces Sec. 250.91.

Procedural Matters

Executive Order (E.O.) 12866

MMS estimates that this final rule will save the oil and gas

industry $34.5 to $46 million per year. These savings result from

having to conduct fewer BOP tests and increased drilling efficiency.

Direct economic effects are reduced drilling costs for each well

drilled on the OCS. The rule does not add any new costs to industry,

and it will not reduce the level of safety to personnel or the

environment. Since the rule will have an annual effect on the economy

of less than $100 million, the rule is not a significant regulatory

action.

The rule will not affect the level of drilling activity on the OCS.

It will reduce the number of BOP tests conducted, which should result

in reduced drilling time for each well. Once the lessee completes a

well, the rig will move on to the next well. This will not have any

adverse effects on employment, investment, productivity, innovation, or

on the ability of U.S.-based enterprises to compete with foreign-based

enterprises in other markets because the economic effects are minor.

The rule will have no effect on competition. Therefore, in accordance

with E. O. 12866, a review by the Office of Management and Budget (OMB)

is not necessary.

Regulatory Flexibility Act

This final rule will not have any significant effects on a

substantial number of small entities. This rule affects only two groups

that operate on the OCS: (1) lessees that contract drilling operations

and (2) drilling contractors.

A lessee that qualifies as a small entity could see a minor,

positive economic benefit due to the cost savings from conducting fewer

BOP tests. However, any savings would probably be offset by increased

costs to contract a drilling rig. Day rates for offshore drilling rigs

are increasing due to high rig utilization.

In general, entities that engage in offshore activities are not

small due to technical and financial resources and experience needed to

safely conduct these operations. Small entities are more likely to

operate onshore or in State waters--areas not covered by this rule.

When small entities do work in the OCS, they are likely to be service

contractors and not owner/operators of OCS platforms or drilling rigs.

Your comments are important. The Small Business and Agriculture

Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were

established to receive comments from small business about Federal

agency enforcement actions. The Ombudsman will annually evaluate the

enforcement activities and rate each agency's responsiveness to small

business. If you wish to comment on the enforcement actions of MMS,

call toll-free (888) 734-3247.

Paperwork Reduction Act (PRA) of 1995

As part of the Notice of Proposed Rulemaking process, OMB approved

the proposed information collection requirements in 30 CFR Part 250,

Subpart D, Oil and Gas Drilling Operations (OMB Control Number 1010-

0053) and Subpart E, Oil and Gas Well-Completion Operations (OMB

Control Number 1010-0067), as required by the PRA of 1995 (44 U.S.C.

3501 et seq.). MMS did not receive any comments on the information

collection aspects in the notice of proposed rulemaking. The final rule

did not change any of the information collection requirements. PRA

provides that an agency may not conduct or sponsor, and a person is not

required to respond to, a collection of information unless it displays

a currently valid OMB control number.

The collections of information in these subparts consist of

reporting and recordkeeping requirements on the conditions of a

drilling site and well-completion operations in the OCS. MMS uses the

information to determine if lessees are properly providing for safe

operations and protection of human life or health and the environment.

MMS estimated the total annual burden for subpart D to be 108,581

hours. This reflects a decrease of 12,499 recordkeeping hours as a

result of the rule. The estimated total annual burden for subpart E is

4,841 hours. MMS estimates that the rule reduced the annual burden for

subpart E by 2,563 recordkeeping hours.

Takings Implication Assessment

The Department of the Interior (DOI) certifies that this final rule

does not represent a governmental action capable of interference with

constitutionally protected property rights. Thus, MMS did not need to

prepare a Takings Implication Assessment pursuant to E.O. 12630,

Governmental Action and Interference with Constitutionally Protected

Property Rights.

Unfunded Mandates Reform Act of 1995

DOI has determined and certifies according to the Unfunded Mandates

Reform Act, 2 U.S.C. 1502 et seq., that this rule will not impose a

cost of $100 million or more in any given year on State, local, and

tribal governments, or the private sector.

E.O. 12988

DOI has certified to OMB that this rule meets the applicable civil

justice reform standards provided in sections 3(a) and 3(b)(2) of E.O.

12988.

National Environmental Policy Act

DOI has determined that this action does not constitute a major

Federal action significantly affecting the quality of the human

environment. Therefore, preparation of an Environmental Impact

Statement is not required.

List of Subjects in 30 CFR Part 250

Continental shelf, Environmental impact statements, Environmental

protection, Government contracts, Investigations, Mineral royalties,

Oil and gas development and production, Oil and gas exploration, Oil

and gas reserves, Penalties, Pipelines, Public lands--mineral

resources, Public lands--rights-of-way, Reporting and recordkeeping

requirements, Sulphur development and production, Sulphur exploration,

Surety bonds.

Dated: May 15, 1998.

Sylvia V. Baca,

Deputy Assistant Secretary, Land and Minerals Management.

For the reasons stated in the preamble, the Minerals Management

Service (MMS) amends 30 CFR part 250 as follows:

PART 250--OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER

CONTINENTAL SHELF

1. The authority citation for part 250 continues to read as

follows:

Authority: U.S.C. 1334.

2. In Sec. 250.406, the fourth sentence in paragraph (d)(10)(i) is

revised to read as follows:

Sec. 250.406 Blowout preventer systems and system components.

* * * * *

(d) * * *

[[Page 29607]]

(10) * * *

(i) * * * All required manual and remotely controlled valves of a

kelly cock or comparable type in a top-drive system must be essentially

full-opening and tested according to the test pressure and test

frequency as stated in Sec. 250.407 of this part. * * *

3. Section 250.407 is revised to read as follows:

Sec. 250.407 Blowout preventer (BOP) system tests, inspections, and

maintenance.

(a) BOP pressure testing timeframes. You must pressure test your

BOP system:

(1) When installed;

(2) Before 14 days have elapsed since your last BOP pressure test.

You must begin to test your BOP system before 12 a.m. (midnight) on the

14th day following the conclusion of the previous test. However, the

District Supervisor may require testing every 7 days if conditions or

BOP performance warrant; and

(3) Before drilling out each string of casing or a liner. The

District Supervisor may allow you to omit this test if you did not

remove the BOP stack to run the casing string or liner and the required

BOP-test pressures for the next section of the hole are not greater

than the test pressures for the previous BOP test. You must indicate in

your APD which casing strings and liners meet these criteria.

(b) BOP test pressures. When you test the BOP system, you must

conduct a low pressure and a high pressure test for each BOP component.

Each individual pressure test must hold pressure long enough to

demonstrate that the tested component(s) holds the required pressure.

Required test pressures are as follows:

(1) All low pressure tests must be between 200 and 300 psi. Any

initial pressure above 300 psi must be bled back to a pressure between

200 and 300 psi before starting the test. If the initial pressure

exceeds 500 psi, you must bleed back to zero and reinitiate the test.

You must conduct the low pressure test before the high pressure test.

(2) For ram-type BOP's, choke manifold, and other BOP equipment,

the high pressure test must equal the rated working pressure of the

equipment or the pressure otherwise approved by the District

Supervisor; and

(3) For annular-type BOP's, the high pressure test must equal 70

percent of the rated working pressure of the equipment or the pressure

otherwise approved by the District Supervisor.

(c) Duration of pressure test. Each test must hold the required

pressure for 5 minutes.

(1) For surface BOP systems and surface equipment of a subsea BOP

system, a 3-minute test duration is acceptable if you record your test

pressures on the outermost half of a 4-hour chart, on a 1-hour chart,

or on a digital recorder.

(2) If the equipment does not hold the required pressure during a

test, you must remedy the problem and retest the affected component(s).

(d) Additional BOP testing requirements. You must:

(1) Use water to test a surface BOP system;

(2) Stump test a subsurface BOP system before installation. You

must use water to stump test a subsea BOP system. You may use drilling

fluids to conduct subsequent tests of a subsea BOP system;

(3) Alternate tests between control stations and pods. If a control

station or pod is not functional, you must suspend further drilling

operations until that station or pod is operable;

(4) Pressure test the blind or blind-shear ram during a stump test

and at all casing points. Additionally, the interval between any blind

or blind-shear ram tests may not exceed 30 days;

(5) Function test annulars and rams every 7 days between pressure

tests;

(6) Pressure-test variable bore-pipe rams against all sizes of pipe

in use, excluding drill collars and bottom-hole tools;

(7) Test affected BOP components following the disconnection or

repair of any well-pressure containment seal in the wellhead or BOP

stack assembly;

(8) Actuate safety valves assembled with proper casing connections

prior to running casing, and

(9) If you install casing rams, you must test the ram bonnet before

running casing.

(e) Postponing BOP tests. You may postpone a BOP test if you have

well-control problems such as lost circulation, formation fluid influx,

or stuck drill pipe. If this occurs, you must conduct the required BOP

test on the first trip out of the hole. You must record the reason for

postponing any test in the driller's report.

(f) Visual inspections. You must visually inspect your surface and

subsea BOP systems and marine riser at least once each day if weather

and sea conditions permit. You may use television cameras to inspect

subsea equipment. The District Supervisor may approve alternate methods

and frequencies to inspect a marine riser. Casing risers on fixed

structures and jackup rigs are not subject to the daily underwater

inspections.

(g) BOP maintenance. You must maintain your BOP system to ensure

that the equipment functions properly.

(h) BOP test records. You must record the time, date, and results

of all pressure tests, actuations, and inspections of the BOP system,

system components, and marine riser in the driller's report. In

addition, you must:

(1) Record BOP test pressures on pressure charts;

(2) Have your onsite representative certify (sign and date) BOP

test charts and reports as correct;

(3) Document the sequential order of BOP and auxiliary equipment

testing and the pressure and duration of each test. You may reference a

BOP test plan if it is available at the facility;

(4) Identify the control station or pod used during the test;

(5) Identify any problems or irregularities observed during BOP

system testing and record actions taken to remedy the problems or

irregularities;

(6) Retain all records, including pressure charts, driller's

report, and referenced documents, pertaining to BOP tests, actuations,

and inspections at the facility for the duration of drilling; and

(7) After drilling is completed, you must retain all the records

listed in paragraph (h)(6) of this section for a period of 2 years at

the facility, at the lessee's field office nearest the Outer

Continental Shelf (OCS) facility, or at another location conveniently

available to the District Supervisor.

(i) Alternate methods. The District Supervisor may require, or

approve, more frequent testing, as well as different test pressures and

inspection methods, or other practices.

4. Section 250.516 is revised to read as follows:

Sec. 250.516 Blowout preventer system tests, inspections, and

maintenance.

(a) BOP pressure testing timeframes. You must pressure test your

BOP system:

(1) When installed; and

(2) Before 14 days have elapsed since your last BOP pressure test.

You must begin to test your BOP system before 12 a.m. (midnight) on the

14th day following the conclusion of the previous test. However, the

District Supervisor may require testing every 7 days if conditions or

BOP performance warrant.

(b) BOP test pressures. When you test the BOP system, you must

conduct a low pressure and a high pressure test for each BOP component.

Each individual pressure test must hold pressure long enough to

demonstrate that the tested component(s) holds the required pressure.

The District Supervisor may approve or require other test pressures or

practices. Required test pressures are as follows:

[[Page 29608]]

(1) All low pressure tests must be between 200 and 300 psi. Any

initial pressure above 300 psi must be bled back to a pressure between

200 and 300 psi before starting the test. If the initial pressure

exceeds 500 psi, you must bleed back to zero and reinitiate the test.

You must conduct the low pressure test before the high pressure test.

(2) For ram-type BOP's, choke manifold, and other BOP equipment,

the high pressure test must equal the rated working pressure of the

equipment.

(3) For annular-type BOP's, the high pressure test must equal 70

percent of the rated working pressure of the equipment.

(c) Duration of pressure test. Each test must hold the required

pressure for 5 minutes.

(1) For surface BOP systems and surface equipment of a subsea BOP

system, a 3-minute test duration is acceptable if you record your test

pressures on the outermost half of a 4-hour chart, on a 1-hour chart,

or on a digital recorder.

(2) If the equipment does not hold the required pressure during a

test, you must remedy the problem and retest the affected component(s).

(d) Additional BOP testing requirements. You must:

(1) Use water to test the surface BOP system;

(2) Stump test a subsurface BOP system before installation. You

must use water to stump test a subsea BOP system. You may use drilling

or completion fluids to conduct subsequent tests of a subsea BOP

system;

(3) Alternate tests between control stations and pods. If a control

station or pod is not functional, you must suspend further completion

operations until that station or pod is operable;

(4) Pressure test the blind or blind-shear ram at least every 30

days;

(5) Function test annulars and rams every 7 days;

(6) Pressure-test variable bore-pipe rams against all sizes of pipe

in use, excluding drill collars and bottom-hole tools; and

(7) Test affected BOP components following the disconnection or

repair of any well-pressure containment seal in the wellhead or BOP

stack assembly;

(e) Postponing BOP tests. You may postpone a BOP test if you have

well-control problems. You must conduct the required BOP test as soon

as possible (i.e., first trip out of the hole) after the problem has

been remedied. You must record the reason for postponing any test in

the driller's report.

(f) Weekly crew drills. You must conduct a weekly drill to

familiarize all personnel engaged in well-completion operations with

appropriate safety measures.

(g) BOP inspections. You must visually inspect your BOP system and

marine riser at least once each day if weather and sea conditions

permit. You may use television cameras to inspect this equipment. The

District Supervisor may approve alternate methods and frequencies to

inspect a marine riser.

(h) BOP maintenance. You must maintain your BOP system to ensure

that the equipment functions properly.

(i) BOP test records. You must record the time, date, and results

of all pressure tests, actuations, crew drills, and inspections of the

BOP system, system components, and marine riser in the driller's

report. In addition, you must:

(1) Record BOP test pressures on pressure charts;

(2) Have your onsite representative certify (sign and date) BOP

test charts and reports as correct;

(3) Document the sequential order of BOP and auxiliary equipment

testing and the pressure and duration of each test. You may reference a

BOP test plan if it is available at the facility;

(4) Identify the control station or pod used during the test;

(5) Identify any problems or irregularities observed during BOP

system and equipment testing and record actions taken to remedy the

problems or irregularities;

(6) Retain all records including pressure charts, driller's report,

and referenced documents pertaining to BOP tests, actuations, and

inspections at the facility for the duration of the completion

activity; and

(7) After completion of the well, you must retain all the records

listed in paragraph (i)(6) of this section for a period of 2 years at

the facility, at the lessee's field office nearest the OCS facility, or

at another location conveniently available to the District Supervisor.

(j) Alternate methods. The District Supervisor may require, or

approve, more frequent testing, as well as different test pressures and

inspection methods, or other practices.

[FR Doc. 98-14294 Filed 5-29-98; 8:45 am]

BILLING CODE 4310-MR-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.