DEPARTMENT OF ENERGY

Western Area Power Administration

Open Access Transmission Service Tariff

AGENCY: Western Area Power Administration, DOE.

ACTION: Notice of final Tariff.

-----------------------------------------------------------------------

SUMMARY: The Western Area Power Administration (Western) is adopting

this final Open Access Transmission Service Tariff (Tariff) in order to

be consistent with the Federal Energy Regulatory Commission (FERC)

Order Nos. 888 and 888-A to the extent consistent with laws applicable

to Western's activities.

DATES: The Tariff will become effective February 5, 1998. The Tariff

will remain in effect until superseded.

FOR FURTHER INFORMATION CONTACT:

Mr. Robert J. Harris, Power Marketing Manager, Upper Great Plains

Region, Western Area Power Administration, P.O. Box 35800, Billings, MT

59107-5800; (406) 247-7394

Mr. Dave Sabo, CRSP Manager, CRSP Customer Service Center, Western Area

Power Administration, P.O. Box 11606, Salt Lake City, UT 84147-0606;

(801) 524-5493

Mr. Anthony H. Montoya, Power Marketing Manager, Desert Southwest

Region, Western Area Power Administration, P.O. Box 6457, Phoenix, AZ

85005-6457; (602) 352-2789

Mr. James D. Keselburg, Power Marketing Manager, Rocky Mountain Region,

Western Area Power Administration, P.O. Box 3700, Loveland, CO 80539-

3003; (970) 490-7370

Ms. Zola Jackson, Power Marketing Manager, Sierra Nevada Region,

Western Area Power Administration, 114 Parkshore Drive, Folsom, CA

95630-4710; (916) 353-4421

Mr. Robert Fullerton, Corporate Communications Office, Western Area

Power Administration, Post Office Box 3402, Golden, CO 80401-0098;

(303) 275-2700.

SUPPLEMENTARY INFORMATION:

Table of Contents

I. Procedures

II. Background

III. Comments Raised During the Development of this Final Tariff

IV. Summary of Significant Changes from Western's Proposed Tariff

V. Coordination with Adoption of Open Access Transmission Rates

VI. Regulatory Requirements

I. Procedures

Western will submit the final Tariff to FERC under a non-

jurisdictional docket and will request a declaratory order that the

Tariff meets FERC comparability standards as set forth in FERC Order

Nos. 888 and 888-A. Western will make the necessary changes in response

to the FERC declaratory order and will publish the revised final Tariff

in the Federal Register.

II. Background

Use of transmission facilities that Western owns, operates, or to

which it has contract rights for delivery of Federal long-term firm

capacity and energy to project use and electric service customers is a

Western responsibility under the terms and conditions of marketing

criteria and electric service contracts implementing statutory

obligations to market Federal power. This is complementary with the

provisions of the Tariff. Transmission service provided by Western

under the Tariff is solely for the use of available transmission

capability in excess of the

[[Page 522]]

amount Western requires for the delivery of long-term firm capacity and

energy to project use and electric service customers of the Federal

government. Western will offer to provide others transmission service

equivalent to the service Western provides itself.

Western was established on December 21, 1977, pursuant to Section

302 of the Department of Energy (DOE) Organization Act, Public Law 95-

91, dated August 4, 1977. Western's primary and long-standing mission

is to market Federal power resources with emphasis on maintaining an

efficient and reliable power system. Western is a power supplier that

markets and transmits Federal power resources in 15 Central and Western

States encompassing a geographic area of 3.38 million-square-kilometers

(1.3 million-square-miles). Western has four Customer Service Regional

Offices and the Colorado River Storage Project Customer Service Center

(CRSP CSC), each referred to in the Tariff as a Regional Office.

Western markets power and provides transmission service from various

multi-purpose hydroelectric projects.

Western is not a public utility under Sections 205 and 206 of the

Federal Power Act and is not specifically subject to the requirements

of the FERC Order Nos. 888 and 888-A. Western is a transmitting utility

subject to Section 211 of the Federal Power Act as amended by the

Energy Policy Act of 1992.

FERC issued a Notice of Proposed Rulemaking (NOPR) for Open Access

Transmission Service, published at 60 FR 17662, on April 7, 1995. On

October 4, 1995, the Secretary of DOE adopted a Power Marketing

Administration Open Access Transmission Policy which stated that DOE

supported the spirit and intent of the NOPR. The Secretary of DOE

stated that the Power Marketing Administrations would comply with the

principles set forth in the FERC's final rule to the extent consistent

with applicable law. FERC issued its final rule, Order No. 888,

published at 61 FR 21540 on May 10, 1996, and followed with Order No.

888-A, published at 62 FR 12273, on March 14, 1997.

In early 1996, Western began developing a Tariff Equivalent Package

(TEP) to comply with the Secretary's directive. A draft TEP, which was

designed as a Western-wide document that would contain Region-specific

rates and charges, was completed in July 1996 and sent to Western's

electric service customers, transmission-service customers, and other

interested parties for review and comment. Western accepted comments on

the TEP through November 1996.

After evaluating comments, Western modified its original concept of

preparing a Western-wide TEP and began developing Regional Open Access

Transmission Service Guidelines (Regional Guidelines). These Regional

Guidelines contained service agreements consistent with the specific

conditions applicable to each Region. The resulting documents were sent

to electric service customers, transmission customers, and other

interested parties for review and comment in April 1997. The review

period for those documents ended in early June 1997. Customer and

interested party participation was conducted informally.

Western began its formal process of developing this Tariff when it

issued a Notice of Proposed Tariff published at 62 FR 50572 on

September 26, 1997. A formal comment period lasted for 31 days. On

October 7, 1997, Western held a combined public information and public

comment forum. The comments received during the comment period were

considered in developing this final Tariff.

Western will submit the Tariff document to FERC under a non-

jurisdictional docket and request a declaratory order from FERC that

this Tariff meets the FERC comparability standards as set forth in FERC

Order Nos. 888 and 888-A. Consistent with a single FERC filing, Western

has developed and will file this Tariff with appended schedules and

attachments. Western's Tariff includes Attachment J, Provisions

Specific to the Transmission Provider, and Attachment K, Authorities

and Obligations, which are specific to Western and are not found in

FERC's pro forma tariff.

By law, the Bureau of Reclamation (Reclamation) provides Federal

power resources to its project use customers. By law, Western markets

Federal power resources to its electric service customers. Western's

transmission system was built primarily to enable the delivery of

Federal power to satisfy these contractual obligations. Western's

Regional Offices reserved transmission capacity shall, therefore,

include capacity sufficient to deliver Federal power resources to

customers of the Federal government. Nothing in this Tariff shall

alter, amend, or abridge the statutory or contractual obligations of

Western to market and deliver Federal power resources and to repay the

Federal investment in such projects. This Tariff provides for

transmission, including each Regional Office's use of those facilities

for third party sales, on the unused capacity of transmission

facilities under the jurisdiction or control of each of Western's

Regional Offices not required for the delivery of long-term firm

capacity and energy to customers of the Federal government in a manner

consistent with the spirit and intent of FERC Order Nos. 888 and 888-A.

Western has prepared this Tariff and service agreements to provide

transmission service comparable to that required of public utilities by

FERC Order Nos. 888 and 888-A, and to implement those Orders consistent

with the DOE Policy. An entity desiring transmission service from

Western must comply with the application procedures outlined herein.

The review and approval requirements detailed herein will apply to all

requesting parties. Western will perform the necessary studies or

assessments for evaluating requests for transmission service as set

forth in this Tariff. Any facility construction or interconnection

necessary to provide transmission service will be subject to Western's

General Requirements for Interconnection which are available upon

request.

Western will provide Firm and Non-Firm Point-to-Point Transmission

Service and Network Integration Transmission Service consistent with

the Tariff. The specific terms and conditions for providing

transmission service specific to a particular customer will be included

in a Service Agreement. Operating Procedures, Available Transmission

Capability (ATC), and System Impact Methodology are defined in the

Attachments. Western's Regional Offices develop rates under separate

public process pursuant to applicable Federal law and regulations.

Therefore, rates and charges for specific services will be set forth in

the appropriate Regional rates schedules attached to each Service

Agreement.

Western has marketed the maximum practical amount of power from

each of its projects, leaving little or no flexibility for provision of

additional electric services from the projects. Changes in water

conditions frequently affect the ability of hydroelectric projects to

meet obligations on a short-term basis. The unique characteristics of

the hydro resource, Western's marketing plans, and the limitations of

the resource due to changing water conditions limit Western's ability

to provide generation-related services including ancillary services and

redispatching, using Federal hydro resources.

[[Page 523]]

III. Comments Raised During the Development of this Final Tariff

Participants in the formal review process raised numerous comments

about the proposed tariff. The following highlights the more

significant comments and Western's responses.

Comment: A commentor stated that the ``Annual Transmission Costs''

definition (Section 1.2) does not appear to include the costs of the

power produced at Reclamation's hydroelectric power facilities. The

transmission rates do, however, indicate the need for ancillary

generation service support. The definition should then also include

costs associated with Reclamation's support of Ancillary Services.

Response: It is correct that the definition for ``Annual

Transmission Costs'' does not include the costs of the power produced

at the hydroelectric facilities. FERC Order Nos. 888 and 888-A provide

that only transmission costs may be included in the definition of

``Annual Transmission Costs.''

Comment: A commentor asked if, in Section 1.2, it is correct that

the Annual Transmission Costs can be modified by the FERC.

Response: FERC decisions may affect what facility costs will be

included in Western's Annual Transmission Costs.

Comment: A commentor asked why Western deleted the reference to

FERC's approval in Section 1.10.

Response: Western is not a public utility and, therefore, is not

subject to FERC's jurisdiction under Sections 205 and 206 of the

Federal Power Act. Western is not, therefore, required to submit

Service Agreements to FERC for approval.

Comment: A commentor stated that, Western, as a Transmission

Provider, does not have retail customers, and, therefore, the word

``retail'' should be deleted from Section 1.19.

Response: Inclusion of this language does not establish the type of

customer Western serves. This change is not necessary.

Comment: A commentor asked if the definition of ``Transmission

Provider'' in Section 1.46 includes the CRSP CSC in the context of the

Regional Office reference.

Response: The definition of ``Transmission Provider'' does include

the CRSP CSC in the context of the Regional Office reference. As

specified in Attachment K, the CRSP CSC is a Transmission Provider as

are Western's other Regional Offices.

Comment: A commentor requested clarification on whether Section 2.1

indicates that existing project use loads will be included in the

initial allocation of available transmission capacity calculations.

Response: Section 2.1 addresses applications for transmission

service received during the first 60 days commencing with the effective

date of the Tariff. Section 2.1 does not address existing commitments

for transmission. However, in response to the comment, existing project

use loads are components in the Regional Office's calculations of ATC.

Comment: Several commentors requested that Western delete ``to the

extent possible'' in the second paragraph of Section 3.0, and delete

the requirement for a separate agreement to purchase Ancillary Services

on behalf of the transmission customer.

Response: Western agrees and has modified Section 3.0.

Comment: A commentor suggested that, in Section 3.0, Western should

insert the word ``uncommitted'' before the word ``surplus.''

Response: Western has removed the referenced sentence.

Comment: A commentor suggested that in Section 3.0 after the

phrase, ``Services it will purchase from the Transmission Provider''

that Western insert this sentence: ``Ancillary Services are included as

part of Federal customer transmission service.''

Response: This section applies only to transmission service

provided under the Tariff and does not refer to existing transmission

commitments of Western.

Comment: A commentor suggested that within the title of Section

5.1, replace the words ``Local Furnishing'' with the words ``Tax

Exempt'' so that the subtitle reads ``Transmission Providers That Own

Facilities Financed by Tax Exempt Bonds'' and make this change

throughout the section. The commentor also suggested that in Section

5.2(i), Western delete the words ``local furnishing.''

Response: This issue was raised in comments to FERC as it developed

its pro forma tariff. The result is the language in Section 5.0 of the

pro forma tariff, which Western has adopted.

Comment: A commentor stated that the proposed Tariff does not

comply with FERC Order Nos. 888 and 888-A. Western's Tariff does not

recognize an exception to comparability and reciprocal service if each

or both would jeopardize a public power utility's tax exempt financing.

Another commentor stated that there has not been a genuine and good

faith effort to include the specific treatment and special requirements

of the non-jurisdictional/non-public utilities that are expressly

recognized and available under FERC Order Nos. 888 and 888-A.

Response: Western has complied with FERC Order No. 888-A by

adopting the pro forma language insofar as Western can and still comply

with Federal law. Nothing in Western's Tariff abrogates any specific

treatment and special requirements of the non-jurisdictional/non-public

utilities that are expressly recognized and available under FERC Order

Nos. 888 and 888-A. Non-public utilities seeking relief from this and

other provisions should seek a waiver of reciprocity from FERC pursuant

to 18 CFR 35.28(e).

Comment: A commentor asked how the cost of System Impact Studies

conducted on behalf of Western or its Federal customers will be shared

between Federal customers and customers served under the Tariff.

Response: Western will assign System Impact Study costs for

Western's benefit in accordance with Section 8.0 of the Tariff.

Comment: A few comments were made that, in Section 10.1, the last

part of the added sentence states, ``* * * and shall exercise due

diligence to remove such inability with all reasonable dispatch.'' This

language appears to either duplicate or modify the ``all reasonable

efforts'' language in the previous sentence. In either case, it should

be removed.

Response: Western agrees and has deleted the added sentence in

Section 10.1.

Comment: A commentor stated that Western should add the following

language to Section 12.1, ``In the event the designated representatives

are unable to resolve the dispute within 45 days (or such other period

as the Parties may agree upon) the dispute may be resolved through the

procedures specified in Section 12.2.''

Response: Western agrees with the suggested concept and has

modified Section 12.1 to allow external dispute resolution under

Section 12.2 if disputes can not be resolved in 30 days.

Comment: Several commentors stated that Western should modify the

final Tariff to provide that the Transmission Provider; i.e., the

appropriate Regional Office of Western, agrees to apply the dispute

resolution process adhered to by the regional transmission group to

which the Transmission Provider belongs.

Response: Western agrees and has modified Section 12.2 to

incorporate the suggested concept.

Comment: A commentor stated that Western must include a Dispute

Resolution Procedure in Section 12 that is binding on Basin Electric

Power Cooperative, Inc. (BEPC) and Heartland Consumers Power District

(HCPD).

[[Page 524]]

Response: Western's Upper Great Plains Region (UGPR) is the

Transmission Provider and all disputes between the Transmission

Provider and the transmission customer will be subject to the dispute

resolution procedures of the Tariff, thus no modifications are

warranted. Disputes that involve only a transmission customer and

either BEPC or HCPD could still be resolved under appropriate Mid-Area

Continent Power Pool (MAPP) procedures whenever it involves an issue

discrete to either and is not a part of the general Tariff provisions.

Comment: A comment was made that Western should incorporate the

word ``uncommitted'' in various sections of the Tariff, including

Sections 13.5, 27.0, and 33.2.

Response: The addition of this term could jeopardize Western's

ability to meet FERC's test for comparability. Therefore, Western has

not made the suggested changes.

Comment: A commentor requested that in Sections 13.8 and 14.6 the

reference to 10 a.m. should include a time zone; e.g., MST or PST for

each operating area, and delete the language in the brackets.

Response: Western adopted the language of the pro forma tariff.

Since this is a Western-wide document, Western is unable to assign a

time zone. Western's scheduling offices are located in three different

time zones. The 10 a.m. reference applies to the time of the

appropriate scheduling office from which transmission service is being

requested.

Comment: A commentor requested that the phrase, ``This does not

apply to the Colorado River Front Work and Levee System or the Salinity

transmission system'', be inserted at the end of Section 15.4.

Response: The last sentence in Section 15.4 addresses this comment.

The facilities identified in the comment are considered distribution

facilities and are not subject to the Tariff. Request for service on

these facilities will be handled on a case-by-case basis.

Comment: Several commentors strongly encouraged the inclusion of

transmission losses in Sections 15.7 and 28.5 of the Tariff and that

the associated section in the applicable Service Agreements be removed,

thus providing them with some reasonable assurance that these factors

will be applied in a non-discriminatory and comparable manner.

Response: Since this is a Western-wide document and transmission

loss factors are calculated separately for each Transmission System,

Sections 15.7 and 28.5 of the pro forma tariff were modified to allow

the applicable transmission loss percentages to be included in the

Regional Office specific Service Agreements. Each of Western's Regional

Offices periodically modifies its Transmission System loss factors

based on system losses and all of its Regional Office(s) s are subject

to these loss factors.

Comment: A commentor requested that Western, in Sections 17.2(iv)

and 18.2, insert ``or other'' after ``Regional Transmission Group

(RTG).''

Response: The commentor's proposed language is too broad and might

adversely affect the rights of entities that are not parties to the

agreement. Therefore, this change was not made.

Comment: Several commentors made the comment that Western's

proposed application processing fees in Sections 17.3 and 29.2 are

inconsistent with the pro forma provisions, and that the processing fee

or at least some portion should be refunded if the request for

transmission service is denied by Western. It is the opinion of the

commentors that, as written, Western's processing fee procedures do not

provide reciprocal service, and Western provides no numerical

justification for the processing fees included in Attachment K.

Response: The processing fee is being collected to offset those

costs incurred by Western in processing applications for transmission

service. These costs will be incurred irrespective of whether

transmission service is taken, so no refunds will be made. In

developing the processing fee, each Regional Office used the same

method, which reflects an average of staff wages and benefits

multiplied by the average time it takes to analyze and respond to

requests for service. Western plans to periodically review these costs.

FERC has previously accepted this methodology.

Comment: A comment was made that Western should incorporate the

phrase ``and applicable Federal law and regulations'' in Section 27.0.

Comments were also made that Western should incorporate the phrase

``and permitted by Federal law and regulations'' in Section 30.5. Both

sections address redispatch procedures.

Response: There are no Federal laws governing redispatch; however,

Western does have certain limitations on this matter based on specific

power marketing plans.

Comment: A commentor recommended that Western insert

``transmission'' in its clarifying statement at the end of Section

28.2, so that there is no misinterpretation of the meaning of capacity.

Response: Western agrees and has made the change.

Comment: A commentor stated FERC's Pricing Policy provides that

Western can only charge the higher of embedded costs or opportunity

costs, but not the sum of the two. This FERC Pricing Policy should be

applicable to Western, since Western agreed to abide by FERC's rate-

making policies as a condition of its membership in Southwest Regional

Transmission Association (SWRTA).

Response: This comment is outside the scope of this process.

Western is meeting the rate-making policies of FERC for Federal Power

Marketing Administrations as agreed in the SWRTA agreement.

Comment: A commentor suggested that, in Section 30.8 in the second

line after the word ``the'' and before ``Transmission Provider'',

Western insert ``available capability of the''.

Response: Western has stated in Attachment K to its Tariff that

only excess transmission capability will be available and has found

this change unnecessary. This excess transmission capability will be

determined as provided in Attachment C to the Tariff.

Comment: A commentor asked what is Federal policy as mentioned in

Section 34.0. Is it published and who has oversight--FERC? What if it

conflicts with FERC? The same commentor also asked what is meant by

applicable Federal law and regulations, and is it different region-by-

region or is it consistent region-by-region? The commentor further

asked what are Western's current applicable laws and regulations

relating to stranded costs?

Response: Federal policy as used in Section 34.0 includes FERC's

policies, regulations and rulings pertaining to open access

transmission service to the extent consistent with the body of Federal

laws governing Western's activities. Applicable Federal law and

regulations are the body of statutes and regulations governing the

activities of Western as a Federal Power Marketing Administration.

Treatment of stranded costs by Western will be governed by the

principles contained in FERC Orders No. 888 and 888-A, related rulings

and orders promulgated by FERC, and Western's statutory obligations as

a Federal Power Marketing Administration.

Comment: Several commentors made comments regarding Western's

decision to change certain pro forma tariff sections to require advance

payment for the cost of any necessary transmission facility additions

and the associated studies, and provide no interest on those advances.

There is also a concern

[[Page 525]]

that public agencies may not be able to meet the deadlines for

providing advances of funds for Facilities Studies and New

Construction, and that there may be improper cost shifting of Direct

Assignment Facilities to other non-benefiting transmission customers.

Response: The Anti-Deficiency Act, 31 U.S.C. 1341(a), and other

appropriations laws allow Federal agencies to incur obligations and

make expenditures only in amounts available in an appropriation or fund

and available to the government for the purpose for which the

appropriation or fund is budgeted. Therefore, Western will request an

advance of funds for construction of Direct Assignment Facilities in

the construction agreement for such facilities as described in Sections

19.4 and 32.4. Recurring operation and maintenance costs related to

Direct Assignment Facilities will be assessed on a periodic basis as

set forth in the Service Agreement. This process will assure the proper

allocation of costs among customers taking transmission. Western will

return the unexpended portion of any funds advanced for studies or

construction. Western is not able to pay interest on advances without

shifting costs to other customers.

As for certain public agencies unable to meet the deadlines for

providing advances of funds, Western will follow the deadlines required

in the Tariff which, in turn, are the same as those in the pro forma

tariff. To do otherwise could impair Western's ability to meet FERC's

requirement that all requestors be treated in a non-discriminatory

manner.

Comment: A commentor stated that Schedules 2 through 6 of the

Tariff outline Western's offer to provide certain Ancillary Services as

both the Transmission Provider and the Control Area operator. The

commentor has no objection to these schedules if Western has available

Ancillary Services to provide. However, the commentor is concerned that

its generating resources and those of other parties may be used by the

Control Area operator, Western, to provide Ancillary Services without

compensation to the owning utilities. Of course, the opposite outcome

could occur also. The commentor encourages Western to take the lead in

establishing effective and practical operating measures to assure

proper accounting for Ancillary Services. Western should also consider

joint participation by all Control Area generators in supplying these

services.

Response: Western appreciates the comment and will take the lead in

establishing effective and practical operating measures to assure

proper accounting for these Ancillary Services.

Comment: A few commentors stated their concern about the narrow

bandwidth allowed for deviation from scheduled transactions contained

in Schedule 4. One commentor believes that it will be extremely

difficult to stay within this bandwidth because of limitations and

errors in metering, scheduling practices, and unit control, and urges

Western to adopt a broader deviation bandwidth, 3.0 percent

at a minimum, in order to mitigate these control and scheduling

problems. Another commentor stated that some of Western's rate

proposals include penalties of monetary charges for deviations beyond

the scheduling band. This commentor does not agree that a ``one size

fits all'' band is necessary and believes that any monetary charges

should be cost based.

Response: Western is consistent with FERC Order Nos. 888 and 888-A

on this service. The monetary charge is a rate issue and is outside the

scope of this process.

Comment: A commentor stated that the accurate measurement of energy

imbalances (Schedule 4) may not be possible in the UGPR. This is

because there may be more than one supplier at a single point of

measurement. Determining who was the cause of the imbalance may only be

possible during after-the-fact analysis. The power supplier may not be

responsible for being a Control Area operator and it may be the

operator who causes the problem. The commentor states that they do not

have accounting that would allow them to do this on an hourly basis and

the imbalance may change from supplier to supplier within that period.

Response: Western recognizes that there are limitations to the

capability of existing metering. However, FERC did not mandate next

hour settlement of energy imbalances. This is a matter that will need

to be further refined in development of Regional Tariff implementation

procedures.

Comment: A commentor stated that there seems to be a redundancy in

the information being requested in Sections 3.0, 4.0, and 5.0 of the

Specifications for Long-Term Firm Point-to-Point Transmission Service

in Attachment A. The commentor is questioning whether the bill to the

customer will be based on the Capacity Reservation in Section 3.0, the

Capacity Reservation in Section 4.0, or on the Reserved Capacity in

Section 5.0.

Response: The information requested in these sections is necessary

for multiple point-to-point transactions. The bill to the customer will

be based on the Reserved Capacity in Section 5.0. In accordance with

Section 13.7(c) of the Tariff, the amount in Section 5.0 will be the

greater of the sum of the Point(s) of Receipt in Section 3.0 or the sum

of the Point(s) of Delivery in Section 4.0.

Comment: A commentor stated that the control area information

requested in Section 2.0 of the Specifications for Long-Term Firm

Point-to-Point Transmission Service in Attachment A is considerably

different than the Control Area information obtained from Sections 1.0

or 4.0. The Control Area to be referenced in Section 2.0 could be

hundreds, or thousands, of miles from the Control Area of the Point of

Receipt/Point of Delivery.

Response: Section 2.0 is intended to define the Control Area in

which the transaction originates, while Sections 3.0 and 4.0 define the

Point(s) of Receipt/Delivery into and out of the Transmission

Provider's Transmission System. Western has followed the FERC pro forma

tariff wording in these sections, and has found no reason to change the

pro forma language.

Comment: A number of commentors made comments regarding Western's

ATC, including suggestions that the methodology for determination of

ATC must be set out in Attachment C and it must be reasonable,

auditable, and supportable, and it should involve customer groups.

Another commentor similarly requested that Western reference criteria

specified within the SWRTA and/or Western Regional Transmission

Association, Inc. (WRTA) agreements.

Response: Western has stated in Attachment C that it will use

``Good Utility Practice and the engineering and operating principles,

standards, guidelines, and criteria of the * * * applicable Regional

Reliability Council, and any entity of which the Transmission Provider

is a member * * * such as a regional transmission group.'' Many

customers are also members of these regional transmission groups. The

methodology outlined in the specific regional transmission group

criteria provides a clear set of guidelines for both Western and the

transmission customer to evaluate Western's determination of ATC. This

approach is consistent with filings approved by FERC for public and

non-public utilities.

Comment: A commentor had concerns with the last sentence of

Attachment C which refers to reserving transmission capability for

``forecasted power service obligations.'' It is improper for Western to

withhold transmission capability in order to enhance future power

[[Page 526]]

marketing activities, and the inclusion of this phrase violates both

the letter and intent of FERC Order Nos. 888 and 888-A.

Response: In FERC Order Nos. 888 and 888-A, Section IV.C(5), FERC

stated that, ``utilities may reserve existing transmission capacity

needed for Native Load growth and Network load growth reasonably

forecasted within the utility's current planning horizon.'' The

Transmission Provider may market this capacity on a firm or non-firm

basis until such time as the capacity is required by Native Load and

Network Customers. Western has the same right to obtain transmission

service for its own marketing activities as others have to obtain

transmission service from Western for their marketing activities.

Comment: Western received a comment that Attachment F and

Attachment G require overlapping information.

Response: The information required in Attachment F and Attachment G

is not overlapping. Attachment G addresses technical and operational

matters associated with the implementation of Attachment F.

Comment: Western received several comments regarding its proposed

10 times penalty included in Attachment H to the Tariff, and requesting

Western to delete the 10 times penalty.

Response: Western believes the penalty is more appropriately

addressed in Regional Office specific rate processes, and, therefore,

has deleted the 10 times penalty from Section 3.0 of Attachment H.

Comment: A commentor asked if the general contract provisions:

Contingent Upon Appropriations--Section 2.0, Contract Work Hours and

Safety Standards--Section 4.0, Equal Employment Opportunity Practices--

Section 5.0, and Use of Convict Labor--Section 6.0, of Attachment J are

necessary in these types of contractual relationships.

Response: These provisions are required by law to be included in

Federal contracts.

Comment: Several commentors stated that Section 7.0 of Attachment J

gives Western the unilateral right to terminate service if it joins or

is required to conform to the protocols of an independent system

operator (ISO). By itself, the fact that Western joins an ISO does not

automatically relieve Western of its obligation to provide comparable

transmission service. The language referring to Western's unilateral

right to terminate service is improper and should be removed.

Response: This language is required in the Sierra Nevada Region

(SNR) Service Agreements consistent with the findings of FERC in

Pacific Gas and Electric Company, et al., 81 FERC para. 61, 122 (1997).

Western has moved this provision from Section J to the Service

Agreements and this language shall be included by SNR in any Service

Agreements entered into under this Tariff. Similar language may be

required in the future by other Western Regional Offices which join

ISO's to conform to the terms and conditions of the ISO agreement

approved by FERC.

Comment: A commentor stated that Section 8.0 of Attachment J could

be interpreted to bar the resale of transmission rights when such

resale is provided for under FERC Order Nos. 888 and 888-A.

Response: The original Section 8.0 of Attachment J, ``Third Party

Rights'', has been deleted.

Comment: A commentor asked what third party rights BEPC and HCPD

have under Section 8.0 of Attachment J.

Response: The original Section 8.0 of Attachment J, ``Third Party

Rights'', has been deleted.

Comment: A commentor asked why Western includes the phrase

``emergency power'' in Section 10.0 of Attachment J since the Tariff is

for transmission service only and it does not provide for Western to

supply capacity and energy. The same commentor asked how does Western

define emergency power and under what circumstances will it be

provided?

Response: Western has modified Section 10.0 of Attachment J to

remove the reference to emergency power.

Comment: A commentor stated that the billing adjustments

contemplated in Sections 13.0 and 14.0 of Attachment J need to include

refunds of advances.

Response: Sections 13.0 and 14.0 are not the mechanism for Western

to provide refunds for funds advanced to Western. Western added

language to Sections 19.4 and 32.4 to clarify that amounts advanced in

excess of costs incurred will be refunded.

Comment: Several commentors have raised issues regarding the bill

crediting and net billing language in Sections 13.0 and 14.0 of

Attachment J to the Tariff. There is a concern that the language is too

broad and creates the potential for abuse. The provisions in Attachment

J and the associated language in the proposed Service Agreements use

the leverage of access to Western's Transmission System to require the

transmission customer to agree to Western's Net Billing and Bill

Crediting procedures as a condition for service and as means to provide

alternative financing for Western. These provisions appear to be in

conflict with the functional unbundling requirements of FERC Order Nos.

888 and 888-A and may, in fact, require the transmission customer to

violate its own Standards of Conduct implementing FERC Order No. 889

and 18 CFR part 37. All provisions requiring the transmission customer

to agree to Net Billing and Bill Crediting procedures as a condition

for service under the Tariff must be removed.

Response: Western has modified these sections to clarify that the

``Net Billing and Bill Crediting'' provisions are optional. The

inclusion of these provisions in the Tariff is non-discriminatory

because they are not a condition for receiving service.

Comment: Western received several comments regarding proposed

changes to Attachment K. A comment was received requesting that the

phrase ``* * * from the Navajo Project for the Central Arizona Project,

Boulder Canyon Project and the * * *'' be deleted from the Desert

Southwest Region's (DSR) section of Attachment K. Another commentor

requested that the phrase ``* * * of the Parker Davis-Project in DSR *

* *'' be inserted. The same commentor also requested that in the first

paragraph of Attachment K, that Western delete the phrase ``* * * and

one coal fired power plant in Arizona * * *,'' and replace the word

``integrated'' with ``interconnect.'' A commentor requested that in the

seventh paragraph of Attachment K that Western change ``little

flexibility'' to ``little or no flexibility.''

Response: Western concurs with the comments and has made the

changes to Attachment K.

Comment: A commentor proposed the following language for inclusion

in the fourth paragraph of Attachment K, which would read as follows:

* * * treat its Federal Customers in a manner analogous to the

treatment of Native Load Customers by public utilities. The enabling

legislation for the various projects authorizes both transmission

and generation project expenses and contemplates recovery of these

through power rates. For these reasons, Western will continue to

recover transmission and generation related costs from Federal

Customers through a bundled power sales rate. Western is committed

to providing * * *

Response: Western does not believe that it is necessary to add the

proposed text to Attachment K. The issue of cost recovery will be

addressed on a case-by-case basis in the appropriate rate process.

Comment: A commentor stated that Sections 17.1 and 29.2 require

that a written application for long-term, firm service be submitted to

the ``appropriate Regional Office, as identified in

[[Page 527]]

Attachment K.'' However, Attachment K provides no address, title, or

even a phone number, to which such an application can be submitted.

Western should correct Attachment K to include this information for

each Regional Office.

Response: Western has noted the omission and has included the

appropriate information in Attachment K to the Tariff.

Comment: Two commentors stated that there is no applicable

definition for Federal project use loads.

Response: Western has modified Attachment K to the Tariff to

clarify that Reclamation is responsible for providing Federal power

resources to its project use customers. Western believes that this

modification is sufficient to address this comment.

Comment: A commentor stated that Attachment K should include

language stating that there will be no on-going transmission

reservation maintained for incremental sales and that when Western does

reserve transmission capacity for incremental sales, it will do so

through its Open Access Same-Time Information System (OASIS) and

account for such reservation as a Third Party Sale pursuant to Section

8.0 of the Tariff.

Response: The Tariff provides for the required treatment and

Western has found no reason to include additional language as proposed

by the commentor.

Comment: Western received many comments that raised issues

concerning its obligations to serve Federal loads and the relationship

of this obligation to Western's ability to comply with open access

comparability standards set forth by FERC in Orders No. 888 and 888-A.

The following summarizes the comments.

Western should be consistent between all of its Regional Offices in

treating its existing transmission obligation to Federal customers as

existing Point-to-Point Service. Any new sales Western makes to Federal

customers should be unbundled and accounted for under the Tariff as

Point-to-Point Service. Transmission for incremental sales to Federal

customers should be reserved, provided, and accounted for as Point-to-

Point Transmission Service under the Tariff.

It may be appropriate for Western to identify existing Federal

customers as Native Load, but such partial requirements service at a

discrete Point of Delivery clearly does not meet the definition of

Network Load as set forth in Section 1.22.

To the extent Western has firm service obligations to Federal

customers, reserving firm transmission capacity is appropriate. To the

extent that Western intends to reserve firm transmission on its system

in order to maintain the opportunity to make incremental sales to

Federal customers above and beyond Western's firm obligations under

certain favorable hydrologic conditions, such transmission reservations

for generation merchant activities appear to be in direct conflict with

the functional unbundling requirements of FERC Order No. 888.

Western has not clearly distinguished the jurisdictional separation

of its statutory service from its proposed service under Western's

Tariff. Western needs further revisions to its Tariff to clearly

delineate the jurisdictional difference.

Western should perform two separate, parallel functions: statutory

transmission service and third party transmission service.

Include the term ``Federal Customer'' in various places of the

Tariff other than Attachment K.

In Attachment K, include the word ``retail'' before the word

``Native'' in the sentence which describes Western's treatment of its

Federal customers.

The use of the term ``Native Load'' appears as an intention to

unbundle firm electric service arrangements. Several commentors

disputed Western's claim that its deliveries of power to Federal

customers, defined by Western as ``the statutory and firm electric

service and project use power users of the Federal Government'' are

analogous to a public utility's deliveries to its own native load

customers. Other comments included suggestions on how to redefine

Federal customers and Federal generation and a suggestion that

Western's deliveries were more precisely analogous to a public

utility's retail Native Load.

The reservation provisions (2.2, 13.6 and 33.2) will not work.

First, carried to its extreme, all current firm electric service

contractors could cancel their contracts and be left with the ability

to transfer other resources across Western's system, leaving Western no

system to deliver hydropower.

The curtailment of contractors' firm electric service deliveries

simultaneously with third party use of the system violates Western's

statutory mandate. Another commentor stated that pro rata curtailments

put Western's preference customers in the position of subsidizing third

party transmission contractors.

A qualifier statement should be included in Section 33.0 to explain

the process of load shedding and curtailment to be used, such as ``* *

* that only load shedding and curtailments covered in this section are

for new contracts entered into on the OASIS. They do not include

existing contracts * * *'' Other commentors stated that there is no

indication of how Reclamation's project use loads are served with

Federal transmission capacity and expressed concern as to the

applicability of curtailment.

How will load shedding and curtailment provisions of Section 33.0

work?

Response: Individual project authorization acts have provided

Western the obligation and authority to market capacity and energy

surplus to the needs of these multi-purpose projects. Western manages

its transmission systems to meet these needs as well as to ensure the

reliable operation of the overall transmission systems for which it is

responsible. Section 211 of the Federal Power Act also requires Western

to provide open transmission access. Western will meet all of these

obligations in the following manner. Use of transmission facilities

that Western owns, operates, or to which it has contract rights for

delivery of Federal long-term firm capacity and energy to project use

and electric service customers is a Western responsibility under the

terms and conditions of marketing criteria and electric service

contracts implementing statutory obligations to market Federal power.

This is complementary with the provisions of the Tariff. Transmission

service provided by Western under the Tariff is solely for the use of

ATC in excess of the capability Western requires for deliveries of

long-term firm capacity and energy to project use and electric service

customers of the Federal government. Western has also stated that

nothing in the Tariff shall alter, amend, or abridge the statutory or

contractual obligations of Western to market and deliver Federal power

resources and to repay the Federal investment in its projects.

Western has found it is no longer necessary to state that service

to customers of the Federal government is analogous to service provided

to Native Load Customers by public utilities. The term ``Federal

Customers'' has been deleted from the Tariff. Further, Western

clarifies that deliveries to discrete points of delivery can be made

under existing authorities and contracts and deliveries of additional

power at the same point may be made under the Tariff without violating

the provisions of Section 1.22 of the Tariff. Western will use the

Tariff for all Third Party Sales.

[[Page 528]]

Western will operate its system according to Good Utility

Practices, and unless otherwise provided for in existing contracts or

regulations, will perform curtailments and other emergency procedures

in a non-discriminatory manner in accordance with the terms of the

Tariff and the governance of the National Electric Reliability Council,

an RTG, or ISO as appropriate.

Western has modified the Tariff to be consistent with the above

statements.

Comment: A commentor asked what does the term ``unused capacity''

in Attachment K mean and how does it apply to UGPR? Does Western have

the right to terminate service if it determines the unused capacity no

longer exists?

Response: Attachment K has been modified by deleting the term

``unused capacity''. Once committed to contractually, transmission

capacity will be available to a transmission customer for the duration

of the contract term in conformance with the provisions of the Tariff.

Comment: A commentor stated that preference should apply to rights

to excess capacity on the Federal Transmission System.

Response: Neither Section 9(c) of the Reclamation Project Act of

1939 nor Section 5 of the Flood Control Act of 1944 require Western to

give preference in the sale of excess transmission capacity to any

particular type of entity.

Comment: A commentor stated that Western must jurisdictionally

separate statutory service and tariff service because Western does not

have new Environmental Impact Statements or Endangered Species Act

determinations which indicate Western can provide Network Integration

Transmission Service or Ancillary Services from its generation.

Western's power contracts should not require future unbundling of

transmission service because the unbundling of contracts and power

deliveries may in fact be in contradiction of the environmental

analysis performed for each of the power contract extensions. Another

comment was made that Ancillary Services are generation-related but

were not included in any environmental analyses for river ecosystem,

hydrodam operations, or power marketing.

Response: Western has not committed or proposed any construction of

specific new transmission or generation facilities in the Tariff. The

establishment of contract language and transmission arrangements that

do not involve: (1) The integration of a new generation resource, (2)

physical changes in the transmission system beyond the previously

developed facility area, or (3) changes in the normal operating limits

of generation resources is categorically excluded by DOE regulations

from the preparation of an environmental assessment (EA) or

environmental impact statement (EIS). Nothing in this generic contract

language requires or causes such events to occur. If and when Western

proposes to enter into a contract or transmission agreement which it

reasonably would expect to require or cause such events to occur,

Western will prepare appropriate documentation for its actions in

compliance with the National Environmental Policy Act of 1969, as

amended, 42 U.S.C. 4321-4347, Council of Environmental Quality

regulations, 40 CFR 1500-1508 and DOE regulations at 10 CFR part 1021.

Western's power contracts do not require future unbundling of

transmission service. Decisions related to unbundling will be

determined through a separate process.

Comment: Several commentors stated that they do not see how Western

can maintain its statutory obligations to generate and deliver the

maximum amount of firm capacity and energy to preference customers

while unbundling, unless Western offers other services.

Response: This comment does not accurately describe Western's

statutory obligations. The creation of the Tariff does not affect

Western's obligations under existing contracts.

Comment: A commentor stated that unbundling will produce cost-

shifts in the projects that are statutorily cost-recovery based.

Response: Western is complying with FERC Order Nos. 888 and 888-A.

This requires the unbundling of Ancillary Services from transmission

service for service under the Tariff. The rates for these services are

based on the costs incurred to provide these services. Any revenues

received from these services will be applied to project repayment.

Comment: A commentor stated that unbundling of firm electric

service leaves no recourse but to file under Section 211 of the Federal

Power Act. Customers may need more up-front oversight of Western's

actions, such as Sections 205 and 206 require of FERC jurisdictional

utilities.

Response: Oversight of Western's activities is outside the scope of

this process.

Comment: Two comments were received stating that the reference to

``Western's hydroelectric power facilities'' is incorrect. The

facilities referred to are Reclamation's hydroelectric power

facilities.

Response: Western agrees with this comment.

Comment: A commentor noted that in FERC Order No. 888-A, FERC

decided to implement Service Agreement procedures for firm point-to-

point transactions of less than a year in duration (short-term firm)

that are similar to those for non-firm point-to-point service. In other

words, only one umbrella service agreement needs to be executed.

Subsequent short-term firm transactions need only be requested and

reserved via the OASIS. The commentor encourages Western to include in

its Tariff a form of umbrella service agreement for Short-term Firm

Point-to-Point Transmission Service that will operate in a similar

manner to the Service Agreement for Non-Firm Service.

Response: Western agrees that Attachment A may be used as an

umbrella service agreement for Short-term Firm Point-to-Point

Transmission Service.

Comment: A commentor stated that the Tariff includes modifications

to recognize Western's distinction as a Federal entity, and this seems

to include non-Federal entities under the cloak of Federal law.

Response: These modifications apply to UGPR as the operator/manager

of the Integrated System (IS). These modifications do not bring BEPC or

HCPD under the cloak of Federal law.

Comment: Several commentors commended Western for its efforts in

developing its proposed open access transmission service Tariff. With

the understanding that Western is committed to working to modify its

Tariff when it is found to be warranted, these commentors also support

both the Tariff and Western's filing of the Tariff with FERC.

Response: Western appreciates these comments.

Comment: A commentor stated that all references to stranded costs

should be deleted from the Tariff.

Response: The right to collect stranded costs is recognized in FERC

Order Nos. 888 and 888-A. The stranded cost language in Western's

Tariff is modeled upon the language in FERC's pro forma tariff.

Recovery of stranded costs is neither incorporated in any of the

Regional Office's proposed rates nor in the Open Access Transmission

Rate formula for the UGPR.

Comment: A commentor asked Western what is its authority to collect

stranded costs for BEPC and HCPD.

Response: Attachment K recognizes the right of UGPR, BEPC, and HCPD

to collect stranded costs in accordance

[[Page 529]]

with the principles established in FERC Order Nos. 888 and 888-A.

Attachment K states that the collection of stranded costs by BEPC and

HCPD will be subject to contracts separate from the Tariff.

Comment: Two commentors requested that Western's DSR and SNR

implement the Ancillary Services, Schedules 1 through 6 under the

Tariff, as a separate tariff on an interim basis to resolve areas of

concern.

Response: The provision of Ancillary Services is an integral part

of FERC's pro forma tariff and cannot be separated from Western's

Tariff. Western is concerned that any further qualifiers on the

provision of Ancillary Services could impair Western's ability to pass

FERC's standards for comparability. This, in turn, would impair

Western's ability to obtain reciprocal transmission service from public

utilities. Therefore, Western will not consider implementing the

Ancillary Services portion of the Tariff on an interim basis.

Comment: Two commentors stated that the language in each of the

service schedules concerning pass-through costs from the Control Area

operator does not apply in those cases when Western is not the Control

Area operator. Reclamation does not pass the costs for generation

through the Control Area operator in those cases, but allocates the

costs to Western, who passes the costs through to the transmission

customer.

Response: These provisions provide Western the ability to purchase

capacity and energy from others when it is necessary and pass those

costs on directly to the beneficiary. This is a transaction involving

only the Control Area operator, the transmission customer, and Western.

Comment: A commentor suggested that Western's statutory obligations

prevent it from effectively providing those Ancillary Services which

involve the dedication of generation resources or output to non-Federal

customers. Western should specifically limit itself to brokering these

types of Ancillary Services to its transmission customers.

Response: Western does recognize resource limitations of the

hydroelectric generation. Section 3 of the proposed Tariff was modified

to include the option for Western to purchase Ancillary Services and

pass through such costs to the transmission customer.

Comment: A commentor stated that it understands that Western will

honor existing transmission service contracts without compelling

existing customers to sign a Service Agreement under the Tariff. The

commentor recommended that this commitment be described in Attachment

J.

Response: Western will honor existing transmission service

contracts without compelling existing customers to sign a Service

Agreement under the Tariff. Western does not believe this needs to be

specified in Attachment J. The Tariff provides for any new requests for

transmission service.

Comment: A commentor stated that Western's power factor requirement

should be clearly stated in the Tariff.

Response: There is no single Western power factor requirement.

Western will include the applicable power factor requirement for each

Regional Office in the offered Service Agreements.

Comment: A commentor asked that if the Tariff is binding upon

Western, by what means would the Tariff be made binding on BEPC and

HCPD?

Response: If the IS rate is approved in the rate setting public

process, then the UGPR will enter into the contracts with BEPC and HCPD

for the management and operation of the IS. Such contractual

arrangements will make the terms of the Tariff binding upon BEPC and

HCPD. This would preclude either BEPC or HCPD from making separate

arrangements to sell transmission service over the IS.

Comment: A commentor is very supportive of Attachment F having

provisions for a credit for integrated facilities and looks forward to

negotiations to recognize and equitably credit customer facilities that

have augmented the Federal system.

Response: Western appreciates the comment.

Comment: Western received a comment that Attachment K states that,

``Western will sell transmission service using Federally owned or

controlled facilities only to the extent that transmission capacity is

available in excess of that needed to deliver Federal power.'' This is

inconsistent with the inclusion of non-Federal facilities in the

definition of Transmission System.

Response: This comment is outside of the scope of this process. The

determination of the facilities to be included in the Transmission

System will be developed in the rate process.

Comment: A commentor stated that Attachment K to the Tariff

describes the UGPR's intent to include the facilities of BEPC and HCPD

in the UGPR transmission facilities. UGPR also includes provisions for

recovery of stranded costs. The commentor recommends that the other

Regional Offices' plans for their respective rate-making activities

remain open to the possibility of incorporating this or similar joint

rates.

Response: This issue is better addressed on a case-by-case basis in

the appropriate rate process.

Comment: Several commentors have raised concerns regarding

Western's provisions in the Tariff for changing rates. It appears to

certain commentors that Western may change a rate only to an individual

customer.

Response: The language is not intended to imply that Western will

unilaterally change rates to one customer. Western's Regional Offices

change rates through rate adjustment processes pursuant to Federal law

and apply the rates uniformly to their respective customers.

Comment: Commentors raised a number of issues that related to

Western's rate setting processes, including among others, inclusion of

specific rates and charges with the Tariff, allocation of costs between

transmission and ancillary services, inclusion of various costs and

facilities in transmission rates, and rate setting methodology.

Response: These comments are outside the scope of this process.

Each of Western's Regional Offices is at a different point in the

process of developing open access transmission rates. Western's

Regional Offices follow a separate and distinct process for the

approval of their rates, which involves considerable public involvement

and filing of the final rates with FERC. DOE approval of Western's

rates is addressed in DOE Delegation Order No. 0204-108. Western's

procedures for public involvement for rate procedures are covered in 10

CFR part 903. Filing requirements and procedures for FERC review of

Federal Power Marketing Administration rates are detailed in 18 CFR

part 300. Since Western's rate procedures are handled through so many

separate processes, Western will not include specific rates and charges

in the Tariff.

Comment: A commentor stated that the distinction between the

transmission system used to deliver Federal power to UGPR's customers

and the larger, more expensive system proffered for service to third

parties does not comport with comparability.

Response: Transmission service to existing UGPR firm power

customers is provided for under the provisions of existing contracts.

This is consistent with FERC's treatment of such existing contracts

under FERC Order Nos. 888 and 888-A.

Comment: A UGPR customer commented that in Section 2.2, existing

firm electric service customers should not be subject to paying a

transmission service rate that is different than all

[[Page 530]]

other preference power customers simply due to the timing of a contract

expiration or renewal.

Response: UGPR intends to have a single firm power rate for all

preference customers who execute service agreements for implementation

of the Post-85 Marketing Plan.

Comment: The statutory obligations referred to in Section II of the

Federal Register are significant and important enough to be contained

in the Tariff possibly at Section 11.0 of Attachment J.

Response: Western agrees that the various statutes governing

Western's actions are significant, but does not agree that it would be

appropriate to include a listing in the Tariff.

Comment: Existing preference customers should not be impacted by

Western's commitment to meet the load growth of Network Integration

Transmission Service Customers.

Response: This comment is a rate issue and is outside of the scope

of this process.

Comment: One commentor stated that Western must carefully weigh the

requirements of compliance with FERC Order No. 889 Standards of

Conduct.

Response: Western will comply with FERC Order No. 889.

IV. Summary of Significant Changes From Western's Proposed Tariff

In Section 1.46, Western deleted portions of the additional

language that were not necessary. In Section 1.49, Western reverted to

the pro forma language. In Section 3, Western modified the proposed

additional language to clarify Western's commitment to make every

effort to provide Ancillary Services from purchased generation when

Western's own resources are unavailable. In Section 10.1, Western

removed the proposed additional language.

Western reinstated the last sentence in Section 12.1 except for

``submitted to arbitration and'', and ``arbitration.'' Those two

phrases remained stricken. In Section 12.2, Western replaced the

proposed language with language that refers to RTG dispute resolution

processes.

In Sections 19.4 and 32.4, Western replaced ``provide the required

letter of credit'' with ``pay the transmission customer's share of the

costs'' and added language that Western will refund amounts advanced in

excess of costs incurred.

A minor change was made to Section 29.1 consistent with the minor

change in FERC Order 888-B, 81 FERC para. 61,248, issued November 25,

1997.

In Attachment H, Western removed references to the 10 times penalty

provision. Western moved the provisions relating to the establishment

of an ISO in Attachment J to Attachment A, Attachment B, and Attachment

F. These terms initially will apply only to SNR. Western deleted

provisions relating to third party rights in Attachment J. Western

clarified that Net Billing and Bill Crediting provisions are applicable

only when mutually agreed.

In Attachment K, Western made editorial changes including the

insertion of the address, title, and telephone numbers of the Regional

Office contacts. Western modified its language in Attachment K to

clarify its statutory obligation to market Federal power. The modified

language further clarifies that this Tariff does not affect existing

contractual obligations.

V. Coordination with Adoption of Open Access Transmission Rates

Each of Western's Regional Offices is at a different point in the

process of developing Open Access Transmission Rates. DOE approval of

Western's rates is addressed in DOE Delegation Order No. 0204-108.

Western's procedures for public involvement for rate procedures are

covered in 10 CFR part 903. Filing requirements and procedures for FERC

review of Power Marketing Administration rates are detailed in 18 CFR

part 300. Until the Regional Offices complete the processes of placing

rates in effect for the services to be provided under the open-access

tariff, they will use existing rates when applicable. Rates for short-

term sales may be placed in effect by Western's Administrator and used

when no rates exist for such services.

The new SNR rates for ancillary services and transmission became

effective October 1, 1997, and will be effective for a 5-year period

ending September 30, 2002.

The CRSP CSC is currently conducting a public process to develop

transmission and ancillary service rates consistent with FERC Order

Nos. 888 and 888-A to be used with the Tariff. The public comment

period concluded September 23, 1997. The proposed effective date of the

rates will be April 1, 1998.

The DSR began a public involvement process to develop transmission

and ancillary service rates consistent with FERC Order Nos. 888 and

888-A through a series of informational meetings with its customers

held on March 5, 1997, July 23, 1997, and September 3, 1997. At the

September 3, 1997, meeting, it was determined that the formal process

to develop new rates will not begin until after publication of

Western's Open Access Tariff. As a result, the proposed effective date

for the new rates will be no later than October 1, 1998. DSR will

implement this Tariff using rates for short-term sales approved by

Western's Administrator in December 1997.

The UGPR has implemented Open Access Transmission Rates approved by

Western's Administrator. These transmission rates and ancillary service

rates became effective December 20, 1997, and will expire December 19,

1998. On March 28, 1997, by the mailing of an Advance Announcement of

the transmission rate adjustment for the Pick-Sloan Missouri Basin

Program, Eastern Division, a public process was initiated to establish

long-term Open Access Transmission Rates for the UGPR. UGPR has

received comments from that announcement and published its proposal in

September 1997. The proposed effective date is February 1, 1998.

The Rocky Mountain Region (RMR) began a formal public involvement

process on September 19, 1997, to develop transmission and ancillary

service rates consistent with FERC Order Nos. 888 and 888-A to be used

with the Tariff. The proposed effective date of the rates will be April

1, 1998. The RMR will have rates for short-term sales in effect between

the effective date of the Tariff and April 1, 1998.

Subsequent changes to Regional Office Open Access Transmission

Rates will be completed on a project-by-project basis using the public

involvement and FERC review processes outlined above.

VI. Regulatory Requirements

Review Under Executive Order 12866

Western has an exemption from centralized regulatory review under

Executive Order 12866; accordingly, no clearance of this notice by the

Office of Management and Budget (OMB) is required.

Regulatory Flexibility Analysis

The Regulatory Flexibility Act of 1980, 5 U.S.C. 601-612, requires

Federal agencies to perform a regulatory flexibility analysis if a

proposed rule is likely to have a significant economic impact on a

substantial number of small entities. The Acting Administrator for

Western certifies that Western's providing open transmission access

would not cause an adverse economic impact on a substantial number of

such entities. Since the proposed open-access Tariff is of limited

applicability, no flexibility analysis is required.

[[Page 531]]

Review Under the Paperwork Reduction Act:

In accordance with the Paperwork Reduction Act of 1980, 44 U.S.C.

3501-3520, Western has received approval from OMB for the collection of

customer information in this rule, under OMB control number 1910-0100.

Review Under the National Environmental Policy Act

In compliance with the National Environmental Policy Act (NEPA) of

1969, 42 U.S.C. 4321 et. seq.; the Council on Environmental Quality

regulations, 40 CFR parts 1500-1508; DOE NEPA regulations, 10 CFR part

1021, Western has determined that this action is categorically excluded

from the preparation of an EIS or an EA.

Availability of Information

Western's final Tariff and a redline/strikeout comparison of

Western's final Tariff to the FERC pro forma will be available from the

informational contacts listed above or on the Internet at http://

www.wapa.gov.

Dated: December 15, 1997.

Michael S. Hacskaylo,

Acting Administrator.

Open Access Transmission Service Tariff

Table of Contents

Part I. Common Service Provisions

1 Definitions

1.1 Ancillary Services

1.2 Annual Transmission Costs

1.3 Application

1.4 Commission

1.5 Completed Application

1.6 Control Area

1.7 Curtailment

1.8 Delivering Party

1.9 Designated Agent

1.10 Direct Assignment Facilities

1.11 Eligible Customer

1.12 Facilities Study

1.13 Firm Point-To-Point Transmission Service

1.14 Good Utility Practice

1.15 Interruption

1.16 Load Ratio Share

1.17 Load Shedding

1.18 Long-Term Firm Point-To-Point Transmission Service

1.19 Native Load Customers

1.20 Network Customer

1.21 Network Integration Transmission Service

1.22 Network Load

1.23 Network Operating Agreement

1.24 Network Operating Committee

1.25 Network Resource

1.26 Network Upgrades

1.27 Non-Firm Point-To-Point Transmission Service

1.28 Open Access Same-Time Information System

1.29 Part I

1.30 Part I

1.31 Part III

1.32 Parties

1.33 Point(s) of Delivery

1.34 Point(s) of Receipt

1.35 Point-To-Point Transmission Service

1.36 Power Purchaser

1.37 Receiving Party

1.38 Regional Transmission Group

1.39 Reserved Capacity

1.40 Service Agreement

1.41 Service Commencement Date

1.42 Short-Term Firm Point-To-Point Transmission Service

1.43 System Impact Study

1.44 Third-Party Sale

1.45 Transmission Customer

1.46 Transmission Provider

1.47 Transmission Provider's Monthly Transmission System Peak

1.48 Transmission Service

1.49 Transmission System

2 Initial Allocation and Renewal Procedures

2.1 Initial Allocation of Available Transmission Capability

2.2 Reservation Priority For Existing Firm Service Customers

3 Ancillary Services

3.1 Scheduling, System Control and Dispatch Service

3.2 Reactive Supply and Voltage Control from Generation Sources

Service

3.3 Regulation and Frequency Response Service

3.4 Energy Imbalance Service

3.5 Operating Reserve--Spinning Reserve Service

3.6 Operating Reserve--Supplemental Reserve Service

4 Open Access Same-Time Information System (OASIS)

5 Local Furnishing Bonds

5.1 Transmission Providers That Own Facilities Financed by

Local Furnishing Bonds

5.2 Alternative Procedures for Requesting Transmission Service

6 Reciprocity

7 Billing and Payment

7.1 Billing Procedures

7.2 Interest on Unpaid Balances

7.3 Customer Default

8 Accounting for the Transmission Provider's Use of the Tariff

8.1 Transmission Revenues

8.2 Study Costs and Revenues

9 Regulatory Filings

10 Force Majeure and Indemnification

10.1 Force Majeure

10.2 Indemnification

11 Creditworthiness

12 Dispute Resolution Procedures

12.1 Internal Dispute Resolution Procedures

12.2 External Dispute Resolution Procedures

12.3 Rights Under The Federal Power Act

Part II. Point-to-Point Transmission Service

Preamble

13 Nature of Firm Point-To-Point Transmission Service

13.1 Term

13.2 Reservation Priority

13.3 Use of Firm Transmission Service by the Transmission

Provider

13.4 Service Agreements

13.5 Transmission Customer Obligations for Facility Additions

or Redispatch Costs

13.6 Curtailment of Firm Transmission Service

13.7 Classification of Firm Transmission Service

13.8 Scheduling of Firm Point-To-Point Transmission Service

14 Nature of Non-Firm Point-To-Point Transmission Service

14.1 Term

14.2 Reservation Priority

14.3 Use of Non-Firm Point-To-Point Transmission Service by the

Transmission Provider

14.4 Service Agreements

14.5 Classification of Non-Firm Point-To-Point Transmission

Service

14.6 Scheduling of Non-Firm Point-To-Point Transmission Service

14.7 Curtailment or Interruption of Service

15 Service Availability

15.1 General Conditions

15.2 Determination of Available Transmission Capability

15.3 Initiating Service in the Absence of an Executed Service

Agreement

15.4 Obligation to Provide Transmission Service that Requires

Expansion or Modification of the Transmission System

15.5 Deferral of Service

15.6 Other Transmission Service Schedules

15.7 Real Power Losses

16 Transmission Customer Responsibilities

16.1 Conditions Required of Transmission Customers

16.2 Transmission Customer Responsibility for Third-Party

Arrangements

17 Procedures for Arranging Firm Point-To-Point Transmission Service

17.1 Application

17.2 Completed Application

17.3 Processing Fee

17.4 Notice of Deficient Application

17.5 Response to a Completed Application

17.6 Execution of a Service Agreement

17.7 Extensions for Commencement of Service

18 Procedures for Arranging Non-Firm Point-To-Point Transmission

Service

18.1 Application

18.2 Completed Application

18.3 Reservation of Non-Firm Point-To-Point Transmission Service

18.4 Determination of Available Transmission Capability

19 Additional Study Procedures For Firm Point-To-Point Transmission

Service Requests

19.1 Notice of Need for System Impact Study

19.2 System Impact Study Agreement and Compensation

19.3 System Impact Study Procedures

19.4 Facilities Study Procedures

19.5 Facilities Study Modifications

19.6 Due Diligence in Completing New Facilities

19.7 Partial Interim Service

19.8 Expedited Procedures for New Facilities

[[Page 532]]

20 Procedures if The Transmission Provider is Unable to Complete New

Transmission Facilities for Firm Point-To-Point Transmission Service

20.1 Delays in Construction of New Facilities

20.2 Alternatives to the Original Facility Additions

20.3 Refund Obligation for Unfinished Facility Additions

21 Provisions Relating to Transmission Construction and Services on

the Systems of Other Utilities

21.1 Responsibility for Third-Party System Additions

21.2 Coordination of Third-Party System Additions

22 Changes in Service Specifications

22.1 Modifications On a Non-Firm Basis

22.2 Modifications On a Firm Basis

23 Sale or Assignment of Transmission Service

23.1 Procedures for Assignment or Transfer of Service

23.2 Limitations on Assignment or Transfer of Service

23.3 Information on Assignment or Transfer of Service

24 Metering and Power Factor Correction at Receipt and Delivery

Point(s)

24.1 Transmission Customer Obligations

24.2 Transmission Provider Access to Metering Data

24.3 Power Factor

25 Compensation for Transmission Service

26 Stranded Cost Recovery

27 Compensation for New Facilities and Redispatch Costs

Part III. Network Integration Transmission Service

Preamble

28 Nature of Network Integration Transmission Service

28.1 Scope of Service

28.2 Transmission Provider Responsibilities

28.3 Network Integration Transmission Service

28.4 Secondary Service

28.5 Real Power Losses

28.6 Restrictions on Use of Service

29 Initiating Service

29.1 Condition Precedent for Receiving Service

29.2 Application Procedures

29.3 Technical Arrangements to be Completed Prior to

Commencement of Service

29.4 Network Customer Facilities

29.5 This section is intentionally left blank

30 Network Resources

30.1 Designation of Network Resources

30.2 Designation of New Network Resources

30.3 Termination of Network Resources

30.4 Operation of Network Resources

30.5 Network Customer Redispatch Obligation

30.6 Transmission Arrangements for Network Resources Not

Physically Interconnected With The Transmission Provider

30.7 Limitation on Designation of Network Resources

30.8 Use of Interface Capacity by the Network Customer

30.9 Network Customer Owned Transmission Facilities

31 Designation of Network Load

31.1 Network Load

31.2 New Network Loads Connected With the Transmission Provider

31.3 Network Load Not Physically Interconnected with the

Transmission Provider

31.4 New Interconnection Points

31.5 Changes in Service Requests

31.6 Annual Load and Resource Information Updates

32 Additional Study Procedures For Network Integration Transmission

Service Requests

32.1 Notice of Need for System Impact Study

32.2 System Impact Study Agreement and Compensation

32.3 System Impact Study Procedures

32.4 Facilities Study Procedures

33 Load Shedding and Curtailments

33.1 Procedures

33.2 Transmission Constraints

33.3 Cost Responsibility for Relieving Transmission Constraints

33.4 Curtailments of Scheduled Deliveries

33.5 Allocation of Curtailments

33.6 Load Shedding

33.7 System Reliability

34 Rates and Charges

34.1 Monthly Demand Charge

34.2 Determination of Network Customer's Monthly Network Load

34.3 Determination of Transmission Provider's Monthly

Transmission System Load

34.4 Redispatch Charge

34.5 Stranded Cost Recovery

35 Operating Arrangements

35.1 Operation under The Network Operating Agreement

35.2 Network Operating Agreement

35.3 Network Operating Committee

Schedule 1 Scheduling, System Control and Dispatch Service

Schedule 2 Reactive Supply and Voltage Control from Generation

Sources Service

Schedule 3 Regulation and Frequency Response Service

Schedule 4 Energy Imbalance Service

Schedule 5 Operating Reserve--Spinning Reserve Service

Schedule 6 Operating Reserve--Supplemental Reserve Service

Schedule 7 long-Term Firm and Short-Term Firm Point-to-Point

Transmission Service

Schedule 8 Non-Firm Point-to-Point Transmission Service

Attachment A Form of Service Agreement For Firm Point-to-Point

Transmission Service

Attachment B Form of Service Agreement For Non-Firm Point-to-Point

Transmission Service

Attachment C Methodology to Assess Available Transmission Capability

Attachment D Methodology for Completing a System Impact Study

Attachment E Index of Point-to-Point Transmission Service Customers

Attachment F Service Agreement For Network Integration Transmission

Service

Attachment G Network Operating Agreement

Attachment H Annual Transmission Revenue Requirement For Network

Integration Transmission Service

Attachment I Index of Network Integration Transmission Service

Customers

Attachment J Provisions Specific to the Transmission Provider

Attachment K Transmission Provider Authorities and Obligations

Open Access Transmission Service Tariff

I. Part I. Common Service Provisions

1 Definitions

1.1 Ancillary Services: Those services that are necessary to

support the transmission of capacity and energy from resources to loads

while maintaining reliable operation of the Transmission Provider's

Transmission System in accordance with Good Utility Practice.

1.2 Annual Transmission Costs: The total annual cost of the

Transmission System for purposes of Network Integration Transmission

Service shall be the amount specified in Attachment H until amended by

the Transmission Provider or modified by the Commission, pursuant to

Federal Law.

1.3 Application: A request by an Eligible Customer for transmission

service pursuant to the provisions of the Tariff.

1.4 Commission: The Federal Energy Regulatory Commission.

1.5 Completed Application: An Application that satisfies all of the

information and other requirements of the Tariff, including any

required application processing fee.

1.6 Control Area: An electric power system or combination of

electric power systems to which a common automatic generation control

scheme is applied in order to:

(1) Match, at all times, the power output of the generators within

the electric power system(s) and capacity and energy purchased from

entities outside the electric power system(s), with the load within the

electric power system(s);

(2) Maintain scheduled interchange with other Control Areas, within

the limits of Good Utility Practice;

(3) Maintain the frequency of the electric power system(s) within

reasonable limits in accordance with Good Utility Practice; and

(4) Provide sufficient generating capacity to maintain operating

reserves in accordance with Good Utility Practice.

1.7 Curtailment: A reduction in firm or non-firm transmission

service in response to a transmission capacity

[[Page 533]]

shortage as a result of system reliability conditions.

1.8 Delivering Party: The entity supplying capacity and energy to

be transmitted at Point(s) of Receipt.

1.9 Designated Agent: Any entity that performs actions or functions

on behalf of the Transmission Provider, an Eligible Customer, or the

Transmission Customer required under the Tariff.

1.10 Direct Assignment Facilities: Facilities or portions of

facilities that are constructed by the Transmission Provider for the

sole use/benefit of a particular Transmission Customer requesting

service under the Tariff. Direct Assignment Facilities shall be

specified in the Service Agreement that governs service to the

Transmission Customer.

1.11 Eligible Customer: (i) Any electric utility (including the

Transmission Provider and any power marketer), Federal power marketing

agency, or any person generating electric energy for sale for resale is

an Eligible Customer under the Tariff. Electric energy sold or produced

by such entity may be electric energy produced in the United States,

Canada or Mexico. However, with respect to transmission service that

the Commission is prohibited from ordering by Section 212(h) of the

Federal Power Act, such entity is eligible only if the service is

provided pursuant to a state requirement that the Transmission Provider

offer the unbundled transmission service, or pursuant to a voluntary

offer of such service by the Transmission Provider. (ii) Any retail

customer taking unbundled transmission service pursuant to a state

requirement that the Transmission Provider offer the transmission

service, or pursuant to a voluntary offer of such service by the

Transmission Provider, is an Eligible Customer under the Tariff.

1.12 Facilities Study: An engineering study conducted by the

Transmission Provider to determine the required modifications to the

Transmission Provider's Transmission System, including the cost and

scheduled completion date for such modifications, that will be required

to provide the requested transmission service.

1.13 Firm Point-To-Point Transmission Service: Transmission

Service under this Tariff that is reserved and/or scheduled between

specified Points of Receipt and Delivery pursuant to Part II of this

Tariff.

1.14 Good Utility Practice: Any of the practices, methods and acts

engaged in or approved by a significant portion of the electric utility

industry during the relevant time period, or any of the practices,

methods and acts which, in the exercise of reasonable judgment in light

of the facts known at the time the decision was made, could have been

expected to accomplish the desired result at a reasonable cost

consistent with good business practices, reliability, safety and

expedition. Good Utility Practice is not intended to be limited to the

optimum practice, method, or act to the exclusion of all others, but

rather to be acceptable practices, methods, or acts generally accepted

in the region.

1.15 Interruption: A reduction in non-firm transmission service

due to economic reasons pursuant to Section 14.7.

1.16 Load Ratio Share: Ratio of a Transmission Customer's Network

Load to the Transmission Provider's total load computed in accordance

with Sections 34.2 and 34.3 of the Network Integration Transmission

Service under Part III of the Tariff and calculated on a rolling twelve

month basis.

1.17 Load Shedding: The systematic reduction of system demand by

temporarily decreasing load in response to transmission system or area

capacity shortages, system instability, or voltage control

considerations under Part III of the Tariff.

1.18 Long-Term Firm Point-To-Point Transmission Service: Firm

Point-To-Point Transmission Service under Part II of the Tariff with a

term of one year or more.

1.19 Native Load Customers: The wholesale and retail power

customers of the Transmission Provider on whose behalf the Transmission

Provider, by statute, franchise, regulatory requirement, or contract,

has undertaken an obligation to construct and operate the Transmission

Provider's system to meet the reliable electric needs of such

customers.

1.20 Network Customer: An entity receiving transmission service

pursuant to the terms of the Transmission Provider's Network

Integration Transmission Service under Part III of the Tariff.

1.21 Network Integration Transmission Service: The transmission

service provided under Part III of the Tariff.

1.22 Network Load: The load that a Network Customer designates for

Network Integration Transmission Service under Part III of the Tariff.

The Network Customer's Network Load shall include all load served by

the output of any Network Resources designated by the Network Customer.

A Network Customer may elect to designate less than its total load as

Network Load but may not designate only part of the load at a discrete

Point of Delivery. Where an Eligible Customer has elected not to

designate a particular load at discrete points of delivery as Network

Load, the Eligible Customer is responsible for making separate

arrangements under Part II of the Tariff for any Point-To-Point

Transmission Service that may be necessary for such non-designated

load.

1.23 Network Operating Agreement: An executed agreement that

contains the terms and conditions under which the Network Customer

shall operate its facilities and the technical and operational matters

associated with the implementation of Network Integration Transmission

Service under Part III of the Tariff.

1.24 Network Operating Committee: A group made up of

representatives from the Network Customer(s) and the Transmission

Provider established to coordinate operating criteria and other

technical considerations required for implementation of Network

Integration Transmission Service under Part III of this Tariff.

1.25 Network Resource: Any designated generating resource owned,

purchased, or leased by a Network Customer under the Network

Integration Transmission Service Tariff. Network Resources do not

include any resource, or any portion thereof, that is committed for

sale to third parties or otherwise cannot be called upon to meet the

Network Customer's Network Load on a non-interruptible basis.

1.26 Network Upgrades: Modifications or additions to transmission-

related facilities that are integrated with and support the

Transmission Provider's overall Transmission System for the general

benefit of all users of such Transmission System.

1.27 Non-Firm Point-To-Point Transmission Service: Point-To-Point

Transmission Service under the Tariff that is reserved and scheduled on

an as-available basis and is subject to Curtailment or Interruption as

set forth in Section 14.7 under Part II of the Tariff. Non-Firm Point-

To-Point Transmission Service is available on a stand-alone basis for

periods ranging from one hour to one month.

1.28 Open Access Same-Time Information System (OASIS): The

information system and standards of conduct contained in Part 37 of the

Commission's regulations and all additional requirements implemented by

subsequent Commission orders dealing with OASIS.

1.29 Part I: Tariff Definitions and Common Service Provisions

contained in Sections 2 through 12.

1.30 Part II: Tariff Sections 13 through 27 pertaining to Point-

To-Point

[[Page 534]]

Transmission Service in conjunction with the applicable Common Service

Provisions of Part I and appropriate Schedules and Attachments.

1.31 Part III: Tariff Sections 28 through 35 pertaining to Network

Integration Transmission Service in conjunction with the applicable

Common Service Provisions of Part I and appropriate Schedules and

Attachments.

1.32 Parties: The Transmission Provider and the Transmission

Customer receiving service under the Tariff.

1.33 Point(s) of Delivery: Point(s) on the Transmission Provider's

Transmission System where capacity and energy transmitted by the

Transmission Provider will be made available to the Receiving Party

under Part II of the Tariff. The Point(s) of Delivery shall be

specified in the Service Agreement for Long-Term Firm Point-to-Point

Transmission Service.

1.34 Point(s) of Receipt: Point(s) of interconnection on the

Transmission Provider's Transmission System where capacity and energy

will be made available to the Transmission Provider by the Delivering

Party under Part II of the Tariff. The Point(s) of Receipt shall be

specified in the Service Agreement for Long-Term Firm Point-to-Point

Transmission Service.

1.35 Point-To-Point Transmission Service: The reservation and

transmission of capacity and energy on either a firm or non-firm basis

from the Point(s) of Receipt to the Point(s) of Delivery under Part II

of the Tariff.

1.36 Power Purchaser: The entity that is purchasing the capacity

and energy to be transmitted under the Tariff.

1.37 Receiving Party: The entity receiving the capacity and energy

transmitted by the Transmission Provider to Point(s) of Delivery.

1.38 Regional Transmission Group (RTG): A voluntary organization

of transmission owners, transmission users and other entities approved

by the Commission to efficiently coordinate transmission planning (and

expansion), operation and use on a regional (and interregional) basis.

1.39 Reserved Capacity: The maximum amount of capacity and energy

that the Transmission Provider agrees to transmit for the Transmission

Customer over the Transmission Provider's Transmission System between

the Point(s) of Receipt and the Point(s) of Delivery under Part II of

the Tariff. Reserved Capacity shall be expressed in terms of whole

megawatts on a sixty (60) minute interval (commencing on the clock

hour) basis.

1.40 Service Agreement: The initial agreement and any amendments

or supplements thereto entered into by the Transmission Customer and

the Transmission Provider for service under the Tariff.

1.41 Service Commencement Date: The date the Transmission Provider

begins to provide service pursuant to the terms of an executed Service

Agreement, or the date the Transmission Provider begins to provide

service in accordance with Section 15.3 or Section 29.1 under the

Tariff.

1.42 Short-Term Firm Point-To-Point Transmission Service: Firm

Point-To-Point Transmission Service under Part II of the Tariff with a

term of less than one year.

1.43 System Impact Study: An assessment by the Transmission

Provider of (i) the adequacy of the Transmission System to accommodate

a request for either Firm Point-To-Point Transmission Service or

Network Integration Transmission Service and (ii) whether any

additional costs may be incurred in order to provide transmission

service.

1.44 Third-Party Sale: Any sale for resale in interstate commerce

to a Power Purchaser that is not designated as part of Network Load

under the Network Integration Transmission Service.

1.45 Transmission Customer: Any Eligible Customer (or its

Designated Agent) that (i) executes a Service Agreement, or (ii)

requests in writing that the Transmission Provider provide transmission

service without a Service Agreement, pursuant to section 15.3 of the

Tariff. This term is used in the Part I Common Service Provisions to

include customers receiving transmission service under Part II and Part

III of this Tariff.

1.46 Transmission Provider: The Regional Office of the Western

Area Power Administration (Western) which owns, controls, or operates

the facilities used for the transmission of electric energy in

interstate commerce and provides transmission service under the Tariff.

1.47 Transmission Provider's Monthly Transmission System Peak: The

maximum firm usage of the Transmission Provider's Transmission System

in a calendar month.

1.48 Transmission Service: Point-To-Point Transmission Service

provided under Part II of the Tariff on a firm and non-firm basis.

1.49 Transmission System: The facilities owned, controlled or

operated by the Transmission Provider that are used to provide

transmission service under Part II and Part III of the Tariff.

2 Initial Allocation and Renewal Procedures

2.1 Initial Allocation of Available Transmission Capability

For purposes of determining whether existing capability on the

Transmission Provider's Transmission System is adequate to accommodate

a request for firm service under this Tariff, all Completed

Applications for new firm transmission service received during the

initial sixty (60) day period commencing with the effective date of the

Tariff will be deemed to have been filed simultaneously. A lottery

system conducted by an independent party shall be used to assign

priorities for Completed Applications filed simultaneously. All

Completed Applications for firm transmission service received after the

initial sixty (60) day period shall be assigned a priority pursuant to

Section 13.2.

2.2 Reservation Priority For Existing Firm Service Customers

Existing firm service customers (wholesale requirements and

transmission-only, with a contract term of one-year or more), have the

right to continue to take transmission service from the Transmission

Provider when the contract expires, rolls over or is renewed. This

transmission reservation priority is independent of whether the

existing customer continues to purchase capacity and energy from the

Transmission Provider or elects to purchase capacity and energy from

another supplier. If at the end of the contract term, the Transmission

Provider's Transmission System cannot accommodate all of the requests

for transmission service, the existing firm service customer must agree

to accept a contract term at least equal to a competing request by any

new Eligible Customer and to pay the current rate for such service.

This transmission reservation priority for existing firm service

customers is an ongoing right that may be exercised at the end of all

firm contract terms of one-year or longer.

3 Ancillary Services

Ancillary Services are needed with transmission service to maintain

reliability within and among the Control Areas affected by the

transmission service. The Transmission Provider is required to provide

(or offer to arrange with the local Control Area operator as discussed

below), and the Transmission Customer is required to purchase, the

following Ancillary Services (i) Scheduling, System Control and

Dispatch, and (ii) Reactive Supply and

[[Page 535]]

Voltage Control from Generation Sources.

The Transmission Provider is required to offer to provide (or offer

to arrange with the local Control Area operator as discussed below) the

following Ancillary Services only to the Transmission Customer serving

load within the Transmission Provider's Control Area (i) Regulation and

Frequency Response, (ii) Energy Imbalance, (iii) Operating Reserve--

Spinning, and (iv) Operating Reserve--Supplemental. The Transmission

Customer serving load within the Transmission Provider's Control Area,

is required to acquire these Ancillary Services, whether from the

Transmission Provider, from a third party, or by self-supply. The

Transmission Customer may not decline the Transmission Provider's offer

of Ancillary Services unless it demonstrates that it has acquired the

Ancillary Services from another source. However, when sufficient

Federal generation is not available to provide the required Ancillary

Services, the Transmission Provider will offer to make every effort to

purchase Ancillary Services from others, as available. The costs of

such purchases on behalf of a Transmission Customer will be passed

directly through to that Transmission Customer. The Transmission

Customer must list in its Application which Ancillary Services it will

purchase from the Transmission Provider.

If the Transmission Provider is a utility providing transmission

service, but is not a Control Area operator, it may be unable to

provide some or all of the Ancillary Services. In this case, the

Transmission Provider can fulfill its obligation to provide Ancillary

Services by acting as the Transmission Customer's agent to secure these

Ancillary Services from the Control Area operator. The Transmission

Customer may elect to (i) have the Transmission Provider act as its

agent, (ii) secure the Ancillary Services directly from the Control

Area operator, or (iii) secure the Ancillary Services (discussed in

Schedules 3, 4, 5, and 6) from a third party or by self-supply when

technically feasible.

The Transmission Provider shall specify the rate treatment and all

related terms and conditions in the event of an unauthorized use of

Ancillary Services by the Transmission Customer.

The specific Ancillary Services, prices and/or compensation methods

for each are described on the Schedules that are attached to and made a

part of the Tariff. Three principal requirements apply to discounts for

Ancillary Services provided by the Transmission Provider in conjunction

with its provision of transmission service as follows: (1) Any offer of

a discount made by the Transmission Provider must be announced to all

Eligible Customers solely by posting on the OASIS, (2) any customer-

initiated requests for discounts (including requests for use by one's

wholesale merchant or an affiliate's use) must occur solely by posting

on the OASIS, and (3) once a discount is negotiated, details must be

immediately posted on the OASIS. A discount agreed upon for an

Ancillary Service must be offered for the same period to all Eligible

Customers on the Transmission Provider's system. Sections 3.1 through

3.6 below list the six Ancillary Services.

3.1 Scheduling, System Control and Dispatch Service: The rates

and/or methodology are described in Schedule 1.

3.2 Reactive Supply and Voltage Control from Generation Sources

Service: The rates and/or methodology are described in Schedule 2.

3.3 Regulation and Frequency Response Service: Where applicable

the rates and/or methodology are described in Schedule 3.

3.4 Energy Imbalance Service: Where applicable the rates and/or

methodology are described in Schedule 4.

3.5 Operating Reserve--Spinning Reserve Service: Where applicable

the rates and/or methodology are described in Schedule 5.

3.6 Operating Reserve--Supplemental Reserve Service: Where

applicable the rates and/or methodology are described in Schedule 6.

4 Open Access Same-Time Information System (OASIS)

Terms and conditions regarding Open Access Same-Time Information

System and standards of conduct are set forth in 18 CFR 37 of the

Commission's regulations (Open Access Same-Time Information System and

Standards of Conduct for Public Utilities). In the event available

transmission capability as posted on the OASIS is insufficient to

accommodate a request for firm transmission service, additional studies

may be required as provided by this Tariff pursuant to Sections 19 and

32.

5 Local Furnishing Bonds

5.1 Transmission Providers That Own Facilities Financed by Local

Furnishing Bonds

This provision is applicable only to Transmission Providers that

have financed facilities for the local furnishing of electric energy

with tax-exempt bonds, as described in Section 142(f) of the Internal

Revenue Code (``local furnishing bonds''). Notwithstanding any other

provision of this Tariff, the Transmission Provider shall not be

required to provide transmission service to any Eligible Customer

pursuant to this Tariff if the provision of such transmission service

would jeopardize the tax-exempt status of any local furnishing bond(s)

used to finance the Transmission Provider's facilities that would be

used in providing such transmission service.

5.2 Alternative Procedures for Requesting Transmission Service

(i) If the Transmission Provider determines that the provision of

transmission service requested by an Eligible Customer would jeopardize

the tax-exempt status of any local furnishing bond(s) used to finance

its facilities that would be used in providing such transmission

service, it shall advise the Eligible Customer within thirty (30) days

of receipt of the Completed Application.

(ii) If the Eligible Customer thereafter renews its request for the

same transmission service referred to in (i) by tendering an

application under Section 211 of the Federal Power Act, the

Transmission Provider, within ten (10) days of receiving a copy of the

Section 211 application, will waive its rights to a request for service

under Section 213(a) of the Federal Power Act and to the issuance of a

proposed order under Section 212(c) of the Federal Power Act. The

Commission, upon receipt of the Transmission Provider's waiver of its

rights to a request for service under Section 213(a) of the Federal

Power Act and to the issuance of a proposed order under Section 212(c)

of the Federal Power Act, shall issue an order under Section 211 of the

Federal Power Act. Upon issuance of the order under Section 211 of the

Federal Power Act, the Transmission Provider shall be required to

provide the requested transmission service in accordance with the terms

and conditions of this Tariff.

6 Reciprocity

A Transmission Customer receiving transmission service under this

Tariff agrees to provide comparable transmission service that it is

capable of providing to the Transmission Provider on similar terms and

conditions over facilities used for the transmission of electric energy

owned, controlled or operated by the Transmission Customer and over

facilities used for the transmission of electric energy owned,

controlled or operated by the Transmission Customer's corporate

[[Page 536]]

affiliates. A Transmission Customer that is a member of a power pool or

Regional Transmission Group also agrees to provide comparable

transmission service to the members of such power pool and Regional

Transmission Group on similar terms and conditions over facilities used

for the transmission of electric energy owned, controlled or operated

by the Transmission Customer and over facilities used for the

transmission of electric energy owned, controlled or operated by the

Transmission Customer's corporate affiliates.

This reciprocity requirement applies not only to the Transmission

Customer that obtains transmission service under the Tariff, but also

to all parties to a transaction that involves the use of transmission

service under the Tariff, including the power seller, buyer and any

intermediary, such as a power marketer. This reciprocity requirement

also applies to any Eligible Customer that owns, controls or operates

transmission facilities that uses an intermediary, such as a power

marketer, to request transmission service under the Tariff. If the

Transmission Customer does not own, control or operate transmission

facilities, it must include in its Application a sworn statement of one

of its duly authorized officers or other representatives that the

purpose of its Application is not to assist an Eligible Customer to

avoid the requirements of this provision.

7 Billing and Payment

7.1 Billing Procedures

Within a reasonable time after the first day of each month, the

Transmission Provider shall submit an invoice to the Transmission

Customer for the charges for all services furnished under the Tariff

during the preceding month. The invoice shall be paid by the

Transmission Customer within twenty (20) days of receipt. All payments

shall be made in immediately available funds payable to the

Transmission Provider, or by wire transfer to a bank named by the

Transmission Provider.

7.2 Interest on Unpaid Balances

Interest on any unpaid amounts (including amounts placed in escrow)

shall be calculated in accordance with the methodology specified for

interest on refunds in the Commission's regulations at 18 CFR

35.19a(a)(2)(iii). Interest on delinquent amounts shall be calculated

from the due date of the bill to the date of payment. When payments are

made by mail, bills shall be considered as having been paid on the date

of receipt by the Transmission Provider.

7.3 Customer Default

In the event the Transmission Customer fails, for any reason other

than a billing dispute as described below, to make payment to the

Transmission Provider on or before the due date as described above, and

such failure of payment is not corrected within thirty (30) calendar

days after the Transmission Provider notifies the Transmission Customer

to cure such failure, a default by the Transmission Customer shall be

deemed to exist. Within the same 30 calendar days after notice of

failure to make payment, the Transmission Customer shall have the right

of appeal to the Administrator of Western. The Transmission Provider

shall submit its recommendation to the Administrator for review and

approval, but shall not terminate service until the Administrator makes

a determination on the Transmission Customer's appeal. In the event of

a billing dispute between the Transmission Provider and the

Transmission Customer, the Transmission Provider will continue to

provide service under the Service Agreement as long as the Transmission

Customer (i) continues to make all payments not in dispute, and (ii)

pays into an independent escrow account the portion of the invoice in

dispute, pending resolution of such dispute. If the Transmission

Customer fails to meet these two requirements for continuation of

service, then the Transmission Provider may provide notice to the

Transmission Customer of its intention to suspend service in sixty (60)

days, in accordance with Commission policy.

8 Accounting for the Transmission Provider's Use of the Tariff

The Transmission Provider shall record the following amounts, as

outlined below.

8.1 Transmission Revenues

Include in a separate operating revenue account or subaccount the

revenues it receives from Transmission Service when making Third-Party

Sales under Part II of the Tariff.

8.2 Study Costs and Revenues

Include in a separate transmission operating expense account or

subaccount, costs properly chargeable to expense that are incurred to

perform any System Impact Studies or Facilities Studies which the

Transmission Provider conducts to determine if it must construct new

transmission facilities or upgrades necessary for its own uses,

including making Third-Party Sales under the Tariff; and include in a

separate operating revenue account or subaccount the revenues received

for System Impact Studies or Facilities Studies performed when such

amounts are separately stated and identified in the Transmission

Customer's billing under the Tariff.

9 Regulatory Filings

Nothing contained in the Tariff or any Service Agreement shall be

construed as affecting in any way the ability of any Party receiving

service under the Tariff to exercise its rights under the Federal Power

Act and pursuant to the Commission's rules and regulations promulgated

thereunder.

10 Force Majeure and Indemnification

10.1 Force Majeure

An event of Force Majeure means any act of God, labor disturbance,

act of the public enemy, war, insurrection, riot, fire, storm or flood,

explosion, breakage or accident to machinery or equipment, any

Curtailment, order, regulation or restriction imposed by governmental

military or lawfully established civilian authorities, or any other

cause beyond a Party's control. A Force Majeure event does not include

an act of negligence or intentional wrongdoing. Neither the

Transmission Provider nor the Transmission Customer will be considered

in default as to any obligation under this Tariff if prevented from

fulfilling the obligation due to an event of Force Majeure. However, a

Party whose performance under this Tariff is hindered by an event of

Force Majeure shall make all reasonable efforts to perform its

obligations under this Tariff.

10.2 Indemnification

The Transmission Customer shall at all times indemnify, defend, and

save the Transmission Provider harmless from, any and all damages,

losses, claims, including claims and actions relating to injury to or

death of any person or damage to property, demands, suits, recoveries,

costs and expenses, court costs, attorney fees, and all other

obligations by or to third parties, arising out of or resulting from

the Transmission Provider's performance of its obligations under this

Tariff on behalf of the Transmission Customer, except in cases of

negligence or intentional wrongdoing by the Transmission Provider. The

liability of the Transmission Provider shall be determined in

accordance with the provisions of the Federal Tort Claims Act, as

amended.

[[Page 537]]

11 Creditworthiness

For the purpose of determining the ability of the Transmission

Customer to meet its obligations related to service hereunder, the

Transmission Provider may require reasonable credit review procedures.

This review shall be made in accordance with standard commercial

practices. In addition, the Transmission Provider may require the

Transmission Customer to provide and maintain in effect during the term

of the Service Agreement, an unconditional and irrevocable letter of

credit as security to meet its responsibilities and obligations under

the Tariff, or an alternative form of security proposed by the

Transmission Customer and acceptable to the Transmission Provider and

consistent with commercial practices established by the Uniform

Commercial Code that protects the Transmission Provider against the

risk of non-payment.

12 Dispute Resolution Procedures

12.1 Internal Dispute Resolution Procedures

Any dispute between a Transmission Customer and the Transmission

Provider involving transmission service under the Tariff shall be

referred to a designated senior representative of the Transmission

Provider and a senior representative of the Transmission Customer for

resolution on an informal basis as promptly as practicable. In the

event the designated representatives are unable to resolve the dispute

within thirty (30) days (or such other period as the Parties may agree

upon) by mutual agreement, such dispute may be resolved in accordance

with the procedures set forth below.

12.2 External Dispute Resolution Procedures

Any complaint arising concerning implementation of this Tariff

shall be resolved as follows:

(a) Through a dispute resolution process, pursuant to the terms of

a Regional Transmission Group governing agreement of which both Parties

are members; or

(b) If both Parties are not members of the same Regional

Transmission Group, through a dispute resolution process agreed to by

the Parties, or through a transmission complaint filed with the

Commission to the extent the Commission has jurisdiction over such

dispute.

12.3 Rights Under The Federal Power Act

Nothing in this section shall restrict the rights of any party to

file a Complaint with the Commission under relevant provisions of the

Federal Power Act.

Part II. Point-to-Point Transmission Service

Preamble

The Transmission Provider will provide Firm and Non-Firm Point-To-

Point Transmission Service pursuant to the applicable terms and

conditions of this Tariff. Point-To-Point Transmission Service is for

the receipt of capacity and energy at designated Point(s) of Receipt

and the transmission of such capacity and energy to designated Point(s)

of Delivery.

13 Nature of Firm Point-To-Point Transmission Service

13.1 Term

The minimum term of Firm Point-To-Point Transmission Service shall

be one day and the maximum term shall be specified in the Service

Agreement.

13.2 Reservation Priority

Long-Term Firm Point-To-Point Transmission Service shall be

available on a first-come, first-served basis i.e., in the

chronological sequence in which each Transmission Customer reserved

service. Reservations for Short-Term Firm Point-To-Point Transmission

Service will be conditional based upon the length of the requested

transaction. If the Transmission System becomes oversubscribed,

requests for longer term service may preempt requests for shorter term

service up to the following deadlines; one day before the commencement

of daily service, one week before the commencement of weekly service,

and one month before the commencement of monthly service. Before the

conditional reservation deadline, if available transmission capability

is insufficient to satisfy all Applications, an Eligible Customer with

a reservation for shorter term service has the right of first refusal

to match any longer term reservation before losing its reservation

priority. A longer term competing request for Short-Term Firm Point-To-

Point Transmission Service will be granted if the Eligible Customer

with the right of first refusal does not agree to match the competing

request within 24 hours (or earlier if necessary to comply with the

scheduling deadlines provided in Section 13.8) from being notified by

the Transmission Provider of a longer-term competing request for Short-

Term Firm Point-To-Point Transmission Service. After the conditional

reservation deadline, service will commence pursuant to the terms of

Part II of the Tariff. Firm Point-To-Point Transmission Service will

always have a reservation priority over Non-Firm Point-To-Point

Transmission Service under the Tariff. All Long-Term Firm Point-To-

Point Transmission Service will have equal reservation priority with

Native Load Customers and Network Customers. Reservation priorities for

existing firm service customers are provided in Section 2.2.

13.3 Use of Firm Transmission Service by the Transmission Provider

The Transmission Provider will be subject to the rates, terms and

conditions of Part II of the Tariff when making Third-Party Sales under

agreements executed on or after March 9, 1998. The Transmission

Provider will maintain separate accounting, pursuant to Section 8, for

any use of the Point-To-Point Transmission Service to make Third-Party

Sales.

13.4 Service Agreements

The Transmission Provider shall offer a standard form Firm Point-

To-Point Transmission Service Agreement (Attachment A) to an Eligible

Customer when it submits a Completed Application for Long-Term Firm

Point-To-Point Transmission Service. The Transmission Provider shall

offer a standard form Firm Point-to-Point Transmission Service

Agreement (Attachment A) to an Eligible Customer when it first submits

a Completed Application for Short-Term Firm Point-to-Point Transmission

Service pursuant to the Tariff.

13.5 Transmission Customer Obligations for Facility Additions or

Redispatch Costs

In cases where the Transmission Provider determines that the

Transmission System is not capable of providing Firm Point-To-Point

Transmission Service without (1) degrading or impairing the reliability

of service to Native Load Customers, Network Customers and other

Transmission Customers taking Firm Point-To-Point Transmission Service,

or (2) interfering with the Transmission Provider's ability to meet

prior firm contractual commitments to others, the Transmission Provider

will be obligated to expand or upgrade its Transmission System pursuant

to the terms of Section 15.4. The Transmission Customer must agree to

compensate the Transmission Provider in advance for any necessary

transmission facility additions pursuant to the terms of Section 27. To

the extent the Transmission Provider can relieve any system constraint

more economically by redispatching the Transmission Provider's

resources than

[[Page 538]]

through constructing Network Upgrades, it shall do so, provided that

the Eligible Customer agrees to compensate the Transmission Provider

pursuant to the terms of Section 27. Any redispatch, Network Upgrade or

Direct Assignment Facilities costs to be charged to the Transmission

Customer on an incremental basis under the Tariff will be specified in

the Service Agreement or a separate agreement, as appropriate, prior to

initiating service.

13.6 Curtailment of Firm Transmission Service

In the event that a Curtailment on the Transmission Provider's

Transmission System, or a portion thereof, is required to maintain

reliable operation of such system, Curtailments will be made on a non-

discriminatory basis to the transaction(s) that effectively relieve the

constraint. If multiple transactions require Curtailment, to the extent

practicable and consistent with Good Utility Practice, the Transmission

Provider will curtail service to Network Customers and Transmission

Customers taking Firm Point-To-Point Transmission Service on a basis

comparable to the curtailment of service to the Transmission Provider's

Native Load Customers. All Curtailments will be made on a non-

discriminatory basis, however, Non-Firm Point-To-Point Transmission

Service shall be subordinate to Firm Transmission Service. When the

Transmission Provider determines that an electrical emergency exists on

its Transmission System and implements emergency procedures to Curtail

Firm Transmission Service, the Transmission Customer shall make the

required reductions upon request of the Transmission Provider. However,

the Transmission Provider reserves the right to Curtail, in whole or in

part, any Firm Transmission Service provided under the Tariff when, in

the Transmission Provider's sole discretion, an emergency or other

unforeseen condition impairs or degrades the reliability of its

Transmission System. The Transmission Provider will notify all affected

Transmission Customers in a timely manner of any scheduled

Curtailments.

13.7 Classification of Firm Transmission Service

(a) The Transmission Customer taking Firm Point-To-Point

Transmission Service may (1) change its Receipt and Delivery Points to

obtain service on a non-firm basis consistent with the terms of Section

22.1 or (2) request a modification of the Points of Receipt or Delivery

on a firm basis pursuant to the terms of Section 22.2.

(b) The Transmission Customer may purchase transmission service to

make sales of capacity and energy from multiple generating units that

are on the Transmission Provider's Transmission System. For such a

purchase of transmission service, the resources will be designated as

multiple Points of Receipt, unless the multiple generating units are at

the same generating plant in which case the units would be treated as a

single Point of Receipt.

(c) The Transmission Provider shall provide firm deliveries of

capacity and energy from the Point(s) of Receipt to the Point(s) of

Delivery. Each Point of Receipt at which firm transmission capacity is

reserved by the Transmission Customer shall be set forth in the Firm

Point-To-Point Service Agreement for Long-Term Firm Transmission

Service along with a corresponding capacity reservation associated with

each Point of Receipt. Points of Receipt and corresponding capacity

reservations shall be as mutually agreed upon by the Parties for Short-

Term Firm Transmission. Each Point of Delivery at which firm

transmission capacity is reserved by the Transmission Customer shall be

set forth in the Firm Point-To-Point Service Agreement for Long-Term

Firm Transmission Service along with a corresponding capacity

reservation associated with each Point of Delivery. Points of Delivery

and corresponding capacity reservations shall be as mutually agreed

upon by the Parties for Short-Term Firm Transmission. The greater of

either (1) the sum of the capacity reservations at the Point(s) of

Receipt, or (2) the sum of the capacity reservations at the Point(s) of

Delivery shall be the Transmission Customer's Reserved Capacity. The

Transmission Customer will be billed for its Reserved Capacity under

the terms of Schedule 7. The Transmission Customer may not exceed its

firm capacity reserved at each Point of Receipt and each Point of

Delivery except as otherwise specified in Section 22. The Transmission

Provider shall specify the rate treatment and all related terms and

conditions applicable in the event that a Transmission Customer,

(including Third-Party Sales by the Transmission Provider) exceeds its

firm reserved capacity at any Point of Receipt or Point of Delivery.

13.8 Scheduling of Firm Point-To-Point Transmission Service

Schedules for the Transmission Customer's Firm Point-To-Point

Transmission Service must be submitted to the Transmission Provider no

later than 10:00 a.m. (or a reasonable time that is generally accepted

in the region and is consistently adhered to by the Transmission

Provider) of the day prior to commencement of such service. Schedules

submitted after 10:00 a.m. will be accommodated, if practicable. Hour-

to-hour schedules of any capacity and energy that is to be delivered

must be stated in increments of 1,000 kW per hour (or a reasonable

increment that is generally accepted in the region and is consistently

adhered to by the Transmission Provider). Transmission Customers within

the Transmission Provider's service area with multiple requests for

Transmission Service at a Point of Receipt, each of which is under

1,000 kW per hour, may consolidate their service requests at a common

point of receipt into units of 1,000 kW per hour for scheduling and

billing purposes. Scheduling changes will be permitted up to twenty

(20) minutes (or a reasonable time that is generally accepted in the

region and is consistently adhered to by the Transmission Provider)

before the start of the next clock hour provided that the Delivering

Party and Receiving Party also agree to the schedule modification. The

Transmission Provider will furnish to the Delivering Party's system

operator, hour-to-hour schedules equal to those furnished by the

Receiving Party (unless reduced for losses) and shall deliver the

capacity and energy provided by such schedules. Should the Transmission

Customer, Delivering Party or Receiving Party revise or terminate any

schedule, such party shall immediately notify the Transmission

Provider, and the Transmission Provider shall have the right to adjust

accordingly the schedule for capacity and energy to be received and to

be delivered.

14 Nature of Non-Firm Point-To-Point Transmission Service

14.1 Term

Non-Firm Point-To-Point Transmission Service will be available for

periods ranging from one (1) hour to one (1) month. However, a

Purchaser of Non-Firm Point-To-Point Transmission Service will be

entitled to reserve a sequential term of service (such as a sequential

monthly term without having to wait for the initial term to expire

before requesting another monthly term) so that the total time period

for which the reservation applies is greater than one month, subject to

the requirements of Section 18.3.

14.2 Reservation Priority

Non-Firm Point-To-Point Transmission Service shall be available

from transmission capability in excess

[[Page 539]]

of that needed for reliable service to Native Load Customers, Network

Customers and other Transmission Customers taking Long-Term and Short-

Term Firm Point-To-Point Transmission Service. A higher priority will

be assigned to reservations with a longer duration of service. In the

event the Transmission System is constrained, competing requests of

equal duration will be prioritized based on the highest price offered

by the Eligible Customer for the Transmission Service. Eligible

Customers that have already reserved shorter term service have the

right of first refusal to match any longer term reservation before

being preempted. A longer term competing request for Non-Firm Point-To-

Point Transmission Service will be granted if the Eligible Customer

with the right of first refusal does not agree to match the competing

request: (a) Immediately for hourly Non-Firm Point-To-Point

Transmission Service after notification by the Transmission Provider;

and, (b) within 24 hours (or earlier if necessary to comply with the

scheduling deadlines provided in Section 14.6) for Non-Firm Point-To-

Point Transmission Service other than hourly transactions after

notification by the Transmission Provider. Transmission service for

Network Customers from resources other than designated Network

Resources will have a higher priority than any Non-Firm Point-To-Point

Transmission Service. Non-Firm Point-To-Point Transmission Service over

secondary Point(s) of Receipt and Point(s) of Delivery will have the

lowest reservation priority under the Tariff.

14.3 Use of Non-Firm Point-To-Point Transmission Service by the

Transmission Provider

The Transmission Provider will be subject to the rates, terms and

conditions of Part II of the Tariff when making Third-Party Sales under

agreements executed on or after March 9, 1998. The Transmission

Provider will maintain separate accounting, pursuant to Section 8, for

any use of Non-Firm Point-To-Point Transmission Service to make Third-

Party Sales.

14.4 Service Agreements

The Transmission Provider shall offer a standard form Non-Firm

Point-To-Point Transmission Service Agreement (Attachment B) to an

Eligible Customer when it first submits a Completed Application for

Non-Firm Point-To-Point Transmission Service pursuant to the Tariff.

14.5 Classification of Non-Firm Point-To-Point Transmission Service

Non-Firm Point-To-Point Transmission Service shall be offered under

terms and conditions contained in Part II of the Tariff. The

Transmission Provider undertakes no obligation under the Tariff to plan

its Transmission System in order to have sufficient capacity for Non-

Firm Point-To-Point Transmission Service. Parties requesting Non-Firm

Point-To-Point Transmission Service for the transmission of firm power

do so with the full realization that such service is subject to

availability and to Curtailment or Interruption under the terms of the

Tariff. The Transmission Provider shall specify the rate treatment and

all related terms and conditions applicable in the event that a

Transmission Customer (including Third-Party Sales by the Transmission

Provider) exceeds its non-firm capacity reservation. Non-Firm Point-To-

Point Transmission Service shall include transmission of energy on an

hourly basis and transmission of scheduled short-term capacity and

energy on a daily, weekly or monthly basis, but not to exceed one

month's reservation for any one Application under Schedule 8.

14.6 Scheduling of Non-Firm Point-To-Point Transmission Service

Schedules for Non-Firm Point-To-Point Transmission Service must be

submitted to the Transmission Provider no later than 2:00 p.m. (or a

reasonable time that is generally accepted in the region and is

consistently adhered to by the Transmission Provider) of the day prior

to commencement of such service. Schedules submitted after 2:00 p.m.

will be accommodated, if practicable. Hour-to-hour schedules of energy

that are to be delivered must be stated in increments of 1,000 kW per

hour (or a reasonable increment that is generally accepted in the

region and is consistently adhered to by the Transmission Provider).

Transmission Customers within the Transmission Provider's service area

with multiple requests for Transmission Service at a Point of Receipt,

each of which is under 1,000 kW per hour, may consolidate their

schedules at a common Point of Receipt into units of 1,000 kW per hour.

Scheduling changes will be permitted up to twenty (20) minutes (or a

reasonable time that is generally accepted in the region and is

consistently adhered to by the Transmission Provider) before the start

of the next clock hour provided that the Delivering Party and Receiving

Party also agree to the schedule modification. The Transmission

Provider will furnish to the Delivering Party's system operator, hour-

to-hour schedules equal to those furnished by the Receiving Party

(unless reduced for losses) and shall deliver the capacity and energy

provided by such schedules. Should the Transmission Customer,

Delivering Party or Receiving Party revise or terminate any schedule,

such party shall immediately notify the Transmission Provider, and the

Transmission Provider shall have the right to adjust accordingly the

schedule for capacity and energy to be received and to be delivered.

14.7 Curtailment or Interruption of Service

The Transmission Provider reserves the right to Curtail, in whole

or in part, Non-Firm Point-To-Point Transmission Service provided under

the Tariff for reliability reasons when, an emergency or other

unforeseen condition threatens to impair or degrade the reliability of

its Transmission System. The Transmission Provider reserves the right

to Interrupt, in whole or in part, Non-Firm Point-To-Point Transmission

Service provided under the Tariff for economic reasons in order to

accommodate (1) a request for Firm Transmission Service, (2) a request

for Non-Firm Point-To-Point Transmission Service of greater duration,

(3) a request for Non-Firm Point-To-Point Transmission Service of equal

duration with a higher price, or (4) transmission service for Network

Customers from non-designated resources. The Transmission Provider also

will discontinue or reduce service to the Transmission Customer to the

extent that deliveries for transmission are discontinued or reduced at

the Point(s) of Receipt. Where required, Curtailments or Interruptions

will be made on a non-discriminatory basis to the transaction(s) that

effectively relieve the constraint, however, Non-Firm Point-To-Point

Transmission Service shall be subordinate to Firm Transmission Service.

If multiple transactions require Curtailment or Interruption, to the

extent practicable and consistent with Good Utility Practice,

Curtailments or Interruptions will be made to transactions of the

shortest term (e.g., hourly non-firm transactions will be Curtailed or

Interrupted before daily non-firm transactions and daily non-firm

transactions will be Curtailed or Interrupted before weekly non-firm

transactions). Transmission service for Network Customers from

resources other than designated Network Resources will have a higher

priority than any Non-Firm Point-To-Point

[[Page 540]]

Transmission Service under the Tariff. Non-Firm Point-To-Point

Transmission Service over secondary Point(s) of Receipt and Point(s) of

Delivery will have a lower priority than any Non-Firm Point-To-Point

Transmission Service under the Tariff. The Transmission Provider will

provide advance notice of Curtailment or Interruption where such notice

can be provided consistent with Good Utility Practice.

15 Service Availability

15.1 General Conditions

The Transmission Provider will provide Firm and Non-Firm Point-To-

Point Transmission Service over, on or across its Transmission System

to any Transmission Customer that has met the requirements of Section

16.

15.2 Determination of Available Transmission Capability

A description of the Transmission Provider's specific methodology

for assessing available transmission capability posted on the

Transmission Provider's OASIS (Section 4) is contained in Attachment C

of the Tariff. In the event sufficient transmission capability may not

exist to accommodate a service request, the Transmission Provider will

respond by performing a System Impact Study.

15.3 Initiating Service in the Absence of an Executed Service

Agreement

If the Transmission Provider and the Transmission Customer

requesting Firm or Non-Firm Point-To-Point Transmission Service cannot

agree on all the terms and conditions of the Point-To-Point Service

Agreement, the Transmission Provider shall commence providing

Transmission Service subject to the Transmission Customer agreeing to

(i) compensate the Transmission Provider at the existing rate placed in

effect pursuant to applicable Federal law and regulations, and (ii)

comply with the terms and conditions of the Tariff including paying the

appropriate processing fees in accordance with the terms of Section

17.3. If the Transmission Customer cannot accept all of the terms and

conditions of the offered Service Agreement, the Transmission Customer

may request resolution of the unacceptable terms and conditions under

Section 12, Dispute Resolution Procedures, of the Tariff. Any changes

resulting from the Dispute Resolution Procedures will be effective upon

the date of initial service.

15.4 Obligation to Provide Transmission Service that Requires

Expansion or Modification of the Transmission System

If the Transmission Provider determines that it cannot accommodate

a Completed Application for Firm Point-To-Point Transmission Service

because of insufficient capability on its Transmission System, the

Transmission Provider will use due diligence to expand or modify its

Transmission System to provide the requested Firm Transmission Service,

provided the Transmission Customer agrees to compensate the

Transmission Provider in advance for such costs pursuant to the terms

of Section 27. The Transmission Provider will conform to Good Utility

Practice in determining the need for new facilities and in the design

and construction of such facilities. The obligation applies only to

those facilities that the Transmission Provider has the right to expand

or modify.

15.5 Deferral of Service

The Transmission Provider may defer providing service until it

completes construction of new transmission facilities or upgrades

needed to provide Firm Point-To-Point Transmission Service whenever the

Transmission Provider determines that providing the requested service

would, without such new facilities or upgrades, impair or degrade

reliability to any existing firm services.

15.6 Other Transmission Service Schedules

Eligible Customers receiving transmission service under other

agreements on file with the Commission may continue to receive

transmission service under those agreements until such time as those

agreements may be modified by the Commission.

15.7 Real Power Losses

Real Power Losses are associated with all transmission service. The

Transmission Provider is not obligated to provide Real Power Losses.

The Transmission Customer is responsible for replacing losses

associated with all transmission service as calculated by the

Transmission Provider. The applicable Real Power Loss factors are

specified in the Service Agreements.

16 Transmission Customer Responsibilities

16.1 Conditions Required of Transmission Customers

Point-To-Point Transmission Service shall be provided by the

Transmission Provider only if the following conditions are satisfied by

the Transmission Customer:

a. The Transmission Customer has pending a Completed Application

for service;

b. The Transmission Customer meets the creditworthiness criteria

set forth in Section 11;

c. The Transmission Customer will have arrangements in place for

any other transmission service necessary to effect the delivery from

the generating source to the Transmission Provider prior to the time

service under Part II of the Tariff commences;

d. The Transmission Customer agrees to pay for any facilities

constructed and chargeable to such Transmission Customer under Part II

of the Tariff, whether or not the Transmission Customer takes service

for the full term of its reservation; and

e. The Transmission Customer has executed a Point-To-Point Service

Agreement or has agreed to receive service pursuant to Section 15.3.

16.2 Transmission Customer Responsibility for Third-Party Arrangements

Any scheduling arrangements that may be required by other electric

systems shall be the responsibility of the Transmission Customer

requesting service. The Transmission Customer shall provide, unless

waived by the Transmission Provider, notification to the Transmission

Provider identifying such systems and authorizing them to schedule the

capacity and energy to be transmitted by the Transmission Provider

pursuant to Part II of the Tariff on behalf of the Receiving Party at

the Point of Delivery or the Delivering Party at the Point of Receipt.

However, the Transmission Provider will undertake reasonable efforts to

assist the Transmission Customer in making such arrangements, including

without limitation, providing any information or data required by such

other electric system pursuant to Good Utility Practice.

17 Procedures for Arranging Firm Point-To-Point Transmission Service

17.1 Application

A request for Firm Point-To-Point Transmission Service for periods

of one year or longer must contain a written Application to the

appropriate Regional Office, as identified in Attachment K to the

Tariff, at least sixty (60) days in advance of the calendar month in

which service is to commence. The Transmission Provider will consider

requests for such firm service on shorter notice when feasible.

Requests for firm

[[Page 541]]

service for periods of less than one year shall be subject to expedited

procedures that shall be negotiated between the Parties within the time

constraints provided in Section 17.5. All Firm Point-To-Point

Transmission Service requests should be submitted by entering the

information listed below on the Transmission Provider's OASIS. Prior to

implementation of the Transmission Provider's OASIS, a Completed

Application may be submitted by (i) transmitting the required

information to the Transmission Provider by telefax, or (ii) providing

the information by telephone over the Transmission Provider's time

recorded telephone line. Each of these methods will provide a time-

stamped record for establishing the priority of the Application.

17.2 Completed Application

A Completed Application shall provide all of the information

included in 18 CFR 2.20 including but not limited to the following:

(i) The identity, address, telephone number and facsimile number of

the entity requesting service;

(ii) A statement that the entity requesting service is, or will be

upon commencement of service, an Eligible Customer under the Tariff;

(iii) The location of the Point(s) of Receipt and Point(s) of

Delivery and the identities of the Delivering Parties and the Receiving

Parties;

(iv) The location of the generating facility(ies) supplying the

capacity and energy and the location of the load ultimately served by

the capacity and energy transmitted. The Transmission Provider will

treat this information as confidential except to the extent that

disclosure of this information is required by the Tariff, by Federal

law, by regulatory or judicial order, for reliability purposes pursuant

to Good Utility Practice or pursuant to RTG transmission information

sharing agreements. The Transmission Provider shall treat this

information consistent with the standards of conduct contained in Part

37 of the Commission's regulations;

(v) A description of the supply characteristics of the capacity and

energy to be delivered;

(vi) An estimate of the capacity and energy expected to be

delivered to the Receiving Party;

(vii) The Service Commencement Date and the term of the requested

Transmission Service;

(viii) The transmission capacity requested for each Point of

Receipt and each Point of Delivery on the Transmission Provider's

Transmission System; customers may combine their requests for service

in order to satisfy the minimum transmission capacity requirement;

The Transmission Provider shall treat this information consistent

with the standards of conduct contained in Part 37 of the Commission's

regulations.

17.3 Processing Fee

A Completed Application for Firm Point-To-Point Transmission

Service also shall include a non-refundable processing fee. Such fee

shall be applicable to all Transmission Customers for firm Transmission

Service requests of one year or longer. Individual Transmission

Provider processing fees will be calculated using the number of

estimated hours it will take to process an application and will be set

forth in Attachment K. This fee does not apply to costs to complete

System Impact Studies or Facility Studies or to add new facilities.

17.4 Notice of Deficient Application

If an Application fails to meet the requirements of the Tariff, the

Transmission Provider shall notify the entity requesting service within

fifteen (15) days of receipt of the reasons for such failure. The

Transmission Provider will attempt to remedy minor deficiencies in the

Application through informal communications with the Eligible Customer.

If such efforts are unsuccessful, the Transmission Provider shall

return the Application. Upon receipt of a new or revised Application

that fully complies with the requirements of Part II of the Tariff, the

Eligible Customer shall be assigned a new priority consistent with the

date of the new or revised Application.

17.5 Response to a Completed Application

Following receipt of a Completed Application for Firm Point-To-

Point Transmission Service, the Transmission Provider shall make a

determination of available transmission capability as required in

Section 15.2. The Transmission Provider shall notify the Eligible

Customer as soon as practicable, but not later than thirty (30) days

after the date of receipt of a Completed Application either (i) if it

will be able to provide service without performing a System Impact

Study or (ii) if such a study is needed to evaluate the impact of the

Application pursuant to Section 19.1. Responses by the Transmission

Provider must be made as soon as practicable to all completed

applications (including applications by its own merchant function) and

the timing of such responses must be made on a non-discriminatory

basis.

17.6 Execution of a Service Agreement

Whenever the Transmission Provider determines that a System Impact

Study is not required and that the service can be provided, it shall

notify the Eligible Customer as soon as practicable but no later than

thirty (30) days after receipt of the Completed Application. Where a

System Impact Study is required, the provisions of Section 19 will

govern the execution of a Service Agreement. Failure of an Eligible

Customer to execute and return the Service Agreement or request service

without an executed Service Agreement pursuant to Section 15.3, within

fifteen (15) days after it is tendered by the Transmission Provider

will be deemed a withdrawal and termination of the Application. Nothing

herein limits the right of an Eligible Customer to file another

Application after such withdrawal and termination.

17.7 Extensions for Commencement of Service

The Transmission Customer can obtain up to five (5) one-year

extensions for the commencement of service. The Transmission Customer

may postpone service by paying a non-refundable annual reservation fee

equal to one-month's charge for Firm Transmission Service for each year

or fraction thereof. If during any extension for the commencement of

service an Eligible Customer submits a Completed Application for Firm

Transmission Service, and such request can be satisfied only by

releasing all or part of the Transmission Customer's Reserved Capacity,

the original Reserved Capacity will be released unless the following

condition is satisfied. Within thirty (30) days, the original

Transmission Customer agrees to pay the Firm Point-To-Point

transmission rate for its Reserved Capacity concurrent with the new

Service Commencement Date. In the event the Transmission Customer

elects to release the Reserved Capacity, the reservation fees or

portions thereof previously paid will be forfeited.

18 Procedures for Arranging Non-Firm Point-To-Point Transmission

Service

18.1 Application

Eligible Customers seeking Non-Firm Point-To-Point Transmission

Service must submit a Completed Application to the Transmission

Provider. Applications should be submitted by entering the information

listed below on the Transmission Provider's OASIS. Prior to

implementation of the

[[Page 542]]

Transmission Provider's OASIS, a Completed Application may be submitted

by (i) transmitting the required information to the Transmission

Provider by telefax, or (ii) providing the information by telephone

over the Transmission Provider's time recorded telephone line. Each of

these methods will provide a time-stamped record for establishing the

service priority of the Application.

18.2 Completed Application

A Completed Application shall provide all of the information

included in 18 CFR Sec. 2.20 including but not limited to the

following:

(i) The identity, address, telephone number and facsimile number of

the entity requesting service;

(ii) A statement that the entity requesting service is, or will be

upon commencement of service, an Eligible Customer under the Tariff;

(iii) The Point(s) of Receipt and the Point(s) of Delivery;

(iv) The maximum amount of capacity requested at each Point of

Receipt and Point of Delivery; and

(v) The proposed dates and hours for initiating and terminating

transmission service hereunder.

In addition to the information specified above, when required to

properly evaluate system conditions, the Transmission Provider also may

ask the Transmission Customer to provide the following:

(vi) The electrical location of the initial source of the power to

be transmitted pursuant to the Transmission Customer's request for

service;

(vii) The electrical location of the ultimate load.

The Transmission Provider will treat this information in (vi) and

(vii) as confidential at the request of the Transmission Customer

except to the extent that disclosure of this information is required by

this Tariff, by Federal Law, by regulatory or judicial order, for

reliability purposes pursuant to Good Utility Practice, or pursuant to

RTG transmission information sharing agreements. The Transmission

Provider shall treat this information consistent with the standards of

conduct contained in Part 37 of the Commission's regulations.

18.3 Reservation of Non-Firm Point-To-Point Transmission Service

Requests for monthly service shall be submitted no earlier than

sixty (60) days before service is to commence; requests for weekly

service shall be submitted no earlier than fourteen (14) days before

service is to commence, requests for daily service shall be submitted

no earlier than two (2) days before service is to commence, and

requests for hourly service shall be submitted no earlier than noon the

day before service is to commence. Requests for service received later

than 2:00 p.m. prior to the day service is scheduled to commence will

be accommodated if practicable [or such reasonable times that are

generally accepted in the region and are consistently adhered to by the

Transmission Provider].

18.4 Determination of Available Transmission Capability

Following receipt of a tendered schedule the Transmission Provider

will make a determination on a non-discriminatory basis of available

transmission capability pursuant to Section 15.2. Such determination

shall be made as soon as reasonably practicable after receipt, but not

later than the following time periods for the following terms of

service (i) thirty (30) minutes for hourly service, (ii) thirty (30)

minutes for daily service, (iii) four (4) hours for weekly service, and

(iv) two (2) days for monthly service. [Or such reasonable times that

are generally accepted in the region and are consistently adhered to by

the Transmission Provider].

19 Additional Study Procedures For Firm Point-To-Point Transmission

Service Requests

19.1 Notice of Need for System Impact Study

After receiving a request for service, the Transmission Provider

shall determine on a non-discriminatory basis whether a System Impact

Study is needed. A description of the Transmission Provider's

methodology for completing a System Impact Study is provided in

Attachment D. If the Transmission Provider determines that a System

Impact Study is necessary to accommodate the requested service, it

shall so inform the Eligible Customer, as soon as practicable. In such

cases, the Transmission Provider shall within thirty (30) days of

receipt of a Completed Application, tender a System Impact Study

Agreement pursuant to which the Eligible Customer shall agree to

advance funds to the Transmission Provider for performing the required

System Impact Study. For a service request to remain a Completed

Application, the Eligible Customer shall execute the System Impact

Study Agreement and return it to the Transmission Provider within

fifteen (15) days. If the Eligible Customer elects not to execute the

System Impact Study Agreement, its application shall be deemed

withdrawn.

19.2 System Impact Study Agreement and Compensation:

(i) The System Impact Study Agreement will clearly specify the

Transmission Provider's estimate of the actual cost, and time for

completion of the System Impact Study. The charge will not exceed the

actual cost of the study. In performing the System Impact Study, the

Transmission Provider shall rely, to the extent reasonably practicable,

on existing transmission planning studies. The Eligible Customer will

not be assessed a charge for such existing studies; however, the

Eligible Customer will be responsible for charges associated with any

modifications to existing planning studies that are reasonably

necessary to evaluate the impact of the Eligible Customer's request for

service on the Transmission System.

(ii) If in response to multiple Eligible Customers requesting

service in relation to the same competitive solicitation, a single

System Impact Study is sufficient for the Transmission Provider to

accommodate the requests for service, the costs of that study shall be

pro-rated among the Eligible Customers.

(iii) For System Impact Studies that the Transmission Provider

conducts on its own behalf, the Transmission Provider shall record the

cost of the System Impact Studies pursuant to Section 8.

19.3 System Impact Study Procedures

Upon receipt of an executed System Impact Study Agreement, the

Transmission Provider will use due diligence to complete the required

System Impact Study within a sixty (60) day period. The System Impact

Study shall identify any system constraints and redispatch options,

additional Direct Assignment Facilities or Network Upgrades required to

provide the requested service. In the event that the Transmission

Provider is unable to complete the required System Impact Study within

such time period, it shall so notify the Eligible Customer and provide

an estimated completion date along with an explanation of the reasons

why additional time is required to complete the required studies. A

copy of the completed System Impact Study and related work papers shall

be made available to the Eligible Customer. The Transmission Provider

will use the same due diligence in completing the System Impact Study

for an Eligible Customer as it uses when completing studies for itself.

The Transmission Provider shall notify the Eligible

[[Page 543]]

Customer immediately upon completion of the System Impact Study if the

Transmission System will be adequate to accommodate all or part of a

request for service or that no costs are likely to be incurred for new

transmission facilities or upgrades. In order for a request to remain a

Completed Application, within fifteen (15) days of completion of the

System Impact Study the Eligible Customer must execute a Service

Agreement or request service without an executed Service Agreement

pursuant to Section 15.3, or the Application shall be deemed terminated

and withdrawn.

19.4 Facilities Study Procedures

If a System Impact Study indicates that additions or upgrades to

the Transmission System are needed to supply the Eligible Customer's

service request, the Transmission Provider, within thirty (30) days of

the completion of the System Impact Study, shall tender to the Eligible

Customer a Facilities Study Agreement pursuant to which the Eligible

Customer shall agree to advance funds to the Transmission Provider for

performing the required Facilities Study. For a service request to

remain a Completed Application, the Eligible Customer shall execute the

Facilities Study Agreement and return it to the Transmission Provider

within fifteen (15) days. If the Eligible Customer elects not to

execute the Facilities Study Agreement, its application shall be deemed

withdrawn. Upon receipt of an executed Facilities Study Agreement, the

Transmission Provider will use due diligence to complete the required

Facilities Study within a sixty (60) day period. If the Transmission

Provider is unable to complete the Facilities Study in the allotted

time period, the Transmission Provider shall notify the Transmission

Customer and provide an estimate of the time needed to reach a final

determination along with an explanation of the reasons that additional

time is required to complete the study. When completed, the Facilities

Study will include a good faith estimate of (i) the cost of Direct

Assignment Facilities to be charged to the Transmission Customer, (ii)

the Transmission Customer's appropriate share of the cost of any

required Network Upgrades as determined pursuant to the provisions of

Part II of the Tariff, and (iii) the time required to complete such

construction and initiate the requested service. The Transmission

Customer shall pay the Transmission Provider in advance Transmission

Customer's share of the costs of new facilities or upgrades. The

Transmission Customer shall have thirty (30) days to execute a

construction agreement and a Service Agreement and provide the advance

payment or request service without an executed Service Agreement

pursuant to Section 15.3 and pay the Transmission Customer's share of

the costs or the request will no longer be a Completed Application and

shall be deemed terminated and withdrawn. Any advance payment made by

the Transmission Customer that is in excess of the costs incurred by

the Transmission Provider shall be refunded.

19.5 Facilities Study Modifications

Any change in design arising from inability to site or construct

facilities as proposed will require development of a revised good faith

estimate. New good faith estimates also will be required in the event

of new statutory or regulatory requirements that are effective before

the completion of construction or other circumstances beyond the

control of the Transmission Provider that significantly affect the

final cost of new facilities or upgrades to be charged to the

Transmission Customer pursuant to the provisions of Part II of the

Tariff.

19.6 Due Diligence in Completing New Facilities

The Transmission Provider shall use due diligence to add necessary

facilities or upgrade its Transmission System within a reasonable time.

The Transmission Provider will not upgrade its existing or planned

Transmission System in order to provide the requested Firm Point-To-

Point Transmission Service if doing so would impair system reliability

or otherwise impair or degrade existing firm service.

19.7 Partial Interim Service

If the Transmission Provider determines that it will not have

adequate transmission capability to satisfy the full amount of a

Completed Application for Firm Point-To-Point Transmission Service, the

Transmission Provider nonetheless shall be obligated to offer and

provide the portion of the requested Firm Point-To-Point Transmission

Service that can be accommodated without addition of any facilities and

through redispatch. However, the Transmission Provider shall not be

obligated to provide the incremental amount of requested Firm Point-To-

Point Transmission Service that requires the addition of facilities or

upgrades to the Transmission System until such facilities or upgrades

have been placed in service.

19.8 Expedited Procedures for New Facilities

In lieu of the procedures set forth above, the Eligible Customer

shall have the option to expedite the process by requesting the

Transmission Provider to tender at one time, together with the results

of required studies, an ``Expedited Service Agreement'' pursuant to

which the Eligible Customer would agree to compensate the Transmission

Provider in advance for all costs incurred pursuant to the terms of the

Tariff. In order to exercise this option, the Eligible Customer shall

request in writing an expedited Service Agreement covering all of the

above-specified items within thirty (30) days of receiving the results

of the System Impact Study identifying needed facility additions or

upgrades or costs incurred in providing the requested service. While

the Transmission Provider agrees to provide the Eligible Customer with

its best estimate of the new facility costs and other charges that may

be incurred, such estimate shall not be binding and the Eligible

Customer must agree in writing to compensate the Transmission Provider

in advance for all costs incurred pursuant to the provisions of the

Tariff. The Eligible Customer shall execute and return such an

Expedited Service Agreement within fifteen (15) days of its receipt or

the Eligible Customer's request for service will cease to be a

Completed Application and will be deemed terminated and withdrawn.

20 Procedures if The Transmission Provider is Unable to Complete New

Transmission Facilities for Firm Point-To-Point Transmission Service

20.1 Delays in Construction of New Facilities

If any event occurs that will materially affect the time for

completion of new facilities, or the ability to complete them, the

Transmission Provider shall promptly notify the Transmission Customer.

In such circumstances, the Transmission Provider shall within thirty

(30) days of notifying the Transmission Customer of such delays,

convene a technical meeting with the Transmission Customer to evaluate

the alternatives available to the Transmission Customer. The

Transmission Provider also shall make available to the Transmission

Customer studies and work papers related to the delay, including all

information that is in the possession of the Transmission Provider that

is reasonably needed by the Transmission Customer to evaluate any

alternatives.

[[Page 544]]

20.2 Alternatives to the Original Faci

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.