Acid Rain Program; Continuous Emission Monitoring Rule Revisions

Federal RegisterMay 21, 1998

Ask Donna

What actually matters in this document.

Text

SUMMARY: Title IV of the Clean Air Act (CAA or the Act), as amended by

the Clean Air Act Amendments of 1990, authorizes the Environmental

Protection Agency (EPA or Agency) to establish the Acid Rain Program.

The Acid Rain Program and the provisions in this proposed rule benefit

the environment by preventing the serious, adverse effects of acidic

deposition on natural resources, ecosystems, materials, visibility, and

public health. The program does this by setting emissions limitations

to reduce the acidic deposition precursor emissions of sulfur dioxide

and nitrogen oxides. On January 11, 1993, the Agency promulgated final

rules, including the final continuous emission monitoring (CEM) rule,

under title IV. On May 17, 1995, the Agency published direct final and

interim rules to make the implementation of the CEM rule simpler.

Subsequently, on November 20, 1996, the Agency published a final rule

in response to public comments received on the direct final and interim

rules.

These proposed revisions to the CEM rule would make a number of

further minor changes to make the implementation of the CEM rule

simpler, more streamlined, and more efficient for both EPA and the

facilities affected by the rule. Furthermore, the proposed revisions

would provide reduced monitoring burdens for affected facility units

with low mass emissions. In addition, the proposed revisions would

establish quality assurance requirements for moisture monitoring

systems and add a new flow monitor quality assurance test to assure the

accuracy of data reported from these types of monitoring systems.

Finally, the proposed revisions would create a new monitoring option,

the F-factor/fuel flow method, for certain units.

DATES: Comments. All public comments must be received on or before July

20, 1998.

Public Hearing. Anyone requesting a public hearing must contact EPA

no later than May 31, 1998. If a hearing is held, it will take place

June 8, 1998, beginning at 10:00 a.m.

ADDRESSES: Comments. Comments must be mailed (in duplicate if possible)

to: EPA Air Docket (6102), Attention: Docket No. A-97-35, Room M-1500,

Waterside Mall, 401 M Street, SW, Washington, DC 20460.

Public Hearing. If a public hearing is requested, it will be held

at the Environmental Protection Agency, 401 M Street, SW, Washington,

DC 20460, in the Education Center Auditorium. Refer to the Acid Rain

homepage at www.epa.gov/acidrain for more information or to determine

if a public hearing has been requested and will be held.

Docket. Docket No. A-97-35, containing supporting information used

to develop the proposal is available for public inspection and copying

from 8:00 a.m. to 5:30 p.m., Monday through Friday, excluding legal

holidays, at EPA's Air Docket Section at the above address.

FOR FURTHER INFORMATION CONTACT: Jennifer Macedonia, Acid Rain Division

(6204J), U.S. Environmental Protection Agency, 401 M Street, SW,

Washington, DC 20460, telephone number (202) 564-9123 or the Acid Rain

Hotline at (202) 564-9620. Electronic copies of this notice and

technical support documents can be accessed through the Acid Rain

Division website at http://www.epa.gov/acidrain.

SUPPLEMENTARY INFORMATION: The contents of the preamble are listed in

the following outline:

I. Regulated Entities

II. Background and Summary of the Proposed Rule

III. Detailed Discussion of Proposed Revisions

A. Use of Projections in the Definitions of Gas-fired, Oil-

fired, and Peaking Unit

B. Wording Correction of the Applicability Provisions in Part 72

C. Low Mass Emissions Excepted Methodology

1. Applicability Criteria

2. Method for Determining Emissions

3. Cutoff Limit for Applicability

4. Continuing Applicability Criteria

5. Reduced Monitoring and Quality Assurance Requirements

6. Reduced Reporting Requirements

D. Quality Assurance Requirements for Moisture Monitoring

Systems

E. Certification/Recertification Procedural Changes

1. Initial Certification versus Recertification

2. Disapproval of an Incomplete Application

3. Submittal Requirements for Certification and Recertification

Applications

4. Decertification Applicability

5. Recertification Test Notice

6. Monitoring Plans

7. Submittal Requirements for Petitions and Other Correspondence

F. Substitute Data

1. Missing Data Procedures for CO2 and Heat Input

2. Prohibition Against Low Monitor Data Availability

G. General Authority to Grant Petitions Under Part 75

H. NOX Mass Monitoring Provisions for Adoption by

NOX Mass Reduction Programs

I. Span and Range Requirements

1. Maximum Potential Values

2. Maximum Expected SO2 and NOX

Concentrations

3. Span and Range Values

4. Dual Span and Range Requirements for SO2 and

NOX

5. Adjustment of Span and Range

J. Quality Assurance/Quality Control (QA/QC) Program

1. QA/QC Plan

2. Flow Monitor Polynomial Coefficient

K. Calibration Gas Concentration for Daily Calibration Error

Tests

L. Linearity Test Requirements

1. Unit Operation During Linearity Tests

2. Linearity Test Frequency

3. Linearity Test Method

4. Exemptions

M. Flow-to-Load Test

N. RATA and Bias Test Requirements

1. RATA Frequency

2. RATA Load Levels

3. Flow Monitor Bias Adjustment Factors

4. Number of RATA Attempts

5. Concurrent SO2 and Flow RATAs

6. SO2 RATA Exemptions and Reduced Requirements

7. QA Provisions for SO2 Monitors, for Natural Gas

Firing or Equivalent

8. General RATA Test Procedures

9. Reference Method Testing Issues

10. Alternative Relative Accuracy Specifications and

Specifications for Low-Emitters

11. Bias Adjustment Factors for Low-Emitters

12. Clarification of Diluent Monitor Certification Requirements

13. Daily Calibration Requirements for Redundant Backup Monitors

14. Daily Performance Specification and Control Limits for Low-

Span DP Flow Monitors

O. CEM Data Validation

1. Recalibration and Adjustment of CEMS

2. Linearity Tests

3. RATAs

4. Recertification of Gas and Flow Monitors

5. Recertification and QA

6. Data from Non-Redundant Backup Monitors

7. Missed QA Test Deadlines

P. Appendix D

1. Pipeline Natural Gas Definitions

2. Fuel Sampling

3. Sulfur, Density, and Gross Calorific Value Used in

Calculations

4. Missing Data Procedures for Sulfur Content, Density, and

Gross Calorific Value

5. Installation of Fuel Flowmeters for Recirculation

6. Fuel Flowmeter Testing

[[Page 28033]]

7. Use of Uncertified Commercial Gas Flowmeter

Q. Appendix G

1. Use of ASTM D5373-93 for Determining the Carbon Content of

Coal

2. Changes to Fuel Sampling Frequency

3. Addition of Missing Data Procedures for Fuel Analytical Data

R. Reporting Issues

1. Partial Unit Operating Hours and Emission and Fuel Flow Rates

2. Use of Bias-Adjusted Flow Rates in Heat Input Calculations

3. Removing the Restriction of Using the Diluent Cap Only for

Start-up

4. Complex Stacks--General Issues

5. Complex Stacks--Heat Input at Common Stacks

6. Start-up Reporting--Units Shutdown Over the Compliance

Deadline

7. Start-up Reporting--New Units

8. Recordkeeping and Reporting Provisions

9. Electronic Transfer of Quarterly Reports

S. Revised Traceability Protocol for Calibration Gases

T. Appendix I--New Optional Stack Flow Monitoring Methodology

U. The Use of Predictive Emissions Modeling Systems (PEMS)

IV. Administrative Requirements

A. Public Hearing

B. Public Docket

C. Executive Order 12866

D. Unfunded Mandate Reform Act

E. Paperwork Reduction Act

F. Regulatory Flexibility Act

G. National Technology Transfer and Advancement Act

I. Regulated Entities

Entities potentially regulated by this action are fossil fuel-fired

boilers and turbines that serve generators producing electricity,

generate steam, or cogenerate electricity and steam. While part 75

primarily regulates the electric utility industry, today's proposal

could potentially affect other industries. The proposal includes

NOX mass provisions for the purpose of serving as a model

which could be adopted by a state, tribal, or federal NOX

mass reduction program covering the electric utility and other

industries. Regulated categories and entities include:

------------------------------------------------------------------------

Examples of regulated

Category entities

------------------------------------------------------------------------

Industry.................................. Electric service providers,

boilers and turbines from a

wide range of industries.

------------------------------------------------------------------------

This table is not intended to be exhaustive, but rather provides a

guide for readers regarding entities likely to be regulated by this

action. This table lists the types of entities which EPA is now aware

could potentially be regulated by this action. Other types of entities

not listed in the table could also be regulated. To determine whether

your facility, company, business, organization, etc., is regulated by

this action, you should carefully examine the applicability criteria in

Secs. 72.6, 72.7, and 72.8 of title 40 of the Code of Federal

Regulations. If you have questions regarding the applicability of this

action to a particular entity, consult the person listed in the

preceding FOR FURTHER INFORMATION CONTACT section of this preamble.

II. Background and Summary of the Proposed Rule

Title IV of the Act requires EPA to establish an Acid Rain Program

to reduce the adverse effects of acidic deposition. On January 11,

1993, the Agency promulgated final rules implementing the program,

including the CEM rule (58 FR 3590-3766). Technical corrections were

published on June 23, 1993 (58 FR 34126) and July 30, 1993 (58 FR

40746-40752). A notice of direct final rulemaking and of interim final

rulemaking further amending the regulations was published on May 17,

1995 (60 FR 26510 and 60 FR 26560). Subsequently, on November 20, 1996,

a final rule was published in response to public comments received on

the direct final and interim rules (61 FR 59142-59166) .

The issues addressed by this proposed rule are: (1) revised

definitions of gas-fired, oil-fired, and peaking unit to allow for

changes in unit fuel usage and/or operation; (2) a minor wording

correction of the applicability provisions in Part 72; (3) new excepted

methodologies for units with low mass emissions; (4) new QA/QC

requirements for moisture monitoring systems; (5) clarifying changes to

the certification and recertification process; (6) substitute data

requirements for CO2 and heat input, as well as a

prohibition against low data availability; (7) clarifying revisions to

the petition provisions for alternatives to part 75 requirements; (8)

NOX mass monitoring provisions provided as a model for

adoption by state, tribal, or federal NOX mass reduction

programs; (9) clarifying changes to span and range requirements; (10)

clarifying revisions to general QA/QC requirements; (11) calibration

gas concentrations for daily calibration error tests; (12) linearity

test requirements; (13) a new flow-to-load QA test for flow monitors;

(14) reductions in and/or clarifications to the relative accuracy test

audit (RATA) and bias test requirements; (15) clarifying revisions to

the procedures for CEM data validation; (16) clarifying revisions to

the SO2 emissions data protocol for gas-fired and oil-fired

units (Appendix D); (17) determining CO2 emissions (Appendix

G, sections 2.1 and 5); (18) recordkeeping and reporting changes to

reflect the proposed revisions; (19) a revised traceability protocol

(Appendix H); and (20) a new optional F-factor/fuel flow method

(Appendix I). In addition, the preamble also includes a discussion on

potential provisions to allow for the use of predictive emissions

modeling systems (PEMS) as an alternative to CEMS for certain units.

Many of the changes proposed today are minor technical revisions

based on comments received from utilities following the initial

implementation of part 75. Based on experience gained in the early

years of the program, utilities have developed a number of suggestions

that EPA believes would simplify and streamline the monitoring process

without sacrificing data quality. In addition, the Agency is proposing

to reduce the monitoring requirements for units with low mass emissions

to reduce burdens on those types of units and to add new monitoring

options for some units. The Agency has also proposed new quality

assurance requirements based on gaps identified by EPA during

evaluation of the initial implementation of part 75. Finally, several

minor technical changes are also proposed in order to maintain

uniformity within the rule itself and to clarify various provisions.

III. Detailed Discussion of Proposed Revisions

A. Use of Projections in the Definitions of Gas-Fired, Oil-Fired, and

Peaking Unit

Background

Section 72.2 of the January 11, 1993 rule provides definitions for

the terms ``gas-fired,'' ``oil-fired,'' and ``peaking unit.'' Each

definition provides a limit on the fuel usage or capacity factor

averaged over a three year period, as well as an individual limit on

each of the three years, in order to qualify under the definition. The

May 17, 1995 revisions to part 75 amended those definitions by adding

provisions for how a unit would initially qualify to meet the

definition. Each definition provides for the case where a unit has

three years of historical data demonstrating qualification, as well as

the case where a unit does not have data for one or more of the three

previous years (e.g., a new unit or a unit that has been in an extended

shutdown). In addition, the gas-fired definition provides for the case

where a unit's fuel usage is projected to change on or before January

1, 1995 and the peaking unit definition provides for the case where a

unit's capacity factor is projected to change on or before the

certification deadline (either 1995 or 1996) for NOX

[[Page 28034]]

monitoring in Sec. 75.4. In each case where historical data does not

exist or is not representative based on projected change, the amended

definitions set provisions for allowing projections of unit operation

to be used in place of historical data in order to meet the criteria of

the respective definition. However, none of the three definitions

provides for the case where a unit's fuel usage or capacity factor is

expected to change after initial classification.

Under the existing rule, the importance of determining whether a

unit qualifies under the definitions of gas-fired, oil-fired, and

peaking unit, centers on the differences in regulatory requirements and

options for different classifications of units. For example, under

Sec. 75.11(d)(2), a unit that qualifies as gas-fired or oil-fired has

an additional option for monitoring SO2 emissions using the

excepted protocol of Appendix D, in lieu of an SO2 CEMS and

flow monitor. Additionally, under Sec. 75.14(c), a unit that qualifies

as gas-fired is exempt from opacity monitoring, and, under section 2.3

of Appendix G to part 75, a gas-fired unit has an additional option for

determining CO2 mass emissions in lieu of a CO2

CEMS or using carbon sampling in conjunction with a fuel flowmeter.

Qualifying under the definition of peaking unit also has the advantage

of allowing additional regulatory options. For example, a peaking unit

has the option of monitoring NOX emission rate using the

excepted protocol under Appendix E, in lieu of a NOX CEMS.

Further, under section 2.3.1 of Appendix B to part 75, a peaking unit

is required to perform annual quality assurance flow monitor RATAs at a

single load level instead of at three load levels.

Utility representatives have contacted EPA for guidance about how a

change in the manner of operation of the unit after certification and

initial classification of the unit affects the status of the unit with

respect to the definitions of gas-fired, oil-fired, and peaking unit.

For example, a utility representative contacted the Agency about a unit

designed to burn gas and/or oil that historically had burned primarily

oil and was classified as an oil-fired unit. The utility had decided to

switch from oil to burn almost entirely gas at the unit and asked

whether it was necessary to wait three years after the switch to gas in

order to gather three years of historical data, to qualify for the

additional regulatory options available only for gas-fired units. The

utility requested permission to use projections of fuel usage certified

by the designated representative, to demonstrate that the unit would

meet the gas-fired definition after the switch to gas, so that the unit

could be exempt from opacity monitoring and qualify to use equation G-4

to determine CO2 mass emissions. The existing rule would

require such a unit to wait three years after the change in operation

in order to qualify as gas-fired. Based on EPA's experience of

implementing the provisions of Parts 72 and 75, the definitions of the

terms gas-fired, oil-fired, and peaking unit are not sufficiently

detailed or flexible to address situations where a permanent change in

the manner of operation after the initial classification (i.e, capacity

factor or fuel usage) affects the gas-fired, oil-fired, or peaking unit

status.

Discussion of Proposed Changes

Today's proposal would amend the definitions of the terms gas-

fired, oil-fired, and peaking unit, to add provisions for an existing

unit that does not presently qualify under the definition but that

experiences a permanent change in operation (i.e., fuel usage for the

gas-and oil-fired definitions and capacity factor for the peaking unit

definition).

For the definition of gas-fired, the proposed revisions would allow

an existing unit to qualify under the definition if the designated

representative submits a minimum of 720 hours of unit operating data

demonstrating that the unit meets the percentage criteria of a gas-

fired unit (i.e., no less than 90.0 percent of the unit's heat input

from the combustion of gaseous fuels with a total sulfur content no

greater than natural gas and the remaining heat input from the

combustion of fuel oil), accompanied by a certification statement from

the designated representative. The designated representative statement

would certify that the changed pattern of fuel usage, represented in

the 720 hours of data, is considered permanent and is projected to

continue for the foreseeable future.

The proposed definition of oil-fired unit would simplify the

provisions for qualification, for purposes of part 75. The proposed

definition would simply require that a unit burn only fuel oil and

gaseous fuels with a total sulfur content no greater than natural gas

and that the unit does not meet the definition of gas-fired, in order

to qualify as oil-fired. With this simplification, a unit could qualify

under any of the following circumstances: (1) a new unit projected to

burn only fuel oil and gaseous fuels with a sulfur content no greater

than natural gas but projected to burn too much oil to qualify as gas-

fired; (2) an existing gas-fired unit, which burns only fuel oil and

natural gas, but which exceeds the gas-fired annual limit of 15 percent

of the annual heat input from fuel oil; and (3) an existing coal-fired

unit that is converted to only burn fuel oil and/or gas but which

projects it will burn too much oil to qualify as gas-fired.

The proposed definition of peaking unit would allow an existing

unit whose capacity factor is projected to change, to qualify as a

peaking unit if the designated representative submits a demonstration

satisfactory to the Administrator that the unit will qualify as a

peaking unit, using the three calendar years beginning with the first

full year following the change in the unit's capacity factor as the

three year period. This demonstration would need to show that the

unit's capacity factor in the year following the permanent change in

operation did not exceed 10.0 percent and that the projected average

annual capacity factor for the unit in the three year period and the

projected capacity for each of the two individual projected years will

meet the definition of a peaking unit.

Additionally, under today's proposal, the gas-fired definition

would be revised to clarify the requirements as they apply for the

purposes of part 75 versus the requirements for the purposes of all

other Parts under the Acid Rain Program. This proposed revision is

merely editorial and would not change the intent of the existing

regulation.

Rationale

The Agency proposes to allow projections of fuel usage or capacity

factor in conjunction with some actual data to be used for the purpose

of meeting the criteria of the gas- or oil-fired or peaking unit

definitions, respectively. The Agency believes it is unnecessary to

require three years to pass before a unit that the designated

representative certifies has permanently changed its manner of

operation is allowed to utilize the additional regulatory options

allowed for units meeting the definitions of gas-fired, oil-fired, and

peaking unit. The Agency believes it is sufficient to require the

designated representative to submit representative data that the unit

would qualify under the definition following the permanent change in

operation or fuel usage (i.e., 720 hours for the gas-fired definition

and a full year for the peaking unit definition) and to certify that

the change in fuel usage or capacity factor is considered permanent and

that the unit is expected to continue to meet the definition of gas-

fired, oil-fired, or peaking unit, as applicable, into the foreseeable

future.

Under the existing rule, the peaking unit definition does provide

for the

[[Page 28035]]

situation where a unit's operation is projected to change and the unit

will meet the peaking unit definition with those projections. However,

this provision is limited to the case where a unit's operation has

changed by the certification deadline for NOX monitoring.

The existing rule does not provide for the scenario where a change to

the unit's operation after the certification deadline would affect the

peaking unit status and where the designated representative might want

to take advantage of regulatory options that are available under this

new status.

EPA believes that it is appropriate to allow a unit to use the

regulatory options that are only allowed for peaking units, if a unit's

operation permanently changes such that it meets the capacity factor

definition with one year of actual data and two years of projections.

If the projections are incorrect, the unit will lose its peaking unit

status and will not be able to use projections again to qualify.

Similarly, under the existing rule, the gas-fired definition does

provide for the situation where an existing unit that does not qualify

under the gas-fired definition experiences a change in operations or

fuel usage that would result in the unit qualifying as gas-fired in

future years. However, this provision is limited to the case where a

unit's operation has changed by the certification deadline for

SO2 and opacity monitoring, from 1995 through 1997. The

existing rule does not provide for the scenario where a change to the

unit's fuel usage after the certification deadline would affect the

gas-fired status and that the designated representative might want to

take advantage of regulatory options that are available under this new

status.

However, EPA believes that it is appropriate to allow a unit to use

the regulatory options that are only allowed for gas-fired units, if a

unit's fuel usage permanently changes such that it meets the gas-fired

definition with 720 hours of actual data and projections of fuel usage

to make up the remainder of the three year period. If the projections

are incorrect, the unit will lose its gas-fired status and will not be

able to use projections again to qualify.

B. Wording Correction of the Applicability Provisions in Part 72

Background

Section 72.6(b)(1) currently includes, in the list of types of

units that are unaffected units under the Acid Rain Program, ``[a]

simple combustion turbine that commenced operation before November 15,

1990.'' 40 CFR 72.6(b)(1). Title IV actually provides, through

statutory definitions and provisions setting emission limitations, that

a simple combustion turbine that commenced commercial operation before

the enactment of title IV, i.e., November 15, 1990, is an unaffected

unit. A simple combustion turbine commencing commercial operation on or

after November 15, 1990 is an affected unit (unless it is exempt under

some other provision, e.g., the new units exemption under Sec. 72.7).

To begin, the definition of ``existing unit'' in section 402(8) of

the Act excludes existing simple combustion turbines (i.e., those that

commenced commercial operation prior to November 15, 1990) and so

excludes them from being affected units subject to an SO2

emission limitation under section 405(a)(1). As stated in that section

402(8):

``existing unit'' means a unit * * * that commenced commercial

operation before the date of enactment of the Clean Air Act

Amendments of 1990 [i.e., November 15, 1990] * * * For purposes of

this title, existing units shall not include simple combustion

turbines * * * 42 U.S.C. 7651a(8).

In contrast, the statutory definition of ``new unit'' does not exclude

any new simple combustion turbines, and under section 403(e), all new

utility units are affected units subject to an SO2 emission

limitation. As stated in section 402(10):

``new unit'' means a unit that commences commercial operation on or

after the date of enactment of the Clean Air Act Amendments of 1990

[i.e., November 15, 1990]. 42 U.S.C. 7651a(10).

A unit that commences commercial operation after November 15, 1990, and

so does not meet the definition of ``existing unit'', is therefore a

new unit and an affected unit subject to Acid Rain Program

requirements.

While Sec. 72.6(b)(1) states that a simple combustion turbine that

``commenced operation'' before November 15, 1990 is not an affected

unit, EPA interprets this provision, consistent with the Act, to refer

to commencement of commercial operation. However, in order to remove

any ambiguity and any possibility of erroneous application of the

statutory exemption for simple combustion turbines, EPA believes that

the regulatory provision should be corrected.

Discussion of Proposed Changes

Today's proposal would revise the existing Sec. 72.6(b)(1) in order

to make it consistent with title IV of the Act. EPA proposes to revise

the language of the provision to refer expressly to ``commercial

operation,'' rather than simply ``operation,'' of a simple combustion

turbine.

Rationale

EPA notes that the existing Sec. 72.6(b)(1) was not intended to

deviate from the provisions in the Act concerning simple combustion

turbines. In proposing the applicability provisions that were finalized

(with changes) as Sec. 72.6, EPA explained that:

simple combustion turbines would be subject to Acid Rain Program

requirements in Phase II (as new units) if such units commenced

commercial operation on or after November 15, 1990, because the

statutory exemption for simple combustion turbines is only

applicable to existing units. 56 FR 63002, 63008 (1991).

In noting that new simple combustion turbines are affected units, EPA

requested comment on whether a ``de minimis exclusion should be

included in the final rule'' for ``very small units'' from the Acid

Rain Program. Id. In response to comments supporting an exemption for

simple combustion turbines and other units, EPA established in the

final rule an exemption for new units (including new simple combustion

turbines) serving generators with total capacity of 25 MWe or less. 58

FR 3590, 3593-4 (1993); Response to Comment at P-22 and P-23 (1993). In

the final rule preamble, EPA did not indicate any intention to make any

other changes concerning the applicability of the Acid Rain Program to

new simple combustion turbines.

C. Low Mass Emissions Excepted Methodology

Background

In the January 11, 1993 Acid Rain permitting rule, EPA provided for

a conditional exemption from the emissions reduction, permitting, and

emissions monitoring requirements of the Acid Rain Program for new

units having a nameplate capacity of 25 MWe or less that burn fuels

with a sulfur content no greater than 0.05 percent by weight, because

of the de minimis nature of their emissions (see 58 FR 3593-94 and

3645-46). Moreover, in the January 11, 1993 monitoring rule, EPA

allowed gas-fired and oil-fired peaking units to use the provisions of

Appendix E, instead of CEMS, to determine the NOX emission

rate, stating that this was a de minimis exception. EPA allowed this

exception from the requirements of section 412 of the Clean Air Act

because the NOX emissions from these units would be

extremely low, both

[[Page 28036]]

collectively and individually, and because the cost of measuring a ton

of NOX with CEMS could be several hundred dollars per ton of

NOX monitored (see 58 FR 3644-45). One utility wrote to the

Agency, suggesting that the Agency consider further regulatory relief

for other units with extremely low emissions that do not fall under the

categories of small new units burning fuels with a sulfur content less

than or equal to 0.05 percent by weight or gas-fired and oil-fired

peaking units (see Docket A-97-35, Item II-D-31). The utility

specifically suggested that the Agency consider an exemption, the

ability to use Appendix E, or some other simplified methods which are

more cost effective.

In the process of implementing part 75, other utilities also have

suggested to EPA that it provide regulatory relief to low mass emitting

units (see Docket A-97-35, Items II-D-29, II-E-25). These units might

be low mass emitting because they use a clean fuel, such as natural

gas, and/or because they operate relatively infrequently. Some

utilities stated that they spend a great deal of time reviewing the

emissions data when preparing quarterly reports for these units. Others

indicated that it would be important to reduce monitoring and quality

assurance (QA) requirements in order to save time and money currently

devoted to units with minimal emissions (see Docket A-97-35, Item II-E-

25).

Discussion of Proposed Changes

Today's proposal would incorporate optional reduced monitoring,

quality assurance, and reporting requirements into part 75 for units

that burn only natural gas or fuel oil, emit no more than 25 tons of

SO2 and no more than 25 tons of NOX annually, and

have calculated annual SO2 and NOX emissions

(reflecting their potential emissions during actual operation) that do

not exceed such limits.

A unit would initially qualify for the reduced requirements by

demonstrating to the Administrator's satisfaction that the unit meets

the applicability criteria in proposed Sec. 75.19(a). Proposed

Sec. 75.19(a) would require facilities to submit historical actual (or

projections, as described below) and calculated emissions data from the

previous three calendar years demonstrating that a unit falls below the

25-ton cutoffs for SO2 and NOX. The calculated

emissions data for the previous three calendar years would be

determined by applying the emission factors and maximum rated hourly

heat input, under Sec. 75.19(c), to the hours of operation and fuel

burned during the previous three calendar years. The data demonstrating

that a unit meets the applicability requirements of Sec. 75.19(a) would

be submitted in a certification application for approval by the

Administrator to use the low mass emissions excepted methodology. The

Agency requests comments on whether a unit that exceeded the 25-ton

emissions cutoff for a part of the previous three years, but that has

made a permanent change in the operation of the unit such that it would

expect to meet the applicability criteria based on projections of

future operation, should be allowed to use the excepted methodology.

For units that lack historical data for one or more of the previous

three calendar years (including new units that lack any historical

data), proposed Sec. 75.19(a) would require the facility to provide (1)

any historical emissions and operating data, beginning with the unit's

first calendar year of commercial operation, that demonstrates that the

unit falls under the 25-ton cutoffs for SO2 and

NOX, both with actual emissions and with calculated

emissions using the proposed methodology, as described above; and (2) a

demonstration satisfactory to the Administrator that the unit will

continue to emit below the tonnage cutoffs (e.g., for a new unit,

applying the emission rates and hourly heat input, under Sec. 75.19(c),

to a projection of annual operation and fuel usage to determine the

projected mass emissions).

For units with historical actual (or projections, as described

above) emissions and calculated emissions falling below the tonnage

cutoffs, facilities would be allowed to use the optional methodology in

proposed Sec. 75.19(c) in lieu of either CEMS or, where applicable, in

lieu of the excepted methods under Appendix D, E, or G for the purpose

of determining and reporting heat input, NOX emission rate,

and NOX, SO2, and CO2 mass emissions.

Under the optional methodology in proposed Sec. 75.19(c), a facility

would calculate and report hourly SO2 and CO2

mass emissions based on the unit's maximum rated hourly heat input and

the appropriate emission factor, defined in Sec. 75.19(c), Tables 1a

and 1c, for the fuel burned that hour. Similarly, a facility would

calculate and report hourly NOX mass emissions as the

product of the maximum rated hourly heat input and the appropriate fuel

and boiler type NOX emission rate located in proposed Table

1b. The facility would no longer be required to keep monitoring

equipment installed on low mass emissions units, nor would it be

required to meet the quality assurance test requirements or QA/QC

program requirements of Appendix B to part 75. Moreover, emissions

reporting requirements would be reduced by requiring only that the

facility report the unit's hourly mass emissions of SO2,

CO2, and NOX, the unit's NOX emission

rate, and the fuel type burned for each hour of operation, and report

the quarterly total and year-to-date cumulative mass emissions, heat

input, and operating time, in addition to the unit's quarterly average

and year-to-date average NOX emission rate for each quarter.

Facilities would continue to be required to monitor, record, and report

opacity data for oil-fired units, as specified under Secs. 75.14(a),

75.57(f), and 75.64(a)(iii) respectively. Under Sec. 75.14(c) and (d),

however, gas-fired, diesel-fired, and dual-fuel reciprocating engine

units would continue to be exempt from opacity monitoring requirements.

If an initially qualified unit were subsequently to burn fuel other

than natural gas or fuel oil, the unit would be disqualified from using

the reduced requirements starting the first date on which the fuel

(other than natural gas or fuel oil) was burned.

In addition, if an initially qualified unit were to subsequently

exceed the 25-ton cutoff for either SO2 or NOX

while using the proposed methodology, the facility would no longer be

allowed to use the reduced requirements in proposed Sec. 75.19(c) for

determining the affected unit's heat input, NOX emission

rate, or SO2, CO2, and NOX mass

emissions. Proposed Sec. 75.19(b) would allow the facility two quarters

from the end of the quarter in which the exceedance of the relevant 25-

ton cutoff(s) occurred to install, certify, and report SO2,

CO2, and NOX data from a monitoring system that

meets the requirements of Secs. 75.11, 75.12, and 75.13, respectively.

Rationale

In addressing concerns from utilities about the cost of monitoring,

quality assurance testing, and reporting emissions from low-emitting

sources, EPA considered how to establish reduced requirements.

Utilities have indicated to EPA that it would be more helpful for the

Agency to reduce testing requirements for monitoring equipment than it

would be to reduce only reporting requirements (see Docket A-97-35,

Item II-E-25). The Agency considered whether a reduction in monitoring

or reporting requirements might have unintended adverse consequences

for the environment. In order to minimize this possibility, but still

make the program more cost

[[Page 28037]]

effective for facilities, the Agency is proposing to allow an exception

from full monitoring and reporting requirements for low mass emitting

units. In proposing these reduced requirements, the Agency is

exercising its discretion to allow de minimis exceptions from statutory

requirements in administering the Clean Air Act (see, e.g., Alabama

Power Co. v. Costle, 636 F.2d 323, 360-61 (D.C. Cir. 1979); and 58 FR

3593-94 and 3645-46). The Agency, in exercising its discretion,

believes that in light of the de minimis aggregate amount of emissions

from low-emitting units as a group, little or no environmental benefit

would be derived from continuing to require the additional accuracy of

monitoring data from low-emitting units under the existing regulations,

if such units are subjected instead to the proposed optional

requirements. EPA also notes that any such benefit would be greatly

outweighed by the cost of providing the more accurate data.

In drafting today's proposal, the Agency considered six relevant

questions: (1) What parameters should the applicability criteria be

based on? (2) How should estimated emissions be calculated? (3) What

cutoff emission level should be used to determine applicability of the

reduced requirements? (4) What should the on-going applicability

requirements be? (5) What should the reduced monitoring and quality

assurance requirements be for these units? and (6) What should the

recordkeeping and reporting requirements be for these units?

1. Applicability Criteria

The Agency believes that the initial criteria for a unit to qualify

for the excepted monitoring should be consistent with the on-going

criteria for using such monitoring so that only units that can likely

continue to use the methodology will qualify in the first place. With

the reduced monitoring requirements under this exception, a unit will

not need to install monitors. Consequently, the Agency believes that

the on-going applicability criteria should not depend on measurements

from emissions monitoring equipment and that actual emissions data or

actual heat input data, which are measured by the monitoring equipment,

would not be appropriate as the primary applicability criteria for

initial qualification for the exception or as the criteria for on-going

qualification.

The Agency considered what criteria, other than actual

measurements, should be used as a basis for determining applicability

to use the reduced monitoring and reporting exception. EPA considered

various parameters to use in the applicability criteria, including:

estimated emissions or heat input, the fuel burned, the unit capacity

factor, and annual generation measured in MW-hr. Because the Agency's

objectives for the exception include ensuring that the total emissions

from the group of units that would qualify under the exception are de

minimis and allowing more cost effective monitoring for units in such a

group, the Agency believes it would be preferable to base the

applicability on estimated emissions. While it may be simpler to base

qualification for reduced monitoring solely on the fuel burned, the

unit capacity factor, or the annual generation than to estimate the

emissions, the Agency believes that it would be more difficult under

that approach to ensure that total emissions that qualify under the

exception were de minimis. The Agency further believes that using any

of the other parameters, while attempting to ensure that the total

emissions from the group are de minimis, might exclude some units that

actually have low emissions. For example, a unit that burns mostly

natural gas with emergency oil would be excluded from an exception

limited to units that burn only natural gas. The Agency believes that

an applicability criteria based on emissions would relate more directly

to the objectives behind the optional exception than would other

operating factors that might serve as a proxy for emissions.

2. Method for Determining Emissions

The Agency considered several methods for determining the estimated

emissions as the basis for applicability of the reduced monitoring and

reporting excepted methodology. For each of the methods considered,

rather than using actual measured sulfur and carbon values,

CO2, SO2, and flow CEM readings, NOX

CEM readings, or NOX values from an Appendix E

NOX-versus-heat input correlation, a facility would

calculate the unit's emissions based on an emission rate factor and

default heat input. Since the units that would qualify for the excepted

methodology would still be accountable for reporting emissions to the

Agency and surrendering allowances based on those emissions, where

applicable, the emissions estimations would not just be used to

determine if the unit qualifies under the exception; the reported

estimations would also be used to determine compliance. The Agency

considered its goals for emissions accounting in order to establish the

emission rate factors and default heat input. The Agency maintains that

it would be inappropriate to select values that would potentially

underestimate emissions, thereby undermining the Agency's ability to

determine compliance and achieve emission reductions under title IV or

any other regulatory program involving SO2, CO2,

or NOX. Some industry representatives suggested that

facilities would be willing to use a conservative emission estimate,

such as a maximum potential emission rate times the maximum heat input,

if it would allow them to save time and money currently spent on

monitoring and quality assurance (see Docket A-97-35, Items II-D-30,

II-D-43, II-D-45, II-E-13, and II-E-25).

The Agency explored basing the estimated emissions on a unit's

maximum potential emissions, i.e., converting the unit's nameplate

capacity (which assumes maximum possible operation) to a maximum annual

heat input for the unit and multiplying by the unit's maximum emission

rate (which assumes the highest emission rate of all fuels capable of

being burned at the unit). This option would have several advantages.

It would ensure that emissions are not underestimated, would allow for

reduced monitoring requirements, and would ensure that a unit that

initially qualifies for the exception would continue to qualify without

having to reevaluate the unit's emissions each year (unless some

modification was made to the unit to increase its nameplate capacity or

allow a higher emitting fuel to be burned). This approach, however,

would likely disqualify gas-fired units that sometimes burn oil or

peaking units that operate infrequently, since maximum potential

emissions would be substantially higher than their actual emissions and

would likely exceed the applicability criteria limit. Using this method

to estimate emissions for purposes of an applicability cutoff would

greatly diminish the usefulness of the reduced requirements and would

fail to fully meet the intended purpose of today's proposal.

In place of using a heat input derived from maximum possible

operation (i.e., nameplate capacity), the Agency considered estimating

heat input by multiplying the actual operating hours times a maximum

rated hourly heat input for the unit. While this would require re-

evaluation of a unit's eligibility each year, this would allow an

infrequently operated peaking unit to qualify if its emissions are low,

which EPA believes is worth the additional burden of annual re-

evaluation. Therefore, the Agency is proposing to use maximum rated

hourly heat input as the heat input in the emissions

[[Page 28038]]

estimation. Maximum rated hourly heat input would be defined, in

Sec. 72.2, as a unit-specific maximum hourly heat input (mmBtu) based

on the manufacturer's rating of the unit or, if that value has been

exceeded in practice, based on the highest observed hourly heat input.

In addition, there would be provisions for a lower maximum hourly heat

input to be used if the unit has undergone modifications which

permanently limit its capacity.

The Agency also considered what emission rate(s) to apply, instead

of using the highest emission rate of all fuels capable of being burned

at the unit, in order to avoid underestimation and to allow a unit that

primarily burns gas but has the ability to burn oil to qualify for the

reduced requirements. The Agency believes that it would be appropriate

to use emission rates based on uncontrolled emissions for the actual

fuel burned in any given hour to estimate emissions for purposes of the

initial and on-going applicability cutoffs to qualify to use the low

mass emissions excepted methodology and for purposes of emissions

reporting, allowance accounting, and compliance. This approach would

avoid disqualifying gas-fired units simply because of their occasional

use of oil and would also avoid underestimating emissions.

For determining SO2 mass emissions using the low mass

emissions methodology, EPA proposes the use of emission factors in lb/

mmBtu based on its AP-42 air pollution emission rate factors, which are

established from the sulfur content and gross calorific value of the

fuel being burned (see Docket A-97-35, Items II-A-11, II-I-1). Since

the SO2 emissions are directly proportional to the amount of

sulfur in the fuel and in light of the limited variability in the

sulfur content of natural gas and oil, the proposed SO2 mass

emission factors should be fairly representative of uncontrolled,

actual emissions. Because of the relatively low sulfur content of

natural gas or oil, it is doubtful that any of such units have

SO2 controls. The proposed factors fall within the typical

range of sulfur content and gross calorific value for each fuel,

although somewhat on the conservative side for sulfur content of diesel

fuel and natural gas other than pipeline natural gas.

For determining NOX mass emissions and emission rate,

EPA proposes using the fuel- and unit-type-specific NOX

emission rate factors based on 90th percentile emission rate data

reported under part 75 generally for uncontrolled units (see Docket A-

97-35, Item II-A-9). While attempting to develop an accounting approach

for NOX emissions from low mass emission units, EPA

encountered several issues. The first issue involves the use of AP-42

factors. During the finalization of the core part 75 monitoring rule,

EPA considered allowing peaking units with negligible emissions both

individually and collectively to estimate NOX emissions

using AP-42 emission rate factors. EPA rejected this approach in the

January 11, 1993 final rule preamble at 58 FR 3644-45 because the AP-42

emission rate factors are derived from industry-wide average estimates

of emissions for different fuel and boiler types and are not based on

actual historical operating experience of the units to which the

estimates would be applied. Applying AP-42 factors could result in

underestimation of NOX emissions because actual

NOX emissions can vary significantly from unit to unit. The

formation of NOX from the combustion of fossil fuels is

dependent on the amount of nitrogen in the fuel being combusted and on

the mix of nitrogen and oxygen in combustion air. Further, the

NOX formation process depends on unit-specific factors of

combustion gas temperature and stoichiometry of fuel and air local to

the flame. Consequently, there can be significant variations in the

level of NOX emissions from unit to unit due to variations

in combustion conditions. Therefore, EPA is not proposing the use of

AP-42 factors to estimate NOX emissions from low mass

emissions units. Instead, now that three years of actual historical

operating data collected under part 75 are available, it was possible

to develop the default NOX emission rate factors being

proposed today. Although the default NOX emission rate

factors in today's proposal are generic factors, they should not

underestimate NOX emissions because they are based on the

90th percentile of actual annual average emission rates reported

generally from uncontrolled units under part 75.

The Agency also considered using site-specific NOX

emission rate factors based on historical emission data or emissions

testing data for the unit. For example, a facility might use the

maximum value ever recorded by the CEM for the unit, or it might use

the highest NOX emission rate value calculated from the

unit's most recent Appendix E NOX test, or it might use

site-specific values similar to those discussed in the guidance manual

for implementing the NOX budget program in the OTR (see

Docket A-97-35, Item II-I-7). The application of site-specific

NOX emission factors for low mass emission units raises

several issues. First, for units with pollution controls where the

emission factor is based on controlled emissions, the site-specific

emission factor could underestimate actual emissions if the controls

are not operating properly. EPA considered only allowing site-specific

NOX emission factors with units that do not utilize

NOX emission controls; however, EPA realizes that many units

employ at least some form of NOX emission controls (e.g.,

water or steam injection). EPA also considered allowing a source with

controls to use a site-specific emission factor only if it could

demonstrate that the pollution controls are operating properly.

However, this would involve extensive, additional recordkeeping and

tracking to verify the proper operation of pollution controls and

ensure that emissions are not underestimated; this would run contrary

to the general approach under the exception of reducing monitoring and

reporting requirements. A second issue involves verifying that the

site-specific NOX emission factor is still representative

over time or after unit modifications. This would require future

NOX emission rate testing. Therefore, for purposes of

creating a methodology that is simple to implement and in order to

reduce future testing requirements for facilities with low mass

emitting units, the Agency proposes instead using NOX

emission rate factors based on fuel and unit type and reflecting

uncontrolled emissions. EPA requests comments on this approach, whether

other approaches should be used, and especially whether there are any

additional boiler types not represented in today's proposed rule for

which NOX emission rates should be provided.

For determining CO2 mass emissions, today's rule

proposes to use CO2 emission rate factors in tons/mmBtu. The

CO2 emission rate factors are derived based on ideal gas

theory and standard Agency Fc factors for estimating the

volume of CO2 to be emitted when a certain heat input of a

particular fuel is burned (see Docket A-97-35, Item II-A-11). This

resembles the approach currently used in Equation G-4 of Appendix G for

gas-fired units.

Therefore, the Agency believes that an appropriate method of

estimating emissions for the purposes of qualifying for a reduced

monitoring and reporting exception and for purposes of emissions

accounting and compliance for units under the exception is to calculate

emissions based on the actual number of operating hours and the actual

fuel burned using maximum rated hourly heat input and fuel-based and,

for NOX unit-type-based, emission factors. The Agency

requests comments on this approach and on whether an alternate

[[Page 28039]]

approach should be used. While the Agency believes that the resulting

emissions estimates will in most, if not all, cases be conservative and

result in an overestimation of emissions, it would be possible, however

unlikely, that the estimate could underestimate the actual emissions

for some types of units. Therefore, for existing units with historical

emissions data available, the proposal would require that in addition

to meeting the applicability criteria using the emissions estimates

calculated as described above, the unit would have to meet the cutoffs

for initial qualification for the exception using the actual annual

emissions monitored during the three years prior to applying to use the

exception.

3. Cutoff Limit for Applicability

EPA began developing applicability criteria by first considering

the level of projected aggregate emissions determined to be de minimis

for purposes of developing the new unit exemption promulgated in the

January 11, 1993 Acid Rain permitting rule (see 58 FR 3593-94 and 3645-

46). Aggregate emissions projected for units under the exemption were

approximately 138 cumulative tons of SO2 and 1934 cumulative

tons of NOX emitted per year. The Agency then conducted a

study of actual emissions data from 1996 quarterly reports under part

75 and evaluated potential tonnage cutoffs for SO2 and

NOX. The Agency compared the cumulative mass emissions from

groups of units emitting less than various specified amounts to the

total emissions reported under the Acid Rain program during the year

(see Docket A-97-35, Item II-A-10). For example, the study shows what

proportion of total SO2 was emitted by units with both

actual and potential 1 emissions of 25 tons or less per

year, 50 tons or less per year, 60 tons or less per year, and 75 tons

or less per year. From these analyses, EPA also estimated how many

units might be eligible for reduced requirements for determining

emissions and how much of an impact the new emissions accounting option

would have on nationwide emissions accounting.

---------------------------------------------------------------------------

\1\ The terms ``potential emissions'' used in this section of

the preamble have a different meaning than the terms ``potential to

emit'' used elsewhere by the Agency.

---------------------------------------------------------------------------

EPA is proposing cutoff values of 25 tons per year of

SO2 and 25 tons per year of NOX. In order to

qualify as a low mass emissions unit, a unit would have to demonstrate

that both actual historical emissions and potential emissions

(calculated with maximum hourly heat input, emission factors and

either, for existing units, actual historical number of operating hours

or, for new units, projections of future annual operating hours) do not

exceed 25 tons each for SO2 and NOX on an annual

basis. Based upon its analyses (see Docket A-97-35, Item II-A-10), EPA

estimates that this tonnage cutoff level would mean that the group of

units subject to the proposed reduced requirements, even after Acid

Rain Program emission reductions are considered, would have total

annual emissions of about 16 tons of SO2 and 90 tons of

NOX (less than a thousandth of a percent of total annual

SO2 emissions and about 0.002 percent of total annual

NOX emissions for all affected units). Both amounts, 16 tons

of SO2 and 90 tons of NOX, are less than the

total number of tons of those pollutants determined to be de minimis

for purposes of the new unit exemption. Today's proposal to treat low

mass emission units as de minimis is consistent with the de minimis

conclusions reached for new units.

While the reduced requirements are somewhat less accurate than the

methodologies under the existing regulations, the reduced requirements

are intended to yield emissions data that are conservative and that, to

the extent they are inaccurate, are likely to overstate emissions.

Moreover, EPA believes that the level of inaccuracy (i.e.,

overstatement of emissions) would similarly be extremely low (i.e.,

less than a thousandth of a percent). Both the total emissions subject

to the reduced requirements and the potential amount of overstatement

of emissions are de minimis. Moreover, any overstatement of regulated

emissions would have the effect of tightening emission limits (e.g., by

requiring surrender of more allowances for SO2 than

otherwise). Any overstatement of other emissions would be too small to

affect adversely the air quality related activities (e.g., air quality

modeling) for which the emissions data would be used.

EPA would, however, be concerned about extending today's proposed

reductions in monitoring, quality assurance, and reporting requirements

to units that exceed the 25-ton cutoffs for actual or potential

emissions. Section 412 of the CAA requires all affected units to

monitor SO2, volumetric flow, NOX, and opacity

using continuous emission monitoring systems or an alternative

monitoring system approved by the Administrator as having the same

precision, reliability, accessibility, and timeliness. In addition,

section 412 of the Act requires that emissions data be quality-assured.

Section 821 of the Clean Air Act Amendments of 1990 provides that,

through regulations issued by the Administrator, all affected units

must be required to monitor CO2 emissions in the same manner

and to the same extent as SO2 and NOX are

monitored under section 412. Part 75 of EPA's rules requires monitoring

of SO2, NOX, and CO2 and allows

certain exceptions to the statutory requirement for CEMS or CEMS-

equivalent alternative monitoring: in Appendix D because, inter alia,

the information gathered using the Appendix D methods is as precise,

reliable, accessible, and useful as that from CEMS, and compares

acceptably with regard to timeliness; and in Appendix E because the

emissions from all units eligible to use Appendix E are negligible and

such units do not have emission limitations for NOX under

the Acid Rain Program (see 58 FR 3641-45). The proposed reduced

monitoring and reporting requirements for low mass emissions units

would not yield information equivalent to that from CEMS. EPA must

balance the benefits of reduced monitoring, quality assurance, and

reporting requirements for units against the intent of the statute that

monitoring with CEMS or their equivalent be required so as to obtain

reliable, precise, timely, and readily accessible information on

emissions. EPA solicits comment on whether 25 tons is the appropriate

cutoff level for applicability of the low mass emission excepted

methodology.

In particular, EPA is concerned that extending the proposed

reduction in requirements to units with more than this de minimis level

of emissions could have a negative impact on the environment. Emissions

data from the Acid Rain Program are being used for a variety of

efforts, including emissions modeling and establishing baseline

emissions information (prior to any emission reductions) for new air

pollution control programs. Using less accurate methods to monitor more

than a de minimis amount of emissions could potentially undermine

efforts to establish baseline emissions and to assess what emission

reductions have already taken place and how much further emissions must

be reduced in order to meet air quality standards.

Furthermore, with regard to coal-fired units, such units account

for the largest proportion of all emissions, tend to be operated more

frequently, and generally have much higher emission rates in lb/mmBtu

for SO2, NOX and CO2, and the majority

of the units have emission limitations and emission reduction

[[Page 28040]]

requirements for SO2 and NOX. In addition, the

sulfur content in coal and gaseous fuels other than natural gas is much

more variable than for natural gas and oil, and the emission factors

for coal or gaseous fuels other than natural gas, particularly an

SO2 emission factor, are therefore less reliable and much

more likely to understate, rather than overstate, emissions. Based on

these considerations, the proposed rule would restrict the use of the

reduced requirements to gas-fired units and oil-fired units that burn

natural gas and/or fuel oil.

In order to qualify for the proposed low mass emissions excepted

methodology, the proposed applicability criteria would require a unit

to meet annual tonnage cutoffs of 25 tons each for SO2 and

NOX. EPA considered whether the excepted methodology should

be available on a pollutant specific level so that, for example, a unit

which falls below the tonnage cutoff for SO2 but not for

NOX could use the proposed excepted methodology under

Sec. 75.19 to measure SO2 emissions but use a NOX

CEM or the excepted methodology under Appendix E, where applicable, to

measure NOX emissions. EPA believes this approach would not

be appropriate because some of the same monitoring equipment and

reporting software is necessary for measuring and reporting both of the

pollutants. One of the prime benefits of the low mass emissions

excepted methodology would be the simplified reporting which would

require less time and a less sophisticated Data Acquisition and

Handling System. In particular, the need for a DAHS that could

calculate substitute data using the missing data algorithms would be

removed because there are no missing data algorithms for the low mass

emissions excepted methodology. If the excepted methodology is only

applied to one of the pollutants, much of the benefit would be negated

because the DAHS would still need to be capable of calculating

substitute data for the measured pollutant and close to the full

quarterly report would still be required. Another prime benefit of the

proposed low mass emissions excepted methodology would be the removal

of monitoring and quality assurance requirements. However, EPA believes

that almost all units that would qualify for a 25-ton cutoff for only

one pollutant would meet the cutoff for SO2, not

NOX, and would already be using Appendices D and E. A unit

using a fuel flowmeter to determine SO2 mass emissions under

Appendix D likely uses the same fuel flowmeter to determine

CO2 emissions and heat input. Additionally, the same fuel

flowmeter is used to determine NOX emissions under Appendix

E. Even if the unit were allowed to use the proposed low mass emissions

excepted methodology for SO2 in lieu of Appendix D, the unit

would still have to install, certify, operate, maintain, quality

assure, and report from a fuel flowmeter to determine NOX

emission rate and heat input. Accurate heat input is important since

heat input is used to calculate NOX mass emissions. In

short, the cost of operation, maintenance, and quality assurance of the

fuel flowmeter would not be removed simply by removing the requirement

to monitor SO2. Even if a unit that qualified under the low

mass emissions excepted methodology for SO2 but not for

NOX was currently monitoring with Appendix D, for

SO2 and heat input, and using a NOX CEM, for

NOX emission rate, using the excepted methodology for

SO2 but not for NOX would have little benefit

since the installation, certification, and quality assurance testing of

the fuel flowmeter would still be required to determine heat input.

Therefore, today's proposed low mass emissions excepted methodology

would be provided as an option only if the unit has low mass emissions

of both SO2 and NOX. EPA solicits comment on this

approach and on whether any benefit of allowing the excepted

methodology for one pollutant only would outweigh the added complexity

in the excepted methodology.

EPA also considered whether a tonnage cutoff for CO2

emissions was appropriate as part of the proposed applicability

criteria for low mass emissions units. However, the proposed excepted

methodology under Sec. 75.19 would require the use of a standard

emission factor (in lb of NOX/mmBtu) for NOX to

determine eligibility for the exception. This would effectively

establish an upper limit on the annual heat input for a given fuel and

boiler type at the level that would allow the unit to meet the tonnage

cutoff applicability requirements. Because CO2 emissions are

directly proportional to heat input, there would be a built-in annual

CO2 emissions cutoff inherent in the methodology.

4. Continuing Applicability Criteria

In drafting today's proposal, EPA also considered how to ensure

that after individual units initially qualified to use the reduced

monitoring exception, they could continue to use the exception only if

they continued to have de minimis emissions. Many of the units that

would qualify as low mass emissions units under the proposal have low

emissions either because they use pipeline natural gas and/or because

they operate infrequently. In both of these situations, it is

conceivable that a unit's emissions could become significant if the

unit's fuel or hours of operation were to change. Most gas-fired units

are capable of burning oil, but generally do so only when pipeline

natural gas is not available. However, if the prices of gas and oil

were to change such that oil became far more economical than gas, some

gas-fired units might switch to burning high sulfur oil. Similarly,

increases in demand for electricity could cause some peaking units to

operate more frequently, thereby generating more emissions. Therefore,

EPA is proposing that in order to ensure that emissions from units

using the reduced requirements would remain de minimis, units would

have to continue to meet the applicability criteria in order to qualify

as low mass emissions units. Because of the conservative heat input and

in some cases, conservative emission factors, the Agency believes that

meeting the applicability criteria of less than 25 tons of both

SO2 and NOX when calculating the emissions using

the low mass emissions excepted methodology, will ensure that the

actual emissions of the low mass emission units will be below those

levels. Therefore, once the methodology is implemented, the on-going

applicability would only require that the limits be met with the

calculated mass emissions, i.e., the facilities would be required to

continue to meet the 25-ton cutoffs on an annual basis, as determined

using the emission calculation procedures in proposed Sec. 75.19.

It would, therefore, be necessary for low mass emissions units to

report NOX mass emissions, in addition to the required

SO2 mass emissions and NOX emission rate, in

order to determine continuing applicability. A continuing applicability

provision of this nature would prevent a unit from continuing to use

the reduced requirements when its emissions were no longer negligible.

If a unit initially met the applicability criteria but failed to meet

one or both of the annual 25-ton cutoffs in a future year, the unit

would become disqualified from using the exception. Sufficient time

would be necessary to purchase, install, and certify CEMS or the

equipment necessary for monitoring under Appendices D and/or E.

Therefore, a unit would not be disqualified until two calendar quarters

after the quarter in which the 25-ton cutoff is exceeded and would not

be required to certify and report from

[[Page 28041]]

monitoring systems until then. If that unit changes, or is projected to

change, its fuel or amount of operation in the future so that it would

again meet the 25-ton SO2 and NOX cutoffs, the

unit could again qualify as a low mass emissions unit. However, if the

unit initially qualified based on projected operating hours and fuel

usage and then was disqualified the unit could not use projected data

to qualify again. The unit would need to monitor using CEMS, an

approved alternative monitoring system, or an optional protocol under

Appendices D and/or E, where applicable, for at least an additional

three years in order to accumulate three years of actual data.

5. Reduced Monitoring and Quality Assurance Requirements

As discussed above, today's proposed rule would allow facilities to

use a maximum rated hourly heat input value and an emission rate factor

to determine the mass emissions from a low-emitting unit for each hour

of actual operation. This approach would involve no actual emissions

monitoring and no quality assurance activities. Instead, the facility

would only need to keep track of whether the unit combusted any fuel

for a particular hour and what type of fuel was combusted. In this way,

the proposed revisions would significantly reduce the burden on

affected facilities, while still ensuring that emissions are not

underreported.

6. Reduced Reporting Requirements

Some utilities have mentioned that they find it troublesome to

spend as much time or more reviewing quarterly report submissions for

small, infrequently operating gas-fired units as they spend reviewing

quarterly report submissions for large coal-fired units (see Docket A-

97-35, Items II-D-75, II-E-25). EPA agrees that facility environmental

personnel should be able to spend a greater percentage of their time

focusing on units with higher emissions than on low mass emissions

units, which, as discussed above, account for such a small portion of

total emissions. Thus, today's proposed rule would simplify the

reporting requirements for low-emitting units so that facilities could

spend less of their environmental department resources on units with

negligible emissions. For units that rely on the procedures in proposed

Sec. 75.19(c), the owner or operator would have no requirements related

to records or reports of certification testing and would be exempt from

all of the specific recordkeeping requirements in Secs. 75.54(b)

through (e) or 75.57(b) through (e) relating to operating parameter and

emissions records. Instead, the rule would require only that an initial

certification application, containing data supporting the applicability

demonstration, and a monitoring plan be submitted and that limited

hourly, quarterly, and year-to-date cumulative data be reported on a

quarterly basis. The hourly record would only be reported for hours of

unit operation, and an hour in which the unit combusted fuel for any

portion of the hour would be considered a full hour, for simplicity.

One utility has suggested that it would be less burdensome if it

could simply report its quarterly cumulative emissions, without

reporting any supporting hourly data; other utility representatives

have indicated that it would be no more burdensome to report an hourly

default emission value if the utility were already reporting hourly

operating information (see Docket A-97-35, Item II-E-25). For purposes

of modeling air quality, the Agency considers hourly operating

information far more valuable (e.g., for modeling discrete periods of

ozone exceedance) than just a quarterly emission value with no time or

date mentioned. Furthermore, because facilities already keep track of

the operation of their units for business purposes, keeping track of

and reporting hourly operating information should not be a substantial

burden. According to industry representatives, however, allowing

facilities to record and report default emission values instead of

hourly measured values would significantly speed up their review of

quarterly reports prior to submission to the Agency (see Docket A-97-

35, Item II-E-25). Thus, requiring facilities to report hourly

operational data and the default emissions data for the fuel burned

that hour, but not hourly measured emissions or heat input in

additional record types, would preserve the Agency's ability to model

air quality while imposing far less burden upon facilities than the

current part 75 requirements. Furthermore, because hourly default

values would be employed, the need for missing data procedures would be

eliminated and the Data Acquisition and Handling System (DAHS) could be

greatly simplified. In fact, the reporting requirements for a low mass

emissions unit could most likely be fulfilled with the use of a

commercially available spreadsheet software package. EPA has

incorporated this approach into today's proposed rule.

D. Quality Assurance Requirements for Moisture Monitoring Systems

Background

Section 75.11(b) of the original January 11, 1993 Acid Rain rule

requires the owner or operator to continuously (or on an hourly basis)

account for the moisture content of the stack gas when SO2

concentration is measured on a dry basis. The moisture content is

needed to correct the measured hourly stack gas volumetric flow rates

to a dry basis when calculating SO2 mass emission rates in

lb/hr. Section 75.13(a) of the rule, as amended on May 17, 1995,

contains provisions for CO2 monitoring paralleling the

provisions of Sec. 75.11(b); that is, when CO2 concentration

is measured on a dry basis, a correction for stack gas moisture content

is needed to accurately determine the CO2 mass emissions.

The stack gas moisture content is also needed when a dry-basis

O2 monitor is used to account for CO2 emissions

and, in some instances, when accounting for unit heat input (see

Secs. 75.13(c), 75.16(e), and Equations F-14b, F-16, F-17 and F-18 in

Appendix F) or when determining NOX emission rate in lb/

mmBtu (see section 3.2 in Appendix F, and Equations 19-3 through 19-5,

19-8, and 19-9 in Method 19 of Appendix A to part 60).

As presently codified, part 75 does not specify any quality

assurance requirements for moisture measurement devices. Implementation

has shown this to be an unfortunate omission in the rule, since

approximately 5 to 10 percent of the continuous emission monitors in

the Acid Rain Program require moisture corrections to accurately

measure SO2, CO2, or NOX emissions or

heat input (see Docket A-97-35, Item II-I-6). The accuracy of the stack

gas moisture measurements directly affects the accuracy of the reported

SO2 mass emission rates, CO2 mass emission rates,

NOX emission rates and heat input values. An error of 1.0

percent H2O in measured moisture content causes a 1.0

percent error in the reported emission rate or heat input value.

Failure to quality assure the moisture data can therefore result in

significant under-reporting of SO2, CO2, and

NOX emissions and heat input. The Agency does not know the

extent of inaccuracy that currently exists in the measurement of

moisture by affected units but believes it is important to require

certification and quality assurance of moisture monitors--just as is

required for other CEMS used under part 75--because the success of the

SO2 trading system depends on accurate monitoring.

[[Page 28042]]

Discussion of Proposed Changes

Today's proposal would incorporate into part 75 quality assurance

requirements for moisture monitoring systems. Section 75.11(b) would be

revised to require the owner or operator to install, maintain, operate,

and quality assure a moisture monitoring system. Proposed Sec. 75.11(b)

also specifies that a moisture monitoring system may either consist of:

(1) a continuous moisture sensor; (2) an oxygen analyzer (or analyzers)

capable of measuring O2 on both a wet basis and on a dry

basis; or (3) a system consisting of a temperature sensor and a

certified DAHS component capable of determining moisture from a lookup

table, i.e., a psychrometric chart (this third option would apply only

to saturated gas streams following wet scrubbers). Corresponding

changes would be made to Secs. 75.12, 75.13(c) and 75.16(e) to require

that a quality assured moisture monitoring system be used whenever

moisture corrections are needed to accurately account for

NOX emissions, CO2 emissions, or heat input.

Requirements for the initial certification of moisture monitoring

systems are proposed in three new sections, Secs. 75.20(c)(5), (c)(6),

and (c)(7). To make room for the new sections, existing

Sec. 75.20(c)(3) would be deleted; existing Secs. 75.20(c)(4) and

(c)(5) would be redesignated as Secs. 75.20(c)(3) and (c)(4); and

existing Secs. 75.20(c)(6), (c)(7), and (c)(8) would be redesignated,

respectively, as Secs. 75.20(c)(8), (c)(9), and (c)(10). The

certification requirements for continuous moisture sensors are found in

proposed Sec. 75.20(c)(6) and include a 7-day calibration error test

and a relative accuracy test audit (RATA). For moisture monitoring

systems consisting of one or more wet- and dry-basis oxygen analyzers,

the proposed certification requirements are found in Sec. 75.20(c)(5)

and include a 7-day calibration error test, a linearity test and a

cycle time test of each O2 analyzer, and a RATA of the

moisture measurement system. Corresponding revisions to

Sec. 75.22(a)(4) are proposed, specifying that EPA Method 4 (either the

standard procedure or the midget impinger procedure) would be used as

the reference method for the moisture RATAs. For saturated gas streams,

if a lookup table is used to determine the hourly stack gas moisture

content, the certification requirement in proposed Sec. 75.20(c)(7)

would consist of a DAHS verification. At a minimum, the DAHS

verification would have to demonstrate, at three temperatures covering

the normal range of stack temperatures, that the software extracts the

proper moisture value from the lookup table and applies it correctly to

the emission calculations. In today's proposal, a new Sec. 75.4(i)

would also be added, requiring owners or operators to complete all of

the applicable moisture monitoring system certification tests specified

in proposed Secs. 75.20(c)(5), (c)(6), and (c)(7) no later than January

1, 2000.

Proposed performance specifications for moisture monitoring systems

are found in sections 3.1, 3.2, 3.3, and 3.5 of Appendix A to part 75.

These specifications would apply to continuous moisture sensors and to

wet- and dry-basis oxygen analyzers. The proposed calibration error

specification in section 3.1 for continuous moisture sensors is 3.0

percent of span. A new section, 2.1.5, would be added to Appendix A,

defining the span of a moisture sensor as equal to the full-scale range

of the instrument and requiring that the range be consistent with

section 2.1 of Appendix A. For moisture monitoring systems consisting

of wet- and dry-basis O2 analyzers, the proposed span values

and performance specifications for calibration error, linearity, and

cycle time in sections 2.1.3, 3.1, 3.2, and 3.5 of Appendix A would be

the same as the current specifications for O2 monitors. The

proposed relative accuracy (RA) specification for moisture monitoring

systems is found in a new section, 3.3.6, in Appendix A and would be

equal to 10.0 percent. An alternative RA specification would also be

provided in section 3.3.6, i.e., the relative accuracy would also be

acceptable if the difference between the mean difference of the

reference method measurements and the moisture monitoring system

measurements is within 1.0 percent H2O. A

relative accuracy specification of 10.0 percent is being proposed in

order to maintain consistency with the relative accuracy requirements

for the other program monitors (SO2, NOX, flow

rate, and CO2). The Agency notes that moisture RATAs have

not previously been required by any other EPA continuous monitoring

regulation, and therefore there is no relative accuracy database upon

which to draw. However, moisture data are sometimes collected using EPA

Method 4 during each run of a part 75 gas monitor RATA to convert the

gas reference method readings from a dry basis to a wet basis.

Therefore, some part 75 sources that currently account for moisture

using wet- and dry-basis oxygen analyzers or a moisture sensor should

be able to construct moisture RATAs from previous test data by

comparing the Method 4 moisture data from the gas monitor RATAs against

the readings recorded by the moisture sensor or O2 analyzers

at the time of the gas RATAs. EPA encourages those facilities that

currently make moisture corrections in their emission equations to

perform this type of data analysis, if possible, and to provide comment

on the appropriateness of the proposed moisture relative accuracy

specification.

On-going QA requirements for moisture monitoring systems are also

proposed in sections 2.1.1, 2.1.4, 2.2.1, 2.3.1.1, and 2.3.1.2 of

Appendix B to part 75. Proposed section 2.1.1 of Appendix B would

require daily calibrations of moisture monitoring systems. Continuous

moisture sensors would be calibrated in accordance with the

manufacturers' recommended procedures. Proposed section 2.1.4 would

give control limits for the daily calibrations (i.e., 1.0

percent O2 for oxygen analyzers and 6.0 percent

of span for continuous moisture sensors). Proposed section 2.2.1 would

require quarterly linearity checks of wet- and dry-basis oxygen

analyzer(s). Proposed section 2.3.1.1 would require semiannual RATAs of

moisture monitoring systems, and proposed section 2.3.1.2 would specify

that if a moisture monitoring system achieves a relative accuracy of

7.5 percent or if the mean difference between the CEMS and

reference method values is within 0.7 percent

H2O, the system qualifies for an annual, rather than

semiannual RATA frequency.

Missing data procedures for moisture are included in today's

proposal in a new section, Sec. 75.37. The proposed missing moisture

data procedures are as follows:

(1) Begin by using the following ``initial'' missing data

procedures as of the date and time of provisional certification of the

moisture monitoring system or as of January 1, 2000 (whichever is

earlier). Substitute 0.0 percent moisture for each hour of missing data

if no prior quality assured data exist, and for the first 720 hours of

quality assured monitor operating data, substitute, for each hour of

each missing data period, the average of the ``hour before'' and ``hour

after'' moisture values.

(2) After 720 hours of quality assured data have been obtained,

provided that the moisture data availability is 90.0

percent, substitute the average of the ``hour before'' and ``hour

after'' values for each hour of the missing data period.

(3) When the percent data availability for moisture is below 90.0

percent, substitute 0.0 percent moisture for each hour of the missing

data period.

[[Page 28043]]

These proposed missing data procedures are considerably simpler

than the corresponding procedures for SO2, NOX,

CO2, and flow rate, in that they do not include the concepts

of lookback periods, 90th, or 95th percentile values. However, the

procedures are also somewhat less representative than the missing data

procedures for SO2, NOX, CO2, and flow

rate, because the most conservative possible value (0.0 percent

moisture) is substituted when the moisture monitor data availability

drops below 90.0 percent. The Agency solicits comment on whether the

simpler (but less accurate) missing data procedures or the more complex

(but more representative) procedures are more appropriate.

Finally, Secs. 75.57(c) and 75.59(a) (revised versions of

Secs. 75.54(c) and 75.56(a)) would be added in today's proposal to

require that records be kept of the following: (1) Component-system

identification code for the moisture monitoring system; (2) hourly

average moisture readings (including, if applicable, hourly averages

from each wet- and dry-basis O2 analyzer); (3) percent data

availability for the moisture monitoring system; (4) daily and 7-day

calibrations of moisture monitoring systems; (5) linearity tests of

each wet and dry oxygen analyzer used to determine moisture; and (6)

relative accuracy tests of moisture monitoring systems.

In summary, EPA is proposing quality assurance (QA) procedures for

moisture monitoring systems because the Agency believes that

continuous, quality assured, direct measurement of the stack gas

moisture content or continuous measurement of surrogate parameters,

such as wet- and dry-basis oxygen concentrations, is the best way to

ensure the accuracy of the reported emission data when moisture

corrections must be applied. However, the Agency is willing to consider

and solicits comment on simpler alternative methods of accounting for

the stack gas moisture content, such as using a conservative default

moisture value. Any proposed alternative methodology submitted to the

Agency for consideration would have to provide a comparable level of

accuracy and would have to ensure that emissions and heat input are not

under-reported.

E. Certification/Recertification Procedural Changes

Background

Currently, Sec. 75.20 lays out the process for certifying

monitoring systems. Section 75.20(a) specifies the requirements for

initial certification, including the contents of a certification

application, when the application must be submitted and the process for

reviewing and acting on an application. Sections 75.20(a)(3) and (4) of

the existing rule establish a certification application review period

of 120 days (after receipt of a complete application) for EPA to review

an application and issue an approval or disapproval. For a continuous

emission monitor (CEM), initial certification includes the following

tests: relative accuracy, bias, linearity (pollutant monitors only), 7-

day calibration error, cycle response time (pollutant monitors only),

missing data, and formula verification. All of these tests must be

passed for a CEM to be certified and produce valid quality assured

data. Once a CEMS is certified, Sec. 75.20(b) specifies that if

something changes that significantly affects the ability of the CEM to

accurately measure concentration or volumetric flow, the affected

monitoring system(s) must be recertified. Recertification includes one

or more of the initial certification tests. All required

recertification tests must be passed, and a recertification application

must be submitted in order for a CEM to be recertified. Section

75.20(b)(5) of the existing rule establishes a 60 day review period for

recertification applications. Separate but similar certification and

recertification test requirements apply for a monitoring system other

than a CEM, i.e., an excepted monitoring system under Appendix D or E,

an alternative monitoring system under subpart E, or a system under

proposed Appendix I.

Submittal requirements for certification and recertification

applications are included in Secs. 75.60 and 75.63 of the current part

75. Generally, these provisions require submittal of certification test

results in electronic formats, with some information required to be

submitted in hardcopy format. Certification or recertification test

results also must be submitted electronically in quarterly reports

under Sec. 75.64. Finally, Sec. 75.61 requires the designated

representative to provide advance notice to the applicable state or

local agency and EPA Regional Office of certification and

recertification testing.

In many respects, monitoring plan requirements are tied to the

certification/recertification process because a modification to the

monitoring system that requires a recertification application also

usually requires a monitoring plan update. In addition, because it

contains the information about what type of equipment is located where,

the monitoring plan is an essential tool in the review of a

certification or recertification application. Section 75.53 specifies

the content of monitoring plans and when changes to the plan are

required. Section 75.62(a) specifies the submission requirements for

monitoring plans.

Based on EPA's initial experience with part 75 implementation and

the numerous questions and problems encountered in the review of

certification and recertification applications and monitoring plans,

the Agency believes that the certification and recertification

provisions and the related sections of the rule are possibly neither

sufficiently detailed nor clear. Therefore, in today's rulemaking, EPA

is proposing to revise those provisions and sections in order to

improve the certification/recertification process. The issues addressed

in today's proposed rule include the following: (1) whether a

particular provision applies to initial certification, recertification,

or both; (2) the scope of events that require submittal of a

recertification application; (3) the review period lengths for initial

certification and recertification applications; (4) the criteria

governing disapproval of an incomplete certification or recertification

application; (5) the format (electronic or hardcopy) in which test

notifications, certification and recertification applications, and

monitoring plans are to be submitted; (6) which EPA Regional Offices

and state and local agency offices must receive test notifications,

certification and recertification applications, and monitoring plans,

and whether the submittal and notice requirements can be waived; and

(7) when a monitoring plan needs to be revised. The proposed revisions

on these topics and the rationale for the changes are discussed below.

The Agency notes that today's package of proposed revisions to part

75 includes other substantive revisions to the certification and

recertification provisions in part 75. These are discussed elsewhere in

this preamble. The provisions of most significance are related to

certain proposed QA/QC revisions, back-up monitoring systems, CEM data

validation issues, and the new Appendix I procedures. See sections

III.D, O, R and T of this preamble for further discussion.

Discussion of Proposed Changes

The proposed revisions discussed in this section affect Sec. 75.20

generally, as well as specific aspects of Secs. 75.20(a)(4), (b)(1),

(b)(5), and (g)(6); 75.21(e)(1); 75.53(b); new Sec. 75.53(e) and (f);

75.60(b); 75.61(a); 75.62(a); 75.63(a) and

[[Page 28044]]

(b); 75.64(a), (b) and (d) and the addition of Sec. 75.59 as a revised

version of Sec. 75.56. Proposed revisions to Sec. 75.20 would clarify

which provisions apply to initial certification, recertification, or

both. Proposed revisions to Sec. 75.20(b)(1) and (g)(6) would provide a

narrow definition of recertification events, thereby significantly

reducing the number of monitoring system changes, configuration changes

or changes in the manner of operation that would require submission of

a recertification application. Proposed revisions to Sec. 75.20(b)(5)

would make the lengths of the review periods the same for initial

certification and recertification applications. Proposed revisions to

Sec. 75.20(a)(4) would clarify what constitutes a complete

certification or recertification application and also would more

clearly define EPA's authority to disapprove an incomplete application.

Proposed revisions to Sec. 75.53(b) would expand the universe of

monitoring system changes that require monitoring plan revisions to

include any change that would make the information in the current plan

inaccurate (currently, only changes that require recertification

require monitoring plan changes). Sections 75.53(e) and (f), which are

revised versions of existing Sec. 75.53(c) and (d), would clarify which

elements of a monitoring plan must be submitted in electronic format

and which elements must be submitted in hardcopy format. Section

75.53(e) would revise existing Sec. 75.53(c) so that after January 1,

2000 an owner or operator would have to report the unit stack height in

the monitoring plan. Section 75.59 (a revised version of Sec. 75.56)

would specify the minimum required content (as of January 1, 2000) for

the hardcopy portion of a certification or recertification application.

Section 75.60(b) would more clearly define the general requirements for

submittal of reports and petitions. Section 75.61(a) would allow for

certification and recertification test notices to be sent in various

alternative media and would allow for EPA or a State or local agency to

waive test notices in some circumstances. Section 75.62(a) would be

revised to clarify when monitoring plans are to be submitted and to

whom elements of the monitoring plan must be submitted. Similarly,

Sec. 75.63(a) would be revised to detail which elements of a

certification or recertification application are to be submitted

electronically, which elements are to be submitted in hard copy, and to

whom the various elements would be submitted. Section 75.63(b) would

clarify when and how failed tests are to be reported in a certification

or recertification application. Finally, Sec. 75.64(a) would specify

that the hardcopy monitoring plan is not to be submitted with a

quarterly report. The rationale for these changes is discussed below.

Rationale

1. Initial Certification Versus Recertification

Several provisions in the current rule refer either to

certifications or to certification applications; however, it is not

always clear whether these provisions apply solely to initial

certifications or whether they also apply to recertifications.

Therefore, today's proposed revisions would make a number of minor text

edits throughout Sec. 75.20 for clarification. There are, however, some

events that do not fit neatly under the definition of initial

certification or recertification (e.g., construction of a new stack

with a new CEM at an existing unit when a scrubber is installed). This

element of subjectivity in classifying an event as a certification or

recertification makes it desirable for the certification and

recertification processes to be as similar as possible. Having one

general process with one set of rules rather than having two separate

processes also makes program implementation easier. Currently, the main

differences between initial certifications and recertifications are the

types of tests required and the lengths of the application review

periods. Today's proposed rule revisions would attempt to minimize

these differences to the extent possible in order to bring greater

uniformity and consistency to the certification and recertification

process.

(a) Scope of Recertification Events. The proposed revisions would

narrow the scope of the types of changes to a monitoring system that

would be classified as ``recertification events'' and would require

submittal of a recertification application. Sections 75.20(b)(1) and

(g)(6) would define a recertification event as any change that requires

the performance of an accuracy test of a monitoring system, i.e.,

either a relative accuracy test audit (RATA) of a CEMS, an accuracy

test of a fuel flowmeter, or a retest to develop the Appendix E

NOX correlation curve. For changes to a monitoring system or

process that do not require a system accuracy test but require one or

more of the other (lesser) quality assurance tests to be performed

(e.g., linearity test or 7-day calibration error test), those other

required tests would be classified as diagnostic tests rather than as

recertification tests in Sec. 75.20(b)(1) of the proposal. For

instance, a source would be required to conduct a linearity check after

replacing a capillary tube in a gas analyzer with a tube from a like

model and manufacturer (see Docket A-97-35, Item II-I-9, Policy Manual,

Question 13.13). However, because this change to the CEMS does not

require a RATA, it would not be considered a recertification event.

Therefore, no recertification application would be required, and the

linearity test would be considered a diagnostic test. Note that even

though diagnostic tests would not be classified as recertifications,

the recertification data validation procedures in proposed

Sec. 75.20(b)(3) of today's rule would apply to these tests. EPA

believes that the proposed narrowing of the definition of a

recertification event will significantly reduce the number of required

recertification applications and will make the submittal requirements

for initial certifications and recertifications more consistent.

(b) Recertification Review Period. Consistent with the proposed

narrowing of the definition of a recertification event, EPA also

proposes to revise Sec. 75.20(b)(5) by increasing the recertification

application review period from 60 days to 120 days to make it the same

as the review period for initial certifications. The advantage of

making the two review periods consistent is that there would be no need

to distinguish which requirements are applicable to which events. Some

events combine aspects of initial certification and of recertification.

For example, the certification of a new CEMS on a new stack at an

existing unit when a scrubber is installed can be thought of as initial

certification because it is an entirely new system in a new location;

however, this event also involves aspects of recertification because it

is an existing unit which has been reporting emissions from certified

systems. Therefore, the Agency believes that making the review periods

the same would reduce confusion and case-by-case determination of how

long the review period should be for a given application. The Agency

believes that it would be more effective to establish consistent

procedural requirements for both initial certification and

recertification events, rather than attempting to classify each event

as an initial certification or recertification.

In making the review periods consistent, EPA considered reducing

the length of the review period for initial certifications. EPA

considered both the

[[Page 28045]]

time it takes to complete a thorough technical review of an application

and the time it takes to resolve issues raised during that technical

review. The resolution of issues raised during a review can take a

significant amount of time because it involves coordination between the

source submitting the application, the applicable state and/or local

air agency, the applicable EPA Regional Office, and the Acid Rain

Division at EPA headquarters. Therefore, even though EPA would

anticipate receiving fewer recertification applications under today's

proposed revisions, EPA believes that a 120-day review period is

necessary for recertifications (which, according to today's proposed

definition of a recertification event, would involve the review of

monitoring system accuracy tests) in order to coordinate resolution of

issues raised during the technical review of an application.

EPA recognizes that there are concerns with increasing the

recertification review period to longer than 60 days, as more hours of

data could be invalidated if an application were disapproved. However,

EPA believes that the criteria for approval of monitoring system

certification tests are clear and that when an application is

submitted, the owner/operator should know whether or not the

performance specifications of part 75 have been met. In EPA's

experience of four years of implementation, disapprovals are rarely

issued; in fact, less than 2 percent of all monitoring system

applications submitted between 1993 and September 1997 were disapproved

(see Docket A-97-35, Item II-A-4). In most cases where applications

have been disapproved, the owner or operator should have been aware of

the deficiencies before the application was submitted. Additionally,

EPA has found that a longer review period has allowed more time to

resolve minor deficiencies which could have served as grounds for

disapproval, but which, given sufficient time, were often resolved

without issuing a notice of disapproval and without invalidating any

hourly emissions data.

2. Disapproval of an Incomplete Application

Section 75.20(a)(4) of the existing rule requires EPA to issue a

``notice of approval or disapproval of the certification application

within 120 days of receipt of the complete certification application.''

This provision implies that an application must be complete in order to

issue a disapproval. In attempting to implement this provision, EPA has

encountered the problem of incomplete applications. The Agency has, in

most of these instances, issued a notice of incompleteness to the

source. However, affected sources have not always complied with the

incomplete notices and have sometimes failed to submit the information

requested to complete the application in a timely manner. Therefore,

EPA proposes to clarify that EPA may disapprove an incomplete

certification or recertification application if the submittal deadline

is passed. Before a disapproval would be issued for an incomplete

application, the designated representative would receive a notice of

insufficiency and be given a reasonable period of time to complete the

application. If the complete application was not received by this

extended deadline, EPA could issue a notice of monitoring system

disapproval. The Agency believes that this provision will result in

faster resolution of incomplete certification or recertification

applications, thereby eliminating extended periods of uncertainty about

data validation status.

3. Submittal Requirements for Certification and Recertification

Applications

The current rule requires the owner or operator to submit

certification and recertification applications to the Administrator

(i.e., the Acid Rain Division of EPA) and to the appropriate EPA

Regional Office and state or local air agency. Hardcopy test results

must be submitted, as well as an updated monitoring plan and electronic

test results. The electronic test results must also be submitted to the

Administrator as part of the next quarterly report.

Sections 75.20(a)(4)(ii), 75.59, and 75.63 of today's proposal

would revise and clarify the completeness, format, and submittal

requirements for certification and recertification applications. For a

certification or recertification application to be considered complete,

the appropriate information specified in proposed Sec. 75.63 would be

sent to the Administrator, to the EPA Regional Office, and to the state

and local air agency. Under proposed Sec. 75.63, the Administrator

would receive only a hardcopy application form and would not receive

any hardcopy test results, unless specifically requested. The

Administrator would, however, receive certification and recertification

test results electronically in the quarterly report. In most cases, the

electronic test results would be submitted in the quarter in which the

testing is completed. However, there may be occasional exceptions to

this, for initial certification testing and for recertification

testing, when a series of tests spans two consecutive calendar

quarters.

The local and State agencies, as well as the EPA Regional Office

would receive a hardcopy application form, electronic test results, and

hardcopy test results. For recertification tests, today's proposal

would allow the EPA Regional Office or the state or local air agency to

waive the requirement for a hardcopy recertification test report for

their respective offices. The EPA Regional Office or the state or local

agency could also reinstate that requirement at a later date. EPA

Regional Offices and state and local agencies have historically

received hardcopy certification and recertification reports with

varying contents and formats. Section 75.59(a)(10) would specify the

minimum content for hardcopy certification and recertification reports

for gas and stack flow CEMS. Section 75.63(a)(2)(iii) would limit the

amount of reporting for ``non-recertification events'' that require

diagnostic tests. For a diagnostic test, the only reporting requirement

would be to submit the applicable electronic test results in the next

quarterly report. For DAHS verifications, no reporting would be

required; instead, records of the tests would be maintained on-site in

a manner suitable for inspection.

This series of revisions is intended both to clarify the elements

of a complete application, and to clarify how and to whom the essential

information should be submitted. By not requiring hardcopy test reports

to be sent to the Administrator and by allowing the EPA Regional Office

or state or local agencies to waive hardcopy recertification test

reports, the Agency believes that unnecessary hardcopy reporting to

offices that do not intend to review the reports will be eliminated.

Finally, Sec. 75.63(b) would clarify that for failed certification

or recertification tests, only tests that affect data validation would

need to be reported. For example, if the ordinary rules of data

validation, rather than the retrospective validation procedures, were

applied and a test failure occurred during the initial certification

testing for a new unit, only the passed test would be reported if the

test was subsequently repeated and passed. However, if the conditional

data validation procedures set forth in Sec. 75.20(b)(3) of today's

proposal had been utilized during that same initial certification, the

failed test would have to be reported because it would affect the data

validation of hourly emissions.

[[Page 28046]]

4. Decertification Applicability

The proposed revisions to Sec. 75.21(e)(1) would clarify that

excepted monitoring systems under Appendix D, E, or I or an alternative

monitoring system under subpart E may be decertified in accordance with

Sec. 75.21(e)(1). The proposed revisions would also clarify that

decertification would apply to both an initial certification and a

recertification. EPA believes that logic and consistency dictate the

need for these changes.

5. Recertification Test Notice

Section 75.61(a) would be revised to reduce the burdens associated

with submitting notices of recertification tests. The proposed

revisions would allow EPA or the state agency to waive notification

requirements for recertification tests. Currently, a designated

representative must notify EPA and the state agency prior to commencing

certification or recertification testing so that EPA or a state

representative has an opportunity to observe the testing. Allowing the

recertification notification requirement to be waived and providing

more media options for notifications will help conserve paper, reduce

the reporting burden, and provide more flexibility to facilities when

scheduling tests. In addition, the Agency solicits comment on whether

Sec. 75.61 should be revised to state that the requirement for written

notification could be satisfied by mail, facsimile, or e-mail, subject

to approval by the agency receiving the notification.

6. Monitoring Plans

In Secs. 75.53(e) and (f), which are revised versions of

Sec. 75.53(c) and (d), and Sec. 75.62, today's proposal clarifies

completeness and formatting requirements for monitoring plans. In

Sec. 75.53(e), the existing provisions would be separated into two

separate paragraphs (e)(1) and (e)(2) to clarify which parts of the

monitoring plan must be submitted in electronic format and which

elements must be submitted in hardcopy format. In addition, a number of

minor changes would be made to clarify the actual required content of

the plan. Similarly, in Sec. 75.53(f), the same type of revisions would

be made to clarify the electronic versus hardcopy elements of

monitoring plans for specific situations (Appendix D, E, and I units,

units claiming an opacity exemption, and units with add-on emission

controls). These proposed revisions are generally consistent with

existing implementation of the monitoring plan reporting requirements

and primarily would serve to clarify possibly ambiguous elements of the

current rule. The revisions reflected in Sec. 75.53(e) would add a

requirement to electronically report in the monitoring plan the unit

stack height above ground level and the stack base elevation above sea

level. EPA understands that these data are readily available to unit

owners and operators. EPA collects stack heights for some units, e.g.,

for new or modified sources subject to 40 CFR Sec. 51.166. However,

stack height data is not currently collected for all of the units

affected under title IV of the Act. Moreover, the stack height data

that the Agency has is inconsistent, i.e., some of the data are for

stack height above sea level, some are for above ground level, and some

are undefined. Stack height data is necessary to improve the modeling

of plume height and transport of sulfates and nitrates as part of

acidic deposition and other atmospheric modeling. EPA conducts

atmospheric modeling as part of the congressionally-mandated program of

air pollution monitoring, analysis, modeling, and inventory research

under section 103 of the Act. Such modeling is also used to analyze the

impact of the Act on the public health, economy, and environment,

pursuant to section 312 of the Act. (See also, e.g., Human Health

Benefits From Sulfate Reductions Under Title IV of the 1990 Clean Air

Act Amendments at 3-6 through 3-11 (EPA, 1995)). EPA is also proposing

to collect the Energy Information Administration (EIA) flue

identification numbers associated with each unit. While this data is

already reported to EIA, it is difficult to correlate it with the unit

and stack level data reported to EPA. By having sources specify for

each unit and stack the corresponding flue identification number

reported to EIA, it will be easier to correlate the emissions data

reported to EPA to other data that is reported to EIA and is used for

atmospheric modeling purposes, such as stack exit temperature and

velocity.

Section 75.62 would be revised to clarify which parts of the

monitoring plan must be submitted to the EPA Regional Office and state

and local agencies, and when such submittals are required. The

Administrator would receive an electronic monitoring plan at the

following times: (1) no later than 45 days prior to the initial

certification application; (2) at the time of a recertification

application, if a change in the hardcopy monitoring plan information is

associated with the recertification event; and (3) in each electronic

quarterly report. The EPA Regional Office and state and local agency

would receive the required hardcopy monitoring plan 45 days prior to an

initial certification. Thereafter, hardcopy monitoring plan information

(changed portions, only) would be submitted as follows: (1) with a

recertification application, if a change in the hardcopy monitoring

plan information is associated with the recertification event; and (2)

within 30 days of any other event with which a hardcopy monitoring plan

change is associated. Finally, today's proposed rule would require a

complete monitoring plan to be kept on-site in a form suitable for

inspection (this could include an electronic portion which could be

printed out for inspection). These revisions are intended to clarify

the monitoring plan format and submission requirements, but are

generally consistent with existing practices.

Today's proposal would also clarify when revisions must be made to

the monitoring plan. Currently, only changes that require

recertification require monitoring plan revisions. The EPA recognizes,

however, that many changes affecting the information in a monitoring

plan would not require recertification. Therefore, Sec. 75.53(b) would

be revised to require that the owner or operator update a monitoring

plan whenever information in the monitoring plan changes (e.g., a

change to a serial number for a component of a monitoring system), and

Sec. 75.62 would require submission of the revised monitoring plan in

the next quarterly report or, for hardcopy portions, within 30 days of

the change. This revision would assure that the monitoring plan does

not contain outdated, erroneous information.

Section 75.64(a) would clarify that no hardcopy monitoring plan is

to be submitted with a quarterly report.

7. Submittal Requirements for Petitions and Other Correspondence

Section 75.60(b)(5) would clarify what hardcopy information is sent

to the Administrator for petitions and other communications. These

revisions would clarify the existing rule, but would not represent a

significant change in the requirements for these types of submittals.

F. Substitute Data

1. Missing Data Procedures for CO2 and Heat Input

Background

In the May 17, 1995 rule, two new sections, Secs. 75.35 and 75.36,

were added to part 75. These two new sections provided, respectively,

missing data procedures for CO2 and heat input,

[[Page 28047]]

which were not provided in the original January 11, 1993 rule. Section

75.35 specifies that for CO2, the initial missing data

procedures of Sec. 75.31 are to be followed for the first 720 quality

assured monitor operating hours following initial certification.

Thereafter, provided that the CO2 data availability (as of

the last hour of the previous quarter) is maintained above 90.0 percent

and provided that the length of any CO2 missing data period

does not exceed 72 consecutive hours, a simple average of the ``hour

before'' and ``hour after'' CO2 concentrations is used to

fill in missing data periods. However, if the monitor availability as

of the last hour in the previous quarter is below 90.0 percent or if a

CO2 missing data period exceeds 72 consecutive hours in

length (regardless of the percent monitor availability), then the fuel

sampling procedures of Appendix G must be used to provide substitute

CO2 data.

Section 75.36 has a parallel structure to Sec. 75.35. For units

that determine unit heat input by using a flow monitor and a diluent

(CO2 or O2) monitor, the initial missing data

procedures of Sec. 75.31 are to be followed for the first 720 quality

assured monitor operating hours (for the diluent monitor) and for the

first 2,160 quality assured monitor operating hours (for the flow

monitor), following initial certification. Thereafter, the standard

missing data procedures of Sec. 75.33 are to be followed for the flow

monitor. For the diluent monitor, the on-going missing data provisions

of Sec. 75.36 are nearly identical to those for CO2 in

Sec. 75.35 (i.e., use an ``hour before hour after'' missing data

algorithm, provided that the monitor availability is 90.0

percent and the missing data period length is 72 hours).

However, when the diluent monitor availability is 2 and heat input (see, e.g.,

Docket A-97-35, Items II-D-20, II-D-30, II-E-13, and II-E-14). The

utilities object to several elements of the current procedures. They

suggest that the Appendix G procedures are burdensome and that the

missing data procedures are considerably different from the standard

missing data procedures for SO2, NOX, and flow

rate, which are based solely on historical data and monitor

availability and require no additional procedures such as fuel

sampling.

Discussion of Proposed Changes

EPA has reconsidered the provisions of Secs. 75.35 and 75.36 in

light of the concerns raised by the regulated community, and is

proposing revisions to the diluent gas missing data procedures for

CO2 and for heat input determinations. The Agency proposes

that the same missing data routines prescribed in Sec. 75.33(b) for

SO2 pollutant concentration monitors also be applied to the

CO2 and O2 data streams that are used to

determine CO2 emissions and heat input. The diluent gas

substitute data values would therefore be determined in a purely

mathematical way, based on historical data and the percent monitor data

availability; no fuel sampling procedures would be required.

Note that these proposed revisions would require the percent

monitor data availability to be known on an hourly basis. This would

require the percent availability for CO2 and O2

monitors to be updated hourly within the data acquisition system. EPA

realizes that this would involve software modifications, and in cases

where the unit heat input is determined using a flow monitor and an

O2 diluent monitor in accordance with Equation F-17 or F-18,

some new recordkeeping provisions would also be required. The necessary

recordkeeping provisions have been proposed in Sec. 75.57(g). To allow

time for software revisions to be made, the revised missing data

procedures in Secs. 75.35 and 75.36 would not take effect until January

1, 2000. The owner or operator could, however, opt to use the new

procedures prior to January 1, 2000.

EPA believes that today's proposed revisions to the missing data

procedures for CO2 and heat input determinations would be

relatively easy to implement because the missing data routines for

SO2 monitors are well-established and are familiar to both

the regulated community and to software vendors. The Agency believes

that the proposed revised missing data procedures would ensure that

data availability remains high and would, over time, reduce the cost of

compliance with the requirements of part 75.

2. Prohibition Against Low Monitor Data Availability

Background

Under the current rule, when a unit uses SO2, flow rate,

and NOX monitoring systems to account for its emissions, for

each clock hour in which a CEMS fails to provide quality assured data,

a substitute data value must be reported to EPA in accordance with the

standard missing data procedures of Sec. 75.33. The method required for

determining the appropriate substitute data values under Sec. 75.33

depends on several factors, such as the overall monitor data

availability and the length of the missing data period. For monitor

data availabilities 90.0 percent, the substitute data value

(which is reported for each clock hour of the missing data period) will

normally be the arithmetic average of the readings from the hour before

and the hour after the missing data period. At other times, it will be

the 90th (or 95th) percentile value from a lookback period of 720 (for

SO2) or 2,160 (for NOX and flow rate) quality

assured monitor operating hours. When the data availability drops below

90.0 percent, the substitute data value for SO2 will be the

maximum concentration recorded in the last 720 quality assured monitor

operating hours, and for flow rate and NOX, the substitute

data value will be the maximum flow rate or NOX emission

rate recorded in the last 2,160 quality assured monitor operating hours

at the corresponding load range.

Based on four years of program implementation, EPA believes that

the standard missing data procedures need to be strengthened. As

presently written, the missing data algorithms lack a safeguard which

will ensure that high monitor data availability continues to be

maintained in future years. In the current version of Sec. 75.33, no

distinction is made between data availabilities of 89.0 percent, 50.0

percent or 10.0 percent. For all three of these data availability

percentages, the substitute data value is the same (i.e., the maximum

value in a lookback period of 720 or 2,160 quality-assured monitor

operating hours). This has potentially serious consequences. For

example, if the substitute data value from the lookback period is non-

punitive or perhaps is even favorable to the facility (e.g., if a low-

sulfur fuel was burned during the lookback period), there would be

little incentive to repair a malfunctioning CEMS in a timely manner and

emissions could possibly be under-reported for a long period of time.

Currently, part 75 does not specifically address this ``gaming

activity.''

Discussion of Proposed Changes

In order to maintain the credibility of the SO2

allowance accounting system and to ensure that affected units continue

to comply with their part 76 NOX emission limits, monitor

data availability must not be allowed to deteriorate indefinitely

without clear and significant consequence to the facility. Therefore,

in today's rulemaking, EPA is proposing to add a

[[Page 28048]]

safeguard to part 75 to ensure that this does not happen. A new

paragraph 75.33(d) would be added, which would make it a violation of

the primary measurement requirement of Sec. 75.10(a) to allow the

annual monitor data availability to drop below 80.0 percent for

SO2, NOX, flow rate, or CO2. Based on

an analysis conducted on data availability information for the third

quarter of 1996, EPA believes that affected facilities will easily be

able to comply with the 80.0 percent data availability criterion (see

analyses in Docket A-97-35, Item II-B-16). The results of that analysis

indicated a mean percent monitor data availability of 96.9 percent for

SO2, 95.0 percent for NOX, and 96.6 percent for

flow rate. Although there were 13 (out of 995 total) SO2

monitors, 21 (out of 997 total) flow monitors, and 46 (out of 1365

total) NOX monitoring systems with percent monitor

availabilities below 80.0 percent in the 4th quarter of 1996, the

Agency expects that many of these systems would be exempt from the

prohibition based on a limited number of operating hours in the

previous year (see Docket A-97-35, Item II-A-8).

The proposed prohibition would not apply to units that have only a

limited number of operating hours (less than 3000 hours of operation in

the previous 12 calendar quarters) because such units can have a low

data availability percentage without necessarily having extended

monitor downtime incidents. In addition, no violation would occur if

the low monitor availability is caused by a sudden and reasonably

unforeseeable event beyond the control of the owner or operator (such

as destruction of monitoring equipment by fire or flood). The owner or

operator would, however, be required to notify the Administrator, in

writing, within 7 days of the occurrence of such catastrophic events

and also to provide notification to the EPA Regional Office and to the

appropriate State agency. The owner or operator would be further

required to submit a corrective action plan, including an

implementation schedule. Thus, this proposed prohibition should not

result in violations of part 75, except for situations involving poor

operation and maintenance practices, which are clearly not beyond the

control of the owner or operator.

Another option considered by the Agency was to modify the standard

missing data algorithms for SO2, NOX, and flow

rate as follows. Under this option, the algorithms for monitor data

availabilities of 90.0 percent to 100.0 percent would remain unchanged.

The algorithms currently used for all monitor data availabilities below

90.0 percent would be retained, but these would apply only to data

availabilities between 80.0 percent and 89.9 percent. Finally, a new

algorithm would be added for monitor data availabilities below 80.0

percent. When the data availability drops below 80.0 percent, the

appropriate maximum substitute data value would have to be used (i.e.,

the maximum potential concentration for SO2 or

CO2, the maximum NOX emission rate, or the

maximum potential flow rate). EPA believes that requiring maximum

values to be reported when the data availability drops below 80.0

percent would provide incentive to the affected sources to keep their

monitors well-maintained. Because any changes to the standard missing

data algorithms would require software modifications, this option, if

adopted, would not take effect until January 1, 2000. The Agency has

not proposed this option because it would require software changes for

all affected units even though very few units have data availabilities

that fall below 80.0 percent. The Agency seeks comment, however, on

whether this option should be used instead of the proposed prohibition

given that it is more consistent with the structure of the missing data

requirements in part 75 and would be self-implementing without any need

to initiate enforcement actions to achieve the desired result of

continued high data availabilities that assure accurate reporting of

emissions.

The Agency also emphasizes that the required data availability for

the Acid Rain Program would remain at 100.0 percent even if the

proposed prohibition is adopted, meaning that substitute data would

have to be supplied for any periods in which data from a certified

monitoring system are not available. This approach is in sharp contrast

to most other CEMS programs that do not rely on substitute data. In

those programs, the Agency, as well as State and local agencies, expect

and often require much higher data availabilities than 80.0 percent.

Based on the number of units with data availability higher than 95.0

percent under the Acid Rain Program, CEMS data availability less than

95.0 percent may well indicate a failure to properly operate and

maintain a CEMS. Many agencies rely on that 95.0 percent availability

level to target systems for inspection and other compliance-related

follow-up actions. In addition, agencies have adopted various required

minimum data availabilities for CEMS that far exceed the 80.0 percent

level selected for the prohibition proposed in today's rulemaking.

It is also important to note that monitor availability under part

75 and monitor downtime under other programs are not always the same.

Under part 75, a source may have actual monitoring data that are

suspect, based on an evaluation of various quality assurance

activities. In this situation, the owner or operator may, as a

conservative measure, report substitute data rather than the actual

data. In contrast, this type of missing data substitution does not

occur under most other programs. In most programs, the suspect data

would simply be invalidated and no emission data would be reported for

those hours.

Therefore, because of the structure of the missing data provisions

in the Acid Rain Program and the generally applicable economic

incentive to achieve high data availabilities under part 75, it would

be improper to equate the proposed prohibition in today's rulemaking

with a required minimum data availability requirement established for

other programs that do not have the same features. The Agency does not

intend that this proposed provision should serve as a precedent for

evaluating the appropriate achievable data availability for other

programs. Consistent with current practices, the Agency would continue

to expect CEMS to achieve high data availability and that, generally,

monitor downtime in excess of 5.0 percent may warrant appropriate

investigation and follow-up activities.

G. General Authority to Grant Petitions Under Part 75

Background

Section 75.66(a) provides generally that a designated

representative of a unit subject to part 75 may submit a petition to

the Administrator. Sections 75.66(b) through (h) address petitions to

the Administrator on the specified topics of alternative flow

monitoring methods, alternatives to standards incorporated by

reference, alternative monitoring systems, parametric monitoring

procedures, missing data for units with add-on emission controls,

emission or heat input apportionments, and the partial recertification

process. Each of these subsections set forth the items which must be

included with a particular type of petition. In addition, Sec. 75.66(i)

states that, for any other petition to the Administrator under part 75,

the designated representative for an affected unit shall include

sufficient information for the evaluation of such petition.

[[Page 28049]]

Discussion of Proposed Changes

Today's proposal would revise Sec. 75.66(a) to state clearly that

the designated representative of an affected unit may petition the

Administrator for authorization to apply an alternative to any

requirement under part 75 or incorporated by reference in part 75,

regardless of whether another section of part 75 explicitly allows such

a petition concerning the particular requirement. EPA views this change

as a clarification to the general authority already provided by

Secs. 75.66(a) and (i). The proposed rule would also be amended to

include new paragraphs (i) through (l), which would set forth the

specific requirements for other petitions that are explicitly allowed

by other sections of the rule but which are not currently included in

this section. In addition, the proposed rule, at Sec. 75.66(m), would

also indicate the appropriate documentation to be submitted for

petitions under subsection (a), except those under subsections (b)

through (l), where the required documentation is already specified. The

required documentation in subsection (m) would be: (1) Identification

of the unit; (2) information explaining why the proposed alternative

should be used instead of the existing part 75 provision; (3)

descriptions and, if applicable, diagrams of the equipment and

procedures to be used in the proposed alternative; and (4) information

demonstrating that the proposed alternative is consistent with the

purposes of the provision for which an alternative is requested and is

consistent with the purposes of part 75 and of section 412 of the Act.

Rationale

As presently codified, EPA is concerned that the rule does not

state clearly what types of petitions may be submitted under

Sec. 75.66. In particular, existing subsection (i) could be interpreted

as referring only to petitions that are mentioned in other sections of

part 75 and that are not specifically listed in Sec. 75.66(b) through

(h). EPA has not interpreted Sec. 75.66(i) in this manner. In

administering the Act, EPA has inherent discretion to grant de minimis

exceptions from statutory or regulatory requirements, where EPA

determines that holding the regulated entity to the applicable

requirement would yield a gain of trivial or no benefit, provided

Congress has not unambiguously demonstrated its intent to foreclose

such exceptions. See, e.g., Public Citizen v. Young, 831 F.2d 1108, 113

(D.C. Cir. 1987); Alabama Power Co. v. Costle, 636 F.2d 323, 360-61

(D.C. Cir. 1979). Since the issuance of part 75 in 1993, EPA has

accepted, and, in some cases exercised its discretion and granted,

petitions under Sec. 75.66 that requested exceptions and that were not

specifically referenced in Sec. 75.66(b) through (h) or elsewhere in

part 75 (see Docket A-97-35, Item II-B-17). Such petitions have

included, for example, a request to set a CO2 span lower

than that required by part 75 in order to more accurately quality

assure the CO2 monitor. Another petition requested an

alternative to the requirement to perform an annual RATA on a unit that

was scheduled to shutdown, prior to the deadline for performing the

RATA, in order to install a scrubber, construct a new stack, and

install and certify new CEMS. A petition was also submitted for

permission to use a propane sampling frequency as specified in the

State operating permit and to then calculate SO2 emissions

by using the highest sulfur content recorded during the previous 365

days and report these data in quarterly reports. These petitions were

submitted for the purpose of requesting alternatives to various

requirements of part 75, even though the ability to petition the Agency

on these issues was not referenced explicitly in other sections of part

75 or in Sec. 75.66(b) through (h). In most cases, the circumstances

leading to the request for an alternative to a part 75 requirement were

not anticipated during the drafting of part 75 regulations. In fact,

today's proposal revises several part 75 requirements to allow for

alternatives that were originally requested and approved through the

petition process set forth in Sec. 75.66. The Agency continues to

believe that the general provision allowing petitions for alternatives

to part 75 requirements is necessary to enable EPA to address

circumstances that were not foreseen during the development of such

requirements. This is important since circumstances can sometimes vary

significantly from boiler to boiler. While the response to comment

document for the January 11, 1993 rule (see Docket A-91-69, Item V-C-1,

Issue # M-8.8.2) might be read to bar petitions for exceptions from any

provision of part 75, EPA maintains that such a reading would be

inconsistent with the regulatory language of Secs. 75.66(a) and (i)

that allow such petitions, and with the established practice of the

Agency in administering part 75.

The existing Sec. 75.66(i) states that for petitions other than

Sec. 75.66(b) through (h) petitions submitted under the section, the

designated representative should include sufficient information for the

evaluation of the petition. No other information is provided concerning

the contents of such petitions. As Secs. 75.66(b) through (h) all

provide a list of the type of information that should be included in

petitions submitted under the respective sections, the Agency believes

that, in addition to amending Sec. 75.66(a) to clarify that petitions

may be submitted for circumstances that may not be covered by other

sections authorizing petitions to the Administrator, it is appropriate

to provide units with a list of the type of information that should be

included with the petition. Similarly, EPA believes that it is

appropriate to add to the section provisions setting forth the

information requirements for those petitions that are explicitly

allowed under other sections of part 75 but that are not listed in the

existing Sec. 75.66. All these revisions would make the petition

process more uniform and minimize confusion regarding what information

EPA would require in order to accept and consider any petition for an

alternative to a part 75 requirement.

H. NOX Mass Monitoring Provisions for Adoption by

NOX Mass Reduction Programs

Background

Part 75 contains requirements for monitoring NOX

emissions with a continuous emission monitoring system or other

approved method. Owners and operators are required to calculate hourly,

quarterly average, and annual average NOX emission rates (in

lb/mmBtu). Part 75, however, currently contains no requirements for

reporting NOX mass emissions (in tons). Other NOX

emission reduction programs being developed pursuant to title I of the

Act (such as the NOX Budget Program in the Ozone Transport

Region) are expected to require reporting of NOX mass

emissions from many of the units affected under the Acid Rain Program.

To streamline reporting burdens under multiple programs and to allow

for the administration of multi-state NOX mass trading

programs, the Agency believes it appropriate to amend part 75 to

include provisions for monitoring, recording, and reporting

NOX mass emissions that could apply to such trading

programs. These provisions would provide standard procedures--resulting

in precise, reliable, accessible, and timely emissions data--that could

be adopted under a state or federal NOX mass emission

reduction program. To the extent that these standard provisions are

adopted, the burden on industry would be reduced and the administration

of the programs would be facilitated, in

[[Page 28050]]

that the Agency or implementing states would not need to develop

NOX mass monitoring provisions anew and industry would not

need to become familiar with multiple approaches to NOX mass

monitoring.

Discussion of Proposed Changes

The proposed NOX mass emissions provisions would apply

only where EPA, states, or groups of states incorporate them and

mandate their use through a separate regulatory action. The proposed

amendments would make changes to Secs. 75.1, 75.2, 75.4, 75.16, 75.17,

Appendix D, section 2.1.2.2, and Appendix F, section 5.5. They would

also add a new subpart H containing new Secs. 75.70, through 75.73 and

a new section 8 in Appendix F containing sections 8.1, 8.1.1, 8.1.2,

8.1.3, 8.1.4, 8.2, 8.3, 8.3.1, and 8.3.2.

Section 75.1, the purpose and scope section, would be amended to

broaden the scope by adding that part 75 will also set forth provisions

for monitoring and reporting NOX mass emissions that EPA,

states, or groups of states may require sources to use to demonstrate

compliance with a NOX mass emission reduction program.

Section 75.2 would be amended to add that the provisions of part 75 may

also apply to sources subject to a state or federal NOX mass

emission reduction program.

The compliance date section, Sec. 75.4(a), would be altered to

state that the provisions relating to monitoring and reporting of

NOX mass emissions become applicable on the deadlines

specified in the applicable state or federal NOX mass

emission reduction program requiring the use of part 75 to monitor and

report NOX mass emissions.

Section 75.16 would be amended to state that title IV affected

units using the provisions of part 75 to monitor and report

NOX mass emissions under a state or federal NOX

mass emission reduction program would have to meet the heat input

monitoring and determination requirements in both Sec. 75.16 and in

subpart H, Secs. 75.71 and 75.72. Section 75.17 would be amended to

state that title IV affected units using the provisions of part 75 to

monitor and report NOX mass emissions under such a program

would have to meet the NOX emission monitoring and

determination requirements in both Sec. 75.17 and subpart H,

Secs. 75.71 and 75.72.

The applicable procedures for the monitoring and determination of

NOX mass emissions would be added in proposed subpart H,

Secs. 75.70, 75.71, and 75.72 and corresponding recordkeeping and

reporting requirements would be set forth in Sec. 75.73.

Section 75.70 would set forth the general requirements including:

definitions, compliance dates, incorporation by reference, initial

certification and recertification procedures, quality assurance and

quality control requirements, substitute data requirements, and

requirements regarding petitions. In general these provisions for

monitoring NOX mass would mirror the provisions for

monitoring of SO2, NOX, and CO2 for

compliance with title IV. However, because the program would be a state

program, rather than a federal program, there would be some differences

in the administrative requirements. These differences would be most

pronounced for units that were not subject to Acid Rain emission

limitations and were not already subject to the provisions of part 75.

The major differences in administrative requirements would involve the

process for petitioning under Sec. 75.66 and the process for certifying

and recertifying monitors. Under the existing Acid Rain Program, the

Administrator must approve all petitions under Sec. 75.66. Under this

proposal, petitions for units that were only subject to the provisions

of part 75 because they were subject to a state or federal

NOX mass emission reduction program, would have to be

approved by both the permitting authority for the applicable

NOX mass program and the Administrator. The permitting

authority would also be responsible for reviewing and approving or

disapproving certification and recertification applications for such

units.

Section 75.71 sets forth the general monitoring methodologies that

would be allowed for different types of units. The proposal would

require units to determine hourly NOX mass emissions (in lb)

by monitoring NOX emission rate (in lbs/mmBtu) and heat

input (in mmBtu/hr) on an hourly basis and by multiplying those two

values and the hourly unit operating time (in hour or fraction of an

hour) together. Coal units and other units that burn solid fuel and

that are covered by subpart H would be required to measure

NOX emission rate using a NOX emission rate CEM

consisting of a NOX concentration CEM and a diluent CEM

(CO2 or O2 CEM) and to measure heat input using a

diluent CEM and a continuous volumetric flow monitor. All gas- and oil-

fired units covered by subpart H would be allowed to use that approach

or, alternatively, could measure NOX emission rate using a

NOX emission rate CEM and heat input by using a fuel

flowmeter and performing fuel sampling and analysis. This alternative

for determining heat input from gas- and oil-fired units is set forth

in Appendix D of part 75. Gas and oil units that qualify as either

peaking units or low mass emission units under part 75 would also have

additional lower cost monitoring methodologies available to them.

Peaking units, for example, would have the option to do source testing

to create heat input versus NOX emission rate correlation

curves. Then, based on hourly measurement of heat input from a fuel

flowmeter and fuel sampling and analysis using the provisions in

Appendix D to part 75, the heat input vs NOX emission rate

correlation curves would be used to estimate the hourly NOX

emission rate. This rate would be used in conjunction with hourly

measured heat input to determine NOX mass. A unit that

qualifies as a low mass emission unit would have the option to use a

fuel-type and boiler-type specific default NOX emission rate

and the unit's maximum rated hourly heat input to determine

NOX mass emissions. The low mass emissions unit provisions

are in proposed Sec. 75.19.

Section 75.72 sets forth the specific requirements for monitoring

emissions at units that share common stacks and/or common pipes, for

units that emit to multiple stacks and for units that receive fuel from

multiple pipes. These provisions mirror similar provisions in

Sec. 75.16 for monitoring SO2 mass emissions from similar

units and groups of units.

Appendix D, section 2.1.2.2 would indicate that the heat input

apportionment procedures of that section would not be applicable for

units whose compliance with this part is required under a

NOX mass emissions reduction program. Instead, the unit

would have to meet the heat input monitoring and determination

requirements in subpart H, Secs. 75.71 and 75.72.

The applicable procedures for calculating NOX mass

emissions would be added in proposed section 8 of Appendix F. Section

8.1 of Appendix F contains proposed equations for determining hourly

NOX mass emissions, section 8.2 contains proposed equations

for determining quarterly, cumulative annual and ozone season

NOX mass emissions, and section 8.3 contains specific

provisions for monitoring NOX emissions from a common stack.

Additionally, revisions to section 5.5 of Appendix F would indicate

that the heat input calculation procedures of section 5.5.3 would not

be applicable for units whose compliance with this part is required

under a NOX mass emissions reduction program.

[[Page 28051]]

Rationale

(a) Authority to Propose NOX Mass Provisions. The

authority for the proposed NOX mass provisions rests in two

separate portions of the Act. First, section 412(a) states that the

owner or operator of an affected source under title IV must monitor and

quality assure data for sulfur dioxide and nitrogen oxide for each

affected unit at the source. 42 U.S.C. 7651k(a). This section does not

limit the nitrogen oxide data requirement to emission rate data in lb/

mmBtu or to data necessary for compliance with emission limits

established under title IV. Indeed, oil-and gas-fired units have been

required to report NOX emission rate data under part 75 even

though only existing coal units are subject to NOX emission

limits under title IV. (See 58 FR 3590, 3644, January 11, 1993). Thus,

the Agency believes that providing for reporting NOX mass

emissions under part 75 is an appropriate exercise of the authority

under section 412, particularly since NOX mass emissions

reporting may be required under a separate applicable requirement.

Second, independently of the authority granted by section 412,

section 114(a) of the Act gives the Administrator broad authority to

collect data for ``the purpose of developing or assisting in the

development of any implementation plan under section 110 or 111(d)'',

``of determining whether any person is in violation of any such

standard or a requirement of such a plan'', or ``carrying out any other

provision of [the] Act'' (except certain provisions of title II

concerning mobile sources). Section 114 is, of course, not limited to

sources that are affected units under title IV. Moreover, section

301(a)(1) authorizes the Administrator ``to prescribe such regulations

as are necessary to carry out his functions'' under the Act, including

the functions specified in section 114. Thus, EPA maintains that the

Agency is authorized to adopt provisions in part 75 that could govern

monitoring of NOX mass emissions, especially where such

information is expected to support States' efforts to attain ambient

air quality standards.

From a policy perspective, now is the appropriate and most

efficient time to adopt these changes. In July 1997, EPA Administrator

Carol Browner announced a series of initiatives to reform environmental

data management and collection (see Docket A-97-35, Item II-I-21). The

new initiatives are intended to streamline reporting requirements and

increase coordination across different programs that affect the same

sources. There are a number of examples of ongoing efforts to

streamline the reporting of emissions for utility units. One example is

a proposal to revise the NSPS NOX standards for utility and

industrial boilers subject to reporting under 40 CFR part 60. That

proposal would allow facilities to submit NSPS reports through part 75

reporting (see 62 FR 36948, July 9, 1997). Another example is the Ozone

Transport Commission's NOX Budget program. That program is

expected to require utility sources and certain industrial sources in

the northeast to reduce emissions of NOX through a trading

program similar to the Acid Rain SO2 trading program. On

January 31, 1996, the OTC released the Model Rule which outlines

procedures for the monitoring and reporting of NOX mass

emissions; these procedures are based on the monitoring and reporting

requirements set forth in part 75 (see Docket A-97-35, Items II-I-7 and

II-I-22). Today's proposal would facilitate the coordination of

reporting under the Acid Rain Program and NOX mass programs

like the OTC NOX Budget Program.

In addition, the Agency believes it is appropriate to include these

requirements in the current proposal because the Acid Rain affected

units may be undertaking DAHS software changes to respond to the other

proposed revisions to part 75 if they are adopted. The Agency would

enable facilities to coordinate the necessary software changes by

proposing the revised reporting requirements to allow for

NOX mass emission reporting at this time along with the

other part 75 revisions. Although EPA is proposing this requirement now

to facilitate software changes, the requirement to actually record and

report NOX mass emission data under part 75 generally would

not become effective for any unit unless and until a program requiring

such recording and reporting is implemented for that particular unit

(EPA notes that, as discussed elsewhere in Section III.C.4. of this

preamble, a limited group of title IV affected units (i.e., low mass

emissions units) would be required to record and report NOX

mass emissions for purposes of the Acid Rain Program.) In addition, if

a state elected to require the use of these requirements to support a

state NOX mass emission monitoring and reporting

requirement, these requirements would not become federally enforceable

until those requirements were approved by EPA as part of the SIP.

(b) Monitoring Methodology. The proposed requirement would require

sources to determine NOX mass as a function of hourly

average NOX emission rates, heat input rates, and unit

operating time. EPA is proposing this approach because it accurately

accounts for NOX mass emissions without requiring any

changes to the current missing data routines and quality assurance

requirements in part 75. An alternative to this approach, not included

in today's proposal, would be to measure total mass emissions using a

NOX pollutant concentration monitor, a volumetric flow

monitor and unit operating time, analogous to the approach taken

currently for SO2 emissions. This methodology would have two

advantages: first, there would be less missing data from a

NOX pollutant concentration monitor than from a

NOX CEMS which (under the existing and proposed rule)

contains both a NOX pollutant concentration monitor and a

diluent monitor; and second, it would avoid possible overestimation

from a bias adjustment factor applied to the NOX system to

correct bias in the diluent monitor (see Docket A-97-35, Item II-D-96).

However, this methodology would also have a number of

disadvantages. In order to monitor NOX as total mass

emissions using a NOX pollutant concentration monitor and a

volumetric flow monitor, several major changes would need to be made to

part 75. The entire concept of a NOX CEMS--and the quality

assurance tests and missing data procedures associated with the

NOX CEMS--might need to be revised, to include either a

NOX CEMS with only a NOX pollutant concentration

monitor and a DAHS (in which case, a separate flow monitoring system

would also be required in order to determine NOX mass), or a

NOX CEMS with a NOX pollutant concentration

monitor, a volumetric flow monitor, and a DAHS. Since the relative

accuracy standard currently in part 75 for NOX systems is in

lb/mmBtu, it would be necessary to establish a new relative accuracy

standard for NOX concentration in ppm if the NOX/

flow method described above were incorporated into the final rule. Bias

adjustment would also have to occur on the newly defined NOX

CEMS. It would also be necessary to create a missing data procedure

either for NOX concentration in ppm or for hourly

NOX mass emission rate in lb/hr. Hourly NOX mass

emission rate would be calculated using the same formula as for

SO2 mass emission rate (Equation F-1 or F-2), only using a

constant of 1.194 x 10-7(lb/scf)/ppm NOX. In

addition, this methodology would not easily support the monitoring and

reporting of NOX emission rate data in lb/mmBtu.

[[Page 28052]]

Therefore, in order to meet the emission rate reporting requirements,

affected sources under title IV would still be required to maintain a

diluent CEMS and the current NOX emission rate missing data

procedures. The Agency has not proposed this approach because it does

not believe that the benefits of slightly reduced amounts of missing

data for NOX mass and removal of the bias adjustment factor

for the diluent monitor justify the complication of having two separate

procedures for monitoring NOX emissions from a given unit.

Nevertheless, the Agency requests comment on whether this approach to

measuring mass emissions should be used in lieu of the proposed heat

input and emission rate approach for sources required to report

NOX mass.

(c) Common Stack and Pipe Monitoring. The Agency notes that the

proposed procedures for monitoring NOX emission rate at a

common stack to determine NOX mass emissions under the

proposed Sec. 75.72 procedures are different than the procedures

currently allowed for monitoring NOX emission rate in

Sec. 75.17. The Agency is concerned that the Sec. 75.17 provisions

would be too imprecise for measuring NOX mass emissions

because the two values used to determine NOX mass emissions

(NOX emission rate and heat input) are not required to be

measured at the same location. In the existing rule, NOX

emission rate may be monitored at the unit level in the duct leading to

the common stack and heat input can be determined from measurements at

the common stack and then apportioned to the individual units using

unit load. While this heat input apportionment method has been allowed

for Acid Rain purposes, it is not accurate in all cases because it does

not account for different heat rates from the units exhausting to the

common stack and does not account for differences in operating time at

the units. It has been allowed by the Agency for Acid Rain purposes

because apportioned heat input determined under Sec. 75.16 (e) had only

a limited effect on emissions trading (i.e., on the SO2

allowance program). Although apportioned heat input determined under

Sec. 75.16(e) is used to determine compliance with the reduced

utilization provisions of the Acid Rain Program, the apportioned heat

input estimate was deemed accurate enough for that purpose and for the

relatively small number of units and short period involved.

Determinations of reduced utilization are required only for Phase I

units during 1995-1999 and for opt-in units. However, for purposes of a

NOX mass trading program, the heat input value would be used

in the calculation to determine NOX mass, and an imprecise

unit level heat input value could cause the NOX mass

emissions from some units to be underestimated. The NOX mass

trading program could be undermined by the lack of a consistent

emissions value for each NOX allowance. Therefore, the

proposed provisions for monitoring heat input and NOX

emission rate from units in a NOX mass trading program would

be similar to the provisions that are currently used for monitoring

SO2 mass emissions at a common stack at Sec. 75.16. The

provisions for monitoring SO2 mass emissions require that

the two values needed to determine SO2 mass emissions, stack

flow rate and SO2 concentration, be monitored at the same

location. The Agency is proposing that, for purposes of determining

NOX mass emissions, a facility could use the same location

options currently available for SO2: the facility could

either monitor both NOX emission rate and heat input at the

common stack level or monitor them both at the unit level. The Agency

is also proposing a third option: heat input could be monitored at the

unit level and summed to the common stack level, while NOX

emission rate could be monitored at the common stack level. Even though

this option would allow NOX emission rate and heat input to

be measured at different locations, it does not have the inherent

inaccuracies described above because it does not require heat input

apportionment.

Similarly, the optional procedures currently allowed for the

apportionment of heat input measured at a common pipe in Appendix D,

section 2.1.2.2 are not available for units with a common pipe under

subpart H. As discussed above for common stacks, the Agency is

concerned that the heat input apportionment under Appendix D, section

2.1.2.2 provisions would be too imprecise for the purpose of

calculating NOX mass emissions. In the existing rule, heat

input can be determined from measurements at the common pipe and then

apportioned to the individual units using unit load. For purposes of

calculating NOX mass emissions under subpart H for a unit

which is supplied fuel from a common pipe, the measurement of fuel flow

rate would have to be made at the pipe leading to the individual unit

in order to determine unit level heat input.

The Agency solicits comment on the proposed approach for monitoring

NOX mass emissions at a common stack or pipe and whether it

is appropriate to mirror the common stack and pipe provisions for

SO2 mass emissions.

(d) Multiple duct/stack monitoring. The current provisions for

monitoring NOX emission rate, in Secs. 75.17(c)(1) and (2),

allow the owner or operator to determine NOX emission rate

for a unit that exhausts through multiple ducts or stacks using a Btu-

weighted sum of the NOX emission rates measured in each duct

or stack or by monitoring NOX emission rate in only one duct

or stack. The new proposed Sec. 75.72 would set forth specific

requirements for monitoring NOX mass in multiple ducts or

stacks and would in some cases place a number of limits on the options

in Sec. 75.17(c) and in some cases not allow the options in

Sec. 75.17(c). The proposed options for monitoring NOX mass

are similar to the existing provision in Sec. 75.16(d) for monitoring

SO2 mass emissions at multiple ducts/stacks. They are also

similar to the provisions being used in the OTC NOX Budget

Program to determine NOX mass in similar situations.

The new proposed Sec. 75.72 does not contain an option for any

units to use a Btu-weighted sum of the NOX emission rates

measured in each duct or stack. The reason that this option is not

appropriate is that in order to use this option to determine a unit's

NOX emission rate, the owner or operator of the unit would

have to monitor both NOX emission rate and heat input in

each duct or stack. (As discussed above, the heat input apportionment

method allowed under Sec. 75.17 is not sufficiently accurate for a

NOX mass program.) These two values allow the calculation of

NOX mass and, therefore, there is no reason to determine a

Btu-weighted sum for purposes of this subpart.

The new proposed Sec. 75.72 would not allow coal units to monitor

NOX emission rate in only one duct or stack. The proposal

would also not allow gas and oil units to monitor the NOX

emission rate in only one duct or stack, unless heat input is

determined using the provisions of Appendix D to this part and the

owner or operator makes a demonstration that the emission rate would

always be the same in both ducts or stacks. Reasons that the emission

rate might vary include the use of add-on emission controls in the

ducts or stacks or venting of emissions to one duct or stack and not

the other.

These limitations are required for monitoring mass emissions (in

lbs), but are not necessary for monitoring emission rate (in lbs/mmBtu)

at coal units or gas and oil units that use continuous volumetric flow

monitors, because, for reasons discussed above, monitoring mass

requires the monitoring of both emission rate and heat input. Since the

amount of stack

[[Page 28053]]

flow that is vented to each duct or stack could vary significantly

depending upon the location and use of dampers and induction fans in

the ducts or stacks, it is necessary to measure volumetric flow in both

ducts or stacks in order to determine heat input for the unit(s). In

order to accurately use these heat input values to determine

NOX mass, it is also necessary to measure NOX

emission rate in both ducts or stacks. Therefore, proposed Sec. 75.72

would require monitoring of heat input and NOX emission rate

in both ducts or stacks for coal units and gas-and oil-fired units that

use continuous volumetric flow monitors and exhaust to multiple ducts

or stacks.

Since gas-and oil-fired units that are using the procedures in

appendix D of part 75 to determine heat input based on fuel consumption

do not have to measure volumetric flow in the duct or stack in order to

determine heat input, EPA believes it is appropriate to allow these

units to measure NOX emission rate in only one duct or stack

if they can demonstrate to both the permitting authority and the

Administrator that the NOX emission rate in either duct or

stack is representative of the NOX emission rate in each

duct or stack. Therefore, proposed Sec. 75.72 allows gas-and oil-fired

units that are using the procedures in appendix D of part 75 to measure

NOX emission rate in only one duct or stack if they can

demonstrate to both the permitting authority and the Administrator that

the NOX emission rate in either duct or stack is

representative of the NOX emission rate in each duct or

stack.

(e) Reporting of NOX Mass Emissions. The Agency also

notes that the proposed procedures differ in two key respects from the

way data is currently reported under part 75. The first difference is

that the proposal would require reporting of hourly NOX mass

emissions, in lbs, (instead of hourly mass emission rate, in lb/hr, as

is currently required for the reporting of SO2 under part

75). The OTC NOX Budget Program is expected to require the

reporting of hourly mass emissions, in lb, rather than hourly mass

emission rates, in lb/hr, because of experience under the Acid Rain

Program with reporting hourly SO2 and CO2 mass

emission rates. As discussed in Section III.R.1 of this preamble, the

reporting of hourly SO2 and CO2 mass emission

rates has been a source of some confusion in the implementation of the

Acid Rain Program. For the reasons presented in Section III.R.1 of this

preamble, EPA is not proposing to change the existing SO2

and CO2 reporting requirements. However, the existing part

75 does not require any NOX mass emission reporting, and in

order to avoid the problems experienced under the Acid Rain Program and

to be consistent with the OTC NOX Budget Program, EPA

proposes here to base the new NOX reporting on mass

emissions in pounds. Maintaining consistency with the provisions

expect

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Acid Rain Program; Continuous Emission Monitoring Rule Revisions · 63 FR 28032 | Frix