Final Draft Environmental Assessment and Draft Finding of No Significant Impact for the Fielding of the ``Generator, Mechanical Smoke: For Dual Purpose Unit, M56'' and the ``Generator Smoke Mechanical: Mechanized Smoke Obscurant System M58''
Federal RegisterApr 27, 1998
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF DEFENSE
Department of the Army
Final Draft Environmental Assessment and Draft Finding of No
Significant Impact for the Fielding of the ``Generator, Mechanical
Smoke: For Dual Purpose Unit, M56'' and the ``Generator Smoke
Mechanical: Mechanized Smoke Obscurant System M58''
AGENCY: Department of the Army, DoD.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Department of the Army announces today the availability of
the final draft Environmental Assessment (EA) and draft Finding of No
Significant Impact (FNSI) for the Fielding of the ``Generator,
Mechanical Smoke: For Dual Purpose Unit, M56'' and the ``Generator
Smoke Mechanical: Mechanized Smoke Obscurant System M58'', in
accordance with Pub. L. 101-510, as amended. The Army will consider
public comments prior to determining whether to sign the FNSI.
The Army needs to field state-of-the-art obscuration systems to
maximize operational success by denying enemy detection of friendly
units and activities on the battlefield. This fielding will preserve
forces and minimize casualties.
This EA has been prepared in accordance with the National
Environmental Policy Act of 1969 (NEPA), its implementing regulations
published by the Council on Environmental Quality (CEQ) and Army
Regulation 200-2, ``Environmental Effects of Army Actions'' (AR 200-2).
This EA is programmatic in nature, and is designed to identify
assess, and disclose to the decision-maker and the public the possible
environmental impacts expected to result from the proposed fielding of
the M56 and M58 at various installations throughout the United States,
as well as the potential impacts associated with reasonable
alternatives to the proposed action. The EA analyzes the environmental
effects associated with introducing graphite particles into the
environment in conjunction with fog oil. The effects of fog oil used
without graphite flakes has been assessed previously.
The Army's proposed action is to field the M56 and M58 to Army
installations across the Nation for use in visual and infrared
training. Alternatives examined in the EA include: Limiting the use
graphite flakes; restricting units to training with fog oil with no
emission of graphite flakes; consolidating training to limited
locations; and prohibiting fielding of the systems within the United
States (the no action alternative). The Army's preferred alternative is
implementation of the proposed action.
The EA examines the potential impacts of the proposed action and
alternatives on resource areas and areas of environmental concern
including: human health, threatened and endangered species, air
quality, water resources, vegetation, the sociological environment, and
cultural resources.
The EA concludes that the implementation of the proposed action
will not have a significant impact on the human environment. As a
result the Army is proposing to make a FNSI and an Environmental Impact
Statement will not be required prior to implementation of the proposed
action.
DATES: Comments must be submitted on or before May 27, 1998.
ADDRESSES: A copy of the EA or inquiries into the draft FNSI may be
obtained by writing to Commander, U.S. Army Environmental Center, ATTN:
SFIM-AEC-PA (Mr. Hankus), Aberdeen Proving Ground, Maryland 21010-5401,
or by calling (410) 671-2556.
Dated: April 21, 1998.
Raymond J. Fatz,
Deputy Assistant Secretary of the Army (Environment, Safety and
Occupational Health) (OASA (I,L&E).
[FR Doc. 98-11066 Filed 4-24-98; 8:45 am]
BILLING CODE 3710-08-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.