Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver From the Furnace Test Procedure to Nordyne
Federal RegisterMar 27, 1997
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF ENERGY
Office of Energy Efficiency and Renewable Energy
[Case No. F-088]
Energy Conservation Program for Consumer Products: Decision and
Order Granting a Waiver From the Furnace Test Procedure to Nordyne
AGENCY: Office of Energy Efficiency and Renewable Energy, Department of
Energy.
ACTION: Decision and Order.
-----------------------------------------------------------------------
SUMMARY: Notice is given of the Decision and Order (Case No. F-088)
granting a Waiver to Nordyne from the existing Department of Energy
(DOE or Department) test procedure for furnaces. The Department is
granting Nordyne's Petition for Waiver regarding blower time delay in
calculation of Annual Fuel Utilization Efficiency (AFUE) for its G5RD
and G5RL series furnaces.
FOR FURTHER INFORMATION CONTACT: Mr. Cyrus H. Nasseri, U.S. Department
of Energy, Office of Energy Efficiency and Renewable Energy, Mail
Station EE-431, Forrestal Building, 1000 Independence Avenue, SW.,
Washington, DC 20585-0121, (202) 586-9138 or Mr. Eugene Margolis, Esq.,
U.S. Department of Energy, Office of General Counsel, Mail Station GC-
72, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC
20585-0103, (202) 586-9507.
SUPPLEMENTARY INFORMATION: In accordance with 10 CFR 430.27(j), notice
is hereby given of the issuance of the Decision and Order as set out
below. In the Decision and Order, Nordyne has been granted a Waiver for
its G5RD and G5RL series furnaces permitting the company to use an
alternate test method in determining AFUE.
Issued in Washington, DC, on March 19, 1997.
Christine A. Ervin,
Assistant Secretary, Energy Efficiency and Renewable Energy.
Decision and Order--Department of Energy, Office of Energy
Efficiency and Renewable Energy
In the Matter of: Nordyne (Case No. F-088).
Background
The Energy Conservation Program for Consumer Products (other than
automobiles) was established pursuant to the Energy Policy and
Conservation Act, Public Law 94-163, 89 Stat. 917, as amended (EPCA),
which requires DOE to prescribe standardized test procedures to measure
the energy consumption of certain consumer products, including
furnaces. The intent of the test procedures is to provide a comparable
measure of energy consumption that will assist consumers in making
purchasing decisions. These test procedures appear at 10 CFR Part 430,
Subpart B.
The Department amended the prescribed test procedures by adding 10
CFR 430.27 to create a waiver process. 45 FR 64108, September 26, 1980.
Thereafter, DOE further amended its appliance test procedure waiver
process to allow the Assistant Secretary for Energy Efficiency and
Renewable Energy (Assistant Secretary) to grant an Interim Waiver from
test procedure requirements to manufacturers that have petitioned DOE
for a waiver of such prescribed test procedures. 51 FR 42823, November
26, 1986.
The waiver process allows the Assistant Secretary to waive
temporarily test procedures for a particular basic model when a
petitioner shows that the basic model contains one or more design
characteristics which prevent testing according to the prescribed test
procedures or when the prescribed test procedures may evaluate the
basic model in a manner so unrepresentative of its true energy
consumption as to provide materially inaccurate comparative data.
Waivers generally remain in effect until final test procedure
amendments become effective, resolving the problem that is the subject
of the waiver.
Nordyne filed a ``Petition for Waiver,'' dated September 6, 1996,
in accordance with section 430.27 of 10 CFR Part 430. The Department
published in the Federal Register on October 22, 1996, Nordyne's
Petition and solicited comments, data and information respecting the
Petition. 61 FR 54783, October 22, 1996. Nordyne also filed an
``Application for Interim Waiver'' under section 430.27(b)(2), which
DOE granted on October 15, 1996. 61 FR 54783, October 22, 1996.
No comments were received concerning either the ``Petition for
Waiver'' or the ``Application for Interim Waiver.'' The Department
consulted with The Federal Trade Commission (FTC) concerning the
Nordyne Petition. The FTC did not have any objections to the issuance
of the waiver to Nordyne.
Assertions and Determinations
Nordyne's Petition seeks a waiver from the DOE test provisions that
require a 1.5-minute time delay between the ignition of the burner and
the starting of the circulating air blower. Nordyne requests the
allowance to test using a 30-second blower time delay when testing its
G5RD and G5RL series furnaces. Nordyne states that since the 30-second
delay is indicative of how these models actually operate, and since
such a delay results in an improvement in AFUE of approximately 2.0
percent, the Petition should be granted.
Under specific circumstances, the DOE test procedure contains
exceptions which allow testing with blower delay times of less than the
prescribed 1.5-minute delay. Nordyne indicates that it is unable to
take advantage of any of these exceptions for its G5RD and G5RL series
furnaces.
Since the blower controls incorporated on the Nordyne furnaces are
designed to impose a 30-second blower delay in every instance of start
up, and since the current test procedure provisions do not specifically
address this type of control, DOE agrees that a waiver should be
granted to allow the 30-second blower time delay when testing the
Nordyne G5RD and G5RL series furnaces. Accordingly, with regard to
testing the G5RD and G5RL series furnaces, today's Decision and Order
exempts Nordyne from the existing test procedure provisions regarding
blower controls and allows testing with the 30-second delay.
It is, therefore, ordered That:
(1) The ``Petition for Waiver'' filed by Nordyne (Case No. F-088)
is hereby granted as set forth in paragraph (2) below, subject to the
provisions of paragraphs (3), (4), and (5).
(2) Notwithstanding any contrary provisions of Appendix N of 10 CFR
Part 430, Subpart B, Nordyne shall be permitted to test its G5RD and
G5RL series furnaces on the basis of the test procedure specified in 10
CFR Part 430, with modifications set forth below:
(I) Section 3.0 of Appendix N is deleted and replaced with the
following paragraph:
3.0 Test Procedure. Testing and measurements shall be as specified
in section 9 in ANSI/ASHRAE Standard 103-82 with the exception of
sections 9.2.2, 9.3.1, and 9.3.2, and the inclusion of the following
additional procedures:
(ii) Add a new paragraph 3.10 to Appendix N as follows:
3.10 Gas-and Oil-Fueled Central Furnaces. The following paragraph
is in
[[Page 14677]]
lieu of the requirement specified in section 9.3.1 of ANSI/ASHRAE
Standard 103-82. After equilibrium conditions are achieved following
the cool-down test and the required measurements performed, turn on the
furnace and measure the flue gas temperature, using the thermocouple
grid described above, at 0.5 and 2.5 minutes after the main burner(s)
comes on. After the burner start-up, delay the blower start-up by 1.5
minutes (t-), unless: (1) the furnace employs a single motor to drive
the power burner and the indoor air circulating blower, in which case
the burner and blower shall be started together; or (2) the furnace is
designed to operate using an unvarying delay time that is other than
1.5 minutes, in which case the fan control shall be permitted to start
the blower; or (3) the delay time results in the activation of a
temperature safety device which shuts off the burner, in which case the
fan control shall be permitted to start the blower. In the latter case,
if the fan control is adjustable, set it to start the blower at the
highest temperature. If the fan control is permitted to start the
blower, measure time delay, (t-), using a stopwatch. Record the
measured temperatures. During the heat-up test for oil-fueled furnaces,
maintain the draft in the flue pipe within 0.01 inch of
water column of the manufacturer's recommended on-period draft.
(iii) With the exception of the modifications set forth above,
Nordyne shall comply in all respects with the test procedures specified
in Appendix N of 10 CFR Part 430, Subpart B.
(3) The Waiver shall remain in effect from the date of issuance of
this Order until DOE prescribes final test procedures appropriate to
the G5RD and G5RL series furnaces manufactured by Nordyne.
(4) This Waiver is based upon the presumed validity of statements,
allegations, and documentary materials submitted by the petitioner.
This Waiver may be revoked or modified at any time upon a determination
that the factual basis underlying the Petition is incorrect.
(5) Effective March 19, 1997, this Waiver supersedes the Interim
Waiver granted Nordyne on October 15, 1996. 61 FR 54783, October 22,
1996 (Case No. F-088).
Issued in Washington, DC, on March 19,1997.
Christine A. Ervin,
Assistant Secretary, Energy Efficiency and Renewable Energy.
[FR Doc. 97-7794 Filed 3-26-97; 8:45 am]
BILLING CODE 6450-01-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.