DEPARTMENT OF THE INTERIOR

Minerals Management Service

30 CFR Part 250

RIN 1010-AB97

Oil and Gas Production Measurement, Surface Commingling, and

Security

AGENCY: Minerals Management Service (MMS), Interior.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: This proposed rule would amend MMS regulations governing oil

and gas operations in the Outer Continental Shelf (OCS) to update

production measurement and surface commingling requirements. The MMS

needs this rule to help ensure that gas produced in the OCS is

accurately measured and reported.

DATES: MMS will consider all comments received by May 27, 1997. We will

begin reviewing comments at that time and may not fully consider

comments we receive after May 27, 1997.

ADDRESSES: Mail or hand-carry comments to the Department of the

Interior; Minerals Management Service; Mail Stop 4700; 381 Elden

Street; Herndon, Virginia 20170-4817; Attention: Rules Processing Team.

FOR FURTHER INFORMATION CONTACT:

Sharon Buffington, Engineering and Research Branch, at (703) 787-1147.

SUPPLEMENTARY INFORMATION: Pipeline and price deregulation and open

access to pipelines that occurred in the late 1980's spawned a

restructuring of OCS pipeline system operations. Pipeline companies

traditionally were merchants buying and selling gas under long-term

contracts to only a few well established customers. Under the Federal

Energy Regulatory Commission Order 636, pipeline companies operate as

common carriers involved in transportation services to a broad spectrum

of gas producers, end users, and transportation brokers. Also, the OCS

pipeline systems have hundreds of short-term, limited volume contracts,

many of which require daily accounting and balance controls.

[[Page 8666]]

Because of the restructuring and complexity in pipeline operating

systems and the increasing use and value of natural gas, the accuracy

and reliability of meters have become even more important to ensuring

product accountability and fiscal responsibility. Therefore, industry

has initiated production measurement research that resulted in more

precise metering and data collection equipment.

Most of the production in the OCS is natural gas and a 1 percent

measurement or reporting uncertainty could result in royalty revenue

variations of $15 million per year. MMS is responsible for ensuring

accurate production measurement and reporting.

The gas measurement and commingling regulations now in effect were

based on conditions before deregulation and before the industry began

to apply the results of research efforts. Therefore, MMS is proposing

to amend the production measurement and commingling regulations. The

regulatory revisions proposed in this rule would:

Reflect current industry technology,

Form the basis for a gas verification system (GVS),

Require tracking of gas lost or used on the lease, and

Clarify the restrictions on surface commingling.

The liquid measurement regulations of 1988 already give the

guidance for our liquid verification system. Therefore, MMS is not

proposing technical changes to liquid measurement; we are only

clarifying the language.

On June 23, 1994, a meeting was held at the Department of the

Interior (DOI) in Washington, D.C., to introduce the oil and gas

industry to the principles of this rulemaking and the proposed GVS. The

participants generally agreed that the regulations on production

measurement should be updated to include current industry standards.

The main items discussed at the meeting are as follows:

1. If MMS verifies gas production and also conducts audits, it

appears that industry is under a double jeopardy. Currently, MMS only

audits some OCS gas production. MMS is proposing to supplement the

audits by implementing a limited gas verification program that will

create a system to quickly check submitted gas production volumes with

gas volume statements. MMS will coordinate gas verification and the

royalty audit programs.

2. Why does MMS want daily production data on the gas volume

statements to verify production reported monthly? While daily

production data is easier to obtain from electronically measured data

than from chart recorders, it appears that meter owners provide gas

producers (lessees) a daily breakout of gas production once a month.

Daily production data is the best data to use to verify gas production.

3. How will MMS verify gas that is processed before royalty is

calculated? MMS will use the monthly statement that gas plant managers

supply to producers instead of the gas volume statement. However, if

these statements are not prepared on a daily basis for the month, MMS

may ask for additional data from the lessee to verify production.

4. MMS is seeking comments concerning whether you receive monthly

gas measurement statements from meter owners that show a daily summary

of volumes and quality. If you do not receive the statements, please

list how you audit the production records.

5. MMS is seeking comments on the applicable industry standards and

practices that we incorporate and exclude. This proposed rule would

require that lessees follow the standards listed in 30 CFR 250.1,

Documents Incorporated by Reference. MMS published that final rule on

November 26, 1996, (61 FR 60019).

6. This proposed rule would require seals only on liquid

hydrocarbon royalty installations. However, MMS may also require seals

on gas installations in the final rule. Please comment on this

proposal.

7. MMS is also seeking comments on the type of records you keep for

gas used on the lease, how you record volumes and quality, and how you

measure or estimate volumes and quality.

Executive Order (E.O.) 12866

DOI has certified that this proposed rule is not a significant rule

under E.O. 12866.

E.O. 12988

DOI has certified to the Office of Management and Budget (OMB) that

the rule meets the applicable reform standards provided in sections

3(a) and 3(b)(2) of E.O. 12988.

Unfunded Mandates Reform Act of 1995

DOI has determined and certifies according to the Unfunded Mandates

Reform Act, 2 U.S.C. 1502 et seq., that this rule will not impose a

cost of $100 million or more in any year on State, local, and tribal

governments, or the private sector.

Regulatory Flexibility Act

The DOI has determined that this proposed rule will not have a

significant economic effect on a substantial number of small entities.

Paperwork Reduction Act

This proposed rule contains a collection of information which has

been submitted to OMB for review and approval under section 3507(d) of

the Paperwork Reduction Act of 1995. As part of our continuing effort

to reduce paperwork and respondent burden, MMS invites the public and

other Federal agencies to comment on any aspect of the reporting

burden. Submit your comments to the Office of Information and

Regulatory Affairs; OMB; Attention Desk Officer for the Department of

the Interior, 725 17th Street NW, Washington, D.C. 20503 (OMB control

number 1010-0051). Send a copy of your comments to the Chief,

Engineering and Standards Branch; Mail Stop 4700; Minerals Management

Service; 381 Elden Street; Herndon, Virginia 20170-4817. You may obtain

a copy of the proposed collection of information by contacting the

Bureau's Information Collection Clearance Officer at (703) 787-1242.

OMB may make a decision to approve or disapprove this collection of

information after 30 days from receipt of our request. Therefore, your

comments are best assured of being considered by OMB if OMB receives

them within that time period. However, MMS will consider all comments

received during the comment period for this notice of proposed

rulemaking.

The title of this collection of information is ``30 CFR 250,

Subpart L, Oil and Gas Production Measurement, Surface Commingling, and

Security.'' OMB previously approved it under OMB control number 1010-

0051.

The collection of information consists of oil run tickets; proving

and calibrations reports; measuring liquid hydrocarbons and gas;

applications for surface commingling, and various recordkeeping

requirements. The proposed rule would delete some recordkeeping and

reporting requirements. it would add the following when required by the

Regional Supervisor:

Gas volume statements,

Production quality data, and

Data concerning gas lost or used on the lease.

MMS would use the information to verify production measurements.

Respondents are Federal OCS oil, gas, and sulphur lessees. MMS will

receive approximately 2,300 new responses

[[Page 8667]]

each year. The frequency of submission varies.

MMS estimates the additional annual reporting burden as a result of

this rule would be approximately 192 hours (.08 hour per response). We

estimate the total annual burden to be 2,615 reporting hours and 2,429

recordkeeping hours. Based on $35 per hour, the total burden hour cost

to respondents is estimated to be $176,540.

In calculating the burden, MMS assumed that respondents perform

many of the requirements and maintain records in the normal course of

their activities. MMS considers these to be usual and customary and did

not include them in the burden estimates. Commenters are invited to

provide information if they disagree with this assumption and they

should tell us what are the burden hours and costs imposed by this

collection of information.

MMS will summarize written responses to this notice and address

them in the final rule. All comments will become a matter of public

record.

1. MMS specifically solicits comments on the following questions:

(a) Is the proposed collection of information necessary for the

proper performance of MMS's functions, and will it be useful?

(b) Are the estimates of the burden hours of the proposed

collection reasonable?

(c) Do you have any suggestions that would enhance the quality,

clarity, or usefulness of the information to be collected?

(d) Is there a way to minimize the information collection burden on

those who are to respond, including through the use of appropriate

automated electronic, mechanical, or other forms of information

technology?

2. In addition, the Paperwork Reduction Act of 1995 requires

agencies to estimate the total annual cost burden to respondents or

recordkeepers resulting from the collection of information. MMS needs

your comments on this item. Your response should split the cost

estimate into two components:

(a) Total capital and startup cost and

(b) Annual operation, maintenance, and purchase of services.

Your estimates should consider the costs to generate, maintain, and

disclose or provide the information. You should describe the methods

you use to estimate major cost factors, including system and technology

acquisition, expected useful life of capital equipment, discount

rate(s), and the period over which you incur costs. Capital and startup

costs include, among other items, computers and software you purchase

to prepare for collecting information; monitoring, sampling, drilling,

and testing equipment; and record storage facilities. Generally, your

estimates should not include equipment or services purchased: Before

October 1, 1995; to comply with requirements not associated with the

information collection; for reasons other than to provide information

or keep records for the Government; or as part of customary and usual

business or private practices.

The Paperwork Reduction Act of 1995 provides that an agency may not

conduct or sponsor, and a person is not required to respond to, a

collection of information unless it displays a currently valid OMB

control number.

Takings Implication Assessment

DOI certifies that the proposed rule does not represent a

governmental action capable of interference with constitutionally

protected property rights. Thus, a Takings Implication Assessment need

not be prepared pursuant to E.O. 12630, Government Action and

Interference with Constitutionally Protected Property Rights.

National Environmental Policy Act

DOI determined that this rulemaking does not constitute a major

Federal action significantly affecting quality of the human

environment; therefore, an Environmental Impact Statement is not

required.

List of Subjects in 30 CFR Part 250

Continental shelf, Environmental impact statements, Environmental

protection, Government contracts, Incorporation by reference,

Investigations, Mineral royalties, Oil and gas development and

production, Oil and gas exploration, Oil and gas reserves, Penalties,

Pipelines, Natural gas, Petroleum, Public lands--mineral resources,

Public lands--rights-of-way, Reporting and recordkeeping requirements,

Sulphur development and production, Sulphur exploration, Surety bonds.

Dated: December 30, 1996.

Bob Armstrong,

Assistant Secretary, Land and Minerals Management.

For the reasons in the preamble, the Minerals Management Service

(MMS) proposes to amend 30 CFR part 250 as follows:

PART 250--OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER

CONTINENTAL SHELF

1. The authority citation for part 250 continues to read as

follows:

Authority: 43 U.S.C. 1334.

2. Subpart L is revised to read as follows:

Subpart L--Oil and Gas Production Measurement, Surface Commingling, and

Security

Sec.

250.180 Question index table.

250.181 Definitions for Subpart L.

250.182 Liquid Hydrocarbon measurement.

250.183 Gas measurement.

250.184 Surface commingling.

250.185 Site security.

250.186 Measuring gas lost or used on a lease.

Subpart L--Oil and Gas Production Measurement, Surface Commingling,

and Security

Sec. 250.180 Question Index Table

The table in this section lists questions concerning Oil and Gas

Production Measurement, Surface Commingling, and Security and the

location of the answers.

------------------------------------------------------------------------

Frequently asked questions CFR citation

------------------------------------------------------------------------

1. What are the requirements for measuring Sec. 250.182 (a).

liquid hydrocarbons?.

2. What are the requirements for liquid Sec. 250.182 (b).

hydrocarbon royalty meters?.

3. What are the requirements for run tickets?. Sec. 250.182 (c).

4. What are the requirements for liquid Sec. 250.182 (d).

hydrocarbon royalty meter provings?.

5. What are the requirements for a master Sec. 250.182 (e).

meter and its calibration?.

6. What are the requirements for calibrating Sec. 250.182 (f).

mechanical-displacement provers and tank

provers?.

7. What correction factors must a lessee Sec. 250.182 (g).

account for when calibrating meters with a

mechanical displacement prover, tank provers

or master meter?.

8. What are the requirements for establishing Sec. 250.182 (h).

and applying operating meter factors for

liquid hydrocarbons?.

9. Under what circumstances does MMS consider Sec. 250.182 (i).

that a liquid hydrocarbon royalty meter

failed and what must a lessee do?.

[[Page 8668]]

10. How must a lessee correct gross liquid Sec. 250.182 (j).

hydrocarbon volumes measured under

nonstandard conditions?.

11. What are the requirements for liquid Sec. 250.182 (k).

hydrocarbon allocation meters?.

12. What are the requirements for tank Sec. 250.182 (l).

facilities designated as a royalty point?.

13. To which meters do MMS requirements for Sec. 250.183 (a).

gas measurement apply?.

14. What are the requirements for measuring Sec. 250.183 (b).

gas?.

15. What are the requirements for gas meter Sec. 250.183 (c).

calibrations?.

16. What must a lessee do if a gas meter is Sec. 250.183 (d).

malfunctioning?.

17. What are the requirements when natural gas Sec. 250.183 (e).

from a Federal lease is delivered to a gas

plant?.

18. What are the requirements when commingling Sec. 250.184 (a).

production at the surface?.

19. What are the requirements for a well test Sec. 250.184 (b).

used for allocation?.

20. What are the requirements for site Sec. 250.185 (a).

security?.

21. What are the requirements for using seals? Sec. 250.185 (b).

22. What are the requirements for measuring Sec. 250.186.

gas lost or used on a lease?.

------------------------------------------------------------------------

Sec. 250.181 Definitions for subpart L.

Terms used in Subpart L have the following meaning:

Allocation meter means a meter whose volume measurement

substantiates which portion of the volume measured by a royalty meter

is attributable to a particular lease, unit, well, or other measurement

point.

API MPMS means the American Petroleum Institute's Manual of

Petroleum Measurement Standards.

British Thermal Unit (Btu) means the amount of heat needed to raise

the temperature of one pound of water by 1 degree Fahrenheit (1 deg.F)

at standard atmospheric pressure.

Calibration means the adjustment or standardization of a measuring

instrument to yield precise data.

Fractional Analysis means separating mixtures into identifiable

components expressed in mole percent.

Gas meter means an approved meter that measures natural gas and

upon which MMS bases royalty and/or allocation volumes.

Gas processing plant means an installation for processing natural

gas to remove impurities and recover natural gas liquids (NGL's) and

other products. The NGL's are reported as the sum of the products

(ethane, propane, butane, and natural gasoline) on the report of sales

and royalty remittance. Products like nitrogen, sulphur, carbon dioxide

and helium are reported separately.

Gas processing plant statement means a monthly statement showing

the volume and quality of the inlet gas stream and the plant products

recovered during the period, volume of deductible plant fuel, and the

allocation of plant products to the sources of the inlet stream.

Gas royalty meter malfunction means an error in the gas measurement

device that exceeds manufacturers specifications.

Gas volume statement means a document prepared by the owner of a

gas meter that identifies the volume of natural gas measured by the

meter. The statement contains information such as pressure base,

temperature base, and volumetric data in a thousand cubic feet (Mcf)

and quality data in gross Btu's per cubic foot.

Liquid hydrocarbons (free liquids) mean a mixture of hydrocarbons

produced in liquid form after passing through surface separating

facilities.

Malfunction factor means a liquid hydrocarbon royalty meter factor

that differs from the previous meter factor by an amount greater than

0.0025.

Natural gas means all components of a whole natural gas stream

which pass a meter in vapor phase at the measurement point.

Natural gas liquids (NGL's) mean components of natural gas that are

liquefied from the whole gas stream and extracted in gas processing

plants.

Operating meter means a meter that is used for measurement at any

time during the month. A meter must be proved or calibrated only if it

is an operating meter.

Pressure base means the pressure at which gas volumes are reported.

The standard pressure base for converting measured volumes to standard

volumes is 14.73 pounds per square inch absolute (psia).

Prove means to determine the accuracy of a meter, usually by

running a known quantity (or quantities) of hydrocarbon through the

meter at a known temperature and pressure while recording the meter

volume registration.

Retrograde condensate means liquid hydrocarbons that drop out of

the separated gas stream at any point prior to entering a gas

processing plant, but after the facility measurement point.

Royalty meter means an approved meter that measures natural gas or

liquid hydrocarbons and upon which MMS bases royalty volumes.

Run ticket means the invoice for liquid hydrocarbons measured at a

royalty point.

Sales meter means a meter at which custody transfer takes place

(not necessarily a royalty meter).

Seal means a device or approved method used to prevent tampering

with measurement facility components.

Standard conditions means 14.73 pounds per square inch absolute

(psia) and 60 deg. F.

Surface commingling means the surface mixing of production from two

or more leases or units prior to measurement for royalty purposes.

Temperature base means the temperature at which gas volumes are

reported. The standard temperature base for use in converting measured

volumes to standard volumes is 60 deg. F.

You or your means the lessee or contractor engaged in operations in

the Outer Continental Shelf (OCS).

Sec. 250.182 Liquid hydrocarbon measurement.

(a) What are the requirements for measuring liquid hydrocarbons?

Lessees must:

(1) Commence liquid hydrocarbon production or make changes to

previously approved measurement procedures only after the Regional

Supervisor has approved the liquid hydrocarbon application or changes

to an existing approval;

(2) Use measurement equipment that will accurately measure the

liquid hydrocarbons produced from a lease or unit;

(3) Use procedures and correction factors according to the

applicable chapters of the API MPMS as referenced in 30 CFR 250.1 when

obtaining net standard volume and associated measurement parameters;

and

(4) When requested by the Regional Supervisor, determine the

retrograde condensate volume and allocate it back to the individual

leases and/or units and wells.

(b) What are the requirements for liquid hydrocarbon royalty

meters? Lessees must:

(1) Ensure that the royalty meter facilities include the following

components (or other MMS-approved

[[Page 8669]]

components) which must be compatible with their connected systems:

(i) A positive-displacement meter equipped with a nonreset

totalizer;

(ii) A mechanical displacement prover, a master meter, a calibrated

tank prover;

(iii) A proportional-to-flow sampling device pulsed by the meter

output; and

(iv) A temperature measurement or temperature compensation device.

(2) Ensure that the royalty meter facilities accomplish the

following:

(i) Prevent flow reversal through the meter;

(ii) Protect meters subjected to pressure pulsations or surges;

(iii) Prevent the meter from shock pressures greater than the

maximum working pressure; and

(iv) Prevent meter bypassing.

(3) Maintain royalty meter facilities to ensure the following:

(i) Meters operate within the gravity range specified by the

manufacturer;

(ii) Meters operate within the manufacturer's specifications for

maximum and minimum flow rate for linear accuracy; and

(iii) Meters are reproven when changes in metering conditions

affect the meters performance such as changes in pressure, temperature,

density (water content), viscosity, pressure, and flow rate.

(4) Ensure that sampling devices conform to the following:

(i) The sampling point is in the flowstream immediately upstream or

downstream of the meter or divert valve;

(ii) The sample container is vapor-tight and includes a mixing

device to allow complete mixing of the sample before removal from the

container; and

(iii) The sample probe is in the center of the flow piping in a

vertical run and is located at least three pipe diameters downstream of

any pipe fitting within a region of turbulent flow.

(c) What are the requirements for run tickets? Lessees must:

(1) Send all run tickets pulled and/or completed to the Regional

Supervisor within 15 days following the end of the month;

(2) Pull a run ticket when establishing the monthly meter factor or

a malfunction meter factor. Send the Regional Supervisor a copy of this

run ticket; and

(3) Ensure that run tickets clearly identify all observed data, all

correction factors not included in the meter factor, the net standard

volume, and all calculations and factors.

(d) What are the requirements for liquid hydrocarbon royalty meter

provings? Lessees must:

(1) Permit MMS representatives to witness regularly scheduled

provings or any proving requested by the Regional Supervisor;

(2) Ensure that the integrity of the prover calibration is

traceable to test measures certified by the National Institute of

Standards and Technology;

(3) Prove each operating royalty meter to determine the meter

factor during each month but the time between meter factor

determinations must not exceed 42 days; and

(4) Submit copies of all meter proving reports for royalty meters

to the Regional Supervisor monthly within 15 days after the end of the

month.

(e) What are the requirements for a master meter and its

calibration? Lessees must:

(1) Calibrate the master meter to obtain a meter factor before

using it to determine operating meter factors;

(2) Use a fluid of similar gravity, viscosity, temperature, and

flow rate as the liquid hydrocarbons that flow through the operating

meter to calibrate the master meter;

(3) Calibrate the master meter during each month but the time

between calibrations must not exceed 42 days;

(4) Calibrate the master meter by recording runs until the results

of two consecutive runs (if a tank prover is used) or five out of six

consecutive runs (if a mechanical-displacement prover is used) produce

maximum meter factor differences of 0.0002. Lessees must use the

average of the two (or the five) runs that produced acceptable results

to compute the master meter factor; and

(5) Install the master meter upstream of any back-pressure or

reverse flow check valves associated with the operating meter. However,

you may install master meters either upstream or downstream of the

operating meter.

(6) Keep a copy of the master meter proving report at your field

location for 2 years.

(f) What are the requirements for calibrating mechanical-

displacement provers and tank provers? Lessees must:

(1) Calibrate mechanical-displacement provers and tank provers at

least once every 5 years according to the API MPMS as referenced in 30

CFR 250.1; and

(2) Submit a copy of each calibration report to the Regional

Supervisor within 15 days after the calibration.

(g) What correction factors must a lessee account for when

calibrating meters with a mechanical-displacement prover, tank prover,

or master meter? Use the following correction factors from the API MPMS

as referenced in 30 CFR 250.1:

(1) The change in prover volume due to pressure in the steel pipe

(Cps);

(2) The change in volume of the test liquid with the change in

temperature (Ctl);

(3) The change in prover volume due to the change in temperature

(Cts); and

(4) The change in volume of the test liquid with the change in

pressure (Cpl).

(h) What are the requirements for establishing and applying

operating meter factors for liquid hydrocarbons?

(1) If you use a mechanical-displacement prover, you must record

proof runs until five out of six consecutive runs produce a maximum

difference between individual runs of .0005. You must use the average

of the five runs to compute the meter factor.

(2) If you use a master meter, you must record proof runs until

three consecutive runs produce a maximum total meter factor difference

of 0.0005. The volume of each run must be at least 10 percent of the

hourly rated capacity of the operating meter. You must use the average

of the three runs to compute the meter factor.

(3) If you use a tank prover, you must record proof funs until two

consecutive runs produce a maximum meter factor difference of .05

percent of the tank prover volume. You must use the average of the two

consecutive runs to compute the meter factor.

(4) You must apply meter factors that are within tolerance starting

with the date of the proving.

(i) Under what circumstances does MMS consider that a liquid

hydrocarbon royalty meter failed and what must a lessee do?

(1) If the difference between the meter factor and the previous

factor exceeds 0.0025 it is a malfunction factor and lessees must do

the following:

(i) Remove the meter from service and check it for damage and/or

wear;

(ii) Adjust it and/or repair it, and reprove it;

(iii) Apply the average of the malfunction factor and the previous

factor to the production measured through the meter between the date of

the previous factor and the date of the malfunction factor; and

(iv) Show all appropriate remarks regarding subsequent repairs and/

or adjustments on the proving report.

(2) If a meter fails to register production the lessee must do the

following:

(i) Remove the meter from service, repair and reprove it;

(ii) Apply the previous meter factor to the production run between

the date of that factor and the date of the failure; and

(iii) Estimate unregistered production by the best possible means

and report it as estimated production on the proving report.

[[Page 8670]]

(3) If the results of a royalty meter proving exceed the run

tolerance criteria and all measures excluding the adjustment and/or

repair of the meter can't bring results within tolerance the lessees

must:

(i) Establish a factor using proving results made before any

adjustment and/or repair of the meter; and

(ii) Treat the established factor like a malfunction factor [See

paragraph (i)(1) of this section].

(j) How must a lessee correct gross liquid hydrocarbon volumes

measured under nonstandard condition?

(1) Calculate Cpl factors into the meter factor or list and apply

them on the appropriate run ticket.

(2) List the Ctl factors on the appropriate run ticket when the

meter is not automatically temperature compensated.

(k) What are the requirements for liquid hydrocarbon allocation

meters? Lessees must:

(1) Take samples continuously or daily;

(2) For turbine meters, take the sample proportional to the flow;

(3) Prove allocation meters monthly if they measure 50 or more

barrels of oil per day per meter; or

(4) Prove allocation meters quarterly if they measure less than 50

barrels of oil per day per meter;

(5) Keep a copy of the proving reports at the field location for 2

years;

(6) Adjust and reprove the meter if a meter factor differs from the

previous meter factor by more than 2 percent and less than 7 percent;

(7) For turbine meters, inspect the meter if a factor differs from

the previous meter factor by more than 2 percent and less than 7

percent; and

(8) Repair or replace and reprove the meter if a meter factor

differs from the previous meter factor by 7 percent or more.

(l) What are the requirements for tank facilities designated as a

royalty point? Lessees must:

(1) Equip the tank with a vapor-tight thief hatch, a vent-line

valve, and a fill line designed to minimize free fall and splashing;

(2) Submit a complete set of calibration charts (tank tables) to

the Regional Supervisor before using the tank for measuring sales;

(3) Obtain the volume and other measurement parameters by using

correction factors and procedures in the API MPMS as referenced in 30

CFR 250.1; and

(4) Submit a copy of each run ticket written from tank gaugings to

the Regional Supervisor within 15 days after the end of the month.

Sec. 250.183 Gas measurement

(a) To which meters do MMS requirements for gas measurement apply?

All OCS gas royalty and allocation meters.

(b) What are the requirements for measuring gas? Lessees must:

(1) Commence gas production or make changes to previously approved

measurement procedures only after the Regional Supervisor has approved

the gas measurement application or changes to an existing approval.

(2) Design, install, use, maintain, and test measurement equipment

to ensure accurate and complete measurement. You must follow the

recommendations in API MPMS (referenced in 30 CFR 250.1).

(3) Ensure that the measurement components are compatible with

their connected systems.

(4) Equip the meter with a chart or electronic data recorder.

Electronic data recorders must be capable of displaying real-time data

during MMS inspections.

(5) Use continuous on-line chromatographic analyzers or sampling

ports upstream or downstream of the meter. Take a sample at least once

each calendar month but intervals must not exceed 42 days.

(6) Ensure that standard conditions for reporting gross heating

value are at a base temperature of 60 deg. F and at a base pressure of

14.73 pounds per square inch absolute (psia).

(7) When requested by the Regional Supervisor, submit gas volume

statements for each requested month's gas sales. Show whether gas

volumes and gross Btu heating value are reported at saturated or

unsaturated conditions.

(8) When requested by the Regional Supervisor, provide any data

necessary for gas volume and quality calculations.

(c) What are the requirements for gas meter calibrations? Lessees

must:

(1) Calibrate meters monthly but not exceed 42 days between

calibrations.

(2) Following a meter calibration, adjust the meter equipment (if

necessary) by using the manufacturer's specifications.

(3) For positive displacement or turbine meters, conduct

calibrations at the average hourly rate of flow since the last

calibration.

(4) Retain calibration test data at the field location for 2 years

and send the data to the Regional Supervisor upon request.

(5) Permit MMS representatives to witness regularly scheduled

calibrations and any calibration requested by the Regional Supervisor.

(d) What must a lessee do if a gas meter is malfunctioning?

(1) If a gas meter is malfunctioning, adjust the meter to function

properly or remove it from service and replace it.

(2) Correct the volumes to the last acceptable calibration as

follows:

(i) If the duration of the error can be determined, calculate the

volume adjustment for that period. The MMS does not require retroactive

volume adjustments for allocation beyond 21 days; or

(ii) If the duration of the error can't be determined, apply the

volume adjustment to one-half of the time elapsed since the last

calibration or 21 days, whichever is less.

(e) What are the requirements when natural gas from a Federal lease

is delivered to a gas plant?

(1) Lessees must provide the following to the Regional Supervisor

upon request:

(i) The gas processing plant statement;

(ii) A gas volume statement for each of the lessee's meter facility

sites that contribute natural gas to the processing plant; and

(iii) Composite fractional analyses and gross heating values.

(2) MMS may inspect the measurement and sampling equipment of

natural gas processing plants that process Federal production.

Sec. 250.184 Surface commingling.

(a) What are the requirements when commingling production at the

surface? Lessees must:

(1) Commence commingling of production only after the Regional

Supervisor has approved the commingling and the method of measurement.

(2) Submit an application containing the following information:

(i) The method of allocation measurement and processing, if

applicable;

(ii) The manner of entry into the commingled system; and

(iii) Any other information that the Regional Supervisor requests.

(3) Submit any changes to an approved commingling application to

the Regional Supervisor for approval.

(4) Upon the request of the Regional Supervisor, lessees who

deliver natural gas into a commingled system of both Federal and non-

Federal production must provide volumetric and fractional analyses on

the non-Federal gas through the designated system operator. If a

lessees fails to provide that data, MMS will not permit the lessee to

deliver Federal gas into the commingled system.

(b) What are the requirements for a well test used for allocation?

Lessees must:

[[Page 8671]]

(1) Conduct a well test at least once every 2 months unless the

Regional Supervisor approved a different frequency;

(2) Follow the well test procedures in Sec. 250.173; and

(3) Retain the well test data at the field location for 2 years.

Sec. 250.185 Site Security.

(a) What are the requirements for site security? Lessees must:

(1) Protect Federal production against production loss or theft;

(2) Post a sign at each storage tank that MMS uses to determine

royalty. The sign must contain the name of the facility operator, the

size of the tank, and the tank number;

(3) Not bypass MMS-approved liquid hydrocarbon royalty meters and

tanks; and

(4) Report the following to the Regional Supervisor as soon as

possible, but no later than the next business day after discovery:

(i) Theft or mishandling of production;

(ii) Tampering or bypassing of meter or prover devices; and

(iii) Falsifying production measurements.

(b) What are the requirements for using seals? Lessees must:

(1) Seal the following components of liquid hydrocarbon royalty

installations to ensure that tampering cannot occur without destroying

the seal:

(i) Meter stack component connections from the base of the stack to

the register;

(ii) Sampling systems including packing device, fittings, chains,

sight glass, and container lid;

(iii) Temperature and gravity compensation device components;

(iv) All valves on lines leaving an oil storage tank including

load-out line valves, drain-line valves, and connection-line valves

between royalty and non-royalty tanks; and

(v) Any additional components required by the Regional Supervisor.

(2) Number and track the seals and keep the record at the field

location for 2 years; and

(3) Make the record of seals available for MMS inspection.

Sec. 250.186 Measuring gas lost or used on a lease.

What are the requirements for measuring gas lost or used on a

lease?

(a) Lessees must either measure or estimate the volume as required

by the Regional Supervisor.

(b) If the Regional Supervisor requires you to measure the volume,

document the measurement equipment used and include the volume

measured.

(c) If the Regional Supervisor requires you to estimate the volume,

document the estimating method and the data used and include the volume

estimated.

(d) Lessees must keep the volume estimates and documentation at the

field location for 2 years.

(e) If the Regional Supervisor requests, lessees must provide

copies of the records.

[FR Doc. 97-4534 Filed 2-25-97; 8:45 am]

BILLING CODE 4310-MR-M

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.