Personnel Demonstration Project; Alternative Personnel Management System for the U.S. Department of Commerce

Federal RegisterDec 24, 1997

Ask Donna

What actually matters in this document.

Text

SUMMARY: Title VI of the Civil Service Reform Act, now codified in 5

U.S.C. 4703, authorizes the Office of Personnel Management (OPM) to

conduct demonstration projects that experiment with new and different

human resources management concepts to determine whether changes in

policies and procedures result in improved Federal human resources

management. This demonstration project is designed to replicate many of

the features of the National Institute of Standards and Technology

(NIST) demonstration project created by Congress pursuant to the

National Bureau of Standards Authorization Act for Fiscal Year 1987

(Pub. L. 99-574). This project will cover units of four Department of

Commerce (DoC) organizations:

(1) Technology Administration

--Office of the Under Secretary

--Office of Technology Policy

(2) Economics and Statistics Administration

--Bureau of Economic Analysis

(3) National Telecommunications and Information Administration

--Institute for Telecommunication Sciences

(4) National Oceanic and Atmospheric Administration

--Units of the Office of Oceanic and Atmospheric Research

--Units of the National Environmental Satellite, Data, and

Information Service

--Units of the National Marine Fisheries Service

DATES: This demonstration project will be implemented on March 24,

1998.

FOR FURTHER INFORMATION CONTACT: (1) Department of Commerce: Darlene F.

Haywood, U.S. Department of Commerce, 1400 Constitution Avenue, N.W.,

Room 5004, Washington, DC 20230, 202-482-3620; (2) OPM: Judith B.

White, U.S. Office of Personnel Management, 1900 E Street, N.W., Room

7460, Washington, DC 20415, 202-606-1526.

SUPPLEMENTARY INFORMATION:

1. Background

The NIST Demonstration Project was successful and was made

permanent by Congress in 1996 (Pub. L. 104-113). Independent surveys

have demonstrated that a majority of NIST employees are satisfied with

the demonstration project. The Federal Employees Pay Comparability Act

of 1990 included many of the interventions tested successfully at NIST.

The DoC project is designed to test whether the interventions of the

NIST project can be successful in DoC environments with different

missions and different organizational hierarchies. Like the NIST

project, the DoC Demonstration Project involves simplified position

classification, pay for performance, and simplified recruiting and

examining processes.

2. Overview

A total of 67 oral and written comments were received in response

to the first Federal Register Notice of May 2, 1997. These comments

were a valuable source of input for the Department of Commerce

Demonstration Project. All comments have been considered, and changes

to the project plan have been made where deemed appropriate. Changes to

the plan involve supervisory pay, performance-based reduction-in-force

retention credit, and the extended probationary period for employees in

the Scientific and Engineering Career Path. In addition to these

changes, several sections of the plan have been clarified and expanded.

Some editorial changes and corrections were also made.

3. Summary of Comments

Nine speakers commented on the first Federal Register Notice at the

five public hearings. A total of 58 letters were received, with one

letter bearing 20 signatures. A variety of issues and concerns were

raised; however, recurring comments addressed five major topics:

(1) accountability, (2) reduction-in-force (RIF) retention credit,

(3) impact of the project on equal employment opportunity (EEO)/

Diversity, (4) pay administration, and

(5) performance appraisal. Other issues raised include

classification, employee input, project evaluation, and communication.

The following summarizes the written and oral comments by topic and

provides a response to each.

(1) Accountability

Comments. A majority (about two-thirds) of the comments from

individuals and organized groups expressed a high level of concern that

the demonstration project gives more authority and responsibility to

supervisors and managers. Believing that many supervisors do not

properly and fairly execute supervisory responsibilities or utilize the

power and tools provided under the current management system, these

employees fear a new system that gives supervisors additional authority

over their career and pay. Employees specifically questioned whether

proper controls would be in place to prevent management abuse in the

administration of the performance appraisal and classification systems.

Comments focused on the potential for favoritism and unfair treatment

of employees in the distribution of ratings and awards. Employees also

questioned whether pay pool managers would have the requisite knowledge

to make fair decisions about the work of all employees in the pay pool.

Response. The Department will implement a number of measures to

ensure management accountability. These will include: (1) employee

focus groups, (2) supervisory training, and (3) oversight.

Employee focus groups: Annual project evaluations will utilize

employee focus groups as an important source of data in measuring the

degree to which project interventions are accomplishing desired

objectives.

Training: Supervisors and managers will receive detailed training

in the new authorities they are to exercise. Classification training

will emphasize the underlying principles of project classification and

will instruct supervisors on the application of these principles to

classification decisions. Training on the performance appraisal system

will cover performance planning, monitoring, feedback, and appraisal.

In addition, supervisors will receive training on the automated

performance pay increase system and will be required to conduct a

simulation of the performance evaluation and rewards system prior to

the actual end-of-year performance appraisal. The training will also

cover the pay pool manager's responsibilities for reviewing and

reconciling ratings and ensuring equity and consistency in performance

plans and ratings.

Oversight: The authorities delegated to supervisors under this

demonstration project will be subject to three levels of oversight. The

Office of Personnel Management will oversee the project under the

authority of 5 U.S.C. 4703. The DoC Departmental Personnel Management

Board (DPMB) will manage and oversee authority delegated to the

Operating Personnel Management Boards (OPMBs) in participating

[[Page 67435]]

organizations, and OPMBs will monitor authorities delegated to

supervisors, withdrawing them when warranted.

(a) Classification: Under authority delegated by the OPMBs,

servicing human resources management staff will monitor and review

classification decisions made by managers to ensure consistent and

uniform application of classification policies and guidelines. When

classification actions are found to be inconsistent with established

policies, the servicing human resources management specialist will

attempt to resolve the inconsistency with the responsible supervisor.

If agreement cannot be reached, the issue will be referred to a

Classification Review Panel (CRP). The CRP is an ad hoc advisory panel

established by authority of the OPMB to review proposed classification

actions referred to it by the servicing Human Resources Manager.

(b) Performance Evaluation: OPMBs will oversee the operating unit

annual performance appraisal process, from development of plans to

individual pay increases and bonuses. OPMBs will also establish

operating unit guidelines on performance elements.

(2) Reduction-in-Force (RIF) Retention Credit

About half of all comments received addressed two related concerns

with respect to RIF retention credit: loss of current performance-based

credit and the percentage of employees eligible for credit under the

project.

(a) Loss of current credit

Comments. Employees thought it unfair that conversion to the

demonstration project would result in the loss of performance-based RIF

credit acquired under the current system.

Response. The demonstration project will introduce a new ``pay-for-

performance'' personnel system, and it is intended that all employees

enter the system on an equal basis, i.e, on a ``level playing field.''

Allowing some employees to bring forward performance-based RIF credit

gained under the current system would give those employees an unfair

advantage.

(b) Percentage of Employees Eligible for Credit

Comments. A number of employees objected to the provision that

would award performance-based credit for only those employees who rank

in the top ten percent of their career paths.

Response. The objective of this feature is to reward performance

that is truly outstanding. Consequently, the group of employees

receiving this credit must, by definition, be limited. However, in

order to more closely parallel agency historical experience, the

project plan has been revised to grant performance-based RIF retention

credit to employees who rank in the top 20 percent of their career path

within a pay pool, rather than the top 10 percent.

(3) Impact of the Project on EEO and Diversity

Comments. Several employees expressed concern that the

demonstration project would not support existing EEO and Diversity

goals. Specific questions were raised about the impact of the project

on the hiring of women and minorities and whether these groups would

receive an equitable share of promotions, pay increases, and bonuses.

Response. EEO and Diversity goals of the Department will not change

under the demonstration project. On an annual basis, the Department

will continue to submit an annual report and update of affirmative

employment to the Equal Employment Opportunity Commission. In addition,

Diversity Plans and Diversity Councils now in place will continue to be

required for organizations participating in the demonstration project.

Also, Senior Executive Service managers will continue to be rated on a

Diversity critical element. The Project Evaluation Model will include

criteria that will track hiring, award, promotion, and retention data

in order to closely monitor the impact of the project on workforce

diversity. A variety of data sources will be used. These include

records in servicing human resources management offices (including

records of recruitment sources) and records of EEO complaints.

(4) Pay Administration

Two major compensation issues were raised. Several employees

objected to the manner in which they would be compensated for time

credited toward their next within-grade increase. In addition, some

employees questioned the appropriateness of the supervisory pay

differential.

(a) Within-Grade Increase (WIGI) Payout

Comments. Employees objected to the one-time lump sum payment for

time credited toward the next within-grade increase on the grounds that

it would result in a negative impact on their salary and retirement

contributions and earnings. In lieu of the lump sum, some suggested

that the WIGI payout be processed as a base pay increase. Others felt

that they should be given a choice between a one-time payment and a

permanent salary increase.

Response. Organizations participating in the demonstration project

will be required to maintain compensation costs at the levels they

would have reached under the current system. A decision to grant

permanent salary increases for time credited toward within-grade

increases would result in immediate cost escalation prior to

implementation that would distort base cost calculations. Such a

decision would be counter to Departmental cost containment goals.

Moreover, under the demonstration project, the salaries of good

performers will soon overtake salaries they would have reached with

WIGIs through the following provisions of the project plan:

(1) Annual Performance Pay Increases: The new pay system provides

an opportunity for a performance pay increase each year, regardless of

an employee's position in the band. This is in contrast to the waiting

periods of one to three years for a WIGI in the General Schedule (GS)

system. The potential size of a performance pay increase in the new

system is significantly higher than the size of a GS within-grade

increase.

(2) Removal of Grade Barriers: Broad banding removes the pay

barriers between the GS grades that are placed in the same band. For

example, because grades GS-7 and GS-8 will be placed in the same band

in the Support Career Path, employees who previously reached the top of

the GS-7 grade will now have access to the GS-8 pay range.

(3) Potential for Higher Pay Increases Upon Promotion: When an

employee is promoted to a higher band, the employee's salary may be set

at any point in the range of the higher band as long as the new salary

represents an increase of at least 6 percent.

(4) Supervisory Performance Pay: Through pay for performance,

supervisors have salary potential 6 percent higher than the normal

ceiling of a band.

(b) Supervisory Performance Pay

Comments. Several employees questioned the appropriateness of the

immediate salary increase that supervisors would receive under the

demonstration project. Some stated that supervisors would receive

additional compensation because they would convert to a higher pay band

on the basis of their supervisory duties, and therefore, an automatic

pay increase would result in double compensation for supervision. Some

asserted that this policy conflicts with the basic ``pay-for-

performance'' concept and suggested that any pay incentive awarded

supervisors should be given after the

[[Page 67436]]

first performance appraisal cycle, if earned through performance.

Response. The proposed project plan provided for an automatic pay

differential for supervisors in the Scientific and Engineering (ZP)

Career Path only. The amount of this type of differential was to be

fixed at 3 percent or 6 percent, for first-level and second-level (and

higher) supervisors, respectively. However, as a result of comments

received, this feature of the system has been eliminated. ZP

supervisors will not be given an immediate salary increase upon

conversion to the demonstration project. Supervisors in all career

paths will be eligible for salaries up to 6 percent higher than the

maximum rates of their pay bands, and there will be no differentiation

in the amount of the increase based on supervisory level. Any employee

who meets the demonstration project definition of ``supervisor'' will

be eligible for the 6 percent increase, which may be reached through

performance pay increases granted through the regular performance

appraisal process (see Section III(D)(4) Supervisory Performance Pay).

1. (5) Performance Appraisal

About half of all comments received addressed the performance

appraisal process. Issues raised focused on three major areas: ranking

versus teamwork, linking the annual comparability increase to

performance, and the requirement for all performance elements to be

critical.

(a) Impact of Ranking on Teamwork

Comments. Several employees commented that ranking employees by

performance score will pit employees against each other, create a

competitive work environment, and destroy teamwork.

Response. Under the demonstration project, employees will be rated

against the criteria in their performance plans and ranked accordingly.

There will be no direct comparison of employees' performance. It is

expected that more competitive salaries that are directly tied to

performance will improve both individual and organizational

performance. Furthermore, the demonstration project performance

appraisal system is flexible enough to reward those aspects of work

that require cooperation and teamwork. For example, in units requiring

high levels of cooperation and teamwork to accomplish organizational

goals, supervisors may include contributions to the team's

accomplishments in performance plans and rate employees accordingly.

(b) Linking the Annual Comparability Increase to Performance

Comments. Several employees expressed concern about the proposal to

allow only those employees with a current annual performance rating of

Eligible to receive the annual general comparability increase. They

consider the annual increase a cost-of-living increase, which should

not be tied to performance.

Response. The annual General Schedule (GS) pay adjustment is

authorized under 5 U.S.C. 5303. It is based on the cost of labor, not

the cost of living. GS pay adjustments are linked to changes in the

Employment Cost Index (ECI), which measures the overall rate of change

in employers' compensation costs in the private and public sector,

excluding the Federal Government. The demonstration project is based on

the principle of pay for performance; therefore, all pay increases,

including the annual comparability increase, are tied to performance.

(c) Use of All Critical Elements in Performance Plans

Comments. Some employees expressed concern about the requirement

for all elements in a performance plan to be critical elements. In

their opinion, this will make it easier for supervisors to withhold pay

increases or bonuses, or even initiate removal, when one element is

rated Unsatisfactory.

Response. The requirement for all elements in a performance plan to

be critical is not a departure from the current performance appraisal

system. The demonstration project will not require that noncritical

elements used in the current system be changed to critical elements

under the project. The project simply eliminates noncritical elements.

Also, while noncritical elements may now be included in an employee's

performance plan, they have very little weight. Under the current

system, unacceptable performance in one critical element results in a

mandatory rating of Unacceptable. Likewise, under the demonstration

project, unsuccessful performance on one element will result in a

rating of Unsatisfactory.

(6) Other Comments

Employees addressed a number of other issues including

classification, employee input to the project, project evaluation, and

communication.

(a) Classification

Comments. One employee expressed concern that problems with the

current GS classification standards would carry over into the

demonstration project. Some questioned the basis for grouping

occupations into four career paths, and a few employees questioned the

career path decisions for their occupations. Others expressed

dissatisfaction with what they consider the ``arbitrary'' structure of

the pay bands, believing that employees who convert to the top of their

bands will have minimal opportunity for pay increases.

Response. (1) Classification Standards: Under the demonstration

project, OPM classification standards will not be used. They will be

replaced with more streamlined classification standards that have been

developed to cover the work in the participating organizations. Each

pay band in a career path will have a narrative standard that uses two

factors:

(1) Duties and Responsibilities and (2) Knowledge, Skills, and

Abilities (KSAs). At each successively higher band, the standards

describe a higher level of work and a higher level of KSAs required to

successfully perform the work. These standards will simplify the

classification process, make it more understandable to managers and

employees, and reduce the time required to make classification

decisions.

(2) Career Paths: The four career paths are intended to replace the

GS method of grouping occupations. Under the current system, GS

occupations are placed in occupational groups according to general

subject matter. Each group includes both two-grade and one-grade

interval occupations, with each type receiving different treatment for

classification and other purposes. By contrast, career paths group

occupations that have parallel career patterns and can be similarly

treated for staffing, classification, pay, and other personnel

purposes.

(3) Pay Bands: Pay bands are designed to parallel the typical

career patterns for occupations in a career path. For example, in the

Scientific and Engineering (ZP) Career Path, professional technical

employees begin their careers as trainees (Band I), move through a

developmental stage that builds on professional knowledge gained

through undergraduate work (Band II), proceed to independent, full

performance research or operational work (Band III), acquire program

responsibility (Band IV), and achieve broad recognition as an authority

in the field (Band V).

(4) Potential for Pay Increases: Within each pay band, the maximum

potential for a performance pay increase is highest for employees in

interval one and lowest for employees in interval

[[Page 67437]]

three. This arrangement is intended to slow salary increases as

employees move through a band, duplicating the effect of the longer

waiting periods for GS within-grade increases as GS employees move

through the steps of a grade.

Comments. Some employees questioned whether their occupations were

assigned to the appropriate career paths.

Response. The four career paths used in the Department of Commerce

Demonstration Project as well as placement of occupations in those

paths replicate the NIST system. Career path determinations for

occupations not covered by the NIST project are based on the

definitions of career paths. However, after the first year of

operation, questions concerning changes in career path may be

considered.

(b) Employee Input

Comment. A few employees felt that the project plan had not

received any input from employees and that this could adversely impact

relationships between management and employees.

Response. Numerous briefings were provided to employees and union

representatives prior to the public hearings. Employees were given an

opportunity to provide oral comments at five public hearings held

between June 9 and June 26, 1997. These hearings were held in locations

across the country that were accessible to most employees. In addition,

the first Federal Register Notice, published on May 2, 1997, informed

employees that written comments would be accepted through July 10,

1997. As a result of comments received from employees during the public

comment period, several changes have been made to the project plan.

(c) Project Evaluation

Comments. Several employees commented on the design of the Project

Evaluation Model. Specifically, it was suggested that employee morale

be measured since a direct link exists between morale and

organizational performance, that employee opinions be one of the data

sources for evaluation of the project, and that EEO complaints and

grievance patterns be incorporated into the evaluations.

Response. The Project Evaluation Model will include employee

surveys as a source of data. The surveys will include criteria to

measure organizational climate and general concerns. In addition, as

part of the evaluation process, data on EEO complaints and grievances

will be monitored.

(d) Communication

Comment. One employee commented that the level of communication to

employees about the project had been inadequate.

Response. All employees were invited to attend general briefings on

the proposed demonstration project in March, April, and early May of

this year. At these briefings, employees received handouts describing

the key features of the project. The publication of the first Federal

Register Notice was announced in a general bulletin issued to all

employees during the week of May 5, 1997. In that announcement,

employees were informed that the Federal Register Notice was

immediately available on the Office of Personnel Management Internet

Home Page. Shortly thereafter, the publication of the Federal Register

Notice was announced on the Department of Commerce Internet Home Page,

and numerous copies were distributed to all servicing human resources

offices for dissemination to employees. An article on the demonstration

project appeared in the May/June 1997 issue of the Department's

Commerce People magazine. In addition, a video which provides an

overview of the project was developed and made available to employees,

and several follow-up briefings were conducted. To ensure that

employees are kept informed on the project, the Department will issue a

Demonstration Project Newsletter periodically.

4. Demonstration Project System Changes

The following directs readers to the substantive changes and

clarifications to the project plan. The page numbers below refer to the

pages of the proposed plan, published in the Federal Register on May 2,

1997.

(1) Page 24256, 24258, and 24260: The Office of the Chief Financial

Officer/Assistant Secretary for Administration and the Office of the

General Counsel have been deleted, as those organizations will not

participate in the project.

(2) Page 24259: Two laboratories of the Office of Oceanic and

Atmospheric Research (OAR) that were inadvertently listed have been

deleted since they will not participate in the demonstration project.

These are the Geophysical Fluid Dynamics Laboratory, in Princeton, New

Jersey, and the Pacific Marine Environmental Laboratory, in Seattle,

Washington. In addition, all of the locations for each of the

participating laboratories have been listed.

(3) Page 24262: Table 3 has been changed to correct an error

introduced by the printing process. Specifically the table has been

corrected to show no GS-15 positions in the GS-1340 Meteorology Series

and a total of 235 positions in this occupation.

(4) Page 24262: Mountain Administrative Support Center (MASC) has

been deleted from Table 4, since MASC will not participate in the

demonstration project.

(5) Page 24263: The definitions of the four career paths have been

expanded for clarification.

(6) Page 24265: Paragraph B2(a) has been revised to restrict direct

examination and the associated requirement for Applicant Supply Files

to occupations for which there is documented evidence that skills are

in short supply.

(7) The requirement for all employees in the Scientific and

Engineering (ZP) Career Path to serve a three-year probationary period

has been modified. The three-year probationary period will be

applicable to only those ZP employees who are assigned to research and

development positions as identified by the functional code assigned in

conjunction with the classification process. All other ZP employees

will serve a one-year probationary period. (For further explanation,

see Section III(B)(10) Probationary Period.)

(8) Page 24266: The provisions for awarding performance-based RIF

retention credit have been changed. An employee with an overall

performance score in the top 20 percent (as opposed to the top 10

percent) of scores within a career path in a pay pool will be credited

with 10 additional years of service for retention purposes.

(9) Page 24267: The demonstration project definition of

``supervisor'' has been clarified and expanded. Minimum criteria for

classification of a position as ``supervisory'' have been included.

(10) Page 24267: The section ``Locality Pay'' has been clarified.

Specifically, the sentence dealing with special rates and locality

rates has been rewritten to indicate that for bands affected by special

rates, the maximum rate will be the higher of the special rate or the

locality rate, rather than the special rate and the locality rate.

(11) Page 24267: The policy on supervisory pay has been revised.

Supervisors in the Scientific and Engineering (ZP) Career Path will not

be eligible for immediate salary increases upon conversion to the

demonstration project. Supervisors in all career paths will be eligible

for salaries up to 6 percent higher than the maximum rates of their pay

bands, and there will be no differentiation in the amount of the

increase based on supervisory level.

[[Page 67438]]

Any employee who meets the demonstration project definition of

``supervisor'' will be eligible for the maximum increase of 6 percent,

which may be reached through performance pay increases granted through

the regular performance appraisal process.

(12) Page 24268: In the section entitled ``Pay Setting Upon

Movement of an Employee to a Different Pay Area,'' the formula for

determining the pay rate in the new area was printed incorrectly and

has been corrected.

(13) Page 24274: The Project Evaluation Model has been revised to

include the objective of ``Support for EEO and Diversity goals.''

(14) Page 24276: In the ``Project Management'' section, the role of

the DoC Acting Chief Financial Officer/Assistant Secretary for

Administration (now the Director of the National Institute of Standards

and Technology) as chairman has been clarified to show that the role is

specific to the individual, who will serve as Chair of the DPMB through

the first cycle of the project's operation. After the first cycle,

chairmanship of the Board will be assumed by one of the members of the

Board.

Janice R. Lachance,

Director.

Table of Contents

I. Executive Summary

II. Introduction

A. Purpose

B. Problems with the Present System

C. Changes Required/Expected Benefits

D. Participating Organizations

E. Participating Employees

F. Labor Participation

G. Project Design/Methodology

III. Personnel System Changes

A. Position Classification

B. Staffing

C. Reduction-in-Force

D. Pay Administration

E. Performance Evaluation and Rewards

IV. Conversion or Movement from a Project Position to a General

Schedule Position

A. Grade-Setting Provisions

B. Pay-Setting Provisions

V. Budget Discipline

A. Reprogramming Costs

B. Base Cost Assessment

C. Funding Pools for Performance Pay Increases and Bonuses

D. Budget Monitoring

VI. Project Evaluation

VII. Project Management

VIII. Training

A. Manager and Supervisor Training

B. Employee Training

C. Support Staff Training

IX. Experimentation and Revision

X. Authorities and Waiver of Laws and Regulations Required

I. Executive Summary

This project was designed by the Department of Commerce with

participation and review by the Office of Personnel Management (OPM).

The demonstration project will pursue several key objectives of the

National Performance Review: to simplify the current classification

system for greater flexibility in classifying work and paying

employees; to establish a performance management and rewards system for

improving individual and organizational performance; and to improve

recruiting and examining to attract highly qualified candidates and get

new hires aboard faster. The duration of the project will be 5 years,

except that the project may be extended by OPM if further testing and

evaluation are warranted.

The proposed project will test whether the interventions of the

NIST project can be successful in other environments. Other reasons for

testing the NIST interventions in the Department are: (1) all of the

diverse operating units in the proposed coverage are within the same

Department, the U.S. Department of Commerce, which is also the parent

agency of NIST; (2) several of the operating units in the proposed

coverage have served for eight years as comparison sites for the NIST

project; and (3) during the implementation and operation of the NIST

project, DoC and NIST staff worked closely with the U.S. Department of

Agriculture's National Finance Center, which provides personnel and

payroll computing and database services to all of DoC, including NIST

and the units proposed for the new project.

II. Introduction

A. Purpose

The purpose of the proposed project is to strengthen the

contribution of human resources management in helping to achieve the

missions of specific operating units of the Department of Commerce. The

project conducted by NIST successfully demonstrated that certain

innovative changes could improve human resources management in the NIST

environment. The proposed project will test whether these same

innovations will produce similarly successful results in other DoC

environments.

B. Problems With the Present System

The Department of Commerce encourages, serves, and promotes the

Nation's international trade, economic growth, and technological

advancement. Within this framework, and in the interest of promoting

the national interest through the encouragement of the competitive free

enterprise system, the Department provides a wide variety of programs,

some of which are included in the proposed coverage of the project.

The current system has three major impediments to a manager's

ability to effectively manage human resources and shape the workforce:

(1) Hiring restrictions, (2) an overly complex job classification

system, and (3) poor tools for rewarding and motivating employees.

These impediments, embedded in a system that does not assist managers

in removing poor performers, build stagnation in the workforce and

waste valuable time.

C. Changes Required/Expected Benefits

The innovations of the project and their objectives are:

1. Classification

Career paths will replace occupational groups, broad bands will

replace grades, and Departmental broad-band standards will replace OPM

classification standards. The classification system will be automated

and classification authority will be delegated to line managers.

These changes are intended to simplify and speed up the

classification process, make the process more serviceable and

understandable, improve the effectiveness of classification decision-

making and accountability, and facilitate pay for performance. Broad

bands provide larger classification targets that can be defined by

shorter, simpler, and more understandable classification standards.

This simpler system will be easier to automate, will require fewer

resources to operate, and will facilitate delegation to line managers.

By providing broader and more flexible pay ranges for setting entry

pay, broad banding will provide hiring officials with an important tool

for attracting high-quality candidates and thus contribute to the

objective of increasing the quality of new hires.

By providing more flexible pay setting based on performance, broad

banding will give managers the ability to increase the pay of good

performers to higher and more competitive levels, thus improving the

retention of good performers. At the same time, the potential for

higher pay increases for good performance, supported by the broader pay

ranges of broad banding, will contribute to the objective of improving

organizational and individual performance.

2. Staffing

Staffing methods will include two that were implemented in the NIST

[[Page 67439]]

Demonstration Project and which are now available to all agencies

through examining authority delegated by OPM. For the sake of

simplification and to parallel the NIST Demonstration Project, they are

retained with the same titles under the Department of Commerce

Demonstration Project: Direct Examination and Agency-Based Staffing. In

addition, there will be placements under Merit Assignment and various

noncompetitive appointing authorities. OPM registers will not be used,

but positions in occupations covered by the Luevano Consent Decree

(Administrative Careers with America or successor programs) will be

filled using OPM guidance. Other supplemental staffing tools will

include such elements as paid advertising, flexible entry salaries,

probation, local authority for recruiting and retention payments, and

more flexible pay increases associated with promotion.

These changes are intended to attract high-quality candidates,

speed up the recruiting and examining process, increase the

effectiveness of the probationary review process, and increase the

retention of good performers.

Agency-based staffing, supported by paid advertising, will allow

hiring officials to focus on more relevant recruiting sources. Direct

examination will allow managers to hire individuals with shortage

skills as they find them, get them on board faster, and avoid the loss

of good candidates who may grow impatient with a long hiring process,

thus contributing to the objectives of increased quality of new hires

and better fit between position requirements and candidate skills.

The three-year probationary period will help ensure that scientists

and engineers who are retained beyond probation are capable of carrying

out the full cycle of research and development (R&D) work, thus

contributing to the objectives of high-quality hires and a high-

performing workforce. (See Section III(B)(10) Probationary Period.)

Local authority for recruiting and retention payments will provide

extra incentives for hiring and retaining individuals with shortage

skills, thus contributing to the objectives of increasing the quality

of new hires, improving the fit between position requirements and

individual qualifications, and improving the retention of good

performers.

3. Pay

The most important change in pay administration is the introduction

of pay for performance, which will govern individual pay progression

within bands. Funds currently applied to within-grade increases,

quality step increases, and promotions from one grade to a higher grade

when both grades are now in the same band, will be used instead to

grant performance-based pay increases within bands. The amount of the

basic pay and locality pay increases approved by Congress and the

President, however, will continue to be applied to pay schedules and to

the salaries of employees with a performance rating of Eligible. Other

pay tools are supervisory performance pay, flexible pay setting for new

hires, and more flexible pay setting upon promotion.

Pay for performance promotes fairness through the peer ranking

process and provides a motivational tool and a retention tool. As a

motivational tool, the promise of higher pay increases for good

performance encourages high achievement. As a retention tool, pay for

performance allows the organization to quickly move the salaries of

good performers to levels that are more competitive in the labor

market.

Supervisory performance pay provides an incentive for supervisors,

addressing the objective of improved individual and organizational

performance. Supervisory performance pay also addresses the objective

of improving retention by raising the pay of high-performing

supervisors to more competitive levels.

Flexible pay setting for new hires is a recruiting tool that gives

hiring officials greater flexibility to offer more competitive salaries

to high-quality candidates, addressing the objective of improving the

quality of new hires. The greater flexibility in setting pay upon

promotion gives managers another retention tool to help retain top

performers.

4. Performance Appraisal

The new system replaces the current five-level rating system with a

two-level rating system, using Unsatisfactory and Eligible labels.

(Unsatisfactory is equivalent to Unacceptable, as used in Part 430 of

Title 5, Code of Federal Regulations.) The most important feature of

the proposed performance appraisal system is that it is based on the

application of a weighted 100-point scoring system linked to pay for

performance. As in the current system, each employee has an individual

performance plan composed of several performance elements (all of which

are critical elements) that are measured with the 100-point scoring

system in conjunction with the application of benchmark performance

standards. Based on the resulting total scores, supervisors rank

employees by performance within peer groups and grant performance pay

increases according to the ranking. Highly ranked employees within a

peer group receive relatively high pay increases and lower ranked

employees receive relatively lower pay increases. Bonuses are granted

at the discretion of the supervisor following the performance appraisal

process.

The performance appraisal process is intended to (1) promote good

performance; (2) encourage a continuing dialogue between supervisors

and employees on organizational objectives, supervisory expectations,

employee performance, employee needs for assistance and guidance, and

employee development; and (3) provide a basis for performance-related

decisions in employee development, pay, rewards, assignment, promotion,

and retention. The system will more effectively communicate to

employees how they are performing in relation to their peers, the

rewards of good performance, and the consequences of poor performance.

Performance-based pay increases give an operating unit the ability

to raise the pay of good performers more rapidly, thus improving

retention of good performers. The potential for higher pay increases

for good performance will encourage achievement and promote the

objective of improved individual and organizational performance.

5. Performance Bonuses

In accordance with 5 CFR 451, at the end of the annual performance

period, Rating Officials, with the approval of Pay Pool Managers, will

have the opportunity to reward employee performance with bonuses up to

$10,000. Bonuses address two objectives. First, rewarding achievement

will make high achievers more likely to remain, thus improving

retention of the best performers. Second, the potential for bonuses for

achievement will encourage improved individual performance.

6. More Efficient Systems

The Department will improve the efficiency of human resource

systems by streamlining procedures, reducing paperwork, and automating

processes wherever possible.

7. Line Management Authority

Under the demonstration project, greater authority and

accountability will be delegated to line managers. This delegation is

intended to improve the effectiveness of human resources management by

strengthening the role of line managers as the human resources managers

of their units. The project will

[[Page 67440]]

be managed by the Departmental Personnel Management Board (DPMB).

Through the first cycle, the Board will be chaired by the Director of

the National Institute of Standards and Technology. Following that, one

of the Board members will assume the role of Chairman. Each major

operating unit will have its own Operating Personnel Management Board

(OPMB) to manage and oversee local operations. (See the section on

Project Management.)

D. Participating Organizations

The Department of Commerce encourages, serves, and promotes the

Nation's international trade, economic growth, and technological

advancement. Within this framework, and in the interest of promoting

the national interest through the encouragement of the competitive free

enterprise system, the Department provides a wide variety of programs,

some of which are included in the proposed coverage. The following

organizations will participate in the project:

Technology Administration (TA)

The Technology Administration, which oversees NIST and the National

Technical Information Service (NTIS), was established by Congress in

1988 as the premier technology agency working with U.S. industry in

improving competitiveness and increasing the impact of technology on

economic growth. The TA coverage would include only the Office of the

Under Secretary for Technology Administration and the Office of

Technology Policy. This coverage would be an opportunity to apply broad

banding principles to a policy, planning, and development environment

dealing with issues vital to the future of the U.S. economy as it is

affected by technology. TA offices in the proposed coverage are located

at the DoC headquarters building in Washington, D.C.

The key occupations are: General Administration, Management

Analyst, and General Business Specialist.

Bureau of Economic Analysis (BEA), Economics and Statistics

Administration

BEA is responsible for providing a current picture of the U.S.

economy through the preparation, development, and interpretation of the

national income and product accounts showing the gross domestic

product, business and other components of the national wealth accounts,

industrial market interrelationships traced by the input-output

accounts, and other accounts showing such economic indicators as

personal income, foreign investment, and balance of payments. The

bureau also develops surveys and other tools for analyzing and

forecasting economic developments. This coverage provides a test of the

NIST system in an environment that uses economists and accountants as

analysts, reporters, and forecasters. BEA is located at 1441 L Street,

N.W., Washington, D.C.

The economic analysis work of the organization is reflected in the

following key occupations: Economist, Accountant, Financial

Administrator, Computer Specialist, Statistician, and Statistical

Assistant.

Institute for Telecommunication Sciences (ITS), National

Telecommunications and Information Administration

ITS is a major component of the National Telecommunications and

Information Administration (NTIA). ITS is the principal Federal

telecommunications research and engineering laboratory. The Institute

conducts telecommunications research in support of NTIA's

responsibilities in advising the President on telecommunications and

information policy; developing U.S. plans and policies in international

forums; and developing policy for Federal use of the radio frequency

spectrum. This application will test how well the NIST interventions

work in a research and development (R&D) environment quite different

from the NIST environment. ITS is located in Boulder, Colorado.

The ITS R&D work is carried out primarily by Electronics Engineers,

with help from Mathematicians.

The remaining units are subunits of the National Oceanic and

Atmospheric Administration (NOAA):

Office of Oceanic and Atmospheric Research (OAR)

OAR is the primary research and development unit of NOAA. OAR

provides the science and technology to support improvements in NOAA

services and address current and future problems. OAR conducts research

programs in coastal, marine, atmospheric, and space sciences through

its own laboratories and offices, as well as through networks of

university-based programs. The work consists of research, modeling, and

environmental observations relating to weather, climate, and

environmental resources. The laboratory component of OAR is the

Environmental Research Laboratories (ERL). ERL includes research

laboratories in space environment, aeronomy, environmental technology,

weather forecast systems, climate monitoring and diagnostics, severe

storms, air resources, oceanography, and geophysical fluid dynamics.

This diversity provides a rich new R&D environment for the testing of

broad banding principles. OAR and ERL headquarters are located in

Silver Spring, Maryland. All ERL laboratories will be included in the

project, except the Great Lakes Environmental Research Laboratory (Ann

Arbor, MI), the Geophysical Fluid Dynamics Laboratory (Princeton, NJ),

and the Pacific Marine Environmental Laboratory (Seattle, WA). The

project laboratories are:

Aeronomy Laboratory--Boulder, CO

Atlantic Oceanographic and Meteorology Laboratory--Miami, FL; Silver

Spring, MD; San Diego, CA; Norfolk, VA; and Seattle, WA.

Air Resources Laboratory--Silver Spring, MD; Boulder, CO; Research

Triangle Park, NC; Oak Ridge, TN; Las Vegas, NV; and Idaho Falls, ID

Climate Diagnostic Center--Boulder, CO

Climate Monitoring and Diagnostics Laboratory--Boulder, CO; Hilo, HI;

Barrow, AK; Pago Pago, American Samoa; South Pole, Antarctica

Environmental Technology Laboratory--Boulder, CO Forecast Systems

Laboratory--Boulder, CO National Severe Storms Laboratory--Norman, OK

Space Environmental Laboratory--Boulder, CO

The dominant occupation within OAR is Meteorologist. Other key

occupations are Physical Scientist, Physicist, Electronics Engineer,

Computer Specialist, Electronics Technician, Physical Science

Technician, and Mathematician.

National Environmental Satellite, Data, and Information Service

(NESDIS)

NESDIS operates NOAA's satellites and ground facilities; collects,

processes, and distributes remotely sensed data; conducts studies,

plans new systems, and carries out the engineering required to develop

and implement new or modified satellite systems; carries out research

and development on satellite products and services; provides ocean data

management and services to researchers and other users; and acquires,

stores, and disseminates worldwide data related to solid earth

geophysics, solar-terrestrial physics, and marine geology and

geophysics. NESDIS provides both a technical operations environment and

a new R&D environment for testing the NIST interventions. NESDIS

headquarters and most of its offices are located in Suitland, Maryland.

Ground stations are located at Wallops Island, Virginia, and Fairbanks,

Alaska. The National Climatic Data Center is located

[[Page 67441]]

in Asheville, North Carolina. All of NESDIS will be included in the

project, except for the Wallops Island ground station.

The key occupations within NESDIS are Physical Scientist,

Meteorologist, Computer Specialist, Oceanographer, Physical Science

Technician, Meteorological Technician, Electronics Engineer,

Engineering Technician, Geophysicist, and Mathematician.

National Marine Fisheries Service (NMFS)

The mission of the National Marine Fisheries Service is the

stewardship of living marine resources for the benefit of the Nation

through their science-based conservation and management and promotion

of the health of their environment. NMFS supports domestic and

international conservation and management of living marine resources.

The goals of NMFS are to rebuild and maintain sustainable fisheries, to

promote the recovery of protected species, and to protect and maintain

the health of coastal marine habitats. NMFS brings in a variety of work

in the biological sciences never before addressed by broad banding

principles.

In addition to the headquarters office in Silver Spring, Maryland,

there are five regions, each of which consists of a Regional Office and

a Fisheries Science Center. The regional offices are located in the

following areas: Northeast (Gloucester, Massachusetts); Southeast (St.

Petersburg, Florida); Northwest (Seattle, Washington); Southwest (Long

Beach, California); and Alaska (Juneau). All the above units of NMFS

will be included in the project except for the following: in

Headquarters, the Office of Enforcement and the Inspection Services

Division; and in the regions, the Fisheries Science Centers located in

Woods Hole, Massachusetts; Miami, Florida; Seattle, Washington; La

Jolla, California; and the Alaska Center located in Seattle,

Washington.

NMFS is supported mainly by occupations in the biological sciences:

Fish Biologist, Biologist, Microbiologist, and Biology Technician.

Other important occupations are Chemist, Oceanographer, Wildlife

Biologist, Computer Specialist, and General Business Specialist.

E. Participating Employees

The project covers all positions that would otherwise be in the

General Schedule (GS) system. Wage Grade positions are not included.

Table 1 shows the total number of employees in each operating unit

to be covered by the project. Table 2 lists the occupational series in

which current positions are classified and shows the number of

employees in each series. The OPM occupational series will be retained.

The series are listed under the career path in which they will be

placed. (See Position Classification for definitions of the four career

paths.) Table 3 shows the number of covered employees in each series,

by General Schedule grade.

Table 1.--Number of Covered Employees by Unit

------------------------------------------------------------------------

Operating unit Number

------------------------------------------------------------------------

TA............................................ ........... 35

BEA, ESA...................................... ........... 414

ITS, NTIA..................................... ........... 82

NOAA.......................................... ........... 2114

OAR....................................... (640)

NESDIS.................................... (736)

NMFS...................................... (738)

-------------------------

Total................................. ........... 2645

------------------------------------------------------------------------

Table 2.--Occupational Series, by Career Path

------------------------------------------------------------------------

Series Title Number

------------------------------------------------------------------------

Scientific and Engineering (ZP) Career Path

------------------------------------------------------------------------

101............................. Social Scientist......... 2

110............................. Economist................ 247

184............................. Sociologist *............ 1

190............................. Anthropologist *......... 1

334............................. Computer Specialist...... 267

401............................. Biologist................ 51

403............................. Microbiologist........... 4

408............................. Ecologist *.............. 4

480............................. Fish Administrator *..... 43

482............................. Fish Biologist *......... 182

486............................. Wildlife Biologist *..... 2

499............................. Biological Science 1

Student.

701............................. Veterinary Medical 1

Officer *.

801............................. General Engineer......... 3

810............................. Civil Engineer........... 8

830............................. Mechanical Engineer...... 3

850............................. Electrical Engineer...... 1

854............................. Computer Engineer........ 2

855............................. Electronics Engineer..... 96

861............................. Aerospace Engineer *..... 1

899............................. Engineering Trainee...... 1

1301............................ Physical Scientist....... 198

1310............................ Physicist................ 71

1313............................ Geophysicist *........... 12

1315............................ Hydrologist *............ 1

[[Page 67442]]

1320............................ Chemist.................. 23

1330............................ Astronomer............... 8

1340............................ Meteorologist *.......... 226

1350............................ Geologist................ 2

1360............................ Oceanographer............ 77

1372............................ Geodesist................ 3

1382............................ Food Technologist *...... 2

1399............................ Physical Science Student. 1

1515............................ Operations Research 1

Analyst.

1520............................ Mathematician............ 24

1529............................ Mathematical Statistician 1

1530............................ Statistician............. 13

1550............................ Computer Scientist....... 7

------------

ZP.......................... Total.................... 1591

------------------------------------------------------------------------

Scientific and Engineering Technician (ZT) Career Path

------------------------------------------------------------------------

332............................. Computer Operator........ 3

392............................. Radio Frequency 2

Technician.

404............................. Biology Technician....... 9

802............................. Engineering Technician... 28

856............................. Electronics Technician... 22

1311............................ Physical Science 79

Technician.

1341............................ Meteorological Technician 41

*.

1531............................ Statistical Clerk/ 21

Assistant *.

------------

ZT.......................... Total.................... 205

------------------------------------------------------------------------

Administrative (ZA) Career Path

------------------------------------------------------------------------

130............................. Foreign Affairs 11

Specialist *.

131............................. International Relations 7

Specialist *.

260............................. Equal Employment 4

Specialist.

301............................. Miscellaneous 77

Administration.

340............................. Program Manager.......... 2

341............................. Administrative Officer... 22

342............................. Support Services 3

Specialist *.

343............................. Management Analyst....... 76

346............................. Logistics Management 2

Specialist *.

391............................. Telecommunications 1

Specialist.

501............................. Financial Administrator.. 10

510............................. Accountant............... 46

560............................. Budget Analyst........... 28

610............................. Nurse *.................. 1

696............................. Consumer Safety 1

Specialist *.

930............................. Appeals Officer *........ 2

1001............................ General Arts and 3

Information.

1035............................ Public Affairs Specialist 6

1082............................ Writer/Editor............ 14

1083............................ Technical Writer/Editor.. 4

1084............................ Visual Information 7

Specialist.

1101............................ General Business 72

Specialist.

1140............................ Trade Specialist......... 8

1165............................ Loan Specialist *........ 16

1410............................ Librarian................ 13

1412............................ Technical Information 5

Specialist.

1654............................ Printing Manager......... 1

1670............................ Equipment Specialist..... 1

1712............................ Training Instructor *.... 1

1750............................ Instructional Systems 1

Specialist *.

ZA.......................... Total.................... 445

Support (ZS) Career Path

------------------------------------------------------------------------

29.............................. Environmental Protection 1

Assistant *.

303............................. Miscellaneous Clerk/ 72

Assistant.

305............................. Mail and File Clerk...... 3

309............................. Correspondence Clerk/ 1

Assistant.

318............................. Secretary................ 190

322............................. Clerk-Typist............. 2

326............................. Office Automation Clerk/ 40

Assistant.

335............................. Computer Clerk/Assistant. 43

[[Page 67443]]

344............................. Management Clerk/ 5

Assistant.

399............................. Student Trainee.......... 8

525............................. Accounting Technician.... 8

561............................. Budget Clerk/Assistant... 3

963............................. Legal Instruments 9

Examiner *.

1087............................ Editorial Clerk/Assistant 1

1101............................ Trade Information/ 7

Financial Assistant *.

1105............................ Purchasing Agent......... 4

1411............................ Library Technician....... 4

2005............................ Supply Clerk/Assistant... 2

2102............................ Transportation Clerk/ 1

Assistant.

------------

ZS.......................... Total.................... 404

------------------------------------------------------------------------

* These occupations were not tested by the NIST project.

BILLING CODE 6325-01-P

[[Page 67444]]

[GRAPHIC] [TIFF OMITTED] TN24DE97.000

[[Page 67445]]

[GRAPHIC] [TIFF OMITTED] TN24DE97.001

[[Page 67446]]

[GRAPHIC] [TIFF OMITTED] TN24DE97.002

[[Page 67447]]

[GRAPHIC] [TIFF OMITTED] TN24DE97.003

BILLING CODE 6325-01-C

Senior Executive Service and ST-3104 Positions

The personnel systems for SES positions (see 5 U.S.C. 3131-3136 and

5 U.S.C. 5381-5385) will not change for the project. SES

classification, staffing, compensation, performance appraisal, awards,

and reduction-in-force will be based on standard SES methods. The

personnel systems for ST-3104 positions (see 5 U.S.C. 3104 and 5376)

will change only to the extent that ST-3104 positions are in the same

performance appraisal, awards, and reduction-in-force systems as

General Schedule positions. Classification, staffing, and compensation,

however, will not change. Neither SES nor ST-3104 employees will be

subject to the pro rata share payouts upon conversion to the

demonstration project. Pay adjustments for their positions under the

project will be carried out in accordance with existing Federal rules

pertaining to SES and ST-3104 pay adjustments.

General Schedule Positions

All General Schedule (GS and GM) positions are incorporated in the

new career path/pay band system. The within-grade increases of the

General Schedule will be replaced by the annual performance pay

increases. Except as otherwise provided in the project plan, laws and

regulations pertaining to GS employees (e.g., overtime pay and cost-of

living allowance provisions) continue in force for all project

employees in the same way as they do for GS employees.

F. Labor Participation

All unions affected by the project are local units of the American

Federation of Government Employees (AFGE). All of the AFGE

representation is within the National Oceanic and Atmospheric

Administration (NOAA). The following table shows the number of project

employees represented by each union local.

Table 4.--Bargaining Unit Coverage

----------------------------------------------------------------------------------------------------------------

Employees

Operating unit Location Union local covered

----------------------------------------------------------------------------------------------------------------

NESDIS............................. Camp Springs, MD........... AFGE 3680........................ 118

Asheville, NC.............. AFGE 146......................... 146

NMFS............................... Silver Spring, MD.......... AFGE 2703........................ 169

OAR................................ Research Triangle Park, NC. AFGE 3347........................ 39

----------------------------------------------------------------------------------------------------------------

The project operating units provided numerous briefings on the

project to employees and union representatives. Human resources

representatives traveled to the various organizational locations to

conduct three-hour information briefings. In addition, each bargaining

unit covered was invited to send a representative to Boulder, Colorado,

at management's cost to receive further information on the project and

to interact with a panel of NIST managers and employees currently in

the NIST project. The project operating units offered Impact and

Implementation Bargaining to each of these unions on the conditions and

provisions of the proposed project. All of the unions on the list have

agreed to the project.

G. Project Design/Methodology

The project methodology is to introduce into selected DoC operating

units certain innovations in human resources management, and to

evaluate over time the effects of those innovations on the ability of

the operating units to manage their human resources. The methodology

includes the following steps:

1. Selection of Innovations: After review of the innovations tested

at NIST, the Department has determined that all would have potential

benefit in other DoC units and therefore should be included in the

proposed project. These innovations, and the procedures associated with

them, are described below under Position Classification, Staffing,

Reduction-in-Force, Pay Administration, and Performance Evaluation and

Rewards.

2. Selection of Operating Units: The Department has selected

several operating units (See Participating

[[Page 67448]]

Organizations.) that will provide a useful test of whether the

innovations successfully tested at NIST will produce similarly

successful results in other environments.

3. Establishment of Goals and Objectives: The following section on

Goals and Objectives describes the overall goals of the project and the

objectives associated with each of the innovations.

4. Partnership: The Department has sought input on the proposal

from each affected local union. (See Labor Participation.) The

Department will also ensure that partnership in accordance with

Executive Order 12871 continues to be an integral part of planning and

implementation.

5. Baseline Evaluation: To provide a basis of comparison between

employee opinions of the current system and their future opinions of

the project system, each employee in the covered operating units will

be asked to complete an opinion questionnaire on the current system

prior to implementation of the project. To establish a baseline cost

analysis, each operating unit will be required to analyze its personnel

costs during fiscal years 1994, 1995, and 1996.

6. Training: The Department and the operating units will provide

training to human resources staff, managers, and employees prior to

implementation of the project and will provide additional training to

managers on the pay-for-performance system prior to the end of the

first performance cycle. (See Training.)

7. Implementation: To ensure a smooth implementation, the

Department and the operating units will emphasize top management

support; the development of detailed operating procedures prior to

implementation; thorough training of managers and human resources

office staff; step-by-step implementation planning; adequate backup

systems, particularly in automated personnel and payroll systems; and

sufficient operating resources.

8. Operation: The Department will exercise continual oversight,

under the direction of the Departmental Personnel Management Board (See

Project Management.) to ensure that project authorities and procedures

are administered correctly.

9. Evaluation: The Department will arrange for an annual evaluation

of the project under an OPM-approved evaluation plan. (See Project

Evaluation.) The evaluation will be designed to determine whether the

innovations are achieving the goals and objectives described in the

following sections and are operating within acceptable cost limits.

(See Budget Discipline.)

III. Personnel System Changes

A. Position Classification

1. Introduction

Career paths will replace occupational groups, broad bands will

replace grades, and Departmental broad-band standards will replace OPM

classification standards. The classification system will be automated,

and classification authority will be delegated to line managers.

These changes are intended to simplify and speed up the

classification process, make the process more serviceable and

understandable, improve the effectiveness of classification decision-

making and accountability, and facilitate pay for performance. Broad

bands provide larger classification targets that can be defined by

shorter, simpler, and more understandable classification standards.

This simpler system will be easier to automate, will require fewer

resources to operate, and will facilitate delegation to line managers.

By providing broader and more flexible pay ranges for setting entry

pay, broad banding will provide hiring officials with an important tool

for attracting high-quality candidates and thus will contribute to the

objectives of increasing the quality of new hires and improving

workforce performance.

By providing more flexible pay setting based on performance, broad

banding will give managers the ability to increase the pay of good

performers to higher and more competitive levels, thus improving the

retention of good performers. At the same time, the promise of higher

pay increases for good performance, supported by the broader pay ranges

of broad banding, will contribute to the objective of improving

organizational and individual performance.

2. Career Paths

A career path aggregates comparable occupations that have parallel

career patterns and are suitable for similar treatment in staffing,

classification, pay, and other personnel functions.

There are four career paths: (a) Scientific and Engineering (ZP):

two-grade interval professional technical positions in the physical,

engineering, biological, mathematical, computer and social science

occupations; and student trainee positions in these disciplines.

(b) Scientific and Engineering Technician (ZT): one-grade interval

positions support scientific and engineering activities through the

application of various skills and techniques in the electrical,

mechanical, physical science, biological, mathematical, and computer

fields; and student trainee fields.

(c) Administrative (ZA): two-grade interval positions in such

administrative and managerial fields as finance, procurement,

personnel, librarianship, public information and program and management

analysis; and student trainee positions in these fields.

(d) Support (ZS): one-grade interval positions that provide

administrative support through the application of typing, clerical,

secretarial, assistant, and similar knowledge and skills; positions

that provide specialized facilities support, such as guards and

firefighters; and student trainee positions in these areas.

3. Bands

Each career path is divided into five bands, which replace GS

grades. The maximum rate of a band is step 10 of the highest GS grade

in the band including locality rates in the 48 contiguous States and

the District of Columbia. When a special rate for an occupation in the

band is higher than the applicable locality rate, the Departmental

Personnel Management Board will have to use the maximum applicable

special rate to set the maximum rate of the band for specific

occupations in certain geographical areas. (See Pay Administration.)

For each regular band, there is a corresponding supervisory band for

employees who receive supervisory performance pay. The supervisory band

has the same minimum rate as the nonsupervisory band, but has a maximum

rate 6 percent higher than the maximum rate of the nonsupervisory band.

Positions in the supervisory band include positions that meet the DoC

Demonstration Project definition of ``supervisor''. (See Pay

Administration.) The following chart shows the four project career

paths, the bands in each career path, and the relationship between

bands and General Schedule grades.

BILLING CODE 6325-01-P

[[Page 67449]]

[GRAPHIC] [TIFF OMITTED] TN24DE97.004

BILLING CODE 6325-01-C

4. Occupational Series

The General Schedule occupational series will be retained. Existing

OPM occupational series may be added or deleted in response to

programmatic needs.

5. Classification Standards

Each classification standard will describe each band in two

factors: (1) general duties and responsibilities and (2) knowledge,

skills, and abilities. These two factors complement each other at each

band in a career path and may not be separated in classifying a

position. OPM classification standards will not be used.

6. Position Descriptions

Line managers will follow an automated menu-driven process to

classify positions and produce position descriptions.

7. Delegation of Classification Authority

The Operating Personnel Management Boards (OPMBs) will oversee the

delegation of classification authority to line managers. Under

authority delegated by the DPMB, the Department's human resources staff

will monitor and review classification decisions made by managers to

ensure consistent and uniform application of classification policies

and guidelines. Under this authority, the Department's Director for

Human Resources Management will establish a plan to review the accuracy

of classification decisions made by line managers and make periodic

reports to the DPMB. A variety of approaches will be used to conduct

classification reviews, such as regularly scheduled Departmental

oversight reviews as well as ad hoc reviews conducted to address

specific classification issues identified through data analysis, random

sampling of classification actions, project evaluation reports, etc.

The Governmentwide system of approval of SES and ST-3104 positions will

be maintained.

8. Classification Appeals

An employee covered by the DoC Demonstration Project may appeal the

career path (when the position is in a series that may be assigned to

more than one career path, e.g., GS-1101), occupational series, or pay

band of his or her position at any time. An employee wishing to

formally appeal must first appeal to the Operating Unit (OU). If the

employee is dissatisfied with the OU decision, he or she may appeal

further to the Department level (DPMB or designee). The decision of the

Department will be final.

Details pertaining to the classification appeals process are found

in the project operating procedures.

B. Staffing

1. Introduction

The project operating units will use a variety of staffing methods

to fill positions, including Direct Examination, Agency-Based Staffing,

Merit Assignment, and various noncompetitive placements. Recruiting and

examining will be carried out directly by the operating units except

for positions covered by the Luevano Consent Decree. OPM registers will

not be used. These methods will be supplemented by other staffing

tools, such as paid advertising, flexible entry salaries, probation,

recruitment and retention payments, and flexible pay increases

associated with promotion. The Department will make necessary

adjustments in response to future revisions in staffing statutes. These

changes are intended to attract higher quality candidates, speed up the

recruiting and examining process, increase the effectiveness of the

probationary review process, and improve the retention of good

performers.

[[Page 67450]]

Agency-based staffing, supported by paid advertising, will allow

hiring officials to focus on more relevant recruiting sources. Direct

examination will allow managers to hire individuals with shortage

skills as they find them, get them on board faster, and avoid the loss

of good candidates who may grow impatient with a long hiring process,

thus contributing to the objectives of increasing the quality of new

hires and improving the fit between position requirements and candidate

skills. The three-year probationary period will help ensure that

scientists and engineers who are retained beyond probation are capable

of carrying out a full cycle of R&D work, thus contributing to the

objectives of high-quality hires and a high-performing workforce (see

Section III(B)(10)). Local authority for recruiting and retention

payments will provide extra incentives for hiring and retaining

individuals with shortage skills, thus contributing to the objectives

of increasing the quality of new hires, improving the fit between

position requirements and individual qualifications, and improving the

retention of good performers.

2. Direct Examination

The project will apply two direct examination authorities: (a)

Direct Examination: Critical Shortage Occupations and (b) Direct

Examination: Critical Shortage Highly Qualified Candidates. These

vacancies will normally be filled through direct recruiting by

selecting officials, supplemented by a required search of the operating

unit Applicant Supply File. Direct examination procedures are not

exempt from the application of veteran preference rules.

(a) Direct Examination: Critical Shortage Occupations

Direct examination procedures will be used for categories of

occupations that require skills that are in short supply. Included in

this group are specific occupations in two categories listed in the

Project Operating Procedures: (1) some occupations for which there is a

special rate under the General Schedule pay system, and (2) some

occupations at Pay Band III and above in the ZP Career Path. Any

position in these shortage categories may be filled through direct

examination procedures.

(b) Direct Examination: Critical Shortage Highly Qualified Candidates

Direct examination procedures will be used for additional positions

for which there is a shortage of highly qualified candidates.

Candidates for positions at Band I or II of the ZP Career Path who have

a bachelor's degree with at least a 2.9 GPA (on a 4.0 scale) in a job-

related major or a master's degree in a job-related field constitute a

shortage category; candidates for positions at Band I of the ZT Career

Path who have at least a 2.9 GPA in a job-related field during a

minimum of at least 2 years in an accredited college, junior college,

or technical institute constitute a shortage category; and candidates

for positions at Band II of the ZT Career Path who have at least a 2.9

GPA in a job-related field in 4 years of college study constitute a

shortage category.

3. Agency-Based Staffing

Agency-based staffing procedures will be used to fill vacancies not

covered by direct examination or the project operating unit Merit

Assignment Plan (MAP). Vacancies filled by agency-based procedures will

be advertised at a minimum through the Governmentwide automated

employment information system operated by OPM.

4. Merit Assignment Plan (MAP)

MAP procedures will be used to fill positions restricted to current

or former Federal employees with competitive status. These plans will

be amended to include any demonstration project flexibilities.

5. Applicant Supply Files

The operating units will advertise the availability of job

opportunities in direct-examination occupations by continuous posting

of an Applicant Supply Bulletin (that conforms with the requirements of

5 U.S.C. 3327) on the Governmentwide automated employment information

system operated by OPM. The operating units will accept applications

for this file on an open-continuous basis for all direct-hire

authorities. Selecting officials will be able to recruit directly for

applicants, but any applicants they find must compete with applicants

who apply through the Applicant Supply Bulletin and other applicants

whose applications are stored in the operating unit Applicant Supply

File.

6. Referral Procedures for Direct Examination and Agency-Based Staffing

Authorities

Either direct referral or rating and ranking will be used to refer

applicants for vacancies under direct examination and agency-based

staffing authorities.

(a) Direct referral

A qualified candidate may be referred directly without rating and

ranking:

(1) When there are no more than three qualified candidates and no

preference eligibles; or

(2) If the candidate is a preference eligible with a compensable

Service-connected disability of 10 percent or more. (These preference

eligibles are given absolute preference except when the position is at

Band III or above in the Scientific and Engineering Career Path.)

Selecting officials may choose any of these preference eligibles when

more than one are referred.

(b) Rating and ranking

Rating and ranking (including veteran preference and ``rule-of-

three'' procedures) will be used when the list of qualified candidates

contains:

(1) More than three candidates; or

(2) Two or more candidates including at least one preference

eligible (except when direct referral of a 10-point veteran is made

under (a)(2) above).

7. Priority Placement

All Department of Commerce and OPM priority placement programs will

be followed.

8. Paid Advertising

Paid advertising may be used as one of the first steps in

recruitment without having to first try unpaid methods.

9. Private Sector Temporaries

Private sector temporary help services may be used as appropriate.

10. Probationary Period

Probation under the project will follow current law and

regulations, except for employees in the Scientific and Engineering

(ZP) Career Path performing research and development (R&D) work. ZP

employees performing R&D work will be required to serve a probationary

period of three years, except that a supervisor may end the

probationary period of a subordinate R&D employee at any time after one

year. Near the end of the first year of the R&D employee's probationary

period, the supervisor will be required to decide whether to: (1)

change the employee from probationary status to non-probationary

status; (2) remove the employee; or (3) continue the employee on

probation. If the employee is continued on probation, the supervisor

must select from the same options near the end of the second year of

probation. If probation is continued into the third year, the

supervisor must make a final decision on whether to retain or remove

the employee near the end of the third and final year of probation.

The purpose of the three-year probationary period for scientists

and engineers performing R&D work is to allow a hiring official to view

the full cycle of a research assignment before

[[Page 67451]]

making a final decision on retaining the employee. The one-year

probationary period is insufficient to cover the full cycle of research

and development from assignment of a research project to publication of

results. For other positions, the one-year probationary period is

adequate.

11. Qualification Standards

The qualifications required for placement within a band and within

a career path will be based on the OPM Qualification Standards for

General Schedule Positions, except that testing requirements will not

be used and the Superior Academic Criterion will be defined as a 2.9

GPA (on a 4.0 scale). The minimum qualifications for the occupation and

for the GS grade corresponding to the lowest grade in the band will

apply. The DPMB may authorize new or modified qualification standards

based on current practices in the scientific, engineering, and computer

science fields and to reflect modern curricula in recognized degree

programs.

12. Recruitment and Retention Payments

The project operating units may grant recruiting and retention

payments in appropriate circumstances, not to exceed $10,000 or 25

percent of basic pay, whichever is greater. Decisions on allowances

will be based on market factors such as salary comparability and salary

offer issues, relocation and dislocation issues, programmatic urgency,

emerging technologies, turnover rates, special qualifications, and

shortage categories or scarcity of positions unique to the operating

unit. All scientific, engineering, and other hard-to-fill positions

will be eligible. Recruitment and retention payments will not be

considered part of basic pay.

13. Travel Expenses

Travel and transportation expenses, advancement of funds, per diem

expenses incident to travel, and/or relocation expenses may be provided

to new hires in the same manner as is authorized in sections 5723,

5724, 5724a, 5724b, and 5724c of title 5, U.S. Code. Recipients must

sign service agreements indicating commitment to at least 12 months of

continued service.

14. Promotion

A promotion is a change of an employee to (1) a higher band in the

same career path, or (2) a band in another career path in combination

with an increase in pay. To be eligible for promotion, an employee must

have a current performance rating of Eligible. The time-in-band

requirement for promotion eligibility is 52 weeks, with two exceptions:

(1) an employee may be promoted from Band I to Band II in the Support

Career Path without time restriction; and (2) an employee may be

promoted from Band II to Band III in the Support Career Path without

time restriction if the employee was not promoted from a Band I to a

Band II position during the previous 52 weeks. (For pay provisions

related to promotion, see Pay Administration.)

C. Reduction-in-force

1. Introduction

The project operating units will follow reduction-in-force

procedures contained in law and regulation, except that career path

will be added to the definition of competitive areas, retention credit

for performance will be based on performance ranking, and grades will

be converted to bands for the purpose of interpreting reduction-in-

force regulations.

The objective of the link between career paths and competitive

areas is to improve the fit between the skills of displaced employees

and the positions they are offered through reduction-in-force

procedures. The objective of the link between performance and retention

standing is to continue to make performance a factor in retention

during reduction-in-force.

2. Competitive Areas

Each of the four career paths in each project operating unit local

commuting area will be a separate competitive area--separate from the

other career paths and separate from the competitive areas of other

operating unit employees.

3. Link Between Performance and Retention

An employee with an overall performance score in the top 20 percent

of scores within a career path in a pay pool (See Performance

Evaluation and Rewards below.) will be credited with 10 additional

years of service for retention purposes. The total credit will be based

on the employee's three most recent annual performance scores received

during the 4-year period prior to an established cutoff date, for a

potential total credit of 30 years. Career status and veteran

preference will continue to have the same effect on retention standing

as they now have under current regulations. No performance-related

retention credit will convert to this system from any other performance

appraisal system.

4. Link Between Bands and Grades

OPM reduction-in-force regulations on assignment rights (5 CFR

351.701) will be applied to the project by substituting ``one band''

for ``three grades'' and ``two bands'' for ``five grades.''

D. Pay Administration

1. Introduction

The most important change in pay administration is the introduction

of pay for performance, which will govern individual pay progression

within bands. The amount of the basic pay and locality pay increases

approved by Congress and the President will continue to be applied to

pay schedules and employee salaries, with the variations described

below. Other pay tools are supervisory performance pay, flexible pay

setting for new hires, and more flexible pay setting upon promotion.

Pay for performance promotes fairness and provides a motivational

tool and a retention tool. It is fair that higher achievement should

produce higher rewards. In particular, the quality work that arises

from a commitment to the goals and objectives of the organization

should be rewarded by higher pay increases. As a motivational tool, the

promise of higher pay increases for good performance encourages high

achievement. As a retention tool, pay for performance allows the

organization to more quickly move the salaries of good performers to

levels that are more competitive in the labor market.

Supervisory performance pay provides an extra performance incentive

for supervisors, addressing the objective of improved individual and

organizational performance. Supervisory performance pay also addresses

the objective of improving retention by raising the pay of high-

performing supervisors to more competitive levels. Flexible pay setting

for new hires is a recruiting tool that gives hiring officials greater

flexibility to offer more competitive salaries to high-quality

candidates, addressing the objective of improving the quality of new

hires. The greater flexibility in setting pay upon promotion gives

managers another retention tool to help retain top performers.

2. Pay for Performance

Pay for performance has three components: (a) the annual adjustment

to basic pay, which includes the annual general increase and the

locality pay increase; (b) annual performance pay increases; and (c)

bonuses. The first component, the annual adjustment to

[[Page 67452]]

basic pay, is set according to the subsections referring to general and

locality increases. The second component, performance pay increases, is

set according to the procedures under Performance Evaluation and

Rewards. The third component, bonuses, is managed in accordance with

the subsection on Performance Bonuses under Performance Evaluation and

Rewards.

3. Placement in a Lower Band

An employee whose performance rating is Unsatisfactory does not

receive the annual adjustment to basic pay. Because the minimum pay

rate for each band is increased each year by the amount of the annual

adjustment to basic pay, it is possible that the new minimum rate of a

band will exceed the basic pay of an employee in that band who does not

receive the annual adjustment to basic pay due to unsatisfactory

performance. When this happens, the employee is placed in the next

lower band. This placement shall not be considered an adverse action

under 5 U.S.C. 7512, nor shall grade (i.e., band) retention under 5

U.S.C. 5362 be applicable.

4. Supervisory Performance Pay

Employees who meet the demonstration project definition of

``supervisor'' will be eligible for supervisory performance pay.

Positions that require incumbents to spend 25 percent or more of their

time performing all of the following duties will be titled

``supervisory'' for classification and other official purposes and will

be eligible for supervisory performance pay.

1. Assign and review work daily, weekly, or monthly;

2. Assure that production and accuracy requirements are met;

3. Approve leave;

4. Evaluate work performance of subordinates; and

5. Exercise at least four of the following authorities and

responsibilities: (a) plan work to be accomplished by subordinates, set

and adjust short-term priorities, and prepare schedules for completion

of work; (b) assign work to subordinates based on priorities, selective

consideration of the difficulty and requirements of assignments, and

the capabilities of employees; (c) give advice, counsel, or instruction

to employees on both work and administrative matters; (d) interview

candidates for positions in the unit and recommend appointment,

promotion, or reassignment to such positions; (e) hear and resolve

complaints from employees, referring group grievances and more serious

unresolved complaints to a higher level supervisor or manager; (f)

effect minor disciplinary measures, such as warnings and reprimands,

recommending other action in more serious cases; (g) identify

developmental and training needs of employees, providing or arranging

for needed development and training; (h) find ways to improve

production or increase the quality of the work developed; and (i)

develop performance standards.

Supervisory performance pay will be considered a part of basic pay.

Upon conversion to the project, all eligible supervisory positions will

be placed in the supervisory bands. The incumbents of these positions

will be converted at their basic pay (including special rates or

locality pay) at the time of conversion. New hires into supervisory

positions after the date of conversion will have their pay set at the

supervisor's discretion within the pay range of the applicable

supervisory band.

Supervisors in all career paths will be eligible for salaries up to

6 percent higher than the maximum rate of their pay bands. The amount

by which a supervisor's pay exceeds the maximum rate of the band

constitutes supervisory performance pay. The higher salaries shall be

reached through performance pay increases granted through the regular

performance appraisal cycle.

The payment of supervisory performance pay is not considered a

promotion or a competitive action. Supervisory performance pay will be

canceled when an employee's supervisory responsibilities are

discontinued. The cancellation of supervisory pay does not constitute

an adverse action, and there is no right of appeal under 5 U.S.C.

Chapter 75. Pay retention under 5 U.S.C. 5363 is not applicable. Before

entering a supervisory position, an employee will be required to sign a

statement certifying that the employee understands that the supervisory

pay will be canceled when the employee ceases to be a supervisor.

5. Pay and Compensation Ceilings

The maximum rate for a band (excluding special bands established to

allow for supervisory performance pay) will be equal to the maximum

rate-- GS rate, locality rate, or special rate, as applicable--payable

to GS employees for the grades corresponding to the band. An employee's

basic pay may not exceed the maximum rate of the employee's band

(including a supervisory band), except for employees receiving retained

rates of pay.

An employee's rate of basic pay payable under any pay band may not

exceed the rate of basic pay payable for Level IV of the Executive

Schedule. An employee's aggregate monetary compensation for a calendar

year may not exceed the basic rate of pay for Level I of the Executive

Schedule, as required by 5 U.S.C. 5307 and OPM regulations in Subpart B

of 5 CFR 530.

6. Locality Pay

Locality pay is implemented as basic pay for all purposes except as

otherwise provided in this plan. The locality adjustment will be

applied to the minimum and maximum rates of each band, as applicable.

For bands affected by special rates, the maximum rate will be the

higher of the special rate or the locality rate. A locality adjustment

may be applied to an eligible employee's basic pay only to the extent

that it does not cause the employee's basic pay to exceed the maximum

rate of the band.

7. Special Salary Rates

When appropriate, special salary rates will be used to determine

employees' maximum pay rates in lieu of the normal pay band ceilings.

The provisions of current regulations (5 CFR 530.303) will be followed

to determine the appropriateness of special salary rates. As provided

for under these regulations, special salary rates will be restricted to

occupations and/or geographic locations for which there is an existing

or likely difficulty in the recruitment or retention of well-qualified

personnel.

8. Effect of General and Locality Pay Increases on Bands

The minimum and maximum rates of each band will be increased at the

time of a general pay increase under 5 U.S.C. 5303 and/or a locality

pay increase under 5 U.S.C. 5304 or 5304a so that they equal the new

locality-adjusted minimum and maximum rates of the grades corresponding

to the band. The maximum rates of bands set according to special rates,

however, may exceed this amount to the extent necessary to equal the

10th step of the appropriate special rate scale if that rate is higher.

9. Effect of General and Locality Pay Increases on Individual Pay

Only employees with a current annual performance rating of record

of Eligible may receive an increase in their basic pay at the time of

band adjustments. This increase in basic pay will reflect any

applicable general and/or locality pay increase for General Schedule

employees. The increase in basic pay for eligible employees whose basic

pay is at

[[Page 67453]]

the ceiling of their band will equal the increase in the ceiling.

The basic pay increase for eligible employees whose basic pay is

below the ceiling of their band will be calculated by applying two

factors to the employee's rate of pay. One factor is the general

increase factor representing the increase in General Schedule rates

under 5 U.S.C. 5303 (e.g., 1.02 if the general increase is 2 percent).

The second factor is the locality pay increase factor, which is derived

by dividing the newly applicable locality pay percentage factor by the

formerly applicable locality pay percentage factor. (For example, if

the locality payment percentage for an area increased from 4.23 percent

to 5.48 percent, the locality pay increase factor would be 1.0548

divided by 1.0423, or approximately 1.012.) Thus, the new rate of basic

pay would be calculated using the following formula:

[GRAPHIC] [TIFF OMITTED] TN24DE97.005

However, a basic pay increase will be applied only to the extent that

it does not cause an employee's basic pay to exceed the ceiling of the

applicable band.

10. Basic Pay

Employees covered by the project will not have separate basic pay

rates and locality pay rates, as do General Schedule employees. Project

basic pay rates will be basic pay for all purposes, except as

specifically provided in the demonstration project plan.

11. Pay Setting Upon Promotion

The new basic pay rate upon promotion may be set at any level in

the new band (If the move is to a different career path, any band in

the new career path would be considered a ``new band.''), except that

the minimum pay increase upon promotion is 6 percent. OPMBs will

establish operating unit guidelines and delegate approval authority for

setting pay levels for promotions.

12. Pay Setting for New Hires

The setting of initial salaries within bands for new appointees

will be flexible, particularly for hard-to-fill positions in the

Scientific and Engineering Career Path. OPMBs will establish operating

unit guidelines and delegate approval authority for setting pay levels

for new hires.

13. Conversion of Employees From the General Schedule to the

Demonstration Project

For employees being converted from the GS pay system to the

demonstration project, GS grades will translate directly to the

project's career path and band structure. Employees will be converted

at their current highest rate under the GS pay system (i.e., highest of

locality rate or special rate or similar rate) at the time of

conversion. No one's salary will be reduced as a result of the

conversion. When conversion of an employee into the project is

accompanied by a geographic move, the employee's GS pay entitlements

(including any locality rate or special rate) in the new area will be

determined before converting the employee's pay to the demonstration

project pay system.

At the time of conversion, each converted employee will be given a

lump-sum cash payment for the time credited to the employee toward what

would have been the employee's next within-grade increase. The payment

for a General Schedule employee will be computed by (1) calculating the

ratio of (a) the number of days the employee will have spent in the

employee's current rate through the day prior to the day of conversion,

to (b) the total number of days in the employee's current waiting

period for a regular within-grade increase (364, 728, or 1092 days),

and (2) multiplying that ratio by the dollar value of the employee's

next within-grade increase, as in effect at the time of conversion.

14. Movement of GS Employees From Other Organizations to the

Demonstration Project

GS employees can move into the project from other organizations

through transfer, reassignment, promotion, or new appointment. When the

movement is by lateral transfer or lateral reassignment, the employee's

GS grade will translate directly to the project's career path/band

structure, and the employee's rate of basic pay under the demonstration

project will equal his or her current highest rate under the GS pay

system (i.e., highest of locality rate or special rate or similar

rate). When a lateral transfer or lateral reassignment is accompanied

by a geographic move, the employee's GS pay entitlements (including any

locality rate or special rate) in the new area will be determined

before converting the employee's pay to the demonstration project pay

system. When the movement is by new appointment, promotion,

reassignment with pay adjustment (through merit assignment plan

competition), or transfer to ``higher grade'' (i.e., to a band higher

than the band that corresponds to the employee's current GS grade), the

new pay rate is set according to project pay setting flexibilities for

new hires and promotions.

15. Pay Setting Upon Movement of an Employee to a Different Pay Area

Employees who move (voluntarily or involuntarily) from one

geographic area to another within their operating unit will have their

pay adjusted to account for any change in the band maximum rates

between the two areas. This adjustment ensures that the employee's

relative position in the band (measured as a percentage of the band

maximum rate) will be maintained upon movement. The pay rate in the new

area will be derived using the following formula:

[GRAPHIC] [TIFF OMITTED] TN24DE97.006

The new pay rate is calculated before any other simultaneous pay

action (e.g., general pay adjustment or promotion effective on the same

date). Any reduction in pay solely attributable to a movement from one

pay area to a lower-paying area shall not be considered a reduction in

basic pay under the adverse action provisions of 5 U.S.C. 7512(4) or

under the pay retention provisions of 5 U.S.C. 5363. (The employee

retains the right to grieve or file a complaint regarding a geographic

reassignment if there is an allegation of

[[Page 67454]]

a violation of nondiscrimination statutes or a prohibited personnel

practice.)

16. Severance Pay

OPM severance pay regulations (5 CFR 550.703) will be applied to

the project by substituting ``one band'' for ``two grades'' and ``two

grades or pay levels.''

17. Grade and Pay Retention

Grade and pay retention will follow current law and regulations,

except as allowed by specific waiver (e.g., ``career path and band''

for ``grade''). Specific waivers are listed in the section entitled,

Authorities and Waiver of Laws and Regulations Required.

E. Performance Evaluation and Rewards

1. Introduction

The most important feature of the performance evaluation system is

that it is based on the application of a weighted 100-point scoring

system in support of pay for performance. As in the current system,

each employee has an individual performance plan composed of several

performance elements. Through application of benchmark performance

standards and a 100-point scoring system, supervisors rank employees by

performance within peer groups and grant performance pay increases

according to the ranking. Highly ranked employees within a peer group

receive relatively high pay increases and lower ranked employees

receive relatively lower pay increases.

The performance appraisal process is intended to (1) promote good

performance; (2) encourage a continuing dialogue between supervisors

and employees on organizational objectives, supervisory expectations,

employee performance, employee needs for assistance and guidance, and

employee development; and (3) provide a basis for performance-related

decisions in employee development, pay, rewards, assignment, promotion,

and retention. The system will more effectively communicate to

employees how they are performing in relation to their peers, the

rewards for good performance, and the consequences of poor performance.

Performance-based pay increases give an operating unit the ability

to raise the pay of good performers more rapidly, thus improving

retention of good performers. The promise of higher pay increases for

good performance will encourage achievement and promote the objective

of improved individual and organizational performance.

2. Coverage

All employees covered by the project will be covered by the project

performance evaluation and rewards system, except that the Departmental

Personnel Management Board may remove from the system any position not

filled by career or career conditional appointment. ST-3104 employees

will have their performance evaluated under the structure of the

performance evaluation system and may receive bonuses, but do not

receive performance pay increases. Members of the Senior Executive

Service will remain under the non-demonstration DoC SES performance

appraisal, pay, and bonus system.

Upon conversion to the demonstration project, any administrative

action already initiated under a previous appraisal program will

continue to be processed in accordance with the requirements and

procedures of the program in effect when the action was initiated.

3. Performance Cycle

The performance year begins October 1 and ends September 30. The

stages of the performance cycle are performance planning, performance

review, performance appraisal, and performance-related decisions.

4. Performance Plans

Performance plans will be developed each year by supervisors with

input from employees. Critical performance elements will be established

for each position. (All elements are critical.) The supervisor weights

each element so that the total weight of all elements is 100 points.

Benchmark performance standards define the range of performance. A

supervisor may add supplemental standards to a performance plan to

further elaborate on the benchmark performance standards.

5. Mid-Year Review

A required mid-year review addresses mid-year accomplishments,

performance successes and deficiencies, and any need for performance

plan modifications. Additional reviews may be held as needed.

6. Performance Appraisal

Performance appraisals bring supervisors and employees together to

discuss performance and accomplishments during the performance year.

The appraisals lead to decisions by supervisors and Pay Pool Managers

on performance scores, performance ratings, performance pay increases,

and bonuses. Performance appraisal is scheduled for the final weeks of

the performance year. However, at any time of the year, a supervisor

may determine that an employee's performance is not satisfactory on one

or more critical elements and place the employee on a Performance

Improvement Plan.

7. Performance Ratings

The demonstration project performance ratings of record are

Eligible (for performance pay increase, bonus, and annual adjustment to

basic pay) and Unsatisfactory. The Eligible rating of record covers the

same performance range as the former ratings of Marginal, Fully

Successful, Commendable, and Outstanding. Unsatisfactory covers the

same performance range as the former ratings of Unsatisfactory and

Unacceptable. An employee whose performance is not satisfactory is

placed on a performance improvement plan and given an opportunity to

improve before a final rating of record is assigned.

8. Performance Scores

Each element is evaluated individually against the benchmark

performance standards and any supplemental standards. If a single

element in an employee's plan is rated Unsatisfactory, the rating of

record is Unsatisfactory and there is no performance score. If all

elements meet at least the minimally acceptable benchmark, the rating

of record is Eligible. Rating Officials score the performance of

employees rated Eligible on a 100-point scale, which corresponds to the

100-point element weighted scale. An individual element score may be as

high as the weight of that element. The total performance score is the

sum of the element scores. A perfect score on each element would

produce a total score of 100 points.

9. Performance Ranking

Employees are ranked, by performance score, within a peer group. A

peer group may involve no more than one career path, but may be

otherwise organized by any combination of organization, occupation,

band, or appointment type. Rating Officials rank their own employees,

then Pay Pool Managers interleave the rankings of subordinate Rating

Officials to produce peer group rankings at the pay pool level. A Pay

Pool Manager is a line manager who manages his or her organization's

pay increase and bonus funds and has final decision authority over the

performance scores, performance pay increases, and bonuses of

subordinate employees.

10. Performance Pay Decisions

The Performance Pay Table divides each band into three segments or

[[Page 67455]]

intervals. Each interval is linked to a range of potential percentage

pay increases beginning at zero and progressing to a maximum percentage

pay increase. The maximum performance pay increase an employee may

receive, therefore, depends on the interval into which the employee's

salary falls. The Pay Pool Manager makes a performance pay decision for

each employee in a peer group, based on the Pay Pool Manager's ranking

and the pay increase ranges in the Performance Pay Table. Within a peer

group, an employee may not receive a higher proportion-of-range than a

higher-ranking employee or a lower proportion-of-range than a lower-

ranking employee. Proportion-of-range is the percentage of the maximum

pay increase allowed for a particular interval of a pay band, i.e., a

percent of a percent. For example, if the pay increase range for the

pay interval is 0-12 percent, and the employee receives a 9 percent

increase, that employee receives a proportion-of-range that equals 75

percent of the maximum 12 percent.

11. Performance Bonuses

Bonuses are the only cash awards directly linked to the project

performance appraisal system, and are awarded at the end of the

performance year in conjunction with decisions on performance pay

increases. A Pay Pool Manager may award a bonus to any employee with an

Eligible rating. The OPMBs will determine the bonus authority to be

delegated to their pay pool managers.

Bonuses address two objectives. First, the ability to reward the

accomplishments of good performers will make them more likely to

remain, thus improving the retention of high achievers. Second, the

promise of bonuses for achievement will encourage improved individual

performance.

12. Action Based on Unsatisfactory Performance

If, after an opportunity to improve, an employee's performance is

still not satisfactory, the operating unit will give a rating of

Unsatisfactory and must take action to reassign or remove the employee,

or place the employee in a lower band, in accordance with performance

action provisions in law and regulation.

IV. Conversion or Movement From a Project Position to a General

Schedule Position

If a DoC Demonstration Project employee moves to a General Schedule

position, the following procedures will be used to convert the

employee's project pay band to an equivalent GS grade and the

employee's project rate of pay to an equivalent GS rate of pay. The

converted GS grade and rates of pay must be determined before movement

out of the project and any accompanying geographic movement, promotion,

or other simultaneous action. For lateral reassignments and lateral

transfers, the converted GS grade and rates of pay will become the

employee's actual GS grade and rates of pay, unless immediately

affected by a simultaneous geographic movement or another pay action.

For non-lateral transfers, promotions, and other actions, the converted

GS grade and rates of pay will be deemed to be the employee's grade and

rates of pay at the time of movement out of the project and will be

used in applying applicable pay setting rules (e.g., promotion rules.)

A. Grade-Setting Provisions

An employee in a band corresponding to a single GS grade is

converted to that grade. An employee in a band corresponding to two or

more grades is converted to one of those grades according to the

following rules:

1. The employee's project basic rate of pay is compared with step 4

rates in the highest applicable GS rate range (including a rate range

in the GS base schedule, a rate range in the applicable locality rate

schedule, or a rate range in a special rate schedule for the employee's

occupation). If the series is a two-grade interval series, only odd-

numbered grades are considered below GS-11.

2. If the employee's pay rate equals or exceeds the applicable step

4 rate of the highest GS grade in the band, the employee is converted

to that grade.

3. If the employee's pay rate is lower than the applicable step 4

rate of the highest grade, the pay rate is compared with the step 4

rate of the second highest grade in the employee's band. If the

employee's pay rate equals or exceeds step 4 of the second highest

grade, the employee is converted to that grade.

4. This process is repeated for each successively lower grade in

the band until a grade is found in which the employee's rate of basic

pay equals or exceeds the applicable step 4 rate of the grade. The

employee is then converted at that grade. If the employee's rate of pay

is below the step 4 rate of the lowest grade in the band, the employee

is converted to the lowest grade.

5. Exceptions: (1) If the employee's pay rate exceeds the maximum

rate of the grade assigned under the above-described ``step 4'' rule

but fits in the rate range for the next higher applicable grade in the

band (i.e., between step 1 and step 4), then the employee shall be

converted to that next higher applicable grade; (2) An employee will

not be converted to a lower grade than the grade held by the employee

immediately preceding a conversion, lateral reassignment, or lateral

transfer in the project unless since that time the employee has

undergone a reduction in band; (3) In Band I of the ZP and ZA Career

Paths, students without a bachelor's degree or comparable experience

are converted no higher than GS-4.

B. Pay-Setting Provisions

An employee's pay within the converted GS grade is set by

converting the project rate to GS pay rates in accordance with the

following rules:

1. The pay conversion is done before any geographic movement or

other pay-related action that coincides with the employee's movement

out of the demonstration project.

2. An employee's project rate is converted to a rate on the highest

applicable rate range for the converted GS grade (including a rate

range in the GS base schedule, a rate range in the applicable locality

rate schedule, or a rate range in a special rate schedule for the

employee's occupation).

3. If the highest applicable rate range is a locality pay rate

range, the project rate is converted to a GS locality rate of pay. If

this rate falls between two steps in the locality-adjusted schedule,

the rate must be set at the higher step. The converted GS rate of basic

pay is the GS base rate corresponding to the converted GS locality rate

(i.e., same step position). (If this employee is also covered by a

special rate schedule as a GS employee, the converted special rate will

be determined based on the GS step position. This underlying special

rate will be basic pay for certain purposes for which the employee's

higher locality rate is not basic pay.)

4. If the highest applicable rate range is a special rate range,

the project rate is converted to a special rate. If this rate falls

between two steps in the special rate schedule, the rate must be set at

the higher step. The converted GS rate of basic pay will be the GS rate

corresponding to the converted special rate (i.e., same step position).

5. Exception: If an employee's project rate exceeds the maximum

rate of the highest applicable rate range upon conversion to the

General Schedule, the affected employee's project rate will be

converted to a retained rate under 5 U.S.C. 5363. If an employee is

entitled to a special rate under the General Schedule, the project rate

is converted

[[Page 67456]]

directly to a retained rate. If an employee is only entitled to

locality pay under the General Schedule, the retained rate is derived

by dividing the project rate by the applicable locality pay factor

(i.e., 1 plus the locality payment percentage). Thus, the locality-

adjusted retained rate will equal the project rate the employee had

been receiving before conversion. Since the employee's total rate of

pay is not reduced upon conversion, this change to converted rates

under the General Schedule will not be considered a reduction in basic

pay under 5 U.S.C. 5363 or 7512.

6. After conversion or movement out of the demonstration project,

an employee's converted GS rates will be used in applying GS pay

administration rules, as necessary, in lieu of using his or her

demonstration project rate. Thus, for example, the converted GS rate of

basic pay (or converted special rate, if applicable) will be used in

applying GS rules for promotions, maximum payable rate determinations,

and pay retention, as appropriate. For conversions upon termination of

the project and for lateral reassignments, the converted GS rates will

become the employee's GS rates immediately after movement out of the

demonstration project (before processing any accompanying geographic

move).

C. Equivalent Increase Determination

Service under the demonstration project is creditable for within-

grade increase purposes upon conversion back to the GS pay system.

Performance pay increases (including a zero increase) under the

demonstration project are equivalent increases for the purpose of

determining the commencement of a within-grade increase waiting period

under 5 CFR 531.405(b).

V. Budget Discipline

Each project operating unit will maintain compensation during the

project at the level it would have reached under the current system.

Current costs will be reallocated to cover project costs. To ensure

appropriate carryover of costs from pre-project to project years, a

base assessment will be made using three base years: Fiscal Years 1994,

1995, and 1996. Budget discipline will be required and achieved by

imposing specific funding principles (described in detail in the

section on Funding Pools for Performance Pay Increases and Bonuses).

Finally, both longitudinal and site comparisons will be used to ensure

that spending remains within acceptable limits.

A. Reprogramming Costs

The following actions and their costs will be eliminated by the new

system:

1. Promotions from one grade to a higher grade where both grades

are now in the same broad band. For example, because Band III of both

the ZP and ZA career paths will cover the same pay range as current

grades GS-11 and GS-12, there will be no more promotions from GS-11 to

GS-12.

2. Regularly scheduled Within-Grade Increases and Quality Step

Increases. There are no steps in the broad band system. These actions

will be eliminated.

3. Cash awards related to the performance appraisal cycle. (These

funds will be applied to bonus pools only--not to pay pools).

The cost savings from eliminating these actions will be used to

finance the following new actions:

--Performance-based pay increases within bands, including the ability

to increase the pay of supervisors, through performance-based pay

increases, to a higher level than under the current system. There is no

guaranteed performance pay increase in the proposed system, however,

for Eligible performance; and

--Performance bonuses.

B. Base Cost Assessment

In order to determine whether project costs are being maintained at

acceptable levels, a base assessment of pre-project costs will be

needed. Costs will be computed as annual averages over three pre-

project years: Fiscal Years 1994, 1995, and 1996. The costs of all

personnel actions of types that are being replaced by project systems

will be totaled and averaged.

C. Funding Pools for Performance Pay Increases and Bonuses

The results of the base cost assessment will provide a basis for:

(1) setting maximum spending limits; and (2) constructing performance

pay increase and bonus funding pools by organization, career path,

band, and salary. Performance pay pools for project employees will be

subject to the same budgetary constraints and reductions imposed on

other Department funding allocations. Neither allocations nor

authorizations convey funding. Therefore, managers will be required to

make payout decisions tied to their individual budgets, within

allocations. The following principles will be observed:

1. In terms of career paths and bands, costs will be kept for the

most part where they are found in the base assessment. That is, base

costs for promotions, within-grade increases, and cash awards in a

particular band and career path will form the basis for project

spending in the same band and career path.

2. Formulas will be devised to authorize pay increase and bonus

pools up to the limits calculated from base-year spending. For each

pool, the authorized spending ceiling will depend on the number of

employees in the pool by career path, band, and salary.

3. No allocation will be placed in performance pay increase pools

for employees who are not eligible for a performance pay increase, such

as those who have insufficient time in the position to be rated and

those whose salaries are at the ceilings of their bands. No money will

be placed in bonus pools for employees not eligible for a bonus, such

as those not eligible for a performance rating or who are not on the

payroll the last day of the performance cycle.

4. The potential size of performance pay increases will be

relatively high for employees whose salaries are near the minimum rate

of the band and relatively low for those whose salaries are near the

maximum rate of the band. This arrangement imposes a reduced rate of

salary increases as an individual advances in the band, similar to the

reduced rate of within-grade increases in a General Schedule grade

imposed by the one-year, two-year, and three-year waiting periods.

5. There will be no guaranteed performance pay increase in the

proposed system. An employee with an Eligible performance rating may,

if ranked at or near the bottom of a peer group, get no performance pay

increase.

6. Although Pay Pool Managers will not be allowed, under normal

circumstances, to exceed their allocated pay increase and bonus pools,

they will be allowed to spend less than the full amounts of their

pools.

7. Funds previously used to pay cash awards will be applied to

bonus pools only--not to performance pay pools.

D. Budget Monitoring

These procedures permit changes in operating unit expenditures

which result from legislatively mandated program changes and changes in

Federal pay and benefits. The operating units may offset selected

salary increases with savings by reducing turnover, eliminating

unnecessary overhead, and cutting other personnel costs.

The operating units will measure their adherence to cost control by

preparing budget estimates based on prescribed Federal budget processes

and

[[Page 67457]]

monitoring actual spending under the project against these budget

estimates. Two cost comparisons will be used:

1. Longitudinal Comparisons

a. Project costs will be calculated on an established schedule.

b. Costs will be compared against the spending limits calculated

from the base years to ensure that budget limitations are not being

exceeded.

c. Each year, the funding of the performance pay increase and bonus

pools will be used as an opportunity to ``balance the books.'' That is,

the funding of the pools will be limited to the amount that is judged

to maintain budget discipline.

2. Site Comparisons

a. A number of non-project units will be selected from within the

Department to serve as comparison sites. The comparison sites will be

selected to reflect, as nearly as possible, the missions and workforces

of the project units.

b. Periodically, the rate of increase in salaries in the project

units will be compared to the rate of increase in salaries in the

comparison units.

c. When it is found that salaries in project units are outpacing

salaries in comparison units, and the differences cannot be explained

by non-project variables, appropriate adjustments will be made in

project funding.

VI. Project Evaluation

The Department will arrange for annual evaluations of the project

under an OPM-approved evaluation plan. The evaluation will be designed

to determine whether the interventions are achieving the goals and

objectives of the project within acceptable cost limits. (See Costs.)

The following table lays out the project evaluation model,

beginning with and flowing from the objectives that the project is

designed to achieve. The Objectives column and the Interventions column

together serve as the project hypotheses; i.e., the hypotheses to be

tested are that the objectives will be achieved by the interventions

linked to them. Most objectives are linked to more than one

intervention. Each intervention is associated with at least one

expected result. The Measures column lists means by which actual

results will be measured. Other measures of results may be used in

order to fully evaluate the hypotheses. The Data Sources column shows

where data required for the measurements can be found.

A hypothesis will be supported--that is, the intervention will be

deemed to have achieved the objective--when actual results are found to

match expected results. Tests of hypotheses will be made by comparing

results to appropriately defined comparison groups.

Table 5.--Project Evaluation Model

----------------------------------------------------------------------------------------------------------------

Objectives Interventions Expected results Measures Data sources

----------------------------------------------------------------------------------------------------------------

Increased quality of new hires; Agency-Based Hiring officials Hiring Interview

improved fit between position Staffing. will be able to officials' s with hiring

requirements and individual focus on more judgments of the officials.

qualifications; greater relevant improvement in Focus

likelihood of getting a highly recruiting the quality of groups.

qualified candidate. sources and avoid new hires. HRM

losing candidates Hiring office records on

who grow officials' offers and

impatient with judgments of acceptances.

long hiring improvements in Periodic

processes. the fit of employee/

qualifications of supervisor

new hires. surveys.

Rate of Exit

acceptance of interviews.

offers.

Direct Examination For skill areas in Hiring Interview

which well officials' s with hiring

qualified judgments of the officials.

individuals are improvement in Focus

hard to find, the quality of groups.

managers will be new hires. HRM

able to hire good Hiring office records on

candidates as officials' offers and

they find them, judgments of acceptances.

thus avoiding the improvements in Periodic

loss of well the fit of employee/

qualified qualifications of supervisor

individuals new hires. surveys.

through delays. Rate of

acceptance of

offers.

Broad-band Broad bands and Hiring Interview

Classification flexible entry officials' s with hiring

System, in salaries within judgments of the officials.

conjunction with bands provide a improvement in Focus

Flexible Entry more competitive the quality of groups.

Salaries. range of entry new hires. HRM

salaries for Hiring office records on

managers to use officials' offers and

in negotiating judgments of acceptances.

with candidates, improvements in Periodic

thus increasing the fit of employee/

the ability to qualifications of supervisor

hire highly new hires. surveys.

qualified Rate of

candidates. acceptance of

offers.

More Flexible Paid Managers will be Number of HRM office

Advertising. able to make selections records.

greater use of resulting from

paid advertising, paid advertising.

thus expanding

the scope of

recruiting

efforts or

focusing the

recruitment

effort on

specialized

sources.

[[Page 67458]]

3-Year Greater likelihood Number of Automated

Probationary that scientists scientists and history file

Period for and engineers who engineers data.

Scientists and are retained released during HRM

Engineers. after probation probation after office records.

will be capable the first year.

of the full range

of R&D functions.

Local Authority The ability of Number of HRM

for Recruitment managers to grant selections made office records.

Payments. recruitment for which the Interview

payments during recruitment s with hiring

negotiations with payment was officials.

highly qualified instrumental in Focus

candidates will attracting the groups.

increase candidate.

competitiveness.

Increased retention of good Broad-Band Broad-banding Turnover rates Automated history

performers. Classification gives an among good file data.

System. operating unit performers.

the ability to Turnover rates of

raise the pay of low performers.

good performers

to higher and

more competitive

levels, thus

improving

retention of good

performers.

Performance-Based Performance-based Turnover rates Automated

Pay Increases. pay increases among good history file

give an operating performers. data.

unit the ability Interview

to raise the pay s with hiring

of good officials.

performers more Focus

rapidly, thus groups.

improving

retention of good

performers.

Bonuses........... The ability to Turnover rates Automated history

reward the compared to size file data.

accomplishments of bonus.

of good

performers will

make them more

likely to remain.

Local Authority The ability of A count of the HRM

for Retention managers to grant instances in office records.

Payments. retention which a retention Interview

payments will payment is s with hiring

improve their instrumental in officials.

ability to retain retaining an Focus

employees in employee who groups.

critical skill would otherwise

areas in a job- have left.

related course of

study.

Supervisory The ability to Turnover rates Automated history

Performance Pay. raise the pay of among supervisors file data.

high-performance in relation to

supervisors to pay and

higher levels performance.

will make their

salaries more

competitive,

improving

retention.

More Flexible Pay Flexible pay Turnover rates in Automated history

Increase Upon increases upon relation to pay file data.

Promotion. promotion gives and performance.

an operating unit

the ability to

raise the pay of

high-performing

employees and

employees in

critical skill

areas to higher

and more

competitive

levels, thus

improving their

retention.

Improved individual and Two-Level, 100- This system will Judgments of Pay Interview

organizational performance. Point, Peer Group more effectively Pool Managers, s with hiring

Performance communicate to Rating Officials, officials.

Appraisal System. employees how and Employees. Periodic

they are employee/

performing in supervisor

relation to their surveys.

peers, the Focus

consequences of groups.

poor performance,

and the rewards

for good

performance.

Pay Increases The promise of Judgments of Periodic

Linked to higher pay managers, employee/

Performance. increases for supervisors, and supervisor

high achievement employees. surveys.

will encourage Focus

improved groups.

performance.

[[Page 67459]]

Supervisory The promise of Judgments of Managemen

Performance Pay. higher pay levels higher-level t interviews.

for effective managers.

supervision will

encourage

improved

supervisory

performance.

Bonuses Linked to The promise of Judgments of Periodic

Performance. bonuses for good managers, employee/

performance will supervisors, and supervisor

encourage employees. surveys.

improved Focus

performance. groups.

Hiring By improving the Judgments of Interview

interventions quality of new managers and s with hiring

(listed above). hires, the hiring supervisors. officials.

interventions Focus

will gradually groups.

produce a higher-

performing

workforce.

Retention By improving the Judgments of Interview

Interventions retention of good managers and s with hiring

(listed above). performers, the supervisors. officials.

quality of the Focus

workforce will be groups.

higher than it

otherwise would

be.

More effective human resources Broad-Band The broad-band Judgments of Interview

management. Classification. classification managers, s with managers.

system will be supervisors, and Periodic

simpler to use, employees. employee/

more supervisor

understandable to surveys.

managers and

employees, and

more accurate.

More effective human resources Delegated Line managers Judgments of Interview

management (cont.) Classification understand the managers and s with hiring

Authority to organizational supervisors. officials.

Managers. mission and the Periodic

work related to employee/

the mission and supervisor

are therefore surveys.

better prepared Focus groups.

to classify the

work.

Delegated Pay Line managers are Judgments of Interview

Authority to in a better managers and s with hiring

Managers. position to supervisors. officials.

understand the Focus

labor market groups.

forces related to

the work they

manage and will

therefore be more

effective pay

mangers.

More efficient human resources Automated Broad- The broad-band Judgments Interview

management. Band classification of managers and s with hiring

Classification system will be supervisors. officials.

System. simpler, faster, Time Periodic

easier to required to employee/

automate, require produce position supervisor

fewer resources descriptions and surveys.

to operate, and classify Focus

involve fewer positions. groups.

classification Number of HRM

decisions. classification office records.

decisions. Automated

history file.

Support for EEO/Diversity goals Hiring Managers will be Increases HRM and

in recruiting, rewarding, Interventions able to hire good in the numbers of EEO records on

paying, and retaining (listed above). minority minorities hired. offers and

minorities; providing candidates as acceptances.

opportunities for a diverse they find them,

workforce; and in maximizing thus avoiding the

contributions of all employees. loss of well

qualified

minorities

through delays.

Performance-Based Performance-based Comparisons HRM

Pay Increases. pay increases between pay of records.

give an operating minorities and

unit the ability non-minorities.

to raise the pay

of good

performers.

Bonuses........... The ability to Comparisons HRM

reward good between the records.

performers will bonuses received

allow managers to by minorities and

more easily non-minorities.

recognize the

performance of

minorities.

[[Page 67460]]

Pay Interventions Supervisory pay Comparisons HRM

(listed above). bands, flexible between the records.

pay increases salaries of

upon promotion, minorities and

and flexible non-minorities.

entry salaries

will allow

managers greater

flexibilities in

paying minorities

at competitive

salaries.

Retention Broad-banding, Turnover rates of Automated

Interventions flexibilities in minorities in history file data/

(listed above). setting pay, relation to pay EEO records.

performance pay for performance.

increases, and

bonuses, will

make it easier

for supervisors

to retain good

performing

minorities.

----------------------------------------------------------------------------------------------------------------

VII. Project Management

The Office of Personnel Management will oversee the project under

its demonstration project authority in 5 U.S.C. 4703. The DoC

Departmental Personnel Management Board will manage the project at the

Department level. Each major operating unit will have its own Operating

Personnel Management Board to oversee local operations.

The Director of NIST will chair the Departmental Personnel

Management Board through the first cycle. After the first cycle,

chairmanship of the Board will be assumed by one of the members of the

Board. The DPMB members will be senior managers of the operating units

in the project. The DoC Director for Human Resources Management will

serve as Executive Secretary. Each OPMB will typically be chaired by

the senior manager designated to serve on the DPMB. The operating units

will appoint other key managers to their boards as they think

appropriate.

The following table lists the separate responsibilities of these

three bodies.

Table 6.--Project Authorities

----------------------------------------------------------------------------------------------------------------

Project authorities

Arena --------------------------------------------------------------------------

OPM DPMB OPMB

----------------------------------------------------------------------------------------------------------------

General.............................. Final approval Approval Establishing

authority for the authority within the operating unit project

Project Plan, Department for the guidelines within the

operating procedures, Project Plan and Project Plan,

and any future changes operating procedures. operating procedures,

to the plan or Approval and DPMB policies.

operating procedures. authority within the Management of

Department for authorities outlined

proposing changes in below and any

the Project Plan or additional athorities

operating procedures delegated by the DPMB.

to OPM.

Monitoring the Delegating

success of project authority to managers

interventions so as to within the operating

propose appropriate unit, including the

mid-course corrections withdrawal of

to OPM. authority when

Setting warranted.

project policies Assuring

within the parameters adequate resources for

of the Project Plan implementing and

and operating operating the project

procedures. within the operating

Delegating unit.

authority to OPMBs, Overseeing

including the training of operating

withdrawal of unit managers,

authority when employees, and support

warranted. staff in project

Exercising the policies and

authority to make procedures.

exceptions to normal

project procedures on

a case-by-case basis

when it believes an

exception is warranted

(the OPMBs will not

have this authority).

Assuring

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Personnel Demonstration Project; Alternative Personnel Management System for the U.S. Department of Commerce · 62 FR 67434 | Frix