Flow Objectives for the Vernalis Adaptive Management Plan (VAMP), California
Federal RegisterDec 9, 1997
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF THE INTERIOR
Bureau of Reclamation
Flow Objectives for the Vernalis Adaptive Management Plan (VAMP),
California
AGENCY: Bureau of Reclamation, Interior.
ACTION: Notice of intent to prepare a draft environmental impact
statement/environmental impact report.
-----------------------------------------------------------------------
SUMMARY: Pursuant to the National Environmental Policy Act of 1969 as
amended, the Bureau of Reclamation (Reclamation), in cooperation with
the U.S. Fish and Wildlife Service (Service), proposes to prepare a
joint environmental impact statement/environmental impact report (EIS/
EIR) on the water made available on the San Joaquin River and its
tributaries to provide pulse flows at Vernalis during April and May and
to help meet anadromous fish flow objectives. The San Joaquin River
Group Authority (Authority) will be the lead agency under the
California Environmental Quality Act.
Reclamation proposes to contract for water on the San Joaquin River
and its tributaries under Pub. L. 102-575, Title 34, Section 3406(b)(3)
of the Central Valley Project Improvement Act (CVPIA). The water would
be made available to Reclamation from the San Joaquin River Group
Authority (Authority). The purpose of the proposed project is to use
the water to provide a pulse flow at Vernalis during April and May and
other flows identified by the CVPIA water acquisition program. This
water is needed to support the Vernalis Adaptive Management Plan (VAMP)
which is being implemented to provide protective measures for fall-run
chinook salmon and to gather scientific information on the effects of
various flows in the lower San Joaquin River, Central Valley Project
and State Water Project export pumping rates, operation of a fish
barrier, and survival of salmon smolts through the Delta. Water is
needed also to provide environmental benefits in the lower San Joaquin
River, San Joaquin River tributaries, and Delta. The EIS/EIR will
address potential impacts to the environment which may result from the
modified flows in the San Joaquin River and its tributaries.
Reclamation and the Authority seek public input on alternatives,
concerns, and issues to be addressed in the EIS/EIR. A series of
scoping meetings will be held to receive oral and written comments.
DATES: Public scoping meetings will be held as follows:
Tuesday, January 6, 1998, from 1:00 to 3:00 p.m. at the
Miller-Lux Building, First Floor, 830 Sixth Street, Los Banos,
California, 93635.
Wednesday, January 7, 1998, from 1:00 to 3:00 p.m. at the
Fairfield Community Center, Studio C, 1000 Kentucky Street, Fairfield,
California, 94533.
Thursday, January 8, 1998, from 6:00 to 8:00 p.m. at the
Modesto Irrigation District, (South Entrance) Multi-Purpose Room,
Second Floor, 1231 Eleventh Street, Modesto, California, 95354.
Written comments on the project scope should be sent to Reclamation
by January 13, 1998. Comments received after this date will be
considered, but will not be included in the resulting scoping report.
The draft EIS/EIR should be available for public review in
September or October 1998.
ADDRESSES: Written comments on the project scope should be sent to
Michael Delamore, Program Manager, South-Central California Office,
2666 N. Grove Industrial Drive, Suite 106, Fresno, California, 93727;
or Dan M. Fults, Friant Water Users Authority, 1521 I Street,
Sacramento, California, 95814.
FOR FURTHER INFORMATION CONTACT: Mr. Delamore, telephone (209) 487-
5039, fax (209) 487-5130; or Mr. Fults, telephone (916) 441-1931, fax
(916) 441-1581.
SUPPLEMENTARY INFORMATION: In May 1995, the State Water Resources
Control Board (State Board) adopted a Water Quality Control Plan (WQCP)
for the San Francisco/Sacramento-San Joaquin Delta Estuary. The WQCP
included water quality and flow objectives pertaining to the San
Joaquin River basin. During 1997, Reclamation purchased water within
the San Joaquin River system to help meet the WQCP's defined flow
objectives. The science supporting the flow objective for the San
Joaquin River as measured at Vernalis has been disputed. In an effort
to clarify the science for the flow objective and resolve the dispute,
the San Joaquin River interests collaborated to identify feasible
actions to protect the San Joaquin River's fish resources and to
implement the State Board's fishery objectives. This collaboration led
to a scientifically-based adaptive fishery management plan known now as
VAMP. This VAMP Agreement provides the basis for the project
information described below.
The VAMP will be implemented through experimental flows on the San
Joaquin River and export pumping flow rates with an Old River fish
barrier during the 1-month period each year, from approximately April
15 to May 15, in the spring of each year. Additional attraction flows
are targeted for October. The experimental design of the VAMP will use
the water identified by this action in various regimes, depending upon
smolt survival and passage through the Delta.
In addition to the total water from the VAMP Agreement, an
additional amount of water may be contracted for release at any time
during the year. The EIS/EIR will analyze the impacts of a maximum
amount of water in any year over the period 1999-2009 for release to
the San Joaquin River and its tributaries.
[[Page 64885]]
(Specific quantities of water from the VAMP Agreement and from willing
sellers are currently under negotiation and will be identified in the
EIS/EIR.)
Issues or resources that may be affected by the proposed project
that will be evaluated in the EIS/EIR are the following: surface water,
groundwater, biological resources (vegetation, wildlife, fisheries),
land use (including agriculture), recreation, cultural resources, and
environmental justice. Impacts to other resources would be evaluated if
public scoping determines the need for such an evaluation. Cumulative
impacts and other short-term and long-term impacts required by CEQA and
NEPA will be evaluated as well.
The Draft EIS/EIR will analyze a range of alternatives that
include, but are not limited to, the no-action alternative and other
flow regimes in support of VAMP and related San Joaquin River flows
under Section 3406(b)(3). The impact analysis may include combinations
of one or more alternatives as well as other alternatives identified
during the public scoping process. Alternatives to the proposed project
have not yet been identified and will depend upon the results of public
scoping. Alternatives to be evaluated in depth in the EIS/EIR need to
be consistent with the project purpose described above.
Dated: December 2, 1997.
Kirk C. Rodgers,
Deputy Regional Director.
[FR Doc. 97-32155 Filed 12-8-97; 8:45 am]
BILLING CODE 4310-94-P