Identification and Mapping of Special Flood Hazard Areas, Procedures for Map Correction, and Procedures and Fees for Processing Map Changes

Federal RegisterFeb 6, 1997

Ask Donna

What actually matters in this document.

Text

SUMMARY: This final rule revises the National Flood Insurance Program

(NFIP) regulations concerning the identification and mapping of Special

Flood Hazard Areas (SFHAs) and correction of NFIP maps by revising the

fee requirements and fee schedule for processing certain changes to

NFIP maps. Under this final rule, the fees will be adjusted

periodically, but no more than once annually, to provide for changes in

the prevailing private-sector labor rate on which the fees are

predicated. Revised fees will be published as a notice in the Federal

Register.

EFFECTIVE DATE: This rule is effective March 10, 1997.

FOR FURTHER INFORMATION CONTACT: Frederick H. Sharrocks, Jr., Chief,

Hazard Identification Branch, 500 C Street SW., Washington, DC 20472,

(202) 646-2796.

SUPPLEMENTARY INFORMATION: This final rule revises the NFIP regulations

governing identification and mapping of SFHAs and correction of NFIP

maps by revising the fee requirements and fee schedule for processing

certain changes to NFIP maps. FEMA established the current fee

requirements under a final rule published in the Federal Register, at

57 FR 29036, on June 30, 1992.

This action reduces expenses to the NFIP and contributes to

maintaining the NFIP as a self-supporting program by: (1) Establishing

flat user fees for most requests for Conditional Letters of Map

Amendment (CLOMAs), Letters of Map Revision Based on Fill (LOMR-Fs),

Conditional Letters of Map Revision Based on Fill (CLOMR-Fs), Letters

of Map Revision (LOMRs), Conditional Letters of Map Revision (CLOMRs),

and Physical Map Revisions (PMRs); (2) reducing the number of user fee

categories; (3) requiring full payment of user fees before FEMA begins

work on a request; (4) changing the initial fee and hourly rate for

LOMR, CLOMR, and PMR requests based on structural measures on alluvial

fans; (5) limiting exemptions; and (6) replacing the mechanism for

recovering the cartographic production costs related to incorporating

map changes made by letter in Flood Insurance Rate Maps (FIRMs) and

Flood Boundary and Floodway Maps (FBFMs).

This final rule supersedes the fee schedules that FEMA established

on June 30, 1992. It also expands the payment method to include credit

card payments.

The listing of fees that are effective as of the date of this rule

is published as a notice elsewhere in this issue of the Federal

Register. A primary component of the fees is the prevailing private-

sector rates charged to FEMA for labor and materials. Because these

rates and the actual review and processing costs may vary from year to

year, FEMA will evaluate the fees at the end of each fiscal year and

publish revised fee schedules, when needed, as notices in the Federal

Register.

These revisions to the NFIP regulations are a result of the

continuing reappraisal of the NFIP to achieve administrative and fiscal

effectiveness and to encourage sound floodplain management so that the

Program can realize reductions in the loss of life and property and in

disaster-related expenditures.

Revisions to Interim Final Rule

FEMA published an interim final rule concerning these regulation

changes in the Federal Register, at 61 FR 46330, on August 30, 1996. In

the interim final rule, we invited the public to comment on the

regulation changes within 30 days. One commenter wrote:

In view of the fact that the National Flood Insurance Program

was promulgated by the United States Congress and assigned to the

Federal Emergency Management Agency as a regulative measure in order

to ensure that minimal development occurs in the floodplain areas, I

feel that promulgation of this regulation is a mandate upon local

government in that it closes access to appealing errors and

omissions or changes on the National Flood Insurance Program maps *

* *. It may well thwart applications for appropriate regulations and

changes due to the fact that many municipalities and counties do not

have sufficient funding to cover the costs without overburdening

their budgets. Accordingly, I disagree with the statement on Page

46631 concerning the Regulatory Flexibility Act, wherein the Acting

Associate Director of the Mitigation Directorate certifies that the

interim [final] rule does not have a significant economic impact on

substantial number of small entities * * *.

There are numerous small communities and rural counties that

adjoin rivers throughout the United States and are impacted by

flooding. They have not, in many cases, been offered the opportunity

for protection by levees or urban flood walls and, therefore, remain

at the mercy of the rivers upon which they were located a century or

two ago. To now require them to pay fees to have maps revised is not

an acceptable position.

I feel that if the federal government wishes to continue this

program that it should stand the costs fully for carrying out the

administrative, mapping and implementation requirements of the

National Flood Insurance Program.

In response to these comments the changes published in this final

rule do not establish completely new requirements for the payment of

user fees. They expand an existing system established during the 1980s

to allow the NFIP to recover costs for providing certain map products

and services and, at the same time, to allow the NFIP to remain self-

supporting for the historic average flood loss year. The objective of

the changes is to distribute the costs of certain products and services

equitably between flood insurance policyholders and the users of the

products and services, rather than to distribute these costs to the

general taxpayer who may or may not benefit from the product or

service. This effort is in keeping with 31 U.S.C. 9701, under which the

U.S. Congress allows Federal agencies to charge fees for products and

services. 31 U.S.C. 9701 provides, in part:

``(a) It is the sense of Congress that each service or thing of

value provided by an agency * * * to a person * * * is to be self-

sustaining to the extent possible.

``(b) The head of each agency * * * may prescribe regulations

establishing the charge for a service or thing of value provided by the

agency. * * * Each charge shall--(1) be fair; and (2) based on: (A) The

costs to the Government; (B) the value of the service or thing to the

recipient; (C) public policy or interest served; and (D) other relevant

facts.''

This rule also does not ``close access to appealing errors and

omissions'' on the NFIP map as suggested in the commenter's September

27 letter. Community officials and property owners may continue to

appeal proposed base (1-percent-annual-chance) flood elevations shown

on NFIP maps under 44 CFR part 67 of the NFIP regulations without

charge. In addition, map revision requests submitted under 44 CFR part

65 of the NFIP regulations will be exempt from fees if the requests are

made to correct mapping or study analysis errors. Furthermore,

community officials who believe a FEMA-contracted restudy of flood

hazards is necessary because conditions have changed since the NFIP map

for their community was last published

[[Page 5735]]

may continue to request such restudies from FEMA. Funding for such

restudies comes from the National Flood Insurance Fund, and FEMA bears

the costs of revising the NFIP maps fully as a result of these

restudies.

FEMA is aware that flooding impacts numerous small communities and

rural counties throughout the United States. FEMA, working in

conjunction with many State and Federal agencies, works with these

communities to develop an overall strategy for mitigating the damage

caused by flooding. Numerous funding options are made available to

communities by FEMA, other Federal agencies, and State agencies to

ensure proper mitigation options are exercised. The regulation changes

promulgated by this final rule will have no impact on those activities.

As indicated in Sec. 72.4(e) of the revised regulations, the entity

that applies to FEMA through the local community for review is

responsible for the cost of the review. The local community incurs no

financial obligation under the reimbursement procedures set forth in

this part as a result of transmitting the application by another party

to FEMA.

Finally, since the requirements for user fees for certain types of

map changes were established, the number of requests for CLOMAs, CLOMR-

Fs, LOMR-Fs, CLOMRs, LOMRs, and PMRs received each year has grown and

is expected to continue to grow. Therefore, the available statistics do

not support the contention that promulgation of these regulation

changes will ``thwart applications for appropriate regulations and

changes * * *'' in the future.

As a result of internal FEMA review, we incorporated the following

changes in this final rule:

1. We revised Sec. 72.3(c) to include two new categories to cover

LOMR-Fs based on as-built information for projects for which CLOMR-Fs

were issued previously by FEMA.

2. We revised Category 6 (now Category 7) in Sec. 72.3(c) to

clarify that this category does not apply to requests based on as-built

information for projects involving structural measures on alluvial

fans. The $5,000 initial fee will be charged to all map revision

requests involving structural measures on alluvial fans.

3. We added Sec. 72.3(d) which reads: ``If a request involves more

than one of the above categories, the highest applicable flat user fee

must be submitted.''

4. We revised Sec. 72.3(e) (now Sec. 72.3(f)) to read: ``The flat

user fees for conditional and final map amendments and map revisions

are based on the actual costs for reviewing and processing the

requests. The fees for requests for LOMR-Fs, LOMRs, and PMRs also

include a fee of $35 to cover FEMA's costs for physically revising

affected FIRM and FBFM panels to reflect the map changes.''

5. We deleted Sec. 72.3(e), which covered cartographic production

fees.

6. We added Sec. 72.5(c), which reads:

(c) Map change requests based on the following shall be exempt

from fees:

(1) Federally sponsored flood-control projects where 50 percent

or more of the project's costs are federally funded; and

(2) Detailed hydrologic and hydraulic studies conducted by

Federal, State, or local agencies to replace approximate studies

conducted by FEMA and shown on the effective FIRM.

Establishment of Flat User Fees

The existing fee collection process is complex and requires time-

intensive efforts on the part of FEMA to administer. More importantly,

it also increases the time required to provide the requesters with the

Letter of Map Change (LOMC) product or PMR they require. The current

system requires requesters to submit an initial fee that is not

intended to cover the full review and processing costs or the

cartographic production costs. Requesters subsequently receive invoices

for the balance. The current system is complicated further by the pre-

authorized spending limits placed on each product. When FEMA determines

that these limits will be exceeded, we must obtain written

authorization before proceeding with their review. We must then delay

the request until we receive the written authorization.

Under this final rule, FEMA charges a single flat user fee for most

LOMC and PMR requests, thereby reducing the turnaround time for

preparing and issuing determination letters and reducing FEMA costs of

administering the fee-charge system. FEMA can recover more of the

actual costs than are recovered by the current system and redistribute

the overall cost of operations.

Requirement for Full Payment Before Work Begins

Under this final rule, the requester must submit the full fee

payment before FEMA begins work on most map change requests. This

minimizes the need for followup invoicing and ensures that FEMA

collects appropriate fees for services rendered.

Consolidation of Product Categories

Under this final rule, we consolidate LOMC products and PMRs with

similar review and processing requirements into the same fee category.

As a result, we reduced the number of fee categories from 19 to 10.

Limitation of Fee Exemptions

Under current standards, we exempt requesters from paying user fees

when they submit requests for changes to (1) remove properties or

structures from the SFHA shown on the FIRM that were inadvertently

included in the SFHA because of map scale limitations, which is handled

by the LOMA process detailed in 44 CFR part 70 of the NFIP regulations;

(2) reflect more detailed information on flooding sources, floodways,

or topographic data; (3) correct mapping errors or errors in the

effective Flood Insurance Study analysis; or (4) reflect projects that

are for public benefit and are primarily intended for flood loss

reduction to insurable structures in identified flood hazard areas that

were in existence prior to the commencement of the projects. Such

exemptions preclude FEMA from recovering fees for a substantial volume

of work.

Under this final rule, we maintain the exemptions for: Requests for

LOMAs; requests to correct mapping or analysis errors; map change

requests based on federally sponsored flood-control projects where 50

percent or more of the project's costs are federally funded; and map

change requests based on detailed hydrologic and hydraulic studies

conducted by Federal, State, or local agencies to replace approximate

studies conducted by FEMA and shown on the effective FIRM.

Maintenance of Initial Fee for Requests Based on Structural Measures on

Alluvial Fans

Under this final rule, we maintain the initial fee for LOMC

requests based on structural measures on alluvial fans. These requests

are rare, the FEMA engineering review for these requests is usually

very complex, and FEMA's costs for processing these requests can

fluctuate significantly. Based on a review of actual processing costs

for Fiscal Year 1995, we established $5,000 as the initial fee for such

requests. The remaining costs are recovered before we issue the LOMC,

consistent with current fee-reimbursement practices. Under this final

rule, we increased to $50 the hourly rate used to calculate the total

fees that must be reimbursed.

National Environmental Policy Act

This final rule is categorically excluded from the requirements of

44 CFR part 10, Environmental Consideration. No environmental impact

assessment has been prepared.

[[Page 5736]]

Regulatory Flexibility Act

The Executive Associate Director, Mitigation Directorate, certifies

that this final rule does not have a significant economic impact on a

substantial number of small entities in accordance with the Regulatory

Flexibility Act, 5 U.S.C. et seq., because it is not expected (1) to

have significant secondary or incidental effects on a substantial

number of small entities, nor (2) to create any additional burden on

small entities. A regulatory flexibility analysis has not been

prepared.

Executive Order 12612, Federalism

This final rule involves no policies that have federalism

implications under Executive Order 12612, Federalism, dated October 26,

1987.

Executive Order 12778, Civil Justice Reform

This final rule meets the applicable standards of Sec. 2(b)(2) of

Executive Order 12778, Civil Justice Reform.

Executive Order 12866, Regulatory Planning and Review

Promulgation of this final rule is required by statute, 42 U.S.C.

4014(f), which also specifies the regulatory approach taken in the

final rule. To the extent possible under the statutory requirements of

42 U.S.C. 4014(f), this final rule adheres to the principles of

regulation as set forth in Executive Order 12866, Regulatory Planning

and Review.

List of Subjects in 44 CFR Parts 65, 70, and 72

Administrative practice and procedure, Flood insurance,

Floodplains, Reporting and recordkeeping requirements.

Accordingly, 44 CFR Parts 65, 70, and 72 are amended as follows:

PART 65--IDENTIFICATION AND MAPPING OF SPECIAL FLOOD HAZARD AREAS

1. The authority citation for part 65 continues to read as follows:

Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of

1978, 43 FR 41943, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR

19367, 3 CFR, 1979 Comp., p.376.

2. Section 65.4(c) is revised to read as follows:

Sec. 65.4 Right to submit new technical data.

* * * * *

(c) Requests for changes to effective Flood Insurance Rate Maps

(FIRMs) and Flood Boundary and Floodway Maps (FBFMs) are subject to the

cost recovery procedures described in 44 CFR part 72. As indicated in

part 72, revisions requested to correct mapping errors or errors in the

Flood Insurance Study analysis are not to be subject to the cost-

recovery procedures.

3. In section 65.5 the heading and paragraph (d) are revised to

read as follows:

Sec. 65.5 Revision to special flood hazard area boundaries with no

change to base flood elevation determinations.

* * * * *

(d) Submission procedures. All requests shall be submitted to the

FEMA Regional Office servicing the community's geographic area or to

the FEMA Headquarters Office in Washington, DC, and shall be

accompanied by the appropriate payment, in accordance with 44 CFR part

72.

4. In section 65.6(g) is revised to read as follows:

Sec. 65.6 Revision of base flood elevation determinations.

* * * * *

(g) Submission procedures. All requests shall be submitted to the

FEMA Regional Office servicing the community's geographic area or to

the FEMA Headquarters Office in Washington, DC, and shall be

accompanied by the appropriate payment, in accordance with 44 CFR part

72.

5. Section 65.8 is revised to read as follows:

Sec. 65.8 Review of proposed projects.

A community, or an individual through the community, may request

FEMA's comments on whether a proposed project, if built as proposed,

would justify a map revision. FEMA's comments will be issued in the

form of a letter, termed a Conditional Letter of Map Revision, in

accordance with 44 CFR part 72. The data required to support such

requests are the same as those required for final revisions under

Secs. 65.5, 65.6, and 65.7, except as-built certification is not

required. All such requests shall be submitted to the FEMA Headquarters

Office in Washington, DC, and shall be accompanied by the appropriate

payment, in accordance with 44 CFR part 72.

6. In section 65.9 the heading and paragraph (h) are revised to

read as follows:

Sec. 65.9 Review and response by the Administrator.

* * * * *

(h) The required payment has not been submitted in accordance with

44 CFR part 72, no review will be conducted and no determination will

be issued until payment is received.

PART 70--PROCEDURE FOR MAP CORRECTION

7. The authority citation for part 70 is revised to read as

follows:

Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of

1978, 43 FR 41943, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR

19367, 3 CFR, 1979 Comp., p. 376.

8. Section 70.9 is revised to read as follows:

Sec. 70.9 Review of proposed projects.

An individual who proposes to build one or more structures on a

portion of property that may be included inadvertently in a Special

Flood Hazard Area (SFHA) may request FEMA's comments on whether the

proposed structure(s), if built as proposed, will be in the SFHA.

FEMA's comments will be issued in the form of a letter, termed a

Conditional Letter of Map Amendment. The data required to support such

requests are the same as those required for final Letters of Map

Amendment in accordance with Sec. 70.3, except as-built certification

is not required and the requests shall be accompanied by the

appropriate payment, in accordance with 44 CFR part 72. All such

requests for CLOMAs shall be submitted to the FEMA Regional Office

servicing the community's geographic area or to the FEMA Headquarters

Office in Washington, DC.

PART 72--PROCEDURES AND FEES FOR PROCESSING MAP CHANGES

9. The authority citation for part 72 is revised to read as

follows:

Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of

1978, 43 FR 41943, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR

19367, 3 CFR, 1979 Comp., p. 376.

10. Section 72.1 is revised to read as follows:

Sec. 72.1 Purpose of part.

This part provides administrative and cost-recovery procedures for

the engineering review and administrative processing associated with

FEMA's response to requests for Conditional Letters of Map Amendment

(CLOMAs), Conditional Letters of Map Revision (CLOMRs), Conditional

Letters of Map Revision Based on Fill (CLOMR-Fs), Letters of Map

Revision Based on Fill (LOMR-Fs), Letters of Map Revision (LOMRs), and

Physical Map Revisions (PMRs). Such requests are based on proposed or

actual manmade alterations within the floodplain, such as the

[[Page 5737]]

placement of fill; modification of a channel; construction or

modification of a bridge, culvert, levee, or similar measure; or

construction of single or multiple residential or commercial structures

on single or multiple lots.

11. Section 72.2 is revised to read as follows:

Sec. 72.2 Definitions.

Except as otherwise provided in this part, the definitions in 44

CFR part 59 are applicable to this part. For the purposes of this part,

the products are defined as follows:

CLOMA. A CLOMA is FEMA's comment on a proposed structure or group

of structures that would, upon construction, be located on existing

natural ground above the base (1-percent-annual-chance) flood elevation

on a portion of a legally defined parcel of land that is partially

inundated by the base flood.

CLOMR. A CLOMR is FEMA's comment on a proposed project that would,

upon construction, affect the hydrologic or hydraulic characteristics

of a flooding source and thus result in the modification of the

existing regulatory floodway, the effective base flood elevations, or

the Special Flood Hazard Area (SFHA).

CLOMR-F. A CLOMR-F is FEMA's comment on a proposed project that

would, upon construction, result in a modification of the SFHA through

the placement of fill outside the existing regulatory floodway.

LOMR. A LOMR is FEMA's modification to an effective Flood Insurance

Rate Map (FIRM), or Flood Boundary and Floodway Map (FBFM), or both.

LOMRs are generally based on the implementation of physical measures

that affect the hydrologic or hydraulic characteristics of a flooding

source and thus result in the modification of the existing regulatory

floodway, the effective base flood elevations, or the SFHA. The LOMR

officially revises the FIRM or FBFM, and sometimes the Flood Insurance

Study (FIS) report, and, when appropriate, includes a description of

the modifications. The LOMR is generally accompanied by an annotated

copy of the affected portions of the FIRM, FBFM, or FIS report.

LOMR-F. A LOMR-F is FEMA's modification of the SFHA shown on the

FIRM based on the placement of fill outside the existing regulatory

floodway.

PMR. A PMR is FEMA's physical revision and republication of an

effective FIRM, FBFM, or FIS report. PMRs are generally based on

physical measures that affect the hydrologic or hydraulic

characteristics of a flooding source and thus result in the

modification of the existing regulatory floodway, the effective base

flood elevations, or the SFHA.

12. Section 72.3 is revised to read as follows:

Sec. 72.3 Fee schedule.

(a) For requests for CLOMRs, LOMRs, and PMRs based on structural

measures on alluvial fans, an initial fee of $5,000, subject to the

provisions of Sec. 72.4, shall be paid to FEMA before FEMA begins its

review of the request. The initial fee represents the minimum cost for

reviewing these requests and is based on the prevailing private-sector

labor rate. A revision to this initial fee, if necessary, will be

published as a notice in the Federal Register.

(b) For requests for CLOMRs, LOMRs, and PMRs based on structural

measures on alluvial fans, the total fee will be calculated based on

the total hours by FEMA to review and process the request multiplied by

an hourly rate based on the prevailing private-sector labor rate. The

hourly rate is published as a notice in the Federal Register. A

revision to the hourly rate, if necessary, shall be published as a

notice in the Federal Register.

(c) For conditional and final map revision requests for the

following categories, flat user fees, subject to the provisions of

Sec. 72.4, shall be paid to FEMA before FEMA begins its review of the

request:

(1) Requests for CLOMAs, CLOMR-Fs, and LOMR-Fs for single

structures or single lots;

(2) Requests for CLOMAs for multiple structures or multiple lots;

(3) Requests for CLOMR-Fs and LOMR-Fs for multiple structures or

multiple lots;

(4) Requests LOMR-Fs for single structures or single lots based on

as-built information for projects for which FEMA issued CLOMR-Fs

previously;

(5) Requests for LOMR-Fs for multiple structures or multiple lots

based on as-built information for projects for which FEMA issued CLOMR-

Fs previously;

(6) Requests for LOMRs and PMRs based on projects involving

bridges, culverts, or channels, or combinations thereof;

(7) Requests for LOMRs and PMRs based on projects involving levees,

berms, or other structural measures;

(8) Requests for LOMRs and PMRs based on as-built information for

projects for which FEMA issued CLOMRs previously, except those based on

structural measures on alluvial fans;

(9) Requests for LOMRs and PMRs based solely on more detailed data;

(10) Requests for CLOMRs based on projects involving new hydrologic

information, bridges, culverts, or channels, or combinations thereof;

and

(11) Requests for CLOMRs based on projects involving levees, berms,

or other structural measures.

(d) If a request involves more than one of the categories listed

above, the highest applicable flat user fee must be submitted.

(e) The flat user fees for conditional and final map amendments and

map revisions are based on the actual costs for reviewing and

processing the requests. The fees for requests for LOMR-Fs, LOMRs, and

PMRs also include a fee of $35 to cover FEMA's costs for physically

revising affected FIRM and FBFM panels to reflect the map changes.

(f) Revisions to the fees, if necessary, shall be published as a

notice in the Federal Register.

13. Section 72.4 is revised to read as follows:

Sec. 72.4 Submittal/payment procedures and FEMA response.

(a) The initial fee shall be submitted with a request for FEMA

review and processing of CLOMRs, LOMRs, and PMRs based on structural

measures on alluvial fans; the appropriate flat user fee shall be

submitted with all other requests for FEMA review and processing.

(b) FEMA must receive initial or flat user fees before it will

begin any review. The fee is non-refundable once FEMA begins its

review.

(c) Following completion of FEMA's review for any CLOMR, LOMR, or

PMR based on structural measures on alluvial fans, FEMA shall invoice

the requester at the established hourly rate for any actual costs

exceeding the initial fee incurred for review and processing. FEMA

shall not issue a determination letter or revised map panel(s) until it

receives the invoiced amount.

(d) For all map revision requests, FEMA shall bear the cost of

reprinting and distributing the revised FIRM panel(s), FBFM panel(s),

or combination.

(e) The entity that applies to FEMA through the local community for

review is responsible for the cost of the review. The local community

incurs no financial obligation under the reimbursement procedures of

this part when another party sends the application to FEMA.

(f) Requesters shall submit payments by check or money order or by

credit card. Checks or money orders, in U.S. funds, shall be made

payable to the National Flood Insurance Program.

[[Page 5738]]

(g) For CLOMA, CLOMR-F, LOMA, and LOMR-F requests, FEMA shall:

(1) Notify the requester and community within 30 days as to the

adequacy of the submittal, and

(2) Provide to the requester and the community, within 60 days of

receipt of adequate information and fee, a determination letter or

other written comment in response to the request.

(h) For CLOMR, LOMR, and PMR requests, FEMA shall:

(1) Notify the requester and community within 60 days as to the

adequacy of the submittal; and

(2) Provide to the requester and the community, within 90 days of

receipt of adequate information and fee, a CLOMR, a LOMR, other written

comment in response to the request, or preliminary copies of the

revised FIRM panels, FBFM panels, and/or affected portions of the FIS

report for review and comment.

14. Section 72.5 is revised to read as follows:

Sec. 72.5 Exemptions.

(a) Requests for map changes based on mapping or study analysis

errors or the effects of natural changes within SFHAs shall be exempt

from fees.

(b) Requests for LOMAs shall be exempt from fees.

(c) Map change requests based on the following shall be exempt from

fees:

(1) Federally sponsored flood-control projects where 50 percent or

more of the project's costs are federally funded; and

(2) Detailed hydrologic and hydraulic studies conducted by Federal,

State, or local agencies to replace approximate studies conducted by

FEMA and shown on the effective FIRM.

15. Section 72.6 is revised to read as follows:

Sec. 72.6 Unfavorable response.

(a) Requests for CLOMAs, CLOMRs, or CLOMR-Fs may be denied or the

determinations may contain specific comments, concerns, or conditions

regarding proposed projects or designs and their impacts on flood

hazards in a community. Requesters are not entitled to any refund of

fees paid if the determinations contain such comments, concerns, or

conditions, or if the requests are denied. Requesters are not entitled

to any refund of fees paid if the requesters are unable to provide the

appropriate scientific or technical documentation or to obtain required

authorizations, permits, financing, etc., for which requesters seek the

CLOMAs, CLOMRs, or CLOMR-Fs.

(b) Requests for LOMRs, LOMR-Fs, or PMRs may be denied or the

revisions to the FIRM, FBFM, or both, may not be in the manner or to

the extent desired by the requesters. Requesters are not entitled to

any refund of fees paid if the revision requests are denied or if the

LOMRs, LOMR-Fs, or PMRs do not revise the map specifically as

requested.

16. Section 72.7 is revised to read as follows:

Sec. 72.7 Resubmittals.

(a) Resubmittals of CLOMA, CLOMR, CLOMR-F, LOMR, LOMR-F, or PMR

requests more than 90 days after FEMA notification that the requests

were denied or after FEMA ended its review because the requester

provided insufficient information will be treated as original

submissions and subject to all submittal/payment procedures described

in Sec. 72.4. The procedure in Sec. 72.4 also applies to a resubmitted

request (regardless of when submitted) if the project on which the

request is based has been altered significantly in design or scope

other than as necessary to respond to comments, concerns, or other

findings made by FEMA regarding the original submission.

(b) When LOMR, LOMR-F, or PMR requests are made after FEMA issues

CLOMRs or CLOMR-Fs, the procedures in Sec. 72.4 and the appropriate fee

apply, as referenced in Sec. 72.3(c). When the as-built conditions

differ from the proposed conditions on which FEMA issued the CLOMRs or

CLOMR-Fs, the reduced fee for as-built requests will not apply.

(Catalog of Federal Domestic Assistance No. 83-100, Flood Insurance)

Dated: January 28, 1997.

Richard W. Krimm,

Executive Associate Director, Mitigation Directorate.

[FR Doc. 97-2963 Filed 2-5-97; 8:45 am]

BILLING CODE 6718-04-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.