Final Environmental Impact Statement for General Management Plan; San Francisco Maritime National Historical Park, San Francisco County, California; Notice of Availability
Federal RegisterSep 3, 1997
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF THE INTERIOR
National Park Service
Final Environmental Impact Statement for General Management Plan;
San Francisco Maritime National Historical Park, San Francisco County,
California; Notice of Availability
-----------------------------------------------------------------------
SUMMARY: Pursuant to Sec. 102(2)(C) of the National Environmental
Policy Act of 1969 (P.L. 91-190, as amended), the National Park Service
has prepared a Final Environmental Impact Statement (FEIS) assessing
the potential impacts of the General Management Plan (GMP) for San
Francisco Maritime National Historical Park, San Francisco, California.
Once approved, the plan will guide management of the park over the next
15 to 20 years.
The Draft Environmental Impact Statement/General Management Plan
(DEIS/GMP) was released for public review on July 25, 1996. A Notice of
Availability was published in the Federal Register on August 2, 1996 to
formally initiate a 60 day public review period (which closed on
October 3, 1996). During this period, two public meetings were held
with the park's Advisory Commission and written comments were also
received. The FEIS/GMP contains responses to the comments received and
minor modifications or clarifications to the document as needed in
response to the comments.
Alternative A (the proposed action) would provide a plan for the
preservation and maintenance of the park's collection, including the
fleet of historic vessels, small watercraft, historic structures,
library, and archival materials. Minimal measures to slow down
deterioration of the steam schooner Wapama would be implemented, but
the vessel's underlying structural decay would not be addressed. The
ship would be dismantled when it could no longer be maintained in a
safe condition. However, before this action would be taken, efforts
would be made to seek out other agencies or private organizations
interested in reconstructing or preserving Wapama as a dryberth
exhibit. The park would pursue multiple strategies for major ship
restoration, such as continued use of commercial shipyards and
appropriate agreements with San Francisco Bay Area dry dock facilities.
Greater use of the park's collection by the public for research and
interpretive purposes would be provided through the use of additional
facilities, including rehabilitation of the Haslett Warehouse. The
intersection at Hyde and Jefferson Streets would be redesigned to
enhance pedestrian access and visibility of the pier and historic ships
and to expand interpretive opportunities. Aquatic Park would be
enhanced and maintained as a public open space, and recreational
activities in the lagoon such as swimming, rowing, and the temporary
mooring of sailboats would continue to be provided to all users. Park
volunteer programs would be enhanced and visitors would be encouraged
to experience other related sites in the San Francisco Bay Area.
In addition to the proposed action, two alternatives were
considered. Alternative B emphasized preservation and maintenance of
the historic ships, small watercraft, historic structures, library, and
archival materials (as would Alternative A). Space would be upgraded
and expanded for the park's collection. The park would pursue multiple
strategies for major ship restoration work. Under Alternative B the
intersection of Hyde and Jefferson Streets would be developed further
as an expanded-permanent pedestrian plaza with public seating,
unobstructed views of the ships and Bay, and additional space for
interpretive demonstrations, displays, and public programs. Alternative
C (No Action-Minimum Requirements) would continue current management
strategies, with minimal actions implemented to stabilize and preserve
the park's collection and historic properties.
The environmental consequences of the proposed action and the
alternatives were fully documented in the DEIS/GMP, and mitigation
provided as appropriate to minimize impacts. The FEIS/GMP provides
additional information on mitigation measures for the Wapama and other
historic properties in the final Programmatic Agreement between the
California State Historic Preservation Office, the Advisory Council on
Historic Preservation, and the NPS.
SUPPLEMENTARY INFORMATION: It should be noted that this FEIS/GMP is an
``abbreviated'' final environmental impact statement (changes from the
DEIS/GMP are minor, with no modification of the alternatives and no new
information which might have a significant effect on the environment).
The FEIS/GMP was prepared in accordance with environmental regulations
set forth at 40 CFR 1503.4(c). It is recommended that readers of the
FEIS/GMP have available a copy of the DEIS/GMP. The ``no-action''
period for this FEIS/GMP will end thirty (30) days after the
Environmental Protection Agency has listed the availability of the
document in the Federal Register. For further information, please
contact the Superintendent, San Francisco Maritime National Historical
Park, National Park Service, Building E, Fort Mason, San Francisco,
California, 94123; telephone (415) 556-1659.
Copies of the FEIS/GMP will be available for public inspection at
the headquarters office of San Francisco Maritime National Historical
Park (contact info above), as well as at area
[[Page 46510]]
libraries and at Offices of Public Affairs, Washington Office of the
National Park Service (1849 C Street NW, Washington DC) and Pacific
West Regional Office of the National Park Service (600 Harrison Street,
Suite 600, San Francisco, California).
Dated: August 21, 1997.
Holly Bundock,
Acting Regional Director, Pacific West Region.
[FR Doc. 97-23324 Filed 9-2-97; 8:45 am]