DEPARTMENT OF TRANSPORTATION
Research and Special Programs Administration
[Docket No. PS-142; Notice 7]
Pipeline Safety: Communications Plan for Effective Public
Communication and Involvement in the Pipeline Safety Risk Management
Demonstration Program
AGENCY: Office of Pipeline Safety, DOT.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Research and Special Programs Administration's (RSPA)
Office of Pipeline Safety (OPS) is establishing and implementing a
Pipeline Risk Management Demonstration Program (Demonstration Program)
in which pipeline operators will propose their pipelines as projects
for the Demonstration Program. Effective communication among OPS,
States, pipeline operators, community representatives, and other
interested parties is a key part of this risk management initiative.
Effective means for communication are vital to OPS understanding local
safety and environmental conditions that may affect the demonstration
projects. This document addresses how OPS intends to inform the
community, seek public
[[Page 43029]]
input, and respond to public concerns. This document also describes how
OPS will provide opportunities for meaningful public involvement,
particularly for communities that may be located within a demonstration
project area. Persons interested in receiving information about
specific demonstration projects, or about the Demonstration Program
overall can make their requests by commenting to this notice. OPS also
seeks public comment on this Communications Plan.
DATES: Comments should be received no later than October 10, 1997.
ADDRESSES: Comments should be sent to the Dockets Facility, U.S.
Department of Transportation, Plaza 401, 400 Seventh Street, SW,
Washington, DC 20590-0001. Comments should identify the docket number
(PS-142). Persons should submit the original document and one (1) copy.
Persons wishing to receive confirmation of receipt of their comments
must include a self-addressed stamped postcard. The Dockets Facility is
located on the plaza level of the Nassif Building in Room Number 401,
400 Seventh Street, SW, Washington, DC. The Dockets Facility is open
from 10:00 a.m. to 5:00 p.m., Monday through Friday, except on Federal
holidays when the facility is closed.
FOR FURTHER INFORMATION CONTACT: Eben M. Wyman, (202) 366-0918, or by
e-mail ([email protected]), regarding the subject matter of this
Notice. Contact the Dockets Unit (202) 366-5046, for other material in
the docket.
SUPPLEMENTARY INFORMATION:
I. Background
Today, pipeline companies must comply with regulations that apply
relatively uniformly regardless of conditions that are specific to the
location and the operation of the pipeline. Although pipelines have
maintained a good record of public safety and environmental protection
under the current regulatory structure, government and industry are
continually looking to improve the pipeline safety program.
Pipeline operators and OPS seek to achieve a better understanding
of the risks related to pipelines, where the risks are, and where and
how operators can use resources effectively to reduce risk across the
pipeline system, thereby better protecting both people and the
environment. In addition, operators seek to gain more flexibility to
address system-unique problems. Both government and industry want to
have a greater knowledge and understanding of how to achieve superior
safety and environmental protection, as well as increase reliability of
pipeline service.
Risk management offers government and industry a comprehensive
decision-making process. It includes the identification and analysis of
risks, the identification, analysis and selection of alternative
measures to control risks, and the subsequent evaluation of
performance. It is one means by which an organization systematically
identifies and assigns resources to address safety and environmental
risks, as well as other business risks that affect the organization's
ability to meet its objectives.
The Demonstration Program will give operators the opportunity to
demonstrate that their risk management programs can achieve superior
safety and environmental protection over and above what they have
already achieved through their compliance with existing pipeline safety
regulations. Government and industry will evaluate the benefits of risk
management as a regulatory alternative, and will test whether or not it
should be considered as an ongoing feature of the OPS regulatory
program. In a memorandum issued to the DOT Secretary on October 12,
1996, the President provided policy direction on implementing the
Demonstration Program. Two goals were clarified: (1) That OPS ensure
that superior protection would be achieved through the Demonstration
Program and, (2) that adequate opportunity would be provided for
meaningful public involvement in the overall implementation and
progress of the individual demonstration projects.
To effectively implement the Demonstration Program, OPS needs to
increase public awareness and understanding of the value and importance
of the pipeline network nationwide, provide a broad understanding of
how pipeline companies operate their systems, and allow ample
opportunity to openly discuss the possible impact of these operations
on public safety and the environment.
To prepare to test risk management in individual demonstration
projects, the Joint Risk Management Quality Teams (JRAQT), made up of
Federal and State government, industry, and public representatives,
studied the benefits and limitations of risk management as a regulatory
alternative. The JRAQT investigated approaches that would allow
pipeline operators greater flexibility to take site-specific
considerations into account in addressing both hazardous liquid and
natural gas pipeline safety and environmental protection. One of its
reports, ``Survey of Regulatory Agency Applications of Risk
Management,'' showed that risk management is already widely and
successfully used in other industry and government practices.
The JRAQT designed a structured program so that risk management
could be applied carefully, with results monitored and adjustments made
as needed. The team created five documents to guide implementation of
the Demonstration Program: the Program Framework (62 FR 14719), the
Program Standard, Performance Measures Guidance, a Training Curriculum,
and this Communications Plan. These documents and related information
can be obtained by contacting Eben Wyman at (202) 366-0918.
Program Framework
This document provides information on how pipeline operators can
propose and get approval of risk management projects. The steps in the
Program are described, as well as the program objectives, selection
criteria, and requirements, including how operators must provide for
communication with the public.
Risk Management Program Standard Requirements
The Program Standard calls for both internal and external
communications, that is communications inside the company as well as to
outside stakeholders. It describes the basic elements and
characteristics that should be contained in a company's risk management
program. The Standard describes two sets of key elements: program and
process elements. Program elements address the corporate responsibility
for the structure and procedures to administer, document, communicate,
and evaluate a risk management program. Process elements describe
technical and analytical methods (i.e., the tools, models, and type of
analyses) used to identify possible ways to control risks, allocate
resources to control risks, monitor each project's performance, and
apply information learned to improve the process.
A variety of steps are involved in identifying and reducing risks
on a pipeline system. First, a company conducts a risk assessment,
develops a risk profile of current pipeline conditions, and identifies
possible adverse events that could occur. The likelihood and severity
of these possible events are also evaluated. Second, the company
examines the options for controlling the risks identified in the risk
assessment and decides which
[[Page 43030]]
actions it can take to control the risks. Third, the company
establishes performance measures to track the progress of the risk
control activities and to evaluate if the intended effect of these
actions is being achieved.
The Program Standard provides operators the flexibility needed to
develop a risk management plan appropriate to the nature and extent of
the risks being addressed in a demonstration project. Because risk
management is a continuous improvement process, as new data becomes
available, the operator can make adjustments accordingly.
II. Purpose and Objectives of Communications Plan
This Communications Plan (Plan) describes how OPS and industry will
communicate with those who may be affected by, or interested in, a
demonstration project. The Plan's purpose is to help communities and
the public understand the Demonstration Program's goals, processes,
safety issues, safety actions and anticipated outcomes within each of
the demonstration projects. This communication will be successful if
OPS provides access to information, receives feedback, interacts and
responds to national, state, and community issues.
Both OPS and operators will work in partnership to provide
information to all who may be affected by a demonstration project so
they may understand and evaluate the potential benefits and liabilities
of risk management. The success of the Demonstration Program depends on
the ability to demonstrate, and therefore communicate, three goals: (1)
Risk management can result in superior safety, environmental
protection, and service reliability than could be achieved through sole
compliance with current pipeline safety regulations; (2) resources will
be better prioritized and more effectively applied under risk
management; and (3) government and industry's discussion of risks and
risk control options, and both their ability to impact desired
outcomes, will increase under risk management.
OPS is building a two-way communication system designed to collect
and distribute information to and from all parties that may be affected
by a demonstration project through numerous direct mail and electronic
means, as well as through direct contact. The goal is to enhance
communication among OPS and national organizations and agencies, State
and community representatives. Additionally, pipeline operators who
apply to participate in the Demonstration Program must describe in
their application how they too will communicate with communities
affected by their projects.
Specific benefits of public involvement in the Demonstration
Program for OPS, industry, State and community representatives include:
Exchange of information about specific and relevant local
factors during the decision-making process that may not be known at the
Federal or State level; and
Feedback regarding the success of the Demonstration
Program in accomplishing the goals for which it was designed.
During the demonstration period, OPS will:
Inform and educate about risk management;
Provide project information and methods to provide input
or feedback;
Interact in a timely manner, and
Respond and report back to all stakeholders.
To guide national and local communication initiatives, OPS expanded
the communications workgroup within the JRAQT to involve other
government agencies, public interest groups, environmental groups,
industry and community representatives. The workgroup currently
includes:
National League of Cities
National Association of Towns and Townships
National Fire Protection Association
International Association of Fire Chiefs
Fairfax Virginia Fire Department
Environmental Defense Fund
Port of Houston Authority
International City/County Management Association
Gas Research Institute
Local Emergency Planning Committees
Interstate Natural Gas Association of America
American Petroleum Institute
Shell Oil Products Company
Northwest Pipeline Company
New Hampshire Public Utilities Commission
Arizona Corporation Commission
National Transportation Safety Board
Federal Emergency Management Agency
For further information about participation in the communications
workgroup, contact Eben M. Wyman on (202) 366-0918.
National Communications
1. By working through national organizations and agencies on the
national level, OPS will continue to provide information about the
Demonstration Program to other Federal agencies and to national public
interest and environmental organizations that maintain outreach
programs to community representatives. Our primary means to reach
federal agencies is through the National Response Teams (NRT).
Comprised of fifteen Federal agencies, the NRT representatives have
agreed to identify any issues of concern they may have regarding
potential demonstration sites. These agencies include the Environmental
Protection Agency, Federal Emergency Management Agency, General
Services Administration, Nuclear Regulatory Commission, and the
Departments of Agriculture, Commerce, Defense, Energy, Health and Human
Services, Interior, Justice, Labor, State, Transportation, and
Treasury. OPS will provide designated NRT regional officials with both
national and project-specific information throughout the project
review, approval, and monitoring process so they can identify issues of
concern and provide feedback on individual demonstration projects in
their regions.
2. Federal Register Notices: Opportunities for public comment will
be provided following the publication of Federal Register notices
during various stages of the Demonstration Program: (1) OPS will
publish a notice describing the risk management proposals selected for
consideration and consultation. This notice will describe the
candidate's ``Letter of Intent'' (The number of proposals described in
each notice will depend on the number submitted and screened for
consultation at the time of publication.); (2) OPS will publish a
follow-up notice once the consultation is underway to provide updated
project information and to describe OPS outreach activities; and (3)
another will be published announcing the final approval of the
demonstration projects. These notices will include information
describing the demonstration project, how the operator approaches
external communication, and a list of contacts from whom to obtain
additional information. Additionally, OPS will provide a prospectus to
national, state, and community representatives that describes
information specific to each demonstration project.
3. Internet Information System: PRIMIS--As part of its national
communications efforts, OPS is also making information about pipeline
risk management available via the Internet on the OPS Home Page (HTTP:/
/ops.dot.gov/riskmgmt.htm). Internet access will provide additional
means to locate information, as well as to solicit public comment. The
OPS Home Page
[[Page 43031]]
will be used to disseminate information and to provide the public a
central point of access to technical assistance.
OPS is creating a new data system, accessible to all interested
parties through the Internet, to collect and exchange project
information. It is called the Pipeline Risk Management Information
System (PRIMIS). This data system will help OPS perform project
consultation, approval and audit functions during the Demonstration
Program, and will help facilitate communication of the resulting
information. PRIMIS will serve as a repository of information on the
Risk Management Program as a whole and will provide details concerning
each of the demonstration projects. It is a place where interested
parties can provide information, comments or questions for OPS.
Each of the incoming letters of intent, as well as other
significant documentation, will be entered and retained in the PRIMIS
system. PRIMIS will include a company profile developed by OPS,
specific information on the company's demonstration project, including
the risk control alternatives proposed in the Letter of Intent, and
follow-up information through the screening, consultation, and
implementation phases. The system will also be used to track
significant meetings, program milestones, events, commitments, and
follow-up dates during the consultation process. PRIMIS will be
accessible via the OPS Home Page in September, 1997.
4. Electronic ``town meetings'': To provide further access to
information on the Demonstration Program, OPS aired an electronic town
meeting to discuss the risk management program and candidate projects.
Based on feedback received from this effort, OPS is considering using
this method as a regular feature of future communication efforts. This
two-way live broadcast was aired on June 5, 1997, through the Federal
Emergency Management Agency's Emergency Education Network (EENET). Use
of EENET was intended to involve thousands of public safety and
emergency management officials. During the live broadcast, viewers had
an opportunity to pose questions and voice concerns to OPS, State,
industry and community representatives. OPS is seeking ways to expand
the audience to include local safety and environmental protection
officials as well as other community representatives. The town meeting
broadcast was also available via new Internet technology, which
provided the information via linkage to personal computers. Videotapes
of this broadcast will be available to loan to interested parties from
their State pipeline safety office, or from OPS Headquarters.
Individuals can request to borrow a copy of the videotape via the OPS
Home page (http://ops.dot.gov), or by contacting OPS by e-mail
([email protected]). State emergency managements agencies will
also have a copy.
5. Identifying other resources: The communications workgroup
mentioned earlier will assist in identifying information that meets the
needs of local communities and methods to distribute information. Use
of the Internet, electronic ``town meetings'' and regional briefings to
provide project status reports are examples of methods to communicate
risk management activities on a national basis. We will identify other
resources during the course of the Demonstration Program.
Local Communications
Both OPS and participating operators are responsible for local
level communications focused on communities within a demonstration
project site area. In its proposal, an operator is required to describe
to OPS its external communication methods as defined in the Program
Standard, including the types of information to be communicated and the
audiences to receive that information. Companies will also describe the
methods of communication, individuals or organizations responsible for
providing information, and methods of receiving feedback from these
audiences.
The operator will initiate communications at the start of the
project to inform community representatives about key issues, progress
and to solicit feedback. Operators will build on existing public
education and outreach programs. The operator will describe to OPS how
it plans to address public interests and concerns, and how it will
communicate to community representatives with varied interests such as
local officials, environmental organization representatives, and fire,
rescue, safety and health organization representatives. These
representatives could include members of organized groups that have a
continuing interest in pipeline safety issues, or citizens with an
interest in the projects who come forward with questions or
suggestions.
OPS will work with operators to help identify interested parties
and to answer questions from State officials and community
representatives. OPS will also help operators gather relevant
information regarding local, site-specific issues in locations of their
demonstration projects. OPS and operators will provide information to
effectively address issues of concern. Many channels of communication,
including local media sources in various demonstration project areas,
will be pursued as a means of communication. OPS seeks names of media
contacts interested in following demonstration projects.
As stated earlier, OPS will provide a prospectus on each of the
demonstration projects being considered to State officials and
community representatives that may be interested in reviewing project
information, providing input, or monitoring the progress of the
project. Each prospectus will contain basic information about the
company and its proposed demonstration project, describe the operator's
approach to communication with States and community representatives,
and identify individuals who can be contacted for information,
questions or comments. These contacts will be OPS, company, and State
pipeline agency representatives (if the State agrees to participate).
OPS will provide additional information on project objectives, risk
management alternatives, and performance measures and progress
throughout the demonstration period.
III. Commonly Asked Questions
The following are two commonly asked questions regarding the
Demonstration Program. OPS will continue to address these and other
questions received from interested parties using the communication
techniques described above.
A. What Are the Expected Benefits of the Risk Management Demonstration
Program?
1. Risk Management Should Help OPS Better Protect the Public and the
Environment
While the traditional approach to safety is effective in
determining if prescribed safety requirements are carried out, it does
not require a structured process to identify risks or to validate the
solutions being implemented. Risk management is intended to provide a
more complete understanding of risks and to provide methods and models
to produce the most appropriate and cost effective measures to reduce
risk.
2. Risk Management Is Designed To Yield Improved Information for Policy
and Decision-Making
Since risk management is predicated on identifying and
understanding potential threats to a pipeline system,
[[Page 43032]]
the risk management approach to safety is likely to generate improved
data to enhance decision-making by both operators and regulators. Both
government and industry should learn more from available data about a
wide range of risks and system configurations to help determine the
most effective methods to measure performance and monitor risk
activities.
3. Risk Management Will Allow Pipeline Safety Programs To Be Tailored
to Local Conditions
Risk management will permit pipeline operators and OPS to focus
greater attention on those pipeline systems, or segments of those
systems, where there is an opportunity to reduce risk and achieve
superior safety, environmental protection and service reliability. The
goal is to design risk management programs that best address pipeline-
specific conditions.
4. Risk Management Should Provide Increased Operator Flexibility To
Achieve Superior Safety
Through risk management, operators plan to use expert knowledge and
experience to tailor company safety plans to unique system conditions,
providing them with the flexibility to select the best methods to
address risks.
5. The Risk Management Demonstration Program Will Be Built Through
Partnerships
A partnership was formed among OPS, the pipeline industry, and
State and community representatives to examine risk management
principles and to evaluate if they should be tested as an alternative
approach to pipeline regulation. This partnership is expected to
continue to improve information exchange between all parties
participating in the Demonstration Program.
B. How Will the Demonstration Program Work?
1. OPS Will Oversee the Risk Management Demonstration Program Process
OPS will carefully assess each proposed demonstration project to
determine whether superior safety and environmental protection can be
achieved. Before OPS issues an order approving a demonstration project,
a Project Review Team (PRT), made up of OPS representatives (assisted
by voluntary State support), will meet with the candidate to clarify
all relevant aspects of the project. To accomplish this, OPS will seek
input from other Federal agencies, affected states and other safety and
environmental officials on their issues and concerns, including their
knowledge of candidate companies' safety and environmental compliance
records.
The selection process will involve a comprehensive review of the
candidate's pipeline system and consultation with the candidate. There
are two important operator submissions.
The first submission is the Letter of Intent. This initial letter
is an expression of an operator's interest in participating in the
Demonstration Program. It describes a specific demonstration project
the operator would like OPS to consider for inclusion in the
Demonstration Program. Following the receipt of the Letter of Intent,
OPS will contact the company to set up a series of consultation
meetings. The second submission is the Formal Application and Work
Plan, which the operator will prepare after discussions with the PRT
have resulted in a mutually acceptable demonstration project. This
submission formally documents the terms and conditions of the project
and is the basis upon which OPS will approve or reject the operator's
project.
Adjustments may be necessary to specific areas of the project
before it starts. Such adjustments will take into account community
concerns. Other adjustments or modifications may also occur during the
course of the project, and may come from periodic reviews by the PRT.
2. Basic Regulatory Roles and Responsibilities Will Not Change Under
Risk Management
The Federal government's fundamental responsibilities and authority
will remain the same. OPS will continue to set standards for, and
independently assess, pipeline safety and integrity. Oversight will be
improved as government agencies focus on better understanding how
individual pipelines are operated, how risk-based decisions are made,
what effective alternatives exist for reducing risk, and whether the
intended results are being achieved.
3. Clear and Ambitious Performance Goals Will Be Set
OPS has worked with representatives of State pipeline safety
agencies and industry to develop guidance on performance measures that
will be used to evaluate the results of the demonstration projects.
Many of the performance measures will be designed to evaluate at the
national program level whether superior safety and environmental
protection are achieved through this alternative approach to government
oversight.
In addition, performance measures will be designed for government
and industry to monitor the achievement of desired safety,
environmental and service reliability results at the individual project
level. OPS and operators should be able to demonstrate improved
accountability to the community as a result of these measures.
4. The Demonstration Program Welcomes Public Input
Improving public involvement has been a Program goal from the
beginning. Government and industry sought public input through the
November 1995, the May 1996, and the January 1997 risk management
public meetings. The public's views have also been sought through the
OPS Home Page on the Internet (HTTP://ops.dot.gov), presentations to
groups representing emergency responders and State and community
representatives, and through newsletters and Federal Register notices.
The previously described Communications Plan has been designed to
continue and enhance the public's involvement.
5. Opportunities to Address Public Concerns
The demonstration project review, consultation, approval, and
communication process is designed to give appropriate opportunities to
raise concerns and to seek information about particular demonstration
projects. Participating companies will facilitate this process by
coordinating with Federal, State and local authorities to provide
methods of information sharing to community representatives.
6. Safeguards Will Be Maintained
The OPS regulatory program that has been in place for 25 years will
continue to be the means of oversight of all pipelines not
participating in the Demonstration Program. Pipelines participating in
demonstration projects will also continue to be safeguarded. OPS and
State pipeline agencies will maintain regulatory oversight activities
on all existing pipelines involved inside and outside the Demonstration
Program.
7. The Focus Will Be on Those Who Can Succeed
The previously described Program Standard and Framework processes
are designed to provide many checks and balances in the selection
process. The process is intended to identify companies that will comply
with the Program Standard, achieve superior
[[Page 43033]]
safety and environmental protection through risk management, work in
partnership with OPS to evaluate the merits of risk management, and
show a corporate commitment to use the risk management process as a
day-to-day part of their business practices. The selection criteria for
the Demonstration Program favors those proposals that are the most
comprehensive. The company must also have a clear and established
record of compliance in the existing program in order to be considered
for participation.
8. Enforceable Agreements and Incentives To Perform
Just as the traditional regulatory system provides a clear process
to monitor performance, so must the risk management alternative. Once
OPS approves a Formal Application and Work Plan, an order will be
issued and notice made to the public through the Federal Register. The
order will specify the pipeline safety regulatory requirements for the
period of the demonstration, and set forth the terms and conditions for
the operator's participation in the project.
OPS will have an audit plan to monitor how well the operator is
meeting the performance goals. OPS's full statutory authority to
inspect pipeline facilities remains in effect.
Should any unsafe conditions arise, OPS will work with
participating companies to see that such conditions are quickly
remedied.
OPS invites comments on ways we can make the communications program
more meaningful.
Issued in Washington, DC, on August 5, 1997.
Richard B. Felder,
Associate Administrator for Pipeline Safety.
[FR Doc. 97-21117 Filed 8-8-97; 8:45 am]
BILLING CODE 4910-60-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.