Petition for Waiver of Compliance
Federal RegisterJun 2, 1997
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
Petition for Waiver of Compliance
In accordance with Part 211 of Title 49 Code of Federal Regulations
(CFR), notice is hereby given that the Federal Railroad Administration
(FRA) received a request for a waiver of compliance with certain
requirements of its safety standards. The individual petition is
described below, including the party seeking relief, the regulatory
provisions involved, the nature of the relief being requested, and the
petitioner's arguments in favor of relief.
Southeastern Pennsylvania Transportation Authority
[Waiver Petition Docket Number H-97-2]
The Southeastern Pennsylvania Transportation Authority (SEPTA)
seeks a waiver of compliance from certain provisions of the Railroad
Locomotive Safety Standards, 49 CFR Section 229.29, for its 304 MU
locomotives. Specifically, SEPTA wants to extend the required time
intervals for cleaning, repairing, and testing of MU locomotive brake
equipment from 736 days to 1104 days.
SEPTA believes that granting this waiver will in no way diminish
the safety of its operations and base its opinion on the following
declarations:
All of the major components of (or components virtually
identical to) SEPTA's MU brake systems are being used successfully with
3 or 4 year clean, oil, test, and stencil (COT&S) intervals on the
National Railroad Passenger Corporation, New Jersey Transit, and
freight railroads.
[[Page 29777]]
The condition of the internal components of the brake
valves at the 2 year COT&S interval is excellent.
All of SEPTA's MU locomotives with air compressors are
equipped with air dryers, as are all of its shop air supplies. (SEPTA
has no yard air plants).
SEPTA's MU fleet is confined to a small area. All air
brake valves are rebuilt at one location, and failures are entered into
a computer tracking system for monitoring of brake system performance
to aid in quick identification of and reaction to any failure trends.
Testing recently completed by Metro-North Railroad (Metro-
North) demonstrating that extending COT&S to 1104 days could be
accomplished without compromising brake system reliability and safety
was successful. While SEPTA's equipment is not identical to Metro-
North's, SEPTA feels the hardware and service requirements are very
similar.
Interested parties are invited to participate in these proceedings
by submitting written views, data, or comments. FRA does not anticipate
scheduling a public hearing in connection with these proceedings since
the facts do not appear to warrant a hearing. If any interested party
desires an opportunity for oral comment, they should notify FRA, in
writing, before the end of the comment period and specify the basis for
their request.
All communications concerning these proceedings should identify the
appropriate docket number [e.g., Waiver Petition Docket Number H-97-2]
and must be submitted in triplicate to the Docket Clerk, Office of
Chief Counsel, FRA, Nassif Building, 400 Seventh Street, S.W.,
Washington, D.C. 20590. Communications received within 45 days of the
date of this notice will be considered by FRA before final action is
taken. Comments received after that date will be considered as far as
practicable. All written communications concerning these proceedings
are available for examination during regular business hours (9:00 a.m.-
5:00 p.m.) at FRA's temporary docket room located at 1120 Vermont
Avenue, N.W., Room 7051, Washington, D.C. 20005.
Issued in Washington, D.C. on May 20, 1997.
Grady C. Cothen, Jr.,
Deputy Associate Administrator for Safety Standards and Program
Development.
[FR Doc. 97-14247 Filed 5-30-97; 8:45 am]
BILLING CODE 4910-06-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.