Giant Multi-Resource Management Project, Placer County, CA

Federal RegisterJun 2, 1997

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF AGRICULTURE

Forest Service

Giant Multi-Resource Management Project, Placer County, CA

AGENCY: Forest Service, USDA.

ACTION: Notice; intent to prepare an environmental impact statement.

-----------------------------------------------------------------------

SUMMARY: The U.S. Department of Agriculture, Forest Service will

prepare an environmental impact statement (EIS) for proposed timber

harvest, plantation thinning, wildlife habitat improvement projects,

creation of an interpretive trail, planting riparian vegetation,

closing of dispersed camping sites, decommissioning of roads, creation

of scenic overlooks, and seasonal road closures for wildlife protection

within the North Shirttail Canyon watershed in accordance with the

requirements of 36 CFR 219.19. It is located in all or part of section

4, 5, 6, 7, 8, 9, 10, 16, 17, and 18, TSN, R11E and portions of

sections 12, 13, and 24, T15N, R10E, Placer County, MDM, CA

The agency invites comments and suggestions on the scope of the

analysis. In addition, the agency gives notice of the full

environmental analysis and decision-making process that will occur on

the proposal so that interested and affected people are aware of how

they may participate and contribute to the final decision.

DATES: Comments should be made in writing and received by June 23,

1997.

ADDRESSES: Written comments concerning the project should be directed

to Rich Johnson, District Ranger, Foresthill Ranger District, 22830

Foresthill Road, Foresthill CA 95631.

FOR FURTHER INFORMATION CONTACT:

John Bradford, Environmental Coordinator, Foresthill Ranger District,

Foresthill, CA 95631, telephone (916) 478-6254.

SUPPLEMENTARY INFORMATION: The Giant Analysis Area is located in the

North Shirttail Canyon watershed. It lies primarily east of Sugar Pine

Reservoir, west of Humbug Canyon, north of Big Reservoir, and south of

the North Fork American River.

In preparing the environmental impact statement, the Forest Service

will identify and analyze a range of alternatives that address the

issues developed for this area. One of the alternatives will be no

treatment. Another alternative will implement all of the actions being

proposed. It also means that the needs of people and environmental

values will be considered in a such way that this area will represent a

diverse, healthy, productive, and sustainable ecosystem.

The proposed actions include:

(1) Commercial timber harvesting on approximately 1100 acres of

plantations and natural stands.

(2) Creation of two scenic overlooks, one near Sugar Pine Reservoir

and one near the North Fork American River.

(3) Wildlife habitat improvement through thinning of black oak

clumps and through burning or masticating of shrubfields.

(4) Closing six dispersed camping sites to restore riparian habitat

and restore potential red-legged frog habitat.

(5) Protect deer winter range by installing gates and implementing

a seasonal road closure.

(6) Restore native riparian vegetation in conifer plantations

through planting riparian species.

(7) Establish a \1/4\ mile long interpretive trail along North

Shirttail Canyon.

(8) Precommercial thin in conifer plantations using chain saw and

track-laying masticating machines on approximately 580 acres.

(9) Prune plantation trees on approximately 350 acres. Public

participation will be important during the analysis, especially during

the review of the Draft Environmental Impact Statement. The Forest

Service is seeking information, comments, and assistance from Federal,

State, and local agencies and other individuals or organizations who

may be interested in or affected by the proposed action. This input

will be used in preparation of the draft environmental impact statement

(DEIS). The scoping process includes:

1. Identifying potential issues.

2. Identifying issues to be analyzed in depth.

3. Eliminating insignificant issues or those which have been

covered by a relevant previous environmental analysis.

4. Exploring additional alternatives.

5. Identifying potential environmental effects of the proposed

action and alternatives (i.e., direct, indirect, and cumulative effects

and connected actions).

The following list of issues has been identified through initial

scoping:

(1) to what extent will harvesting affect water quality?

(2) What affect will timber harvesting have on the Off-Highway

Vehicle (OHV) trail system in the project area.?

[[Page 29707]]

(3) To what extent can forest health be improved within the project

area? In addition, what level of timber commodities could result from

forest health improvement projects?

(4) To what extent will the view from Sugar Pine Reservoir be

affected? What will the visual character be resulting from the proposed

activities?

(5) What affect will the proposed activities have on long-term soil

productivity?

(6) to what extent will air quality in the Sacramento Valley be

affected by proposed activities?

(7) What affect will including harvest of <10'' diameter trees have

on the potential to sell harvested trees in a commercial timber sale?

Comments from other Federal, State, and local agencies,

organizations, and individuals who may be interested in, or affected by

the decision, are encouraged to identify other significant issues.

Public participation will be solicited through mailing letters to

potentially interested or affected mining claim owners, private land

owners, and special use permittees on the Foresthill Ranger District;

posting information in local towns; and mailing letters to local timber

industries, politicians, school boards, county supervisors, and

environmental groups. Continued participation will be emphasized

through individual contacts. Public meetings used as a method of public

involvement during preparation and review of the draft environmental

impact statement will be announced in newspapers of general circulation

in the geographic area of such meetings well in advance of scheduled

dates.

The comment period on the draft EIS will be 45 days from the date

the Environmental Protection Agency publishes the notice of

availability in the Federal Register.

The Forest Service believes, at this early stage, it is important

to give reviewers notice of several court rulings related to public

participation in the environmental review process. First, reviewers of

draft environmental impact statements must structure their

participation in the environmental review of the proposal so that it is

meaningful and alerts an agency to the reviewer's position and

contentions. Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519,

553 (1978). Also, environmental objections that could be raised at the

draft EIS stage but that are not raised until after completion of the

final EIS may be waived or dismissed by the courts. City of Angoon v.

Hodel, 803 F.2d 1016, 1022 (9th Cir. 1986) and Wisconsin Heritages Inc.

v. Harris, 490 F. Supp. 1334, 1338 (E.D. Wis. 1980). Because of the

court rulings, it is very important that those interested in this

proposed action participate by the close of the 45 day comment period

so that substantive comments and objections are made available to the

Forest Service at a time when it can meaningfully consider them and

respond to them in the final EIS.

To assist the Forest Service in identifying and considering issues

and concerns on the proposed action, comments on the draft EIS should

be as specific as possible. It is also helpful if comments refer to

specific pages or chapters of the draft EIS. Comments may also address

the adequacy of the draft EIS or the merits of the alternatives

formulated and discussed in the statement. Reviewers may wish to refer

to the Council on Environmental Quality Regulations for implementing

the procedural provisions of the National Environmental Policy Act at

40 CFR 1503.3 in addressing these points.

The draft EIS is expected to be available for public review by the

end of July, 1997. The final EIS is expected to be available by the end

of September, 1997.

The responsible official is John H. Skinner, Forest Supervisor,

Tahoe National Forest, PO Box 6003, Nevada City, CA 95959.

Dated: May 16, 1997.

John H. Skinner,

Forest Supervisor.

[FR Doc. 97-14231 Filed 5-30-97; 8:45 am]

BILLING CODE 3410-11-M

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.