DEPARTMENT OF DEFENSE

Corps of Engineers

Department of the Army

Intent to Prepare a Draft Environmental Impact Statement (DEIS)

for the Dade County Erosion Control and Hurricane Protection Project,

Project Modification at Sunny Isles

AGENCY: U.S. Army Corps of Engineers, Department of Defense.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: The Jacksonville District, U.S. Army Corps of Engineers

intends to prepare a Draft Environmental Impact Statement for the Dade

County Erosion Control and Hurricane Protection Project, Project

Modification at Sunny Isles. The study is a cooperative effort between

the U.S. Army Corps of Engineers and the Dade County Department of

Environmental Resources Management (DERM) which is also a cooperating

agency for this DEIS.

FOR FURTHER INFORMATION CONTACT:

Kenneth Dugger, 904-232-1686, Environmental Branch, Planning Division,

P.O. Box 4970, Jacksonville, Florida 32232-0019.

SUPPLEMENTARY INFORMATION: The Beach Erosion Control and Hurricane

Protection (BEC & HP) Project for Dade County, Florida was authorized

by the Flood Control Act of 1968. The Supplemental Appropriations Act

of 1985 and the Water Resources Development Act of 1986 (Public Law 99-

662) provided authority for extending the northern limit of the

authorized project to include the construction of a protective beach

along the 2.5 mile reach of shoreline north of Haulover Beach Park

(Sunny Isles) and for periodic nourishment of the new beach.

Beach fill placed along the northern portion of Sunny Isles rapidly

erodes due to spreading (end) losses. Following each beach fill

placement, a large discontinuity in berm widths exists at the Sunny

Isles/Golden Beach city limit. Material from the wide post-nourishment

Sunny Isles shoreline diffuses rapidly northward into Golden Beach,

which is offset approximately 150 feet further landward immediately

following beach fill placement.

To resolve the problem of end losses and to increase storm

protection along the Sunny Isles coastline, a combination of

interacting and interdependent shore protection measures have been

studied. The proposed action consists of construction of a 120 foot

wide advance maintenance berm (along Sunny Isles Beach), a 1500 foot

beach fill transition (offshore Golden Beach), and two 400 ft

[[Page 3013]]

segments of submerged geotextile breakwater (offshore Sunny Isles). All

construction of the beach fill transition offshore of Golden Beach

would occur on State of Florida lands, which are located below the mean

high water line. The transition would taper from 120 feet wide at the

Sunny Isles/Golden Beach city limit to zero feet, over a length of 1500

feet offshore of Golden Beach. The planned source of borrow for this

action is a southerly extension of an offshore borrow site south of

Government Cut. The forecast completion date for the proposed project

modification would be by the end of 1998.

The 2nd Periodic Renourishment at Sunny Isles was addressed in a

final Environmental Assessment dated May 1995. The proposed

modification primarily differs from the 2nd Periodic Renourishment in

that it uses a different borrow source, places additional material on

the beach (an advance maintenance berm), and it also involves two

project features not previously used at this location. These are a

geotextile breakwater (offshore of Sunny Isles) and a transition fill

(offshore of Golden Beach). The proposed action including the above was

described in the feasibility study and final Environmental Impact

Statement for the ``Coast of Florida Erosion and Storm Effects Study,

Region III'' dated November 1996 but was not proposed for authorization

in that document.

Alternatives: Alternatives considered include no action, non-

structural measures, the construction of revetments, perched beaches,

breakwaters, beach fills of varying widths, construction of submerged

nearshore berms, beach fill transitions, and a beach fill/groin

combination. Alternative sand sources in addition to the use of the

proposed borrow area for nourishment, include the use of other local

offshore sand sources, the use of other sand sources such as upland

sources, Bahamian sand, other foreign sands, or other distant sources.

Issues: The EIS will consider impacts on coral reefs and other

hardbottom communities, protected species, shore protection, health and

safety, water quality, aesthetics and recreation, fish and wildlife

resources, cultural resources, energy conservation, socio-economic

resources, and other impacts identified through scoping, public

involvement, and interagency coordination.

Scoping: A scoping letter was sent to interested parties on April

21, 1993. In addition, all parties are invited to participate in the

scoping process by identifying any additional concerns on issues,

studies needed, alternatives, procedures, and other matters related to

the scoping process. At this time there are no plans for a public

scoping meeting.

Public Involvement: We invite the participation of affected

Federal, state and local agencies, affected Indian tribes, and other

interested private organizations and parties.

Coordination: The proposed action is being coordinated with the

U.S. Fish and Wildlife Service (FWS) and the National Marine Fisheries

Service under Section 7 of the Endangered Species Act, with the FWS

under the Fish and Wildlife Coordination Act, and with the State

Historic Preservation Officer.

Other Environmental Review and Consultation: The proposed action

would involve evaluation for compliance with guidelines pursuant to

Section 404(b) of the Clean Water Act; application (to the State of

Florida) for Water Quality Certification pursuant to Section 401 of the

Clean Water Act; certification of state lands, easements, and rights of

way; and determination of Coastal Zone Management Act consistency.

Agency Role: As cooperating agency, non-Federal sponsor, and

leading local expert; DERM will provide extensive information and

assistance on the resources to be impacted, mitigation measures, and

alternatives.

DEIS Preparation: It is estimated that the DEIS will be available

to the public on or about February 1, 1997.

Dated: December 31, 1996.

Hanley K. Smith,

Acting Chief, Planning Division.

[FR Doc. 97-1335 Filed 1-17-97; 8:45 am]

BILLING CODE 3710-AJ-M