DEPARTMENT OF TRANSPORTATION
Federal Transit Administration
Environmental Impact Statement on Canal Street Spine Streetcar
Project
AGENCY: Federal Transit Administration, DOT.
ACTION: Notice of intent to prepare an environmental impact statement.
-----------------------------------------------------------------------
SUMMARY: The Federal Transit Administration (FTA) and the Regional
Transit Authority (RTA) intend to prepare an Environmental Impact
Statement (EIS) in accordance with the National Environmental Policy
Act (NEPA) for transportation improvements in the Canal Street Corridor
within the City of New Orleans, Louisiana. The Locally Preferred
Alternative (the Proposed Action) for transportation improvements
consists of the construction of a streetcar rail route in the neutral
ground (median) of Canal Street extending from the Riverfront streetcar
line to City Park Avenue with a connection along Carrollton and Orleans
Avenues to City Park and Delgado Community College.
The FTA and RTA will prepare the draft and final EIS in conformance
with 40 CFR Parts 1500-1508, Council on Environmental Quality,
Regulations for Implementing the Procedural Requirements of the
National Environmental Policy Act of 1969, and 49 CFR Part 622, FTA,
Environmental Impact and Related Procedures. In addition, in
conformance with Federal Transit Laws, as codified at 49 U.S.C. 5301 et
seq., and FTA policy, the Draft EIS will be prepared as a follow-on
document to the Canal Street Corridor Project, Major Investment Study
(March
[[Page 15561]]
1995) and the Canal Street Corridor Project, Locally Preferred
Alternative Report (March 1995). In addition, both the Draft and Final
EIS will be prepared in conjunction with Preliminary Engineering for
the Canal Street Spine Streetcar Project.
DATES: Comment Due Date: Written comments on the scope of alternatives
and impacts to be considered should be sent to Mr. Jeffrey Roesel,
Project Manager, RTA by May 8, 1996. Scoping Meeting: A public scoping
meeting will be held on Tuesday, April 30, 1996, at the St. John
Lutheran Church Fellowship Center. See ADDRESSES below.
ADDRESSES: Written comments on the project scope should be sent to Mr.
Jeffrey Roesel, Project Manager, RTA, 6700 Plaza Drive, New Orleans,
Louisiana 70127-2677.
A Scoping Meeting will be held beginning at 7:00 p.m. on April 30,
1996, at the following location: St. John Lutheran Church Fellowship
Center, 136 North Pierce Street, New Orleans, LA 70119.
FOR FURTHER INFORMATION CONTACT: Mrs. Peggy Crist, Director, Planning
and Program Development, FTA, (817) 860-9663.
SUPPLEMENTARY INFORMATION:
I. Scoping
The FTA and RTA invite the public and affected Federal, State, and
local agencies to comment on the alternatives that will be evaluated in
the EIS and identify any significant issues related to the
alternatives. Written materials describing the Proposed Action, the
expected environmental impacts, a public involvement program, and the
preliminary work schedule are being mailed to affected Federal, State,
and local agencies and to interested parties on record. Others may
request these scoping materials by calling or writing to Mr. Jeffrey
Roesel, Project Manager, RTA, 6700 Plaza Drive, New Orleans, Louisiana
70127-2677; Telephone (504) 248-3899.
A scoping meeting is set for April 30, 1996, at the St. John
Lutheran Church Fellowship Center. Verbal and written comments may be
submitted at this meeting, and RTA staff will be available for
questions. Opportunity for additional public comment will be provided
during the study. If you would like to be placed on the mailing list to
receive further information on the project and notices of public
meetings and hearings, please contact Mr. Roesel at the above address.
II. Description of Study Areas and Project Need
The Canal Street Corridor is delineated by the area bounded by and
including the abutting properties from the intersection of City Park
Avenue and the I-10 to Canal Boulevard to the Norfolk Southern Railroad
right-of-way to the Bayou St. John to St. Ann Street to Decatur Street
to Elysian Fields Avenue to the Mississippi River to Poydras Street to
the I-10 to the intersection with City Park Avenue. This corridor
contains several of the City's oldest and most famous neighborhoods,
some of which are listed on the National Register of Historic Places.
The neighborhoods in the study area include Mid-City, Treme, the French
Quarter, Faubourg Marigny, the Warehouse District, the Central Business
District (CBD), and the New Orleans Regional Medical Center.
The RTA, in cooperation with the FTA, is undertaking the Canal
Street Spine Streetcar Project as part of an overall plan to upgrade
and expand transit ridership and services in the New Orleans
Metropolitan Area. The project is needed to improve local commuting
access along the Canal Street Corridor and into the New Orleans CBD.
Other transportation goals include increasing transit system ridership
and operating efficiency, while reducing conflicts between transit
vehicles and passenger cars.
III. Alternatives
Transportation improvements proposed for consideration in the Canal
Street Corridor EIS include the No Build Alternative and the Proposed
Action. The No Build Alternative consists of a continuation of the
current five bus lines operating in the Canal Street Corridor. Issues
to be evaluated under the No Build Alternative include elimination of
underutilized stops and modification of traffic signals to incorporate
priority control.
The Proposed Action consists of re-occupation of the traditional
street rail corridor in the neutral ground (median) of Canal Street
from the foot of Canal Street (connection to the Riverfront Line) to
City Park Avenue. It also includes a spur line that would depart from
the Canal Spine at Carrollton Avenue, travel along Carrollton to
Orleans Avenue, and follow Orleans across City Park Avenue to a
terminus in Marconi Boulevard near the entrances to City Park and
Delgado Community College at Victory Drive. Service will begin at the
Esplanade station on the Riverfront Line and proceed along the existing
Riverfront Line to the foot of Canal Street. From the foot of Canal,
service will proceed in the Canal Street neutral ground (median) to the
terminus at City Park Avenue or the Marconi Boulevard terminus. The
entire route, consisting of double-tracked rail, is approximately 5.6
miles (9.0 km) in length.
In addition, the Proposed Action will include the construction of a
maintenance facility for daily service, inspection, and storage of the
Canal Street Spine and Riverfront streetcar fleet (SIS Barn).
Preliminary screening of locations has identified three potential
locations for the SIS Barn: (1) and (2) Lafitte Avenue Sites I and II,
located within the rail corridor bounded by St. Louis Street, Lafitte
Avenue, North Claiborne Avenue, and North Dorgenois Street; and (3)
Jefferson Davis/Tulane Site, bounded by Tulane Avenue, South Jefferson
Davis Parkway, Julia Street, South Genois Street, and South Clark
Street. All existing facilities have also been considered.
IV. Probable Effects/Potential Impacts for Analysis
The FTA and RTA propose to evaluate in the EIS all significant
social, economic, and environmental impacts of the alternatives under
consideration. The impacts evaluated will include: noise; residential
and business displacements; changes in development patterns and land
use; community disruption due to traffic, noise, displacements, and
parking changes; safety considerations; effects on parks and historic
sites (Sections 106 and 4(f)); degradation of the air quality and water
quality; encroachment on wetlands and floodplains, ecologically
sensitive areas, hazardous waste sites; changes to wildlife habitat;
and the overall aesthetic quality of the area. These impacts will be
evaluated for both the construction period and for the long-term
operation of each alternative. Measures to mitigate identified impacts
will be discussed.
V. FTA Procedures
In accordance with Federal transportation planning regulations, the
DEIS will be prepared as a follow-on document to the Canal Street
Corridor Project, Major Investment Study (March 1995) and the Canal
Street Corridor Project, Locally Preferred Alternative Report (March
1995) as approved by the City of New Orleans. In addition, both the
Draft and Final EIS will be prepared in conjunction with Preliminary
Engineering for the Canal Street Spine Streetcar Project. Upon
completion of the DEIS, and in consideration of comments received from
the public and
[[Page 15562]]
affected agencies, the RTA, as the lead agency, will continue with
further preliminary engineering and preparation of a Final EIS.
Issued on: April 3, 1996.
Wilbur E. Hare,
Regional Administrator.
[FR Doc. 96-8649 Filed 4-5-96; 8:45 am]
BILLING CODE 4910-57-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.