Agency Information Collection Activities

Federal RegisterApr 3, 1996

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF ENERGY

Energy Information Administration

Agency Information Collection Activities

AGENCY: Energy Information Administration, Department of Energy.

ACTION: Agency information collection activities: Proposed collection;

comment request.

-----------------------------------------------------------------------

SUMMARY: The Energy Information Administration (EIA) is soliciting

comments concerning the revisions to the Form EIA-411, ``Coordinated

Bulk Power Supply Program Report.''

DATES: Written comments must be submitted on or before June 3, 1996. If

you anticipate that you will be submitting comments, but find it

difficult to do so within the period of time allowed by this notice,

you should advise the contact listed below of your intention to do so

as soon as possible.

ADDRESSES: Send comments to Mr. John W. Makens, EI-523, Office of Coal,

Nuclear, Electric and Alternate Fuels, Energy Information

Administration, U.S. Department of Energy, 1000 Independence Avenue,

SW., Washington, DC 20585. Phone--(202) 426-1165. FAX--(202) 426-1308.

E:mail: [email protected]

FOR FURTHER INFORMATION CONTACT: Requests for additional information or

copies of the form and instructions should be directed to Mr. John W.

Makens at the address listed above.

SUPPLEMENTARY INFORMATION:

I. Background.

II. Current Actions.

III. Request for Comments.

[[Page 14767]]

I. Background

In order to fulfill its responsibilities under the Federal Energy

Administration Act of 1974 (Pub. L. No. 93-275) and the Department of

Energy Organization Act (Public Law 95-91), the Energy Information

Administration is obliged to carry out a central, comprehensive, and

unified energy data and information program. As part of this program,

EIA collects, evaluates, assembles, analyzes, and disseminates data and

information related to energy resource reserves, production, demand,

and technology, and related economic and statistical information

relevant to the adequacy of energy resources to meet demands in the

near and longer term future for the Nation's economic and social needs.

The Energy Information Administration, as part of its continuing

effort to reduce paperwork and respondent burden (required by the

Paperwork Reduction Act of 1995 (Public Law 104-13)), conducts a

presurvey consultation program to provide the general public and other

Federal agencies with an opportunity to comment on proposed and/or

continuing reporting forms. This program helps to ensure that requested

data can be provided in the desired format, reporting burden is

minimized, reporting forms are clearly understood, and the impact of

collection requirements on respondents can be properly assessed.

The Form EIA-411 is filed annually as a voluntary report. The

information reported includes: (1) Actual energy and peak demand for

the preceding year and 10 additional years; (2) existing and future

generating capacity; (3) scheduled capacity transfers; (4) projections

of capacity, demand, purchases, sales, and scheduled maintenance; and

(5) bulk power system maps. These data support queries from the

executive branch, Congress, other public agencies, and the general

public. The data present various council aggregate totals for their

member electric utilities, with some nonmember information included.

The 1994 Electric Power Annual, Volume II published selected

information, while the 1994 Inventory of Power Plants in the United

States published capacity information. These publications and other EIA

publications may be purchased from the Superintendent of Documents,

U.S. Government Printing Office. Telephone orders may be directed to:

Mail Order Desk, (202) 512-1800 or by FAX at (202) 512-2250.

II. Current Actions

EIA is requesting a 3 year clearance to an existing collection that

has been changed. The following schedules were dropped when the form

(previously the OE-411, ``Coordinated Regional Bulk Power Supply

Program Report) was transferred to EIA: Item 3-B, Assessment of

Adequacy; Item 3-C, Generating Capacity Unavailability; Item 5-A, Near

Term Transmission Adequacy; Item 5-B, Future Critical Bulk Power

Facilities That Will Not Be in Service When Required; Item 5-C, System

Evaluation Criteria; Item 6-A, Coordination of Operations; Item 6-B,

Load Preservation Program; and Item 7, Additional Information.

Comments, if any, about these deletions from the new form will be

considered. In addition, the information from Item 1, Actual Energy and

Peak Demand for the Preceding Year and 10 Additional Years, will not be

available in 1996; however, Item 1 is under consideration to be kept on

the new form via this clearance review. Information found in Item 1

includes, by North American Electric Reliability Council Region (NERC),

the 12 monthly peak and energy demand data elements for the prior year,

estimated values for the reporting year, and 10-year projections. The

information provided shows all monthly peak loads and energy, thereby

allowing the examination of seasonal patterns by NERC regions and for

any region having sub-regions.

The Form EIA-411 will be filed in a unified, electronic format in

which the national and individual council aggregates will be provided

for all items. There will be no individual council reports produced on

paper.

III. Request for Comments

Prospective respondents and other interested parties should comment

on the actions discussed in item II. The following guidelines are

provided to assist in the preparation of responses.

General Issues

EIA is interested in receiving comments from persons regarding:

A. Whether the proposed collection of information is necessary for

the proper performance of the functions of the agency, including

whether the information will have practical utility. Practical utility

is the actual usefulness of information to or for an agency, taking

into account its accuracy, adequacy, reliability, timeliness, and the

agency's ability to process the information it collects.

B. What enhancements can EIA make to the quality, utility, and

clarity of the information to be collected?

As a Potential Respondent

A. Are the instructions and definitions clear and sufficient? If

not, which instructions require clarification?

B. Can data be submitted in accordance with the due date specified

in the instructions?

C. Public reporting burden for this collection is estimated to

average 13 hours per utility providing information to the NERC regional

councils and average of 650 hours for each of the regional councils to

provide consolidated information to NERC. It is then estimated that it

will take NERC 240 hours to file 1 report covering all council regions

with the EIA. Burden includes the total time, effort, or financial

resources expended to generate, maintain, retain, or disclose or

provide the information including: (1) Reviewing instructions; (2)

developing, acquiring, installing, and utilizing technology and systems

for the purposes of collecting, validating, verifying, processing,

maintaining, disclosing and providing information; (3) adjusting the

existing ways to comply with any previously applicable instructions and

requirements; (4) training personnel to respond to a collection of

information; (5) searching data sources; (6) completing and reviewing

the collection of information; and (7) transmitting, or otherwise

disclosing the information.

Please comment on (1) the accuracy of our estimate, and (2) how the

agency could minimize the burden of the collection of information,

including, through the use of automated collection techniques or other

forms of information technology.

D. What are the estimated (1) total dollar amount annualized for

capital and start-up costs, and (2) recurring annual dollar amount of

operation and maintenance and purchase of services costs associated

with this data collection? The estimates should take into account the

costs associated with generating, maintaining, and disclosing or

providing the information. Estimates should not include purchases of

equipment or services made as part of customary and usual business

practices, or the cost of any burden hours for completing the form. EIA

estimates that there are no additional costs other than those that the

respondent incurs in keeping the information for its own uses.

E. Do you know of any other Federal, State, or local agency that

collects similar data? If you do, specify the agency, the data

element(s), and the methods of collection.

[[Page 14768]]

As a Potential User

A. Can you use data at the levels of detail indicated on the form?

B. For what purpose would you use the data? Be specific.

C. Are there alternate sources of data and do you use them? If so,

what are their deficiencies and/or strengths?

D. For the most part, information is published by EIA in U.S.

customary units, e.g., cubic feet of natural gas, short tons of coal,

and barrels of oil. Would you prefer to see EIA publish more

information in metric units, e.g., cubic meters, metric tons, and

kilograms? If yes, please specify what information (e.g., coal

production, natural gas consumption, and crude oil imports), the metric

unit(s) of measurement preferred, and in which EIA publication(s) you

would like to see such information.

Comments submitted in response to this notice will be summarized

and/or included in the request for OMB approval of the form. They also

will become a matter of public record.

Statutory Authority: Section 3506 (c)(2)(A) of the Paperwork

Reduction Act of 1995 (Public Law No. 104-13).

Issued in Washington, DC March 27, 1996.

Yvonne M. Bishop,

Director, Office of Statistical Standards Energy Information

Administration.

[FR Doc. 96-8133 Filed 4-2-96; 8:45 am]

BILLING CODE 6450-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.