NUCLEAR REGULATORY COMMISSION

[Docket No. 50-213]

Connecticut Yankee Atomic Power Company; Notice of Consideration

of Issuance of Amendment to Facility Operating License and Opportunity

for a Hearing

The U.S. Nuclear Regulatory Commission (the Commission) is

considering issuance of an amendment to Facility Operating License No.

DPR-61, issued to Connecticut Yankee Atomic Power Company (the

licensee), for operation of the Haddam Neck Plant located in Middlesex

County, Connecticut.

The proposed amendment would modify the Technical Specifications

(TS) and associated Bases based on Dose Consequence Reanalysis and

Containment Pressure and Temperature Reanalysis as follows:

TS 3.4.6.2--Extend the 2 liter per hour pump seal leakage criteria

to be applicable to an individual charging or high pressure safety

injection (HPSI) pump. Change allowable combined leakage from 3 liters

per hour to 5 liters per hour for recirculation systems outside of

containment.

TS 3/4.6.2--Revise required containment air recirculation (CAR)

system flow from 52,000 plus or minus 2,500 cfm per unit to 40,000 cfm

to 55,000 cfm per unit. Revise the heat removal rate for each CAR unit

from 26.5 x 10 \6\ BTU/hr to 24.0 x 10 \6\ BTU/hr.

TS Table 3.7-6--Revise the maximum isolation time for the feedwater

motor operated valves from 70 seconds to 40 seconds.

TS 3/4.7.11--Delete the APPLICABILITY and ACTION statement for

modes 1,2,3, and 4. The Primary Auxiliary Building (PAB) Air

[[Page 11230]]

Cleanup System is only explicitly credited by the Haddam Neck Plant in

a fuel assembly handling accident. This section will be moved to

Section 3/4.9 (Refueling Operations) since this proposed change will

require the PAB Air Cleanup System be operable during refueling

activities only.

B3/4.4.6.2--The change provides a discussion of the 2 liter per

hour limitation on leakage from an individual residual heat removal,

charging, or HPSI pump mechanical seal. It also provides a discussion

on the new limitation on combined leakage for recirculation systems

outside of containment.

B3/4.6.2--Provides the basis for the 40,000 cfm lower air flow

limit, the revised heat removal rate, and a discussion on the existence

of higher than normal air flows for the CAR system during a loss of

coolant accident.

B3/4.7.11--This discussion on the PAB Air Cleanup System will be

renumbered 3/4.9.15 as part of the Refueling Operations bases. This

section will specify that air cleanup is accomplished by one exhaust

fan, one prefilter, the HEPA/HECA filter, and interconnecting ductwork

(i.e., one train of the PAB Air Cleanup System).

The appropriate Index pages from the Haddam Neck Plant Technical

Specifications will also be revised to reflect the changes discussed

above.

Before issuance of the proposed license amendment, the Commission

will have made findings required by the Atomic Energy Act of 1954, as

amended (the Act) and the Commission's regulations.

By April 18, 1996, the licensee may file a request for a hearing

with respect to issuance of the amendment to the subject facility

operating license and any person whose interest may be affected by this

proceeding and who wishes to participate as a party in the proceeding

must file a written request for a hearing and a petition for leave to

intervene. Requests for a hearing and a petition for leave to intervene

shall be filed in accordance with the Commission's ``Rules of Practice

for Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested

persons should consult a current copy of 10 CFR 2.714 which is

available at the Commission's Public Document Room, the Gelman

Building, 2120 L Street, NW., Washington, DC, and at the local public

document room located at the Russell Library, 123 Broad Street,

Middletown, CT 06457. If a request for a hearing or petition for leave

to intervene is filed by the above date, the Commission or an Atomic

Safety and Licensing Board, designated by the Commission or by the

Chairman of the Atomic Safety and Licensing Board Panel, will rule on

the request and/or petition; and the Secretary or the designated Atomic

Safety and Licensing Board will issue a notice of hearing or an

appropriate order.

As required by 10 CFR 2.714, a petition for leave to intervene

shall set forth with particularity the interest of the petitioner in

the proceeding, and how that interest may be affected by the results of

the proceeding. The petition should specifically explain the reasons

why intervention should be permitted with particular reference to the

following factors: (1) The nature of the petitioner's right under the

Act to be made a party to the proceeding; (2) the nature and extent of

the petitioner's property, financial, or other interest in the

proceeding; and (3) the possible effect of any order which may be

entered in the proceeding on the petitioner's interest. The petition

should also identify the specific aspect(s) of the subject matter of

the proceeding as to which petitioner wishes to intervene. Any person

who has filed a petition for leave to intervene or who has been

admitted as a party may amend the petition without requesting leave of

the Board up to 15 days prior to the first prehearing conference

scheduled in the proceeding, but such an amended petition must satisfy

the specificity requirements described above.

Not later than 15 days prior to the first prehearing conference

scheduled in the proceeding, a petitioner shall file a supplement to

the petition to intervene which must include a list of the contentions

which are sought to be litigated in the matter. Each contention must

consist of a specific statement of the issue of law or fact to be

raised or controverted. In addition, the petitioner shall provide a

brief explanation of the bases of the contention and a concise

statement of the alleged facts or expert opinion which support the

contention and on which the petitioner intends to rely in proving the

contention at the hearing. The petitioner must also provide references

to those specific sources and documents of which the petitioner is

aware and on which the petitioner intends to rely to establish those

facts or expert opinion. Petitioner must provide sufficient information

to show that a genuine dispute exists with the applicant on a material

issue of law or fact. Contentions shall be limited to matters within

the scope of the amendment under consideration. The contention must be

one which, if proven, would entitle the petitioner to relief. A

petitioner who fails to file such a supplement which satisfies these

requirements with respect to at least one contention will not be

permitted to participate as a party.

Those permitted to intervene become parties to the proceeding,

subject to any limitations in the order granting leave to intervene,

and have the opportunity to participate fully in the conduct of the

hearing, including the opportunity to present evidence and cross-

examine witnesses.

A request for a hearing or a petition for leave to intervene must

be filed with the Secretary of the Commission, U.S. Nuclear Regulatory

Commission, Washington, DC 20555, Attention: Docketing and Services

Branch, or may be delivered to the Commission's Public Document Room,

the Gelman Building, 2120 L Street, NW., Washington, DC, by the above

date. Where petitions are filed during the last 10 days of the notice

period, it is requested that the petitioner promptly so inform the

Commission by a toll-free telephone call to Western Union at 1-(800)

248-5100 (in Missouri 1-(800) 342-6700). The Western Union operator

should be given Datagram Identification Number N1023 and the following

message addressed to Phillip F. McKee: petitioner's name and telephone

number; date petition was mailed; plant name; and publication date and

page number of this Federal Register notice. A copy of the petition

should also be sent to the Office of the General Counsel, U.S. Nuclear

Regulatory Commission, Washington, DC 20555, and to Lillian M. Cuoco,

Esq., Senior Nuclear Counsel, Northeast Utilities Service Company, P.O.

Box 270, Hartford, CT 06141-0270, attorney for the licensee.

Nontimely filings of petitions for leave to intervene, amended

petitions, supplemental petitions and/or requests for hearing will not

be entertained absent a determination by the Commission, the presiding

officer or the presiding Atomic Safety and Licensing Board that the

petition and/or request should be granted based upon a balancing of the

factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).

If a request for a hearing is received, the Commission's staff may

issue the amendment after it completes its technical review and prior

to the completion of any required hearing if it publishes a further

notice for public comment of its proposed finding of no significant

hazards consideration in accordance with 10 CFR 50.91 and 50.92.

For further details with respect to this action, see the

application for amendment dated December 19, 1995, which is available

for public inspection at the Commission's Public Document Room, the

Gelman Building, 2120 L

[[Page 11231]]

Street, NW., Washington, DC, and at the local public document room

located at the Russell Library, 123 Broad Street, Middletown, CT 06457.

Dated at Rockville, Maryland, this 12th day of March, 1996.

For the Nuclear Regulatory Commission.

Phillip F. McKee,

Director, Northeast Utilities Project Directorate, Division of Reactor

Projects--I/II, Office of Nuclear Reactor Regulation.

[FR Doc. 96-6520 Filed 3-18-96; 8:45 am]

BILLING CODE 7590-01-P