Notice of Public Hearing for the Draft Environmental Impact Statement (DEIS) for Reuse of Naval Station Puget Sound, Sand Point, Seattle, WA

Federal RegisterNov 8, 1996

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF DEFENSE

Department of the Navy

Notice of Public Hearing for the Draft Environmental Impact

Statement (DEIS) for Reuse of Naval Station Puget Sound, Sand Point,

Seattle, WA

SUMMARY: Pursuant to Section 102(2)(c) of the National Environmental

Policy Act (NEPA) of 1969 as implemented by the Council on

Environmental Quality regulations (40 CFR Parts 1500-1508), the

Department of the Navy, has prepared and filed with the U.S.

Environmental Protection Agency a Draft Environmental Impact Statement

(DEIS) for proposed reuse of the former Naval Station Puget Sound, Sand

Point property and structures in Seattle, Washington. The Draft EIS has

been prepared in compliance with the 1991 Base Realignment and Closure

(BRAC) directive from Congress to close Naval Station Puget Sound, Sand

Point. The property will be disposed of in accordance with the

provisions of the Defense Base Closure and Realignment Act (Public Law

101-510) of 1990 as amended, and applicable federal property disposal

regulations. Naval Station Puget Sound, Sand Point closed on September

30, 1995.

The DEIS assesses the potential environmental impacts associated

with reuse of Naval Station Puget Sound, Sand Point. Three action

alternatives are under consideration in this DEIS: the City of Seattle

Community Reuse Plan for Sand Point (City Plan); the City Plan with

Option; and the Muckleshoot Indian Tribe Reuse Plan for the Naval

Station Puget Sound, Sand Point (Muckleshoot Plan). The ``No Action''

alternative is also being evaluated.

The preferred alternative, the City Plan, proposes the following

land uses to be located within five functionally distinct subareas:

arts/cultural activities, open space/ recreation, education/community

activities, residential, and institutional. The Muckleshoot Plan

proposes the following land uses: recreation, education,

administration, recreational/commercial, warehousing, light industrial,

and institutional. Under the ``No Action'' alternative, the Navy would

continue to be caretaker of the base, with no defined productive reuse.

Although both reuse plans have the potential for significant impacts,

appropriate mitigation measures implemented by the acquiring entity

would minimize the impacts.

On September 30, 1995, the Navy closed the Naval Station Puget

Sound, Sand Point and placed it in caretaker status. The City Plan

continues to be refined and possible changes to the City Plan under

consideration are analyzed in the DEIS under the headings: Options to

the City Plan and Ballard High School Option.

This DEIS evaluates the following elements of the environment: land

use, historic and cultural resources, socioeconomics, recreation,

transportation, noise, public services and utilities, public health and

safety, biological resources/endangered species, water, and air

quality.

The Draft EIS is available for review at the following public

libraries: Seattle Public Library, 1000 4th Ave., Seattle; Northeast

Branch Library, 6801 35th

[[Page 57857]]

Ave. NE, Seattle; and King County Library, 300 8th Ave. North, Seattle.

ADDRESSES: The Navy will conduct a public hearing on Monday December 2,

1996 at 7:00 PM in the auditorium at Eckstein Middle School, 3003 NE

75th Street, Seattle, Washington, to inform the public of the DEIS

findings and to solicit comments. Federal, state and local agencies,

and interested individuals are invited to be present or represented at

the hearing. Oral comments will be heard and transcribed by a

stenographer. To assure accuracy of the record, all comments should be

submitted in writing. All comments, both oral and written, will become

part of the public record in the study. In the interest of available

time, each speaker will be asked to limit oral comments to three

minutes. Longer comments should be summarized at the public hearing and

submitted in writing either at the hearing or mailed to the address

listed below.

FOR FURTHER INFORMATION CONTACT: All written comments must be submitted

no later than December 23, 1996, to Mr. Don Morris (Code 232DM),

Engineering Field Activity Northwest, Naval Facilities Engineering

Command, 19917 7th Ave. NE, Poulsbo, WA 98370-7570; telephone (360)

396-0920; FAX (360) 396-0854.

Dated: November 5, 1996.

D.E. Koenig,

LCDR, JAGC, USN, Federal Register Liaison Officer.

[FR Doc. 96-28767 Filed 11-7-96; 8:45 am]

BILLING CODE 3810-FF-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.