DEPARTMENT OF STATE

[Public Notice 2443]

Bureau of Economic and Business Affairs; Finding of No

Significant Impact: Rio Grande Pipeline Company, Pipeline To Cross the

U.S.-Mexico Border at El Paso County, TX

AGENCY: Department of State.

ACTION: Notice of a finding of no significant impact with regard to an

application to construct, connect, operate and maintain a pipeline to

transport petroleum products (liquid petroleum gas) across the U.S.-

Mexico border.

-----------------------------------------------------------------------

SUPPLEMENTARY INFORMATION: Rio Grande Pipeline Company has applied for

a Presidential Permit to authorize construction, connection, operation

and maintenance of a 8.625 inch diameter pipeline to convey liquid

petroleum gas (LPG) across the border to Mexico in El Paso County,

Texas.

The proposed pipeline will utilize existing pipelines commencing in

Hardisty County, Texas. Approximately 30 miles of new pipeline will be

constructed commencing in Hudspeth County, Texas, crossing El Paso

County, Texas to cross the border south of the town of San Elizario

into Mexico.

The pipeline will continue approximately 20 miles into Mexico, with

a terminus at the Mendez Terminal in Ciudad Juarez. The pipeline will

initially receive an estimated 16,000 barrels per day for

transportation with a capacity for approximately 24,000 barrels per

day. The pipeline will facilitate LPG exports from the United States to

Mexico at an estimated annual value of 60 to 65 million dollars.

Summary

In accordance with the requirements of the National Environmental

Policy Act (NEPA), 42 U.S.C. 4321 et seq., The Council on Environmental

Quality (CEQ) regulations, 40 CFR Parts 1500-1508, and the Department's

regulations for implementation of NEPA (22 CFR Part 161), the

Department of State has conducted an environmental assessment of the

proposed construction by Rio Grande Pipeline Company of a LPG pipeline

across the international boundary in El Paso County south of San

Elizario, Texas. The Department of State is charged with the issuance

of Presidential Permits authorizing construction of such international

pipelines under Executive Order 11423 (1968), as amended by Executive

Order 12847 (1993). Several Federal agencies cooperated in preparation

of the environmental assessment, reviewing and commenting on the

analysis and conclusions presented therein.

Agencies participating in this process together with the Department

of State included: the Environmental Protection Agency, the Departments

of Defense, Treasury, Interior, Commerce, Transportation, the Attorney

General, the Chairman of the Surface Transportation Safety Board, and

the Director of the Federal Emergency Management Agency.

Interested parties were invited to comment on the proposed

application in a Federal Register Notice number 2397, in the Federal

Register Vol. 61, No. 104, pages 26945-26946.

Based on the final environmental assessment, which included a

preliminary environmental assessment, comments received from interested

agencies and responses to those comments, the Department of State has

concluded that issuance of a Presidential Permit authorizing

construction of the proposed pipeline (as described in the final

environmental assessment) will not have a significant effect on the

quality of the human environment within the United States. Therefore,

in accordance with CEQ's

[[Page 49003]]

NEPA regulations, 40 CFR 1501.4 and 1508.13 and with State Department

Regulations, 22 CFR 161.8 (c) an environmental impact statement will

not be prepared.

Factors Considered

The environmental assessment carefully considered delivery

alternatives, truck and rail exports of LPG, as well as alternative

pipeline routes. National statistics show that pipelines are safer than

rail and many times safer than trucks for transporting liquid petroleum

products. LPG exports to Mexico by pipeline are the safer alternative

than their shipment by rail or truck, especially in the congested

border crossing areas. Delivery of LPG to Mexico by pipeline produces

substantially less emissions than does delivery by diesel truck and

enhances highway safety. The pipeline route corridor selection is based

on the most direct routing, use of existing rights-of-way, avoidance of

populated areas, and avoidance of cultural and biological resources. No

conflicts with active locatable mineral operations, metallic or non-

mettalic, were identified along the proposed pipeline route. Wetlands,

including jurisdictional wetlands regulated under the Clean Water Act,

will not be affected by the pipeline as all aquatic features will be

crossed by boring beneath them. There is no specific habitat for any

federally listed Endangered or Threatened species identified in the

area. Any disturbances to land, vegetation, wildlife, and socioeconomic

resources are expected to be minimal and short-term, arising mainly due

to initial pipeline construction.

Further analysis and reasoning supporting the pipeline routing are

presented in the original pipeline application. Copies of supporting

information for this finding and the final environmental assessment can

be obtained from the State Department's office of International Energy

and Commodities Policy, 202-647-2875.

Environmental Justice

In addition to the analysis conducted in accordance with NEPA, the

Department of State addressed environmental justice considerations

pursuant to Executive Order 12898 of February 11, 1994 (``Federal

Actions to Address Environmental Justice in Minority Populations and

Low-Income Populations''). Based on its examination of environmental

justice considerations, the Department has determined that the proposed

pipeline will not have disproportionately high and adverse human health

or environmental effects on minority and low-income populations. The

analysis supporting this determination can be obtained from the State

Department Office of International Energy and Commodities Policy, 202-

647-2887.

FOR FURTHER INFORMATION ON THE PIPELINE PERMIT APPLICATION, CONTACT:

Susan Phillips, Office of International Energy and Commodities Policy,

Room 3529, U..S. Department of State, Washington, DC, 20520, (202) 647-

2887.

Dated: August 22, 1996.

Herbert Yarvin,

Acting Director, International Energy and Commodities Policy.

[FR Doc. 96-23937 Filed 9-16-96; 8:45 am]

BILLING CODE 4710-07-M

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.