Identification and Mapping of Special Flood Hazard Areas, Procedures for Map Correction, and Procedures and Fees for Processing Map Changes

Federal RegisterAug 30, 1996

Ask Donna

What actually matters in this document.

Text

SUMMARY: This interim final rule will revise the National Flood

Insurance Program (NFIP) regulations concerning the identification and

mapping of Special Flood Hazard Areas (SFHAs) and revision of NFIP maps

by revising the fee requirements and schedule for processing certain

changes to NFIP maps. Under this interim final rule, the fees will be

adjusted periodically, but no more than once annually, to provide for

changes in the prevailing private-sector labor rate on which the fees

are predicated. Revised fees will be published in the Federal Register.

DATES: This interim final rule is effective August 30, 1996. We invite

your comments on this interim final rule. Please submit comments on or

before October 1, 1996.

ADDRESSES: Please send written comments to the Rules Docket Clerk,

Office of the General Counsel, Federal Emergency Management Agency, 500

C Street SW., Washington, DC 20472, or by facsimile at (202) 646-4536

(not a toll-free call).

FOR FURTHER INFORMATION CONTACT: Michael K. Buckley, P.E., Chief,

Hazard Identification Branch, Mitigation Directorate, 500 C Street SW.,

Washington, DC 20472; (202) 646-2756 or by facsimile at (202) 646-4596

(not toll-free calls).

SUPPLEMENTARY INFORMATION: This interim final rule will revise the

National Flood Insurance Program (NFIP) regulations concerning the

identification and mapping of Special Flood Hazard Areas (SFHAs) and

revision of NFIP maps by revising the fee requirements and schedule for

processing certain changes to NFIP maps. The current fee requirements

and schedule were established under a final rule published in the

Federal Register on June 30, 1992, 57 FR 29036.

This action will reduce expenses to the NFIP and will contribute to

the NFIP's self-support by: (1) Establishing flat user fees for most

requests for Conditional Letters of Map Amendment (CLOMAs), Letters of

Map Revision Based on Fill (LOMR-Fs), Conditional Letters of Map

Revision Based on Fill (CLOMR-Fs), Letters of Map Revision (LOMRs),

Conditional Letters of Map Revision (CLOMRs), and Physical Map

Revisions (PMRs); (2) reducing the number of user fee categories; (3)

requiring payment of user fees in full before beginning work on a

request; (4) changing the initial fee and hourly rate for LOMR, CLOMR,

and PMR requests based on structural measures on alluvial fans; (5)

limiting fee exemptions for requests involving LOMAs and requests to

correct mapping or analysis errors; and (6) replacing the mechanism for

recovering the cartographic production costs related to incorporating

map changes made by letter in Flood Insurance Rate Maps (FIRMs) and

Flood Boundary and Floodway Maps (FBFMs).

This interim final rule supersedes the fee schedules that were

established on June 30, 1992. It also expands the payment method to

include credit card payments.

Under this interim final rule, the fees will be adjusted

periodically, but no more than once annually, to provide for changes in

the prevailing private-sector labor rate on which the fees are

predicated. Revised fees will be published as a notice in the Federal

Register.

These amendments to the NFIP criteria for identification and

mapping of SFHAs are a result of the continuing reappraisal of the NFIP

for the purposes of achieving greater administrative and fiscal

effectiveness and encouraging sound floodplain management so that

reductions in the loss of life and property and in disaster-related

expenditures can be realized.

Establishment of Flat User Fees

The existing fee collection process is complex and its

administration requires time-intensive efforts on the part of FEMA. It

also increases the time required to provide requesters with the Letter

of Map Change (LOMC) product or PMR they require. The current system

requires requesters to submit an initial fee that is not intended to

cover the full review and processing costs or the cartographic

production costs. Requesters subsequently receive invoices for the

balance. The current system is further complicated by the pre-

authorized spending limits placed on each product. When FEMA determines

that these limits will be exceeded, written authorization must be

obtained before proceeding with their review. Processing the request is

delayed until the written authorization is received.

Under this interim final rule, FEMA will charge a single flat user

fee for most LOMC and PMR requests, thereby reducing the turnaround

time for preparing and issuing determination letters and reducing FEMA

costs of administering the fee-charge system. FEMA could recover more

of the actual costs than are recovered by the current system and

redistribute the overall cost of operations.

Requirement for Full Up-Front Payment

Under this interim final rule, the requester will be required to

submit the full fee payment before any work is begun on most map change

requests. This will minimize the need for follow-up invoicing and

ensure FEMA collects appropriate fees for services rendered.

Consolidation of Product Categories

Under this interim final rule, LOMC services and PMRs with similar

review and processing requirements will be consolidated into the same

fee category. As a result, the number of fee categories is reduced from

19 to 10.

Limitation of Fee Exemptions

Under current standards, requesters are exempted from paying user

fees when they submit requests for changes to (1) remove properties or

structures from the SFHA shown on the FIRM that were inadvertently

included in the SFHA because of map scale limitations. This is handled

by the LOMA process detailed in part 70 of the NFIP regulations; (2)

reflect more detailed information on flooding sources, floodways, or

topographic data; (3) correct mapping errors or errors in the effective

Flood Insurance Study analysis; or (4) reflect projects that are for

public benefit and are primarily intended for flood loss reduction to

insurable structures in identified flood hazard areas that were in

existence prior to the commencement of the projects. Such exemptions

preclude FEMA from recovering fees for a substantial volume of work.

Under this interim final rule, exemptions are maintained only for

requests for LOMAs and requests to correct mapping or analysis errors.

Maintenance of Initial Fee for Requests Based on Structural Measures on

Alluvial Fans

Under this interim final rule, the initial fee for LOMC requests

based on structural measures on alluvial fans will be maintained

because these requests are rare, the FEMA engineering review for these

requests is usually very complex, and FEMA's costs for processing these

requests can fluctuate

[[Page 46331]]

significantly. Based on a review of actual processing costs for Fiscal

Year 1995, $5,000 will be established as the initial fee for such

requests, with the remaining costs to be recovered before the LOMC is

issued, consistent with current fee-reimbursement practices. Under this

interim final rule, the hourly rate used to calculate the total fees

that must be reimbursed is increased to $50.

National Environmental Policy Act

This interim final rule is categorically excluded from the

requirements of 44 CFR part 10, Environmental Consideration. No

environmental impact assessment has been prepared.

Regulatory Flexibility Act

The Acting Associate Director, Mitigation Directorate, certifies

that this interim final rule does not have a significant economic

impact on a substantial number of small entities in accordance with the

Regulatory Flexibility Act, 5 U.S.C. 610 et seq., because it is not

expected (1) to have significant secondary or incidental effects on a

substantial number of small entities, nor (2) to create any additional

burden on small entities. A regulatory flexibility analysis has not

been prepared.

Executive Order 12612, Federalism

This interim final rule involves no policies that have federalism

implications under Executive Order 12612, Federalism, dated October 26,

1987.

Executive Order 12778, Civil Justice Reform

This interim final rule meets the applicable standards of Section

2(b)(2) of Executive Order 12778, Civil Justice Reform.

Executive Order 12866, Regulatory Planning and Review

Promulgation of this interim final rule is required by statute, 42

U.S.C. 4014(f), which also specifies the regulatory approach taken in

the interim final rule. To the extent possible under the statutory

requirements of 42 U.S.C. 4014(f), this interim final rule adheres to

the principles of regulation as set forth in Executive Order 12866,

Regulatory Planning and Review.

(Catalog of Federal Domestic Assistance No. 83.100, Flood Insurance)

List of Subjects in 44 CFR Parts 65, 70, and 72

Administrative practice and procedure, Flood insurance,

Floodplains, and Reporting and recordkeeping requirements.

Accordingly, 44 CFR Parts 65, 70, and 72 are amended as follows:

PART 65--IDENTIFICATION AND MAPPING OF SPECIAL FLOOD HAZARD AREAS

1. The authority citation for part 65 continues to read as follows:

Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of

1978, 43 FR 41943, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR

19367, 3 CFR, 1979 Comp., p. 376.

2. Section 65.4(c) is revised to read as follows:

Sec. 65.4 Right to submit new technical data.

* * * * *

(c) Requests for changes to effective Flood Insurance Rate Maps and

Flood Boundary and Floodway Maps are subject to the cost recovery

procedures described in part 72 of this subchapter. As indicated in

part 72, revisions requested to correct mapping errors or errors in the

Flood Insurance Study analysis are not subject to cost-recovery

procedures.

3. Section 65.5(d) is revised to read as follows:

Sec. 65.5 Revision to special hazard area boundaries with no change

to base flood elevation determinations.

* * * * *

(d) Submission procedures. All requests shall be submitted to the

FEMA Regional Office servicing the community's geographic area or to

the FEMA Headquarters Office in Washington, DC, and shall be

accompanied by the appropriate payment, in accordance with part 72 of

this subchapter.

4. Section 65.6(g) is revised to read as follows:

Sec. 65.6 Revision of base flood elevation determinations.

* * * * *

(g) Submission procedures. All requests shall be submitted to the

FEMA Regional Office servicing the community's geographic area or the

FEMA Headquarters Office in Washington, DC, and shall be accompanied by

the appropriate payment, in accordance with part 72 of this subchapter.

5. Section 65.8 is revised to read as follows:

Sec. 65.8 Review of proposed projects.

A community, or an individual through the community, may request

FEMA's comments on whether a proposed project will justify a map

revision, if built as proposed. FEMA's comments will be issued in the

form of a letter, termed a Conditional Letter of Map Revision, in

accordance with part 72 of this subchapter. The data required to

support such requests are the same as those required for final

revisions in accordance with Secs. 65.5, 65.6, and 65.7, except as-

built certification is not required. All such requests shall be

submitted to the FEMA Headquarters Office in Washington, DC, and shall

be accompanied by the appropriate payment, in accordance with part 72

of this subchapter.

6. Section 65.9(h) is added to read as follows:

Sec. 65.9 Review and response by the Administrator.

* * * * *

(h) The required payment, in accordance with part 72 of this

subchapter, has not been submitted, and no review will be conducted and

no determination will be issued until payment is received.

PART 70--PROCEDURE FOR MAP CORRECTION

7. The authority citation for part 70 is revised to read as

follows:

Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of

1978, 43 FR 41943, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR

19367, 3 CFR, 1979 Comp., p. 376.

8. Section 70.9 is revised to read as follows:

Sec. 70.9 Review of proposed projects.

An individual who proposes to build one or more structures on a

portion of property that may be inadvertently included in a Special

Flood Hazard Area (SFHA) may request FEMA's comments on whether the

proposed structure(s) will be in the SFHA if built as proposed. FEMA's

comments will be issued in the form of a letter, termed a Conditional

Letter of Map Amendment (CLMA). The data required to support such

requests are the same as those required for final Letters of Map

Amendment in accordance with Sec. 70.3, except as-built certification

is not required and the requests shall be accompanied by the

appropriate payment, in accordance with part 72 of this subchapter. All

such requests for CLOMAs shall be submitted to the FEMA Regional Office

servicing the community's geographic area or the FEMA Headquarters

Office in Washington, DC.

PART 72--PROCEDURES AND FEES FOR PROCESSING MAP CHANGES

9. The authority citation for part 72 is revised to read as

follows:

[[Page 46332]]

Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of

1978, 43 FR 41943, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR

19367, 3 CFR, 1979 Comp., p. 376.

10. Section 72.1 is revised to read as follows:

Sec. 72.1 Purpose of part.

The purpose of this part is to provide administrative and cost-

recovery procedures for the engineering review and administrative

processing associated with FEMA's response to requests for Conditional

Letters of Map Amendment (CLOMAs), Conditional Letters of Map Revision

(CLOMRs), Conditional Letters of Map Revision Based on Fill (CLOMR-Fs),

Letters of Map Revision Based on Fill (LOMR-Fs), Letters of Map

Revision (LOMRs), and Physical Map Revisions (PMRs). Such requests are

based on proposed or actual manmade alterations within the floodplain,

such as the placement of fill; modification of a channel; construction

or modification of a bridge, culvert, levee, or similar measure; or

construction of single or multiple residential or commercial structures

on single or multiple lots.

11. Section 72.2 is revised to read as follows:

Sec. 72.2 Definitions.

Except as otherwise provided in this part, the definitions set

forth in Part 59 of this subchapter are applicable to this part. For

the purpose of this part, the products are defined as follows:

CLOMA. A CLOMA is FEMA's comment on a proposed structure or group

of structures that upon construction, will be located on existing

natural ground above the base (1-percent annual chance) flood elevation

on a portion of a legally defined parcel of land that is partially

inundated by the base flood.

CLOMR. A CLOMR is FEMA's comment on a proposed project that upon

construction will affect the hydrologic or hydraulic characteristics of

a flooding source and thus result in the modification of the existing

effective base flood elevations, the Special Flood Hazard Area (SFHA),

or the regulatory floodway.

CLOMR-F. A CLOMR-F is FEMA's comment on a proposed project that

upon construction will result in a modification of the SFHA through the

placement of fill outside the regulatory floodway.

LOMR. A LOMR is FEMA's modification to an effective Flood Insurance

Rate Map (FIRM) or Flood Boundary and Floodway Map (FBFM), or both,

based on the implementation of physical measures that affect the

hydrologic or hydraulic characteristics of a flooding source and thus

result in the modification of the existing regulatory floodway, the

effective base flood elevations, or the SFHA. The LOMR officially

revises the FIRM or FBFM, and sometimes the Flood Insurance Study (FIS)

report, and when appropriate, includes a description of the

modifications. The LOMR is generally accompanied by an annotated copy

of the affected portions of the FIRM, FBFM, or FIS report.

LOMR-F. A LOMR-F is FEMA's modification of the SFHA shown on the

FIRM based on the placement of fill outside the regulatory floodway.

Physical Map Revision. A Physical Map Revision (PMR) is FEMA's

revision and republication of an effective FIRM, FBFM, or FIS report

based on physical measures that affect the hydrologic or hydraulic

characteristics of a flooding source and thus result in the

modification of the existing regulatory floodway, the effective base

flood elevations, or the SFHA.

12. Section 72.3 is revised to read as follows:

Sec. 72.3 Fee schedule.

(a) For requests for CLOMRs, LOMRs, and Physical Map Revisions

based on structural measures on alluvial fans, an initial fee subject

to the provisions of Sec. 72.4, shall be paid to FEMA before FEMA

begins review of the request. The initial fee represents the minimum

cost for reviewing these requests and is based on the prevailing

private-sector labor rate. A revision to this initial fee, if

necessary, will be published as a notice in the Federal Register.

(b) For requests for CLOMRs, LOMRs, and Physical Map Revisions

based on structural measures on alluvial fans, the total fee is to be

calculated based on the total hours expended by FEMA in reviewing and

processing the request multiplied by an hourly rate based on the

prevailing private-sector labor rate. The hourly rate is published as a

notice in the Federal Register. A revision to the hourly rate, if

necessary, will be published as a notice in the Federal Register.

(c) For conditional and final map revision requests for the

following categories, flat user fees, subject to the provisions of

Sec. 72.4, shall be paid to FEMA before FEMA begins review of the

request.

(1) Requests for CLOMAs, CLOMR-Fs, and LOMR-Fs for single

structures or single lots;

(2) Requests for CLOMAs for multiple structures or multiple lots;

(3) Requests for CLOMR-Fs and LOMR-Fs for multiple structures or

multiple lots;

(4) Requests for LOMRs and Physical Map Revisions based on projects

involving bridges, culverts, or channels, or combinations thereof;

(5) Requests for LOMRs and Physical Map Revisions based on projects

involving levees, berms, or other structural measures;

(6) Requests for LOMRs and Physical Map Revisions based on as-built

information for projects for which CLOMRs were issued previously by

FEMA;

(7) Requests for LOMRs and Physical Map Revisions based solely on

more detailed data;

(8) Requests for CLOMRs based on projects involving new hydrologic

information, bridges, culverts, or channels, or combinations thereof;

and

(9) Requests for CLOMRs based on projects involving levees, berms,

or other structural measures.

(d) The flat user fees for conditional and final map amendments and

map revisions are based on the actual costs for reviewing and

processing the requests. The fees for requests for LOMR-Fs, LOMRs, and

PMRs also shall include FEMA's costs for physically revising affected

FIRM and FBFM panels to reflect map changes at a later date.

(e) In addition to the flat user fees for Physical Map Revisions,

payment of a fee for FEMA's cartographic production costs, based on

actual per-panel costs, shall be required.

(f) Revisions to the fees, if necessary, will be published as a

notice in the Federal Register.

13. Section 72. 4 is revised to read as follows:

Sec. 72.4 Submittal/payment procedures and FEMA response.

(a) The initial fee shall be submitted with a request for FEMA

review and processing of CLOMRs, LOMRs, and Physical Map Revisions

based on structural measures on alluvial fans; the appropriate flat

user fee shall be submitted with all other requests for FEMA review and

processing.

(b) FEMA must receive initial and flat user fees before it will

begin any review. The fee is non-refundable when FEMA begins its

review.

(c) Following completion of FEMA's review for any CLOMR, LOMR, or

Physical Map Revision based on structural measures on alluvial fans,

FEMA shall invoice the requester at the established hourly rate for any

actual costs exceeding the initial fee incurred for review and

processing. FEMA will

[[Page 46333]]

not issue a determination letter or revised map panels until the

invoice amount is received.

(d) For all map revision requests, FEMA will bear the cost of

reprinting and distributing the revised FIRM or FBFM panels, or

combination.

(e) The entity that applies to FEMA through the local community for

review is responsible for the cost of the review. The local community

incurs no financial obligation under the reimbursement procedures set

forth in this part as a result of transmitting the application by

another party to FEMA.

(f) Requesters shall submit payments by check or money order or by

credit card. Checks or money orders, in U.S. funds, shall be made

payable to the National Flood Insurance Program.

(g) For CLOMA, CLOMR-F, LOMA, and LOMR-F requests, FEMA shall:

(1) Notify the requester and the community within 30 days as to the

adequacy of the submittal, and

(2) Provide to the requester and the community, within 60 days of

receipt of adequate information and fee, a determination letter or

other written comment in response to the request.

(h) For CLOMR, LOMR, and PMR requests, FEMA shall:

(1) Notify the requester and the community within 60 days as to the

adequacy of the submittal; and

(2) Provide to the requester and the community, within 90 days of

receipt of adequate information and fee, a CLOMR, a LOMR, other written

comment in response to the request, or preliminary copies of the

revised FIRM panels, FBFM panels, or affected portions of the FIS

report to the community and the requester for review and comment.

14. In Sec. 72.5, paragraphs (a) and (b) are revised to read as

follows:

Sec. 72.5 Exemptions.

(a) Requests for map changes based on mapping or analysis errors or

the effects of natural changes within Special Flood Hazard Areas shall

be exempt from fees.

(b) Requests for LOMAs shall be exempt from fees.

* * * * *

15. Section 72.6 is revised to read as follows:

Sec. 72.6 Unfavorable response.

(a) A request for a CLOMA, CLOMR, or CLOMR-F may be denied or the

determination may contain specific comments, concerns, or conditions

regarding a proposed project or design and its impacts on flood hazards

in a community. A requester is not entitled to any refund of the fees

paid if the determination contains such comments, concerns, or

conditions, or if the request is denied. A requester is not entitled to

any refund of the fees paid if the requester is unable to provide the

appropriate scientific or technical documentation or to obtain required

authorizations, permits, financing, etc., for which the CLOMA, CLOMR,

or CLOMR-F was sought.

(b) A request for a LOMR, LOMR-F, or Physical Map Revision may be

denied or the revisions to the FIRM, FBFM, or both, may not be in the

manner or to the extent desired by the requester. A requester is not

entitled to any refund of the fees paid if the revision request is

denied or if the LOMR, LOMR-F, or Physical Map Revision action does not

revise the map specifically as requested.

16. Section 72.7 is revised to read as follows:

Sec. 72.7 Resubmittals.

(a) Any resubmittal of a CLOMA, CLOMR, CLOMR-F, LOMR, LOMR-F, or

Physical Map Revision request more than 90 days after FEMA notification

that the request has been denied or after the review has been

terminated because insufficient information was provided by the

requester will be treated as an original submission and subject to all

submittal/payment procedures described in Sec. 72.4. The procedure in

Sec. 72.4 also applies to any resubmitted request (regardless of when

it is submitted) if the project on which the request is based has been

altered significantly in design or scope other than as necessary to

respond to comments, concerns, or other findings made by FEMA regarding

the original submission.

(b) When a LOMR, LOMR-F, or Physical Map Revision request is made

following a CLOMR or CLOMR-F issued previously by FEMA, the procedures

in Sec. 72.4 and the appropriate fee, as referenced in Sec. 72.3(c),

apply when the as-built conditions differ from the proposed conditions

on which the issuance of the CLOMR or CLOMR-F was based.

Dated: August 23, 1996.

Richard W. Krimm,

Acting Associate Director, Mitigation Directorate.

[FR Doc. 96-22077 Filed 8-29-96; 8:45 am]

BILLING CODE 6718-04-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Identification and Mapping of Special Flood Hazard Areas, Procedures for Map Correction, and Procedures and Fees for Processing Map Changes · 61 FR 46330 | Frix