FEDERAL COMMUNICATIONS COMMISSION

47 CFR Parts 25 and 101

[CC Docket No. 92-297, FCC 96-311]

Redesignating the 27.5-29.5 GHz Frequency Band, Reallocating the

29.5-30.0 GHz Frequency Band, and Establishing Rules and Policies for

Local Multipoint Distribution Service and for Fixed Satellite Services

AGENCY: Federal Communications Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: By this First Report and Order, the Commission designates band

segments in the 27.5-30.0 GHz band (``28 GHz band'') for several types

of wireless systems, clearing the way for licensing Local Multipoint

Distribution Service (``LMDS'') providers, Fixed Satellite Service

(``FSS'') systems, and feeder links for certain Mobile Satellite

Service (``MSS'') systems. The associated downlink bands for satellite

services at 17.7-20.2 GHz, are designated as well. Our band

segmentation plan seeks to promote competition by permitting all

proposed services to develop and offer innovative consumer services

such as video program distribution, two-way interactive video,

teleconferencing, telemedicine, telecommuting, and high speed data

services within our borders and around the globe.

EFFECTIVE DATE: October 28, 1996.

FOR FURTHER INFORMATION CONTACT: Robert James, Wireless

Telecommunications Bureau, (202) 418-0798; Jennifer Gilsenan,

International Bureau, Satellite Policy Branch, (202) 418-0757; Kathleen

Campbell, International Bureau, Satellite Policy Branch, (202) 418-

0753.

SUPPLEMENTARY INFORMATION: This is a summary of the First Report and

Order portion of the Commission's First Report and Order and Fourth

Notice of Proposed Rulemaking in CC Docket No. 92-297; FCC 96-311,

adopted July 17, 1996 and released July 22, 1996. The complete text of

this document is available for inspection and copying during normal

business hours in the FCC Reference Center (Room 239), 1919 M Street,

NW., Washington, DC, and also may be purchased from the Commission's

copy contractor, International Transcription Service, (202) 857-3800,

2100 M Street, NW., Suite 140, Washington, DC 20037.

The First Report and Order contains information collections and

third party disclosure requirements subject to the Paperwork Reduction

Act of 1995, Pub. L. 104-13 (PRA). Notice of this collection appeared

at 61 FR 43058, August 20, 1996. It will be submitted to the Office of

Management and Budget (OMB) for review under PRA.

As required by section 603 of the Regulatory Flexibility Act, the

Commission has prepared a Final Regulatory Flexibility Act (FRFA) of

the expected impact on small entities of the First Report and Order

adopted.

Summary of First Report and Order

1. This is the First Report and Order in a proceeding that involves

the development of one of the largest contiguous spectrum segments

available to the Commission, the 28 GHz band. The commercialization of

this spectrum enables consumers to receive emerging domestic and global

technologies via multiple service providers.

2. With this First Report and Order, the Commission designates band

segments in the 28 GHz band for several types of wireless systems,

clearing the way for licensing Local Multipoint Distribution Service

(``LMDS'') providers, Fixed Satellite Service (``FSS'') systems, and

feeder links for certain Mobile Satellite Service (``MSS'') systems.

The associated downlink bands for satellite services are designated as

well.1 We will address issues relating to service rules for both

GSO/FSS and NGSO/FSS systems proposing to operate in the 28 GHz band in

a forthcoming Report and Order. Service and auction rules relating to

LMDS will also be addressed in a separate Report and Order.

---------------------------------------------------------------------------

\1\ Satellite downlinks paired with satellite uplinks in the 28

GHz band are in the 17.7-20.2 GHz band.

---------------------------------------------------------------------------

3. The band segmentation plan seeks to promote competition by

permitting all proposed services to develop and offer innovative

consumer services such as video program distribution, two-way

interactive video, teleconferencing, telemedicine, telecommuting, and

high speed data services within our borders and around the globe.

4. The Commission's band segmentation plan is depicted graphically

as follows:

Uplink Band 27.5-30.0 GHz

--------------------------------------------------------------------------------------------------------------------------------------------------------

MSS feeder MSS feeder

LMDS fss GSO/FSS NGSO/FSS links & LMDS links & GSO/ GSO/FSS ngso/

850 MHz ngso/fss gso/fss 500 (h-s) 150 FSS 250 fss 500 GOVT LMDS (h-to-s) (s-to-h) 300 MHz

250 MHz MHz MHz MHz MHz

--------------------------------------------------------------------------------------------------------------------------------------------------------

27.5........ 28.35 28.60 29.1 29.25 29.5 30.0 31.0 31.3 GHz

--------------------------------------------------------------------------------------------------------------------------------------------------------

5. The Commission's plan designates co-frequency sharing in band

segments where the Commission and the parties have concluded it is

technically feasible. This band plan promotes spectrum efficiency and

facilitates the deployment of diverse, interactive, competitive

services for consumers.

6. The band segmentation plan will be implemented through

appropriate changes in part 25 and part 101 of the Commission's rules.

The Commission designates discrete spectrum bands for specific types of

systems. Services designated for domestic licensing priority are

specified in capital letters in the graphic depiction of the band plan.

These services have licensing priority vis-a-vis any other type of

service allocated domestically or internationally in the band. Lower-

case letters indicate services in a particular band segment which also

have licensing priority vis-a-vis any third service allocated

domestically or internationally in the band, but have no licensing

priority over the service in capital letters in the band segment and

must operate on a non-interference basis and must accept interference

vis-a-vis that service. Services designated with two priority users

have equal licensing rights based on the sharing principles adopted for

that particular band segment.

7. In implementing this band plan, the Commission set out

procedures for ``grandfathering'' the existing LMDS system,

CellularVision, in the 28 GHz band. Specifically, the Commission

requires CellularVision to vacate the 28.35-28.50 GHz band by 24 months

following the release date of the First

[[Page 44178]]

Report and Order, or by the date of launch of the first GSO/FSS

satellite intended to provide service in the United States in this

band, whichever occurs later. In order to ensure certainty for both

CellularVision's customers and for potential GSO/FSS systems planning

to provide service in the United States in the 28.35-28.50 GHz band,

the Commission clarified its reference to ``launch'' as the date which

the first GSO/FSS satellite, intended to operate in the 28.35-28.50 GHz

band, leaves the Earth's surface. The satellite licensee is responsible

for notifying CellularVision six months prior to the planned launch

date, and for giving CellularVision, upon its request, updates on the

satellite's status. CellularVision has the responsibility to remain

apprised of the satellite's status and to ensure that LMDS operations

cease on the 150 MHz allocated for GSO/FSS operations in accordance

with the order herein.

8. To ensure the implementation of this band plan, the Commission

adopted specific inter-service sharing rules for those services

designated in the same band segment.

9. The Commission also designated band segments for the associated

satellite downlink band at 17.7-20.2 GHz. The 17.7-20.2 GHz band

segmentation plan can be depicted as follows:

Downlink Band 17.7-20.2 GHz

------------------------------------------------------------------------

GSO/FSS

fixed ngso/ NGSO/FSS MSS F.L.

fss 1100 fixed gso/ fixed gso/ GSO/FSS ngso/fss 500 MHz

MHz fss 500 MHz fss 400 MHz

------------------------------------------------------------------------

17.7........ 18.80 19.30 19.70 20.20 GHz

------------------------------------------------------------------------

This plan specifically designates downlinks in the 17.7-18.8 GHz

band for GSO/FSS uses, the 18.8-19.3 GHz band for NGSO/FSS uses, the

19.3-19.7 GHz band for NGSO/MSS feeder links, and the 19.7-20.2 GHz

band for GSO/FSS uses. These designations do not preclude the

authorized use of these bands by other satellite applications on a

secondary basis to the primary satellite application designated in the

band.

10. GSO/FSS, NGSO/MSS feeder links and NGSO/FSS systems are all

fixed satellite services. Under current rules, such services share the

17.7-19.7 GHz band with fixed services on a coequal basis.2

Current rules require coordination of these services pursuant to the

requirements in Sec. 25.130(b) of the rules, and under the procedures

outlined in Sec. 101.103 of the rules. These coordination rules will

continue to be applied in these bands; however, should the affected

parties wish to propose slightly modified procedures to facilitate the

deployment of these services, we would consider such a proposal in the

future. The record does not indicate that other requirements for

coordination between non-government satellite systems are necessary at

this time.3

---------------------------------------------------------------------------

\2\ See 47 CFR 25.202 (a)(1).

\3\ With respect to government systems, parties should take note

of footnote US 334 of the Table of Frequency Allocations. See 47 CFR

2.106.

---------------------------------------------------------------------------

Final Regulatory Flexibility Analysis of First Report and Order

11. As required by section 603 of the Regulatory Flexibility Act, 5

U.S.C. 603 (RFA), an Initial Regulatory Flexibility Analysis (IRFA) was

incorporated in the Third Notice of Proposed Rulemaking in this

proceeding (Third NPRM), 60 FR 43470 (August 23, 1995). The Commission

sought written public comments on the proposals in the Third NPRM,

including on the IRFA. The Commission's Final Regulatory Flexibility

Analysis (FRFA) in this First Report and Order conforms to the RFA, as

amended by the Contract With America Advancement Act of 1996, (CWAAA),

Pub. L. 104-121, 110 Stat. 847 (1996).4

---------------------------------------------------------------------------

\4\ Subtitle II of the CWAAA is ``The Small Business Regulatory

Enforcement Fairness Act of 1996'' (SBREFA), codified at 5 U.S.C.

601 et seq.

---------------------------------------------------------------------------

Need for and Purpose of this Action

12. In this decision, the Commission, adopts a band plan

designating discrete spectrum segments for the Local Multipoint

Distribution Systems (``LMDS''), Fixed Satellite Service (FSS) systems,

and feeder links for certain Mobile Satellite Service (``MSS'') systems

in the 27.5-30.0 GHz band (``28 GHz band''). The Commission also adopts

rules and procedures intended to facilitate the efficient use of this

large spectrum segment among these three different types of services.

The purposes of this action are to help launch two new broadband

industries well-suited to compete in the domestic and global

marketplace.

Summary of Issues Raised by the Public Comments in Response to the

Initial Regulatory Flexibility Analysis

13. No comments were filed in direct response to the IRFA. In

general, comments on the Third NPRM, however, the only licensee in the

band, CellularVision, an LMDS small entity believed that the plan

proposed in the Third NPRM accommodated all competing interests for

spectrum in the band. Furthermore, the proposal to grandfather

CellularVision's existing system in the New York Primary Metropolitan

Statistical Area was supported by CellularVision as a reasonable plan

to facilitate its existing operations as it phases into licensing under

the new band segmentation scheme.

Description and Estimate of the Small Entities Subject to the Rules

14. The Commission has not developed a definition of small entities

applicable to GSO/FSS licensees. Therefore, the applicable definition

of small entity is the definition under the Small Business

Administration (SBA) rules applicable to Communications Services, Not

Elsewhere Classified. This definition provides that a small entity is

expressed as one with $11.0 million in annual receipts.5

---------------------------------------------------------------------------

\5\ 13 CFR 121.201, Standard Industrial Classification (SIC)

Code 4899.

---------------------------------------------------------------------------

Estimates for GSO/FSS Satellite System Applicants for the 28 GHz

Band

15. At present there are no GSO/FSS satellite licensees in the band

and the Commission has not adopted any final service rules for

satellite systems proposing to operate in the 28 GHz band. Therefore,

there are no small businesses currently providing these types of

broadband interactive services in the band. However, there has been a

cut-off date for applications to be considered in the first GSO/FSS

processing round.6 There are a total of thirteen applications

currently on file proposing to provide GSO/FSS services in the band.

Eight of these systems propose global systems. Five systems

[[Page 44179]]

propose regional coverage. The Commission acknowledges that a couple of

these applications are start-up companies and assumes that new

satellite systems may be developed in this frequency band that may

qualify as small entities pursuant to the SBA's definition.

---------------------------------------------------------------------------

\6\ See Ka-Band Satellite Applications Accepted For Filing: Cut-

Off Established for Additional Applications, Public Notice, Report

No. SPB-20, Release No. DA 95-1689, July 28, 1995.

---------------------------------------------------------------------------

Estimates for NGSO/FSS System Applicant in the Band

16. At present there are no NGSO/FSS satellite licensees in the 28

GHz band and final service rules have not been adopted for such

satellite systems proposing to operate in the band. Therefore, there

are no small businesses currently providing these services in the band.

However, there has been a cut-off date for applications to be

considered in the first GSO/FSS processing round. Currently, there is

only one NGSO/FSS application on file. The Commission assumes that new

satellite systems may be developed in this frequency band that may

qualify as small entities pursuant to the SBA's definition.

Estimates for NGSO/MSS Systems With Feeder Links in the 28 GHz Band

17. At present there are two licensed NGSO/MSS systems proposing

feeder links for their systems in the 28 GHz band. The Commission

assumes that new satellite systems may be developed in this frequency

band that may qualify as small entities pursuant to the SBA's

definition.

Estimates for LMDS

18.The rules adopted in this First Report and Order will apply to

any company which chooses to apply for a license in the new services.

In addition, the new rules impact fixed microwave licensees, some of

whom requested that the Commission institute a channeling plan in the

28 GHz band to set standards for point-to-point microwave equipment

manufacturers. With regard to both the traditional point-to-point

entities and the Local Multipoint Distribution Service (LMDS), the

Commission has not developed a definition of small entities applicable

to such licensees. The SBA definitions of small entity for LMDS are the

definitions applicable to radiotelephone companies and to pay

television services. The definition of radiotelephone companies

provides that a small entity is a radiotelephone company employing

fewer than 1,500 persons.7 The definition of a pay television

service is one which has annual receipts of less than $11

million.8 Since the Regulatory Flexibility Act amendments were not

in effect until the record in this proceeding was closed, the

Commission was unable to request information regarding the potential

number of small businesses interested in LMDS and is unable at this

time to determine the precise number of potential applicants which are

small businesses.

---------------------------------------------------------------------------

\7\ 13 CFR 121.201, Standard Industrial Classification (SIC)

Code 4812.

\8\ Id., SIC Code 4841.

---------------------------------------------------------------------------

19. The size data provided by the SBA does not enable us to make a

meaningful estimate of the number of telecommunications providers which

are small entities because it combines all radiotelephone companies

with 500 or more employees.9 The Commission used the 1992 Census

of Transportation, Communications, and Utilities, conducted by the

Bureau of the Census, which is the most recent information available.

This document shows that only 12 radiotelephone firms out of a total of

1,178 such firms which operated during 1992 had 1,000 or more

employees.10 Therefore, a majority of LMDS entities providing

radiotelephone services could be small businesses under the SBA's

definition. Likewise, the size data provided by the SBA does not enable

us to make a meaningful estimate of the number of cable and pay

television providers which are small entities because it combines all

such providers with revenues of less than $11 million.11 The

Commission used the 1992 Census of Transportation, Communications, and

Utilities (Table 2D), conducted by the Bureau of the Census, which is

the most recent information available. This document shows that only 36

of 1,788 firms providing cable and pay television service have a

revenue of greater than $10 million. Therefore, the vast majority of

LMDS entities providing video distribution could be small businesses

under the SBA's definition.

---------------------------------------------------------------------------

\9\ U.S. Small Business Administration 1992 Economic Census

Employment Report, Bureau of the Census, U.S. Department of

Commerce, SIC Code 4812 (radiotelephone communications industry data

adopted by the SBA Office of Advocacy).

\10\ U.S. Bureau of the Census, U.S. Department of Commerce,

1992 Census of Transportation, Communications, and Utilities, UC92-

S-1, Subject Series, Establishment and Firm Size, Table 5,

Employment Size of Firms: 1992, SIC Code 4812 (issued May 1995).

\11\ Id., SIC 4841.

---------------------------------------------------------------------------

20. However, in the Third NPRM,12 we proposed to define a

small business as an entity that, together with affiliates and

attributable investors, has average gross revenues for the three

preceding years of less than $40 million. We have not yet received

approval by the SBA for this definition because the service rules for

LMDS have not been finalized. A definition of small point-to-point

entities have not yet received approval by the SBA because such

entities have not as yet been subject to competitive bidding

procedures.

---------------------------------------------------------------------------

\12\ In the Matter of Rulemaking to Amend parts 1, 2, 21, and 25

of the Commission's Rules to Redesignate the 27.5-29.5 GHz Frequency

Band, to Reallocate the 29.5-30.0 GHz Frequency Band, to Establish

Rules and Policies for Local Multipoint Distribution Service and for

Fixed Satellite Services and Suite 12 Group Petition for Pioneer's

Preference, CC Docket No. 92-297, 11 F.C.C. Rcd. 53 (1995) (Third

NPRM), para. 188.

---------------------------------------------------------------------------

21. The Commission assumes, for purposes of our evaluations and

conclusions in this FRFA, that nearly all of the LMDS licensees will be

small entities, as that term is defined by the SBA. Many of the

competitors using LMDS to compete with LECs or cable companies could be

small businesses.

22. With regard to traditional point-to-point microwave entities,

the same analysis for small radiotelephone entities as made above

applies to these entities. In the First Report and Order, the

Commission declines to specify a channeling plan for point-to-point

entities. It is the Commission's opinion that retaining maximum system

design flexibility for LMDS licensees within their service areas

precludes our specifying a point-to-point channeling plan. Entities

interested in providing point-to-point service may seek other spectrum

or may become LMDS licensees and configure their systems as they

choose. In addition, such entities may lease spectrum, or seek

partitioning or disaggregation opportunities from LMDS licensees.

Moreover, the traditional point-to-point microwave equipment

manufacturing industry could seek to establish standards for its

members to use in the 28 GHz band. Accordingly, this First Report and

Order does not provide direct relief requested by, e.g., the

Telecommunications Industry Association, which represents fixed

microwave entities, the majority of whom may be small businesses.

23. Another category of small entities affected by this First

Report and Order are those operating in the 17.5-19.5 GHz frequency

band. These entities are fixed point-to-point microwave entities of

many subcategories. The same analysis for these entities as made for

traditional fixed microwave entities made above applies to these

entities (a definition of small point-to-point entities has not been

submitted for approval by the SBA because such entities have not as yet

been subject to competitive bidding procedures). The First Report and

Order does not change the Commission's treatment of these entities, but

it adds

[[Page 44180]]

potential additional satellite operators in the band with which the

entities will have to coordinate in the future. The Commission has

coordination procedures in effect; should they prove inadequate in the

future, we will reconsider the issue at that time.

Summary of Projected Reporting, Recordkeeping and Other Compliance

Requirements

24. There are some reporting requirements imposed by the First

Report and Order. In some instances, it is likely that the entities

filing the reports will require no professional skills for the

preparation of such requests. In other cases, the services of persons

with technical or engineering expertise may be required to prepare the

reports. First, in one band segment, a satellite licensee is required

to notify the one existing licensed LMDS operator, CellularVision, of

its launch date six months prior to the satellite's launch date. It is

also required to provide, upon CellularVision's request, updates on the

satellite's status. Such a request is reasonable of CellularVision. At

this time, it is not clear how many potential GSO/FSS licensees this

will effect. Second, in another shared band segment, LMDS licensees are

required to serve copies of their application on all NGSO/MSS

applicants. At this time, it is not clear how many LMDS entities will

be participating. Currently there are only two NGSO/MSS licensees who

will be using this band for feeder links. Feeder links for a third

NGSO/MSS system could possibly also be accommodated in this band.

Third, NGSO/MSS feeder link earth stations are required to specify a

set of geographic coordinates for the location of these earth stations,

15 days after the release of a public notice announcing the

commencement of LMDS auctions. Finally, one NGSO/MSS licensee is

required to provide its feeder link earth station locations to the GSO/

FSS licensees. At this time, it is not clear how many potential GSO/FSS

licensees this will effect.

Steps Taken to Minimize the Economic Impact on Small Entities

25. The Commission adopts a band plan that facilitates the

accommodation of all proposed systems in the 28 GHz band. It believes

this plan is a reasonable accommodation of all competing interests in

this new band segment, including small entities. The band plan along

with the Fourth Notice of Proposed Rulemaking for the 31 GHz band

provides both small entities and larger businesses the same opportunity

to develop and operate viable systems within the band, and initiate

competitive services. The band plan also accords, CellularVision, the

only licensee in the band, flexibility during the implementation phase

of the band plan.

Significant Alternatives Considered and Rejected

26. The Commission considered and rejected several alternatives to

the band plan adopted.13 The Commission considered various band

segmentation plans over the last several months with the goal of

accommodating the various divergent proposals made in response to the

band plan proposed in the Third NPRM.14 For example, the

Commission considered plans which ultimately proved to require

difficult inter-service sharing rules and to not completely support

interactivity of LMDS systems.15 The Commission also considered a

band plan that designated 1000 MHz each for GSO/FSS and LMDS service.

That plan, however, would have divided LMDS among three non-contiguous

spectrum segments.16 This option was not acceptable to the

potential LMDS service providers, including small providers, because,

they argued, it would have significantly decreased spectrum efficiency

for LMDS, resulting in increased cost and delay in offering both

subscriber and hub equipment.17 The Commission also considered two

band plans that designated GSO/FSS systems with less than 1000

MHz.18 These options were unacceptable to the GSO/FSS applicants

because, they argued, any of these plans would result in a significant

loss of system capacity and revenue.19 Such loss and capacity

could affect potential small entities. Another plan, resulting from a

GSO/FSS applicant's proposal, was also considered. It would have

designated a total of 1010 MHz to GSO/FSS applicants and 985 MHz to

LMDS, but required sharing of 135 MHz between GSO/FSS and LMDS.20

However, the mutually acceptable sharing principles required to

implement this plan were not developed by the LMDS and GSO/FSS

parties.21 The Commission staff was also unable to successfully

propose sharing criteria.

---------------------------------------------------------------------------

\13\ See First Report and Order at Paras. 38-40.

\14\ See ex parte submission filed by the International Bureau

to William F. Caton, Acting Secretary (Feb. 6, 1996), for diagrams

of Commission Band Plan Options 1, 2, 2A, 2B, 3(a), 4 and 5.

\15\ See First Report and Order note 76.

\16\ Id. note 77.

\17\ Id. note 78.

\18\ Id. note 79.

\19\ Id. note 80.

\20\ Id. note 81.

\21\ Id. note 82.

---------------------------------------------------------------------------

27. In March 1996, NASA was also asked to undertake an immediate

study to assess whether its space services and LMDS could share

spectrum below 27.5 GHz.22 NASA concluded three weeks later that

no rules acceptable to all parties could be drafted which would

guarantee protection of NASA space services from harmful

interference.23 NASA also concluded that coordination with other

space service systems in the band from other administrations would make

this a difficult option to implement effectively.

---------------------------------------------------------------------------

\22\ Id. note 83.

\23\ Id. note 84.

---------------------------------------------------------------------------

28. One alternative of not adopting a band segmentation plan for

this spectrum is the preclusion of LMDS service or satellite service in

the 28 GHz band. In the Third NPRM, the Commission tentatively

concluded that denying one or the other of the proposed services for

the band was not in the public interest and that both proposed services

bring the promise of competition and innovative services to the

nation's infrastructure. Moreover, preclusion of either service

potentially affects small businesses on both the satellite side and the

LMDS side.

Report to Congress

29. The Commission shall send a copy of this Final Regulatory

Flexibility Analysis, along with this First Report and Order, in a

report to Congress pursuant to the Small Business Regulatory

Enforcement Fairness Act of 1996, 5 U.S.C. 801(a)(1)(A). A copy of this

FRFA will also be published in the Federal Register.

Ordering Clause

30. Accordingly, it is ordered that part 25 and part 101 of the

Commission's rules are amended as specified below, effective October

28, 1996.

List of Subjects

47 CFR Part 25

Satellites.

47 CFR Part 101

Communications equipment, Radio, Reporting and recordkeeping

requirements.

Federal Communications Commission.

William F. Caton,

Acting Secretary.

Rule Changes

Parts 25 and 101 of Title 47 of the Code of Federal Regulations are

amended as follows:

[[Page 44181]]

PART 25--SATELLITE COMMUNICATIONS

1. The authority citation for part 25 continues to read as follows:

Authority: Secs. 101-404, 76 Stat. 419-427; 47 U.S.C. 701-744,

Sec. 4, 48 Stat. 1066, as amended; 47 U.S.C. 154. Interprets or

applies sec. 303, 48 Stat. 1082, as amended; 47 U.S.C. 303.

2. Section 25.203 is amended by adding paragraph (h) to read as

follows:

Sec. 25.203 Choice of sites and frequencies.

* * * * *

(h) Sites and frequencies for GSO and NGSO earth stations,

operating in a frequency band where both have a co-primary allocation,

shall be selected to avoid earth station antenna mainlobe-to-satellite

antenna mainlobe coupling, between NGSO systems and between NGSO and

GSO systems, in order to minimize the possibility of harmful

interference between these services. Prior to filing an earth station

application, in bands with co-primary allocations to NGSO and GSO earth

stations, the applicant shall coordinate the proposed site and

frequency usage with existing earth station licensees and with current

earth station authorization applicants.

* * * * *

3. A new Sec. 25.250 is added to subpart C to read as follows:

Sec. 25.250 Sharing between NGSO MSS Feeder links Earth Stations in

the 19.3-19.7 GHz and 29.1-29.5 GHz Bands.

(a) NGSO MSS applicants shall be licensed to operate in the 29.1-

29.5 GHz band for Earth-to-space transmissions and 19.3-19.7 GHz for

space-to-Earth transmissions from feeder link earth station complexes.

A ``feeder link earth station complex'' may include up to three (3)

earth station groups, with each earth station group having up to four

(4) antennas, located within a radius of 75 km of a given set of

geographic coordinates provided by NGSO-MSS licensees or applicants.

(b) Licensees of NGSO MSS feeder link earth stations separated by

800 km or less are required to coordinate their operations, see

Sec. 25.203. The results of the coordination shall be reported to the

Commission.

4. A new Sec. 25.257 is added to subpart C to read as follows:

Sec. 25.257 Special requirements for operations in the band 29.1-29.25

GHz between NGSO MSS and LMDS.

(a) Non-geostationary mobile satellite service (NGSO MSS) operators

shall be licensed to use the 29.1-29.25 GHz band for Earth-to-space

transmissions from feeder link earth station complexes. A ``feeder link

earth station complex'' may include up to three (3) earth station

groups, with each earth station group having up to four (4) antennas,

located within a radius of 75 km of a given set of geographic

coordinates provided by a NGSO MSS licensees or applicants pursuant to

Sec. 101.147.

(b) A maximum of seven (7) feeder link earth station complexes in

the contiguous United States, Alaska and Hawaii may be placed into

operation, in the largest 100 MSAs, in the band 29.1-29.25 GHz in

accordance with Sec. 25.203 and Sec. 101.147 of this chapter.

(c) One of the NGSO MSS operators licensed to use the 29.1-29.25

GHz band may specify geographic coordinates for a maximum of eight

feeder link earth station complexes that transmit in the 29.1-29.25 GHz

band. The other NGSO MSS operator licensed to use the 29.1-29.25 GHz

band may specify geographic coordinates for a maximum of two feeder

link earth station complexes that transmit in the 29.1-29.25 GHz band.

(d) Additional NGSO MSS operators may be licensed in this band if

the additional NGSO MSS operator shows that its system can share with

the existing NGSO MSS systems.

(e) All NGSO MSS operators shall cooperate fully and make

reasonable efforts to identify mutually acceptable locations for feeder

link earth station complexes. In this connection, any single NGSO MSS

operator shall only identify one feeder link earth station complex

protection zone in each category identified in Sec. 101.147(c)(2) of

this chapter until the other NGSO MSS operator has been given an

opportunity to select a location from the same category.

5. A new Sec. 25.258 is added to subpart C to read as follows:

Sec. 25.258 Sharing between NGSO MSS Feeder links Stations and GSO FSS

services in the 29.25-29.5 GHz Bands.

(a) Operators of NGSO MSS feeder link earth stations and GSO FSS

earth stations in the band 29.25 to 29.5 GHz where both services have a

co-primary allocation shall cooperate fully in order to coordinate

their systems. During the coordination process both service operators

shall exchange the necessary technical parameters required for

coordination.

(b) Licensed GSO FSS systems shall, to the maximum extent possible,

operate with frequency/polarization selections, in the vicinity of

operational or planned NGSO MSS feeder link earth station complexes,

that will minimize instances of unacceptable interference to the GSO

FSS space stations.

(c) NGSO MSS satellites operating in this frequency band shall

compensate for nodal regression due to the oblate shape of the Earth,

and thus maintain constant successive sub-satellite ground tracks on

the surface of the Earth.

(d) NGSO MSS systems applying to use the 29.25-29.5 GHz band, for

feeder link earth station uplink, will have to demonstrate that their

system can share with the authorized U.S. GSO/FSS systems operating in

this band.

PART 101--FIXED MICROWAVE SERVICES

1. The authority citation for part 101 continues to read as

follows:

Authority: 47 U.S.C. 154, 202, unless otherwise noted.

2. Section 101.3 is amended by adding the following definitions, in

alphabetical order, to read as follows:

Sec. 101.3 Definitions.

* * * * *

Local Multipoint Distribution Service Backbone Link. A point-to-

point radio service link in a Local Multipoint Distribution Service

System that is used to interconnect Local Multipoint Distribution

Service Hub Stations with each other or with the public switched

telephone network.

Local Multipoint Distribution Service Hub Station. A fixed point-

to-multipoint radio station in a Local Multipoint Service System that

provides one-way or two-way communication with Local Multipoint

Distribution Service Subscriber Stations.

Local Multipoint Distribution Service Subscriber Station. Any one

of the fixed microwave radio stations located at users' premises, lying

within the coverage area of a Local Multipoint Distribution Service Hub

Station, capable of receiving one-way communications from or providing

two-way communications with the Local Multipoint Distribution Service

Hub Station.

Local Multipoint Distribution Service System. A fixed point to-

multipoint radio system consisting of Local Multipoint Distribution

Service Hub Stations and their associated Local Multipoint Distribution

Service Subscriber Stations.

* * * * *

3. Section 101.109 is amended by removing the entry for 27,500 MHz

to 29,500 MHz and adding the entries for 27,500 to 28,350 MHz and

29,100 to 29,250 MHz in the table in paragraph (c) to read as follows:

Sec. 101.109 Bandwidth.

* * * * *

[[Page 44182]]

(c) * * *

------------------------------------------------------------------------

Frequency band (MHz) Maximum authorized bandwidth

------------------------------------------------------------------------

* * * * *

27,500 to 28,350 MHz...................... 850 MHz.

29,100 to 29,250 MHz...................... 150 MHz.

* * * * *

------------------------------------------------------------------------

4. Section 101.113 is amended by removing the entry for 27,500 to

29,500 MHz and adding new entries 27,500 to 28,350 MHz and 29,100 to

29,250 MHz in the table in paragraph (a) and by adding a new paragraph

(c) to read as follows:

Sec. 101.113 Transmitter power limitations.

(a) * * *

------------------------------------------------------------------------

Maximum allowable

EIRP \1\

Frequency band (MHz) --------------------

Fixed Mobile

(dBW) (dBW)

------------------------------------------------------------------------

27,500 to 28,350................................... 55 ........

29,100 to 29,250................................... (\7\) ........

------------------------------------------------------------------------

\1\ Per polarization.

\7\ See Sec. 101.113(c).

* * * * *

(c) (1) Transmitter power limitations: Point-to-point stations in

the 29.1-29.25 GHz band for the LMDS backbone between LMDS hubs shall

be limited to a maximum allowable e.i.r.p. density per carrier of 23

dBW/MHz in any one megahertz in clear air, and may exceed this limit by

employment of adaptive power control in cases where link propagation

attenuation exceeds the clear air value due to precipitation and only

to the extent that the link is impaired.

(2) Hub Transmitter EIRP Spectral Area, Density Limit: LMDS

applicants shall demonstrate that, under clear air operating

conditions, the maximum aggregate of LMDS transmitting hub stations in

a Basic Trading Area in the 29.1-29.25 GHz band will not transmit a co-

frequency hub-to-subscriber e.i.r.p. spectral area density in any

azimuthal direction in excess of X dBW/(MHz-km \2\) when averaged over

any 4.375 MHz band, where X is defined in Table 1. Individual hub

stations may exceed their clear air e.i.r.p.s by employment of adaptive

power control in cases where link propagation attenuation exceeds the

clear air value and only to the extent that the link is impaired.

(i) The e.i.r.p. aggregate spectral area density is calculated as

follows:

[GRAPHIC] [TIFF OMITTED] TR28AU96.732

where:

N=number of co-frequency hubs in BTA.

A=Area of BTA in km \2\.

pi=spectral power density into antenna of i-th hub (in W/MHz).

gi=gain of i-th hub antenna at zero degree elevation angle.

Each pi and gi are in the same 1 MHz within the designated frequency

band.

(ii) The climate zones in Table 1 are defined for different

geographic locations within the US as shown in Appendix 28 of the ITU

Radio Regulations.

Table 1 \1\

------------------------------------------------------------------------

e.i.r.p. Spectral Density (Clear

Climate zone Air) (dBW/MHz-km \2\) \2\

------------------------------------------------------------------------

1.................................. -23

2.................................. -25

3,4,5.............................. -26

------------------------------------------------------------------------

\1\ LMDS system licensees in two or more BTAs may individually or

collectively deviate from the spectral area density computed above by

averaging the power over any 200 km by 400 km area, provided that the

aggregate interference to the satellite receiver is no greater than if

the spectral area density were as specified in Table 1. A showing to

the Commission comparing both methods of computation is required and

copies shall be served on any affected non-GSO 20/30 GHz MSS

providers.

\2\ See Sec. 21.1007(c)(i) for the population density of the BTA.

(3) Hub Transmitter e.i.r.p. Spectral Area Density Limit at

Elevation Angles Above the Horizon: LMDS applicants shall demonstrate

that, under clear air operating conditions, the maximum aggregate of

LMDS transmitting hub stations in a Basic Trading Area in the 29.1-

29.25 GHz band will not transmit a co-frequency hub-to-subscriber

e.i.r.p. spectral area density in any azimuthal direction in excess of

X dBW/(MHz-km\2\) when averaged over any 4.375 MHz band where X is

defined in Table 2. Individual hub stations may exceed their clear air

e.i.r.p.s by employment of adaptive power control in cases where link

propagation attenuation exceeds the clear air value and only to the

extent that the link is impaired.

(i) The e.i.r.p. aggregate spectral area density is calculated as

follows:

[GRAPHIC] [TIFF OMITTED] TR28AU96.733

where:

N=number of co-frequency hubs in BTA.

A=Area of BTA in km\2\.

e.i.r.p. (ai)=equivalent isotropic radiated spectral power density of

the i-th hub (in W/MHz) at elevation angle a where a is the angle in

degrees of elevation above horizon. e.i.r.p.(0 deg.) is the hub

e.i.r.p. area density at the horizon used in Section 101.113c(2). The

nominal antenna pattern will be used for elevation angles between

0 deg. and 8 deg., and average levels will be used for angles beyond

8 deg., where average levels will be calculated by sampling the antenna

patterns in each 1 deg. interval between 8 deg. and 9015, dividing by

83.

Table 2

------------------------------------------------------------------------

Relative e.i.r.p. density

Elevation angle (a) (dBW/MHz-km \2\)

------------------------------------------------------------------------

0 deg. a 4.0 deg.. e.i.r.p.(a) = e.i.r.p.(0

deg.) + 20 log (sinx)(1/x) where x

= (a + 1)/7.5 deg..

4.0 deg. 7.7 deg.......... e.i.r.p.(a) = e.i.r.p.(0

deg.) - 3.85a + 7.7.

a > 7.7 deg............................... e.i.r.p.(a) = e.i.r.p.(0

deg.) - 22.

------------------------------------------------------------------------

(ii) LMDS system licensees in two or more BTAs may individually or

collectively deviate from the spectral area density computed above by

averaging the power over any 200 km by 400 km area, provided that the

aggregate interference to the satellite receiver is no greater than if

the spectral area density were as specified in Table 1. A showing to

the Commission comparing both methods of computation is required and

copies shall be served on any affected non-GSO MSS providers.

(4) Power Reduction Techniques: LMDS hub transmitters shall employ

methods to reduce average power levels received by non-geostationary

mobile satellite receivers, to the extent necessary to comply with

paragraphs (c)(1) and (c)(2) of this section, by employing the methods

set forth below:

(i) Alternate Polarizations. LMDS hub transmitters in the LMDS

service area may employ both vertical and horizontal linear

polarizations such that 50 percent (plus or minus 10 percent) of the

hub transmitters shall employ vertical polarization and 50 percent

(plus or minus 10 percent) shall employ horizontal polarization.

(ii) Frequency Interleaving. LMDS hub transmitters in the LMDS

service area may employ frequency interleaving such that 50 percent

(plus or minus 10 percent) of the hub transmitters shall employ channel

center frequencies which are different by one-half the channel

bandwidth of the other 50

[[Page 44183]]

percent (plus or minus 10 percent) of the hub transmitters.

(iii) Alternative Methods. As alternatives to paragraphs (c)(4)(i)

and (c)(4)(ii) of this section, LMDS operators may employ such other

methods as may be shown to achieve equivalent reductions in average

power density received by non-GSO MSS satellite receivers.

5. Section 101.133 is amended by adding new paragraph (d) to read

as follows:

Sec. 101.133 Limitations on use of transmitters.

* * * * *

(d) LMDS Subscriber Transmissions: LMDS licensees shall not operate

transmitters from subscriber locations in the 29.1-29.25 GHz band.

6. Section 101.147 is amended by adding new paragraph (y) to read

as follows:

Sec. 101.147 Frequency assignments.

* * * * *

(y) Special requirements for operations in the band 29.1-29.25 GHz:

(1)(i) LMDS receive stations operating on frequencies in the 29.1-29.25

GHz band within a radius of 75 nautical miles of the geographic

coordinates provided by a non-GSO MSS licensee pursuant to paragraphs

(c)(2) or (c)(3)(i) of this section (the ``feeder link earth station

complex protection zone'') shall accept any interference caused to them

by such earth station complexes and shall not claim protection from

such earth station complexes.

(ii) LMDS licensees operating on frequencies in the 29.1-29.25 GHz

band outside a feeder link earth station complex protection zone shall

cooperate fully and make reasonable efforts to resolve technical

problems with the non-GSO MSS licensee to the extent that transmissions

from the non-GSO MSS operator's feeder link earth station complex

interfere with an LMDS receive station.

(2) No more than 15 days after the release of a public notice

announcing the commencement of LMDS auctions, feeder link earth station

complexes to be licensed pursuant to Section 25.257 shall be specified

by a set of geographic coordinates in accordance with the following

requirements: no feeder link earth station complex may be located in

the top eight (8) metropolitan statistical areas (``MSAs''), ranked by

population, as defined by the Office of Management and Budget as of

June 1993, using estimated populations as of December 1992; two (2)

complexes may be located in MSAs 9 through 25, one of which must be

Phoenix, AZ (for a complex at Chandler, AZ); two (2) complexes may be

located in MSAs 26 to 50; three (3) complexes may be located in MSAs 51

to 100, one of which must be Honolulu, Hawaii (for a complex at

Waimea); and the three (3) remaining complexes must be located at least

75 nautical miles from the borders of the 100 largest MSAs or in any

MSA not included in the 100 largest MSAs. Any location allotted for one

range of MSAs may be taken from an MSA below that range.

(3) (i) Any non-GSO MSS licensee may at any time specify sets of

geographic coordinates for feeder link earth station complexes with

each earth station contained therein to be located at least 75 nautical

miles from the borders of the 100 largest MSAs.

(ii) For purposes of paragraph (c)(3)(i) of this section, non-GSO

MSS feeder link earth station complexes shall be entitled to

accommodation only if the affected non-GSO MSS licensee preapplies to

the Commission for a feeder link earth station complex or certifies to

the Commission within sixty days of receiving a copy of an LMDS

application that it intends to file an application for a feeder link

earth station complex within six months of the date of receipt of the

LMDS application.

(iii) If said non-GSO MSS licensee application is filed later than

six months after certification to the Commission, the LMDS and non-GSO

MSS entities shall still cooperate fully and make reasonable efforts to

resolve technical problems, but the LMDS licensee shall not be

obligated to re-engineer its proposal or make changes to its system.

(4) LMDS licensees or applicants proposing to operate hub stations

on frequencies in the 29.1-29.25 GHz band at locations outside of the

100 largest MSAs or within a distance of 150 nautical miles from a set

of geographic coordinates specified under paragraph (c)(2) or (c)(3)(i)

of this section shall serve copies of their applications on all non-GSO

MSS applicants, permitees or licensees meeting the criteria specified

in Sec. 25.257(a). Non-GSO MSS licensees or applicants shall serve

copies of their feeder link earth station applications, after the LMDS

auction, on any LMDS applicant or licensee within a distance of 150

nautical miles from the geographic coordinates that it specified under

paragraph (c)(2) or (c)(3)(i) of this section. Any necessary

coordination shall commence upon notification by the party receiving an

application to the party who filed the application. The results of any

such coordination shall be reported to the Commission within sixty

days. The non-GSO MSS earth station licensee shall also provide all

such LMDS licensees with a copy of its channel plan.

[FR Doc. 96-21795 Filed 8-27-96; 8:45 am]

BILLING CODE 6712-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.