TENNESSEE VALLEY AUTHORITY
Environmental Impact Statement: Proposed Exercise of Option
Purchase Agreement With LSP Energy Limited Partnership for Supply of
Electric Energy
AGENCY: Tennessee Valley Authority.
ACTION: Notice of Intent.
-----------------------------------------------------------------------
SUMMARY: The Tennessee Valley Authority (TVA) will prepare an
environmental impact statement (EIS) for the proposed exercise of an
electric energy option purchase agreement (OPA) with LSP Energy Limited
Partnership. Under the terms of the OPA, TVA may elect to purchase firm
electric energy provided as 750 megawatt (MW) of base load electric
capacity. This energy would be provided from a 750 MW (approximate
capacity) natural gas-fired combustion turbine combined cycle power
plant that LSP Energy Limited Partnership has proposed to construct and
operate in the City of Batesville, Mississippi. Batesville is in Panola
County and is about 140 miles north of Jackson, Mississippi and 50
miles south of Memphis, Tennessee. The EIS will evaluate the potential
environmental impacts of the proposed power plant. TVA wants to use the
EIS process to obtain the public's comments on this proposal.
DATES: Comments on the scope of the EIS must be postmarked no later
than September 13, 1996. TVA will conduct a public meeting on the scope
of the EIS. The location and time of this meeting is announced below.
ADDRESSES: Written comments should be sent to Greg Askew, PE, Senior
Specialist, National Environmental Policy Act, Tennessee Valley
Authority, mail stop WT 8C, 400 West Summit Hill Drive, Knoxville,
Tennessee 37902-1499. Comments may also be e-mailed to [email protected].
FOR FURTHER INFORMATION CONTACT:
Ron Westmoreland, Environmental Research Center, Tennessee Valley
Authority, mail stop CEB 4C, Muscle
[[Page 42300]]
Shoals, Alabama 35662-1010. E-mail may be sent to [email protected].
SUPPLEMENTARY INFORMATION:
Project Description
The natural gas-fired combustion turbine combined cycle power plant
proposed by LSP Energy Limited Partnership to satisfy the requirements
of the OPA would be located on a 50 acre site in the Batesville
Industrial Park. The industrial park fronts the east side of
Mississippi Highway 35 at Brewer Road and is within the Batesville city
limits. The power plant would consist of two or more natural gas fired
combustion turbine-generators, two or more heat recovery steam
generators and exhaust stacks, one or more steam turbine-generators,
wet mechanical draft cooling towers, fuel oil storage tanks for backup
fuel, feedwater and wastewater treatment systems, a 161 kilovolt
switchyard, a control building, and other minor appurtenances and
equipment necessary for plant operation and maintenance.
Other actions necessary for operation of the power plant include
development and operation of water supply and conveyance systems,
construction and operation of wastewater treatment with conveyance and
outfall, construction and operation of one or more natural gas pipeline
taps and conveyances, construction and operation of an interconnection
between the plant switchyard and the TVA Batesville Substation, and
construction and operation of improvements to the Batesville
Substation. Other improvements to the TVA power transmission system may
be necessary to support plant operation.
TVA's Integrated Resource Plan
TVA's integrated resource plan and final programmatic environmental
impact statement, Energy Vision 2020, was completed in December 1995.
Energy Vision 2020 contains recommendations for meeting future TVA
customer energy requirements. Call options (option purchase agreements)
are recommended as one component of TVA's preferred alternative which
is a portfolio of energy resource options. The Energy Vision 2020
short-term action plan for the years 1996-2002 recommends that TVA
purchase call options for up to 3,000 MW of peaking and base load
capacity additions to be available in the years 1998 to 2002.
Proposed Issues to be Addressed
The EIS will describe the existing environmental, cultural, and
recreational resources that may be potentially affected by construction
and operation of the project. TVA's evaluation of potential
environmental impacts due to project construction and operation will
include, but not necessarily be limited to the impacts on air quality,
water quality, aquatic and terrestrial ecology, endangered and
threatened species, wetland resources, aesthetics and visual resources,
noise, land use, cultural resources, and socioeconomic resources.
Because the proposed project is to be located in an industrial park,
the on-site issues of terrestrial wildlife, vegetation, and land use
are not likely to be important.
TVA's Integrated Resource Plan, Energy Vision 2020, identifies and
evaluates TVA's need for additional energy resources and the
environmental impacts of alternative energy resources.
Alternatives
The results from evaluating the potential environmental impacts
related to these issues and other important issues identified in the
scoping process together with engineering and economic considerations
will be used in selecting a preferred alternative. At this time, TVA
has identified as alternatives for detailed evaluation in the EIS: (1)
Not exercising the OPA (No Action), and (2) Exercising the OPA.
Scoping Process
Scoping, which is integral to the NEPA process, is a procedure that
solicits public input to the EIS process to ensure that: (1) Issues are
identified early and properly studied; (2) issues of little
significance do not consume substantial time and effort; (3) the draft
EIS is thorough and balanced; and (4) delays caused by an inadequate
EIS are avoided. TVA's NEPA procedures require that the scoping process
commence after a decision has been reached to prepare an EIS in order
to provide an early and open process for determining the scope of
issues to be addressed and for identifying the significant issues
related to a proposed action. The scope of issues to be addressed in a
draft EIS will be determined, in part, from written comments submitted
by mail, and comments presented orally or in writing at a public
meeting. The preliminary identification of reasonable alternatives and
environmental issues is not meant to be exhaustive or final. TVA
considers the scoping process to be open and dynamic in the sense that
alternatives other than those given above may warrant study and new
matters may be identified for potential evaluation.
The scoping process will include both interagency and public
scoping. The public is invited to submit written comments or e-mail
comments on the scope of this EIS no later than the date given under
the DATES section of this notice and/or attend the public scoping
meeting. TVA will conduct a public meeting on the scope of the EIS in
Batesville, Mississippi on September 5, 1996. The meeting will begin at
5:00 p.m. at the offices of the Tallahatchie Valley Electric Power
Association located at 200 Power Drive just west of the intersection of
Mississippi Highway 6 and U.S. Interstate Highway 55.
The agencies to be included in the interagency scoping are U.S.
Army Corps of Engineers, U.S. Fish and Wildlife Service, Mississippi
Department of Environmental Quality, Mississippi Historical Commission,
and other federal, state and local agencies as appropriate.
Upon consideration of the scoping comments, TVA will develop
alternatives and identify important environmental issues to be
addressed in the EIS. Following analysis of the environmental
consequences of each alternative, TVA will prepare a draft EIS for
public review and comment. Notice of availability of the draft EIS will
be published by the Environmental Protection Agency in the Federal
Register. TVA will solicit written comments on the draft EIS, and
information about possible public meetings to comment on the draft EIS
will be announced. TVA expects to release a final EIS by May 1997.
Dated: August 8, 1996.
Kathryn J. Jackson,
Senior Vice President, Resource Group.
[FR Doc. 96-20701 Filed 8-13-96; 8:45 am]
BILLING CODE 8120-01-M