Designation of Areas for Air Quality Planning Purposes; Illinois

Federal RegisterAug 8, 1996

Ask Donna

What actually matters in this document.

Text

ENVIRONMENT PROTECTION AGENCY

40 CFR Parts 52 and 81

[IL146-1a; FRL-5540-6]

Designation of Areas for Air Quality Planning Purposes; Illinois

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: In this action EPA is approving the State Implementation Plan

(SIP) submitted by the State of Illinois through the Illinois

Environmental Protection Agency (IEPA) on June 2, 1995, and January 9,

1996, for the purpose of redesignating the portion of LaSalle County

currently designated as nonattainment to attainment status for the

particulate matter National Ambient Air Quality Standard (NAAQS). The

EPA is also approving the maintenance plan for the LaSalle County PM

nonattainment area, which was submitted with the redesignation request

to ensure that attainment will be maintained.

DATES: The ``direct final'' is effective on October 7, 1996, unless EPA

receives adverse or critical comments by September 9, 1996. If the

effective date is delayed, timely notice will be published in the

Federal Register.

ADDRESSES: Copies of the revision request are available for inspection

at the following address: U.S. Environmental Protection Agency, Region

5, Air and Radiation Division, 77 West Jackson Boulevard, Chicago,

Illinois 60604. (It is recommended that you telephone David Pohlman at

(312) 886-3299 before visiting the Region 5 Office.)

Written comments should be sent to: J. Elmer Bortzer, Chief,

Regulation Development Section, Air Programs Branch (AR-18J), U.S.

Environmental Protection Agency, 77 West Jackson Boulevard, Chicago,

Illinois 60604.

FOR FURTHER INFORMATION CONTACT: David Pohlman at (312) 886-3299.

SUPPLEMENTARY INFORMATION:

I. Background

On July 1, 1987 (52 FR 24634), EPA revised the NAAQS for

particulate matter (PM) with a new indicator that includes only those

particles with an aerodynamic diameter less than or equal to a nominal

10 micrometers. (See 40 CFR Sec. 50.6). The 24-hour primary PM standard

is 150 micrograms per cubic meter (g/m3), with no more

than one expected exceedance per year. The annual primary PM standard

is 50 g/m3 expected annual arithmetic mean. The secondary

PM standards are identical to the primary standards.

Portions of LaSalle County were designated as a moderate PM

nonattainment area upon enactment of the Clean Air Act (Act) Amendments

of 1990 (November 15, 1990). 56 FR 56694 at 56705-706, 56714 (November

6, 1991). The nonattainment area includes the following townships,

ranges, and sections: T32N, R1E, S1; T32N, R2E, S6; T33N, R1E, S24;

T33N, R1E, S25; T33N, R2E, S30; T33N, R2E, S31; AND T33N, R1E, S36. The

area is known as the Oglesby PM nonattainment area, after the nearby

town of Oglesby, Illinois.

II. Evaluation Criteria

Title I, section 107(d)(3)(D) of the amended Act and the general

preamble to Title I [57 FR 13498 (April 16, 1992)], allow the Governor

of a State to request the redesignation of an area from nonattainment

to attainment. The criteria used to review redesignation requests are

derived from the Act, general preamble, and the following policy and

guidance memorandum from the Director of the Air Quality Management

Division to the Regional Air Directors, September 4, 1992, Procedures

for Processing Requests to Redesignate Areas to Attainment. An area can

be redesignated to attainment if the following conditions are met:

1. The area has attained the applicable NAAQS;

2. The area has a fully approved SIP under section 110(k) of the

Act;

3. The air quality improvement must be permanent and enforceable;

4. The area has met all relevant requirements under section 110 and

Part D of the Act;

5. The area must have a fully approved maintenance plan pursuant to

section 175(A) of the Act.

III. Review of State Submittal

Under cover letters dated June 2, 1995, and January 9, 1996, the

State submitted a redesignation request for the LaSalle County PM

nonattainment area. A public hearing was held on September 22, 1995.

The request was reviewed by EPA to determine completeness shortly after

its submittal, in accordance with the completeness criteria set out at

40 CFR Part 51, Appendix V (1991), as amended by 57 FR 42216 (August

26, 1991). The submittal was found to be complete and a letter dated

February 29, 1996, was forwarded to the Chief, Bureau of Air, Illinois

Environmental Protection Agency, indicating the completeness of the

submittal and the next steps to be taken in the review process. The

following is a description of how the State's redesignation request

meets the requirements of Section 107(d)(3)(E).

1. Attainment of the PM NAAQS

According to EPA guidance, the demonstration that the area has

attained the PM NAAQS involves submittal of ambient air quality data

from an ambient air monitoring network representing peak PM

concentrations, which should be recorded in the Aerometric Information

Retrieval System (AIRS). The area must show that the average annual

number of expected exceedances of the 24-hour PM standard is less than

or equal to 1.0 pursuant to 40 CFR Part 50, section 50.6. The data must

represent the most recent three consecutive years of complete ambient

air quality monitoring data collected in accordance with EPA

methodologies.

The IEPA operates one PM monitoring site in the nonattainment area.

Illinois submitted ambient air quality data from the monitoring site

which demonstrates that the area has attained the PM NAAQS. This air

quality data was

[[Page 41343]]

verified in AIRS. Quality assurance procedures are a component of the

AIRS data entry process. No exceedance of the 24-hour NAAQS has been

measured since 1991, and no exceedance of the annual NAAQS has been

measured since 1990. Therefore, the State has adequately demonstrated,

through ambient air quality data, that the PM NAAQS has been attained

in LaSalle County, with 1993 as the attainment year.

2. State Implementation Plan Approval

Those States containing initial moderate PM nonattainment areas

were required to submit a SIP by November 15, 1991 which implemented

reasonably available control measures (RACM) by December 10, 1993 and

demonstrated attainment of the PM NAAQS by December 31, 1994. The SIP

for the area must be fully approved under section 110(k) of the Act,

and must satisfy all requirements that apply to the area. On October

21, 1993, (58 FR 54291), EPA approved the LaSalle County PM

nonattainment area SIP originally submitted by the State on October 16,

1991.

3. Improvement in Air Quality Due to Permanent and Enforceable Measures

The State must be able to reasonably attribute the improvement in

air quality to permanent and enforceable emission reductions. In making

this showing, the State must demonstrate that air quality improvements

are the result of actual enforceable emission reductions.

The PM dispersion modeling conducted as part of the LaSalle County

PM SIP predicted that the control measures included in the SIP were

sufficient to provide for attainment and maintenance of the PM NAAQS.

The State has adequately demonstrated that the improvement in air

quality is due to permanent and enforceable emission reductions of PM

as a result of implementing the federally enforceable control measures

in the SIP.

4. Meeting Applicable Requirements of Section 110 and Part D of the Act

To be redesignated to attainment, section 107(d)(3)(E) requires

that an area must have met all applicable requirements of section 110

of part D of title I of the Act. The EPA interprets this to mean that

for a redesignation request to be approved, the State must have met all

requirements that applied to the subject area prior to or at the time

of a complete redesignation request.

A. Section 110 Requirements. Section 110(a)(2) contains general

requirements for nonattainment plans. For purposes of redesignation,

the Illinois SIP was reviewed to ensure that all applicable

requirements under the amended Act were satisfied. These requirements

were met with Illinois' October 16, 1991, and November 13, 1991,

submittal for the LaSalle County nonattainment area. This submittal was

approved by the EPA on October 21, 1993. See 58 FR 12006 (March 2,

1993), and 58 FR 54291 (October 21, 1993).

B. Part D Requirements. Before a PM nonattainment area may be

redesignated to attainment, the State must have fulfilled the

applicable requirements of part D. Subpart 1 of part D establishes the

general requirements applicable to all nonattainment areas and subpart

4 of part D establishes specific requirements applicable to PM

nonattainment areas.

The requirements of sections 172(c) and 189(a) for providing for

attainment of the PM NAAQS, and the requirements of section 172(c) for

requiring reasonable further progress, imposition of RACM, the adoption

of contingency measures, and the submission of an emission inventory

have been satisfied through the October 21, 1993, approval of the

LaSalle County PM SIP (58 FR 54291), the July 13, 1995, approval of the

Illinois PM contingency measures SIP (60 FR 36060), and the

demonstration that the area is now attaining the standard. The

requirements of the Part D--New Source Review (NSR) permit program will

be replaced by the Part C--Prevention of Significant Deterioration

(PSD) program once the area has been redesignated. However, in order to

ensure that the PSD program will become fully effective immediately

upon redesignation, either the State must be delegated the Federal PSD

program or the State must make any needed modifications to its rules to

have the approved PSD program apply to the affected area upon

redesignation. The PSD program was delegated to the State of Illinois

on January 29, 1981 (46 FR 9584).

5. Fully Approved Maintenance Plan Under Section 175(A) of the Act

Section 175(A) of the Act requires states that submit a

redesignation request for a nonattainment area under section 107(d) to

include a maintenance plan to ensure that the attainment of NAAQS for

any pollutant is maintained. The plan must demonstrate continued

attainment of the applicable NAAQS for at least ten years after the

approval of a redesignation to attainment. Eight years after the

redesignation, the State must submit a revised maintenance plan

demonstrating attainment for the ten years following the initial ten

year period.

The State of Illinois adequately demonstrated attainment and

maintenance of the PM NAAQS through the dispersion modeling submitted

as part of the LaSalle County PM attainment demonstration SIP. Since

emissions in the area are not expected to increase substantially in the

next 10 years, that initial attainment demonstration is still

appropriate. Further, emissions from the area's only significant PM

source, the Lone Star portland cement plant (and its associated quarry,

are currently only about 75% of the levels modeled for the 1991

submittal. Thus, even if production should increase, emissions would

likely not exceed the modeled amounts. Also, emissions from any new

sources would be restricted by PSD requirements.

Once an area has been redesignated, the State must continue to

operate an appropriate air quality monitoring network, in accordance

with 40 CFR Part 58, to verify the attainment status of the area. The

maintenance plan should contain provisions for continued operation of

air quality monitors that will provide such verification. Illinois

operates one PM air monitoring site in the nonattainment area. This

site is approved annually by the EPA, and any future change would

require discussion with EPA. In its submittal, the State commits to

continue to operate the PM monitoring station to demonstrate ongoing

compliance with the PM NAAQS.

Section 175(A) of the Act also requires that a maintenance plan

include contingency provisions, as necessary, to promptly correct any

violation of the NAAQS that occurs after redesignation of the area.

These contingency measures are distinguished from those generally

required for nonattainment areas under section 172(c)(9). However, if

the contingency measures in a nonattainment SIP have not been

implemented to attain the standards and they include a requirement that

the State will implement all of the PM control measures which were

contained in the SIP before redesignation to attainment, then they can

be carried over into the area's maintenance plan.

Under a cover letter dated July 29, 1994, IEPA submitted a State

Rule to satisfy the contingency measures requirements specified in

section 172(c)(9) for the LaSalle County PM nonattainment area, among

others. This rule is eligible to also be used as the section 175(A)

contingency measures, because the State was able to attain the PM NAAQS

with the limitations and control measures already contained in

[[Page 41344]]

the SIP. On July 13, 1995, the EPA approved the rule into the Illinois

SIP in a direct final rulemaking (60 FR 36060), which became effective

on September 11, 1995. Also, Illinois' June 2, 1995, and January 9,

1996, submittal included a commitment by the State to take action to

reduce PM emissions when monitored 24-hour PM concentrations exceed 90%

of the NAAQS.

IV. Final Rulemaking Action

In this action, EPA is approving the State of Illinois' request to

redesignate the LaSalle County PM nonattainment area to attainment. The

EPA is also approving the maintenance plan for the LaSalle County PM

nonattainment area, which was submitted with the redesignation request

to ensure that attainment will be maintained. The EPA has completed an

analysis of this SIP revision request based on a review of the

materials presented and has determined that it is approvable because

all requirements for redesignation have been met as discussed above.

The EPA is publishing this action without prior proposal because

EPA views this action as a noncontroversial revision and anticipates no

adverse comments. However, EPA is publishing a separate document in

this Federal Register publication, which constitutes a ``proposed

approval'' of the requested SIP revision and clarifies that the

rulemaking will not be deemed final if timely adverse or critical

comments are filed. The ``direct final'' approval shall be effective on

October 7, 1996, unless EPA receives adverse or critical comments by

September 9, 1996. If EPA receives comments adverse to or critical of

the approval discussed above, EPA will withdraw this approval before

its effective date by publishing a subsequent Federal Register document

which withdraws this final action. All public comments received will

then be addressed in subsequent rulemaking. Please be aware that EPA

will institute another comment period on this action only if warranted

by significant revisions to the rulemaking based on any comments

received in response to today's action. Any parties interested in

commenting on this action should do so at this time. If no such

comments are received, EPA hereby advises the public that this action

will be effective on October 7, 1996.

This action has been classified as a Table 3 action for signature

by the Regional Administrator under the procedures published in the

Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a

July 9, 1995, memorandum from Mary D. Nichols, Assistant Administrator

for Air and Radiation. The Office of Management and Budget has exempted

this regulatory action from Executive Order 12866 review.

Nothing in this action should be construed as permitting, allowing

or establishing a precedent for any future request for revision to any

SIP. EPA shall consider each request for revision to the SIP in light

of specific technical, economic, and environmental factors and in

relation to relevant statutory and regulatory requirements.

Under section 801(a)(1)(A) of the Administrative Procedure Act

(APA) as amended by the Small Business Regulatory Enforcement Fairness

Act of 1996, EPA submitted a report containing this rule and other

required information to the U.S. Senate, the U.S. House of

Representatives and the Comptroller General of the General Accounting

Office prior to publication of the rule in today's Federal Register.

This rule is not a ``major rule'' as defined by section 804(2) of the

APA as amended.

Section 202 of the Unfunded Mandates Reform Act of 1995 (``Unfunded

Mandates Act'') (signed into law on March 22, 1995) requires that the

EPA prepare a budgetary impact statement before promulgating a rule

that includes a Federal mandate that may result in expenditure by

State, local, and tribal governments, in aggregate, or by the private

sector, of $100 million or more in any one year. Section 203 requires

the EPA to establish a plan for obtaining input from and informing,

educating, and advising any small governments that may be significantly

or uniquely affected by the rule.

Under section 205 of the Unfunded Mandates Act, the EPA must

identify and consider a reasonable number of regulatory alternatives

before promulgating a rule for which a budgetary impact statement must

be prepared. The EPA must select from those alternatives the least

costly, most cost-effective, or least burdensome alternative that

achieves the objectives of the rule, unless the EPA explains why this

alternative is not selected or the selection of this alternative is

inconsistent with law.

Because this final rule is estimated to result in the expenditure

by State, local, and tribal governments or the private sector of less

then $100 million in any one year, the EPA has not prepared a budgetary

impact statement or specifically addressed the selection of the least

costly, most cost-effective, or least burdensome alternative. Because

small governments will not be significantly or uniquely affected by

this rule, the EPA is not required to develop a plan with regard to

small governments. This rule only approves the incorporation of

existing state rules into the SIP. It imposes no additional

requirements.

Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA

must prepare a regulatory flexibility analysis assessing the impact of

any proposed or final rule on small entities. (5 U.S.C. 603 and 604.)

Alternatively, EPA may certify that the rule will not have a

significant impact on a substantial number of small entities. Small

entities include small businesses, small not-for-profit enterprises,

and government entities with jurisdiction over populations of less than

50,000.

SIP approvals under section 110 and subchapter I, part D of the

Clean Air Act do not create any new requirements, but simply approve

requirements that the State is already imposing. Therefore, because the

Federal SIP-approval does not impose any new requirements, I certify

that it does not have a significant impact on any small entities

affected. Moreover, due to the nature of the Federal-State relationship

under the Act, preparation of a regulatory flexibility analysis would

constitute Federal inquiry into the economic reasonableness of the

State action. The Clean Air Act forbids EPA to base its actions

concerning SIPs on such grounds. Union Electric Co. v. EPA., 427 U.S.

246, 256-66 (S.Ct. 1976); 42 U.S.C. 7410(a)(2).

Under section 307(b)(1) of the Clean Air Act, petitions for

judicial review of this action must be filed in the United States Court

of Appeals for the appropriate circuit by October 7, 1996. Filing a

petition for reconsideration by the Administrator of this final rule

does not affect the finality of this rule for the purposes of judicial

review nor does it extend the time within which a petition for judicial

review may be filed, and shall not postpone the effectiveness of such

rule or action. This action may not be challenged later in proceedings

to enforce its requirements. (See Section 307(b)(2)).

List of Subjects

40 CFR Part 52

Environmental protection, Air pollution control, Intergovernmental

relations, Particulate matter, Reporting and recordkeeping

requirements.

40 CFR Part 81

Air pollution control, National parks, Wilderness areas.

[[Page 41345]]

Dated: July 3, 1996.

Valdas V. Adamkus,

Regional Administrator.

For reasons stated in the preamble, parts 52 and 81 of chapter I,

title 40 of the Code of Federal Regulations are amended as follows:

PART 52--[AMENDED]

1. The authority citation for part 52 continues to read as follows:

Authority: 42 U.S.C. 7401-7671q.

Subpart O--Illinois

2. Section 52.725 is amended by adding paragraph (d) to read as

follows:

Sec. 52.725 Control strategy: Particulates.

* * * * *

(d) Approval--On June 2, 1995, and January 9, 1996, the State of

Illinois submitted a maintenance plan for the particulate matter

nonattainment portion of LaSalle County, and requested that it be

redesignated to attainment of the National Ambient Air Quality Standard

for particulate matter. The redesignation request and maintenance plan

satisfy all applicable requirements of the Clean Air Act.

PART 81--DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES

1. The authority citation for part 81 continues to read as follows:

Authority: 42 U.S.C. 7401-7671q.

2. In Sec. 81.314, the table for ``Illinois PM-10'' is amended by

revising the table heading and the entry for ``LaSalle County'' to read

as follows:

Sec. 81.314 Illinois.

* * * * *

Illinois--PM-10

--------------------------------------------------------------------------------------------------------------------------------------------------------

Designation Classification

Designated area -----------------------------------------------------------------------------------------------------------------------

Date Type Date Type

--------------------------------------------------------------------------------------------------------------------------------------------------------

* * * * * * *

LaSalle County October 7, 1996............. Attainment

Oglesby including the

following Townships,

ranges, and sections: T32N,

R1E, S1; T32N, R2E, S6;

T33N, R1E, S24; T33N, R1E,

S25; T33N, R2E, S30; T33N,

R2E, S31; and T33N, R1E,

S36

* * * * * * *

--------------------------------------------------------------------------------------------------------------------------------------------------------

* * * * *

[FR Doc. 96-19888 Filed 8-7-96; 8:45 am]

BILLING CODE 6560-50-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.