Request for REACH Plans Under the Office of Community Services FY 1996 Low-Income Home Energy Assistance Program, Residential Energy Assistance Challenge Option (REACH) Program

Federal RegisterJul 5, 1996

Ask Donna

What actually matters in this document.

Text

SUMMARY: The Administration for Children and Families (ACF), Office of

Community Services (OCS) announces that, based on availability of

funds, REACH Plans will be accepted for grants pursuant to the

Secretary's authority under Section 2607B(b) of the Low-Income Home

Energy Assistance Act of 1981, as amended, 42 U.S.C. 8621 et seq.

CLOSING DATES: The closing date and time for receipt of REACH

applications is 4:30 p.m., eastern time zone, on September 3, 1996.

Applications received after 4:30 p.m. on that day will be classified as

late. Postmarks and other similar documents do not establish receipt of

an application. Detailed application submission instructions including

the addresses where applications must be received are found in Part VI

B, Application Submission.

FOR FURTHER INFORMATION CONTACT: Office of Community Services,

Administration for Children and Families, Division of Community

Demonstration Programs, 370 L'Enfant Promenade, S.W., Fifth Floor,

Washington, D. C. 20447. Attention: Richard Saul--(202) 401-9341; Anna

Guidery--(202) 401-5318.

This Notice is accessible on the OCS Electronic Bulletin Board for

downloading through your computer modem by calling 1-800-627-8886. For

assistance in accessing the Bulletin Board, a Guide to Accessing and

Downloading is available from Ms. Minnie Landry at (202) 401-5309.

The Catalog of Federal Domestic Assistance number for this

program is 93.568.

Table of Contents

Part I--Introduction

A. Legislative Authority

B. Definition of Terms

C. Purpose

Part II--Background Information

A. Program Priority Areas

B. Project Periods and Budget Periods

C. Availability of Funds and Grant Amounts

D. Program Participants/Beneficiaries

E. Prohibition and Restrictions on the Use of Funds

F. Multiple Submittals and Multiple Grants

G. Maintenance of Effort

Part III--Reach Priority Areas and Program Requirements

A. Program Requirements for Priority Area 1.0

1. Eligible Applicants for Priority Area 1.0

2. Program Focus

3. Economic Development Strategy and Mobilization of Resources

4. Scope of the Priority Area 1.0 REACH Plan

5. Low-Income Citizen Participation

6. Third-Party Project Evaluation

7. Consistency With LIHEAP Legislation

8. Dissemination of Project Results.

B. Special Program Requirements for Priority Area 2.0

1. Eligible Applicants for Priority Area 2.0

2. Program Focus

3. Economic Development strategy

4. Scope of the Priority Area 2.0 REACH Plan

5. Low-Income Citizen Participation

6. Third Party Project Evaluation

7. Consistency With LIHEAP Legislation

8. Dissemination of Project Results

Part IV--Reach Plan Elements and Review Criteria

A. Program Elements, Review and Assessment Criteria for REACH Plans

Under Priority Area 1.0

B. Special Program Elements, Review and Assessment Criteria for

REACH Plans Under Priority Area 2.0

Part V--Quality Standards for Energy Efficiency Education Services

Plans

A. Purpose

B. Target Population

C. Needs Assessment and Project Design Process

D. Service Delivery

E. Relation of Services to Changes, of Changes to Outcomes, and of

Outcomes to Goals (a ``Logic Model'')

F. Evaluation

Part VI--Application Procedures

A. Availability of Forms

B. Application Submission

C. Paperwork Reduction Act of 1995

D. Application Consideration

E. Criteria for Screening Applications

Part VII--Instructions for Completing Application Forms

A. SF-424--Application for Federal Assistance

B. SF-424A--Budget Information--Non-Construction Programs

C. SF-424B--Assurances--Non-Construction

Part VIII--Contents of Reach Plan

Part IX--Post-Award Information and Reporting Requirements

A. Notification of Grant Award

B. Attendance at Workshops

C. Reporting Requirements

D. Audit Requirements

E. Prohibitions and Requirements with regard to Lobbying

F. Applicable Federal Regulations

Part I. Introduction

A. Legislative Authority

Section 2607B(b) of the Low-Income Home Energy Assistance Act of

1981, as amended, 42 U.S.C. 8621 et seq., authorizes the creation of

the Residential Energy Assistance Challenge Option (REACH) Program, to

be funded for the first time in FY 1996. REACH is designed to provide

services through local community-based agencies to help LIHEAP eligible

households reduce their energy vulnerability.

The Secretary is authorized to make incentive grants to States,

Tribes, Tribal Organizations, and certain Insular Areas that submit

qualifying Plans, hereinafter referred to as REACH Plans, that are

approved by the Secretary as REACH initiatives. Successful applicants

are to use such grants for the costs of planning, implementing, and

evaluating the initiative.

The Secretary must also reserve from any funds allocated under the

REACH initiative, funds to make additional payments to REACH programs

that (a) have energy efficiency education services plans that meet

quality standards established by the Secretary in consultation with the

Secretary of Energy; and (b) have the potential for being replicable

model designs for other programs.

This Announcement is requesting competitive REACH Plans from

eligible applicants which are consistent with the information,

requirements, and program elements and review criteria outlined in

Parts II, III, IV, and V, below.

B. Definition of Terms

For purposes of this Program Announcement, the following

definitions apply [Definitions marked with an asterisk(*) are the

definitions found in Section 2603 of the Low Income Home Energy

Assistance Act, as amended, (42 U.S.C. 8622) and apply to the REACH

Initiative]:

--Budget Period: The term ``budget period'' refers to the interval of

time into which a multi-year period of assistance (project period) is

usually divided for budgetary and funding purposes.

[[Page 35519]]

--Community-based, nonprofit: A corporation or association whose

profits may not lawfully accrue to the benefit of any shareholder or

individual, and whose goals, objectives and activities are established

and carried out through a process involving the participation of

residents of the community or local area being served, including low-

income residents.

--Community-Based Organization Recipient (CBO Recipient): The

Community-based nonprofit entity through which State REACH Project

services shall be delivered in the applicant State under Priority Area

1.0.

--Energy burden* means the expenditures of the household for home

energy divided by the income of the household.

--Energy crisis* means weather-related and supply shortage emergencies

and other household energy-related emergencies.

--Highest home energy needs* means the home energy requirements of a

household determined by taking into account both the energy burden of

such household and the unique situation of such household that results

from having members of vulnerable populations, including very young

children, individuals with disabilities, and frail older individuals.

--Home energy* means a source of heating or cooling in residential

dwellings.

--Household* means any individual or group of individuals who are

living together as one economic unit for whom residential energy is

customarily purchased in common or who make undesignated payments for

energy in the form of rent.

--Innovative project: One that departs from or significantly modifies

past program practices and tests (a) new approach(es).

--Intervention: Any planned activity within a project that is intended

to produce changes in the target population or the environment, and can

be formally evaluated.

--Nonprofit Organization: A corporation or association whose profits

may not lawfully accrue to the benefit of any shareholder or individual

(and through which REACH Project services may be delivered under

Priority Area 2.0).

--Outcome evaluation: An assessment of measured results designed to

provide a valid determination of the net effects attributable to the

intervention. An outcome evaluation will produce and interpret findings

related to whether the intervention produced desirable changes and its

potential for replicability. It should answer the question, ``Did this

program work?''

--Poverty level* means, with respect to a household in any State, the

income poverty line as prescribed and revised at least annually

pursuant to section 673(2) of the Community Services Block Grant Act,

as applicable to such State. (See Attachment A.)

--Process evaluation: Descriptive information that is gathered on the

development and implementation of a program/intervention that may serve

as a document for replicating the program elsewhere. The evaluation

should also identify problems that occurred and how they were dealt

with and recommend improved means of future implementation. It should

answer the question: ``How was the program carried out?'' In concert

with the outcome evaluation, it should also help explain, ``Why did

this program work/not work?''

--Project period: The term ``project period'' refers to the total time

for which a project is approved for support, including any extensions.

--Secretary* means the Secretary of Health and Human Services.

--State* means each of the several States and the District of Columbia.

--State median income* means the State median income promulgated by the

Secretary in accordance with procedures established under section

2002(a)(6) of the Social Security Act (as such procedures were in

effect on the day before the date of the enactment of this Act) and

adjusted, in accordance with regulations prescribed by the Secretary,

to take into account the number of individuals in the household.

C. Purpose

As described in the authorizing legislation, the purpose of the

REACH Program is to--

(1) minimize health and safety risks that result from high energy

burdens on low-income Americans;

(2) prevent homelessness as a result of inability to pay energy

bills;

(3) increase efficiency of energy usage by low-income families; and

(4) target energy assistance to individuals who are most in need.

In keeping with this broad mandate, OCS will support a limited

number of innovative Pilot Projects that seek to demonstrate the long

term cost effectiveness of supplementing energy assistance payments

with non-monetary benefits that can increase the ability of eligible

households to meet energy costs and help them to achieve energy self-

sufficiency.

Part II. Background Information

A. Program Priority Areas

The REACH Program will have two Priority Areas: Priority Area 1.0,

for which eligible applicants are States, the District of Columbia and

Puerto Rico; and Priority Area 2.0, for which eligible applicants are

Tribes, Tribal Organizations, and certain Insular Areas which are

LIHEAP grantees that use LIHEAP funds to implement a LIHEAP Program.

B. Project Periods and Budget Periods

(See Part I, B, Definition of Terms)

The Low Income Home Energy Assistance Act of 1981 authorizes a

block grant program of which the REACH Program is a part, and to which

45 CFR Parts 74 and 92 and OMB Circulars do not apply. However, 45 CFR

Part 96 does apply to REACH funds. Grantees must obligate REACH funds

within the Fiscal Year following the Fiscal Year in which the REACH

grant was awarded by OCS.

1. Project Periods. Project periods will be 36 months for all REACH

projects under Priority Area 1.0 and for projects under Priority Area

2.0 when the applicant elects to delegate the project to a non-profit

organization as described below.

States under Priority Area 1.0 and applicants under Priority Area

2.0 with thirty-six month Project Periods are encouraged to provide for

completion of the planning and consummation of awards to sub-recipients

within a time frame that will allow for adequate start-up and an

implementation period of at least two years, followed by a phase-out

period that will permit completion of the required evaluation under

Priority Area 1.0 and reporting under Priority Area 2.0.

Project periods will be 12 months under Priority Area 2.0 where

applicants elect to operate projects directly, as described below.

2. Budget Periods. Budget Periods for all REACH Projects in

Priority Areas 1.0 and 2.0 will be twelve months (one year).

(a) In the case of projects under Priority Area 1.0, States will

receive grants for the full amount of the three-year Project Period,

and will award REACH funds to CBO Recipients for total project budgets

covering the full Project Period as described above, and should solicit

and/or design local projects accordingly. Applicants under Priority

Area 1.0 may include in the REACH Initiative budget an amount up

[[Page 35520]]

ten percent (10%) of the total REACH grant for planning,

administration, and coordinating costs at the State level, and for

contracting with a third party evaluator as defined in Part IV-A,

Element VI, below, and discussed in Part III-A.6., during the first

project year (the first twelve month budget period) of the REACH

Initiative. States may apply for continued funding for such costs for

each of the second and third project years (budget periods) on a non-

competitive basis, for an amount each year of up to two and one-half

percent (2.5%) of the original grant, subject to the availability of

funds, satisfactory progress of the grantee, and determination that

this would be in the best interest of the government.

(b) In the case of REACH Projects under Priority Area 2.0, where

applicants elect to operate REACH projects through non-profit

organizations, grants awarded pursuant to this announcement will

likewise be for the full amount of the three year Project Period, and

applicants will in like manner award REACH funds to sub-recipients for

total project budgets covering the full Project Period as described in

the preceding paragraph (a). Such applicants may include up to five

percent (5%) of the total REACH grant for planning, administration and

coordinating costs of the first year, which may be continued for years

two and three on the same terms as described in preceding paragraph

(a).

(c) Where applicants under Priority Area 2.0 elect to operate REACH

programs themselves, as described below, grants awarded pursuant to

this announcement will be for 12-month (one year) Project and Budget

Periods only.

C. Availability of Funds and Grant Amounts

The total amount expected to be available for REACH Initiative

grants pursuant to this announcement is approximately $5,000,000. The

Office of Community Services expects to award up to eight competitive

grants under Priority Area 1.0 for General Pilot Projects of $500,000

to $1,500,000 each for the planning, implementation and evaluation of

REACH Initiatives; but the total amount awarded under Priority Area 1.0

will not exceed $4,000,000, except as provided under Priority Area 2.0.

OCS expects to award up to eight grants under Priority Area 2.0 for

smaller Pilot Projects of $50,000 to $150,000 each to Indian Tribes and

Tribal Organizations for a total of up to $400,000. Any funds not

awarded under Priority Area 2.0 will be available for funding under

Priority Area 1.0. Pursuant to the legislative mandate, an additional

$600,000 has been reserved by the Secretary to make additional payments

of up to $100,000 each to qualifying funded REACH Initiatives under

Priority Area 1.0, and payments of up to $25,000 each under Priority

Area 2.0, for implementation and evaluation of Energy Efficiency

Education Services Plans which meet the Quality Standards established

in consultation with the Secretary of Energy which are set forth in

Part V of this Announcement, and have the potential for being

replicable model designs for other programs. Where any funded REACH

Initiatives do not qualify for such payments, available reserved funds

may be distributed among the applicants that do qualify, at the

discretion of OCS and through negotiation with the qualifying

applicants.

D. Program Participants/Beneficiaries

Projects proposed for funding under this announcement must result

in direct benefits to low-income individuals and families who are

eligible for LIHEAP benefits under the applicant's LIHEAP program,

pursuant to Section 2605(b)(2) of the Low Income Home Energy Assistance

Act of 1981, as amended. However, not all LIHEAP recipients and/or

eligible households must be provided REACH services. Applicants may

target a portion of the LIHEAP-eligible population for REACH services.

Attachment A to this announcement is an excerpt from the Poverty

Income Guidelines currently in effect. Annual revisions of these

guidelines are normally published in the Federal Register in February

or early March of each year. Where relevant to REACH eligibility

criteria, grantees will be required to apply the most recent guidelines

throughout the project period. These revised guidelines also may be

obtained at public libraries, Congressional offices, or by writing the

Superintendent of Documents, U.S. Government Printing Office,

Washington, D.C. 20402. They also are accessible on the OCS Electronic

Bulletin Board for reading and/or downloading. (See For Further

Information at beginning of this announcement.)

Consistent with the legislative purpose of the REACH Initiative

``to target energy assistance to individuals who are most in need'',

projects proposed for funding under this Announcement may further

restrict eligibility to lower income individuals and families within

the LIHEAP eligible universe.

Under the authorizing legislation applicants may designate all or

part of the State or all or part of the client population as a focus of

its REACH Initiative. The Secretary has determined that in order best

to compare the cost effective outcomes of REACH benefits with those of

LIHEAP payment benefits alone, the geographic/client focus of the REACH

program should be one which results in REACH expenditures bearing a

reasonable relationship to the LIHEAP payment benefits available to the

same target population. For example, if the target population of the

REACH Project were to receive REACH benefits costing ten times the

amounts they received in LIHEAP payments, it would be difficult to

compare the long-term cost effectiveness of these benefits with those

of LIHEAP payments alone. Consequently, REACH Project expenditures

should not be less than one-half nor more than twice the amount of

LIHEAP benefits paid within the REACH service area to REACH eligible

households over two years, under the current appropriation. In other

words, if LIHEAP financial assistance to a REACH target population

totals $100,000 over two years, the applicant should plan to provide

between $50,000 and $200,000 in REACH services to that target

population area.

E. Prohibition and Restrictions on the Use of Funds

The use of funds for the purchase or construction of real property

is prohibited. Costs incurred for rearrangement and alteration of

facilities required specifically for the funded program are allowable

when specifically approved by ACF in writing. However, in keeping with

the legislative mandate to include in REACH Project activities energy

related residential repair and energy efficiency improvements, such

activities will not be considered to be violative of these prohibitions

or restrictions.

If the applicant is proposing a project which will affect a

property listed in, or eligible for inclusion in the National Register

of Historic Places, it must identify this property in the narrative and

explain how it has complied with the provisions of section 106 of the

National Historic Preservation Act of 1966 as amended. If there is any

question as to whether the property is listed in or eligible for

inclusion in the National Register of Historic Places, the applicant

should consult with the State Historic Preservation Officer. (See

Attachment D: SF-424B, Item 13 for additional guidelines.) The

applicant should contact OCS early in the

[[Page 35521]]

development of its application for instructions regarding compliance

with the Act and data required to be submitted to the Department of

Health and Human Services. Failure to comply with the cited Act will

result in the application being ineligible for funding consideration.

F. Multiple Submittals and Multiple Grants

Due to the limited number of grants that will be made under this

program, only one application from any one eligible applicant will be

funded by OCS from FY 1996 REACH funds. (This does not preclude

applicants under Priority Area 1.0 from including more than one local

REACH Project/CBO Recipient in their REACH plans.)

G. Maintenance of Effort

The activities funded under this program announcement must be in

addition to, and not in substitution for, activities previously carried

on without Federal assistance. Also, the benefits and services provided

eligible participants in the REACH Project must be provided in addition

to and in coordination with benefit payments and services provided

under the applicant's regular LIHEAP Program. A signed certificate of

Maintenance of Effort must be included with the application (see

Attachment J).

Part III. Reach Priority Areas and Program Requirements

A. Program Requirements for Priority Area 1.0

1. Eligible Applicants for Priority Area 1.0. Eligible applicants

for these grants under Priority Area 1.0 are the fifty States, the

District of Columbia and Puerto Rico. They must deliver REACH services,

in one or more specific projects, through community-based, nonprofit

organizations, hereinafter referred to as CBO Recipients, by awarding

grants to or entering into contracts with such CBO Recipients for the

purpose of providing such services and payments directly to individuals

eligible for benefits. If a State makes LIHEAP payments directly to

eligible individuals or energy suppliers, the State must enter into

contract(s) with such CBO Recipients to administer such programs,

including (i) determining eligibility, (ii) providing outreach

services, and (iii) providing benefits other than payments.

In awarding grants or entering into contracts to carry out its

REACH Initiative, the State must give priority to eligible entities, as

defined in Section 673 of the Community Services Block Grant Act (42

U.S.C. 9902(1)) except where significant geographic portions of the

State are not served by such entities, that (1) have a record of

successfully providing services under the Low-Income Home Energy

Assistance Program (as determined by DHHS), and (2) receive funds under

the Department of Energy's Low Income Weatherization Assistance

Program. The State may not require any such entity to operate a REACH

Project.

2. Program Focus.

The goals of a Priority 1.0 funded REACH Plan over the project

period must include:

(1) a reduction in energy costs of participating low-income

households;

(2) an increase in the regularity of home energy bill payments by

participating households; and

(3) an increase in energy vendor contributions towards reducing

energy burdens of eligible households.

As noted above, so that the cost effective outcomes of REACH

benefits may best be compared with those of LIHEAP benefits alone, an

Applicant, in designating the REACH service area or segment of the

eligible population to be served by the proposed REACH Plan, should

seek to define (an) area(s) or population segment(s) whose allocation

under the LIHEAP program bears a reasonable relationship to the

resources available to the REACH Project. That is, REACH Project

expenditures should not be less than one-half or more than twice the

amount of LIHEAP benefits paid within the REACH service area to REACH

eligible households over two years, under the current appropriation. In

this regard, the applicant should consider the totality of resources

that will be available to support the REACH Project's implementation

and the level of benefit and/or services reasonably required to achieve

the Project's goals and objectives. This will be a function, in part,

of the specific interventions that will go to make up the ``benefits

and services'' in the particular Project design; and an objective of

every REACH Plan should be to measure the success of such interventions

in achieving more cost-effective long-term outcomes than energy payment

benefits alone. Thus OCS is interested in REACH Plans that propose

testing innovative approaches to helping low-income families achieve

energy self-sufficiency, and ultimate independence from energy

assistance payments.

3. Economic Development Strategy and Mobilization of Resources. OCS

is interested in having Applicants approach the energy needs of low-

income families within a holistic context of the economic, social,

physical, and environmental barriers to achieving self-sufficiency.

Thus applicants should include in their REACH Plan an explanation of

how the proposed project(s) will be integrated with and support a

larger economic development strategy within the target community or

communities.

REACH grantees are not required to match REACH grant awards with

either cash or in-kind contributions of goods and services. However, in

keeping with this holistic integration of REACH Projects within the

community, they are expected to be closely coordinated with other

public and private sector programs involved with community

revitalization, housing rehabilitation and weatherization, and family

development; and OCS will give favorable consideration in the

application review process to applicants who mobilize third-party cash

and/or in-kind contributions for direct use in the REACH Project. Even

though there is no matching requirement for the REACH Program, grantees

will be held accountable for any match, cash or in-kind contribution

proposed or pledged as part of an approved application. (See Part IV,

Element III.)

If the REACH service area or portion thereof is covered by a

comprehensive community-based strategic plan, such as that required for

applying for Empowerment Zone/-Enterprise Community (EZ/EC) status, to

achieve both economic and human development in an integrated manner,

applicants should document how they and/or the designated CBO

Recipient(s) were involved in the preparation and implementation of the

plan, and how the proposed REACH project(s) will support the goals of

that plan. (See Part IV-A, Element VIII.)

4. Scope of the Priority Area 1.0 REACH Plan. A State may submit a

REACH Plan which proposes one local REACH Project to be implemented by

one CBO Recipient; it may submit a Plan in which the same project is

proposed to be implemented in several localities by separate CBO

Recipients; or it may submit a plan proposing two or more different and

distinct Projects, each to be implemented through a separate CBO

Recipient. Where a State proposes different and distinct REACH Projects

to be carried out by more than one CBO Recipient, the REACH Plan should

include, for each of these projects/CBO Recipients, a separate

narrative section, no more than ten pages in length, covering Element I

(with three Sub-Elements), explaining the project Theory, Design and

Plan of the proposed project, as explained in Part IV, and designated

as Segment One

[[Page 35522]]

of the Project Narrative; and a Budget Justification as described in

Element II, covering Project Budget Appropriateness. As set forth in

Part IV, ``Segment One'' of the Project Narrative should describe the

concept of the proposed REACH Project, describing the goals or outcomes

that the project seeks to achieve; the needs of the target population

that the project seeks to address, and the assumptions about how those

needs can be met; and the activities or interventions that the project

will undertake to meet the needs and achieve the goals and outcomes of

the project.

Where a REACH Plan proposes only one distinct project, to be

implemented either in one locality or in several, by either one or more

than one CBO Recipient, then the Plan need include only one Segment One

narrative.

Each Priority Area 1.0 REACH Plan must also include the

designation, in accordance with the priorities described in Section A.

1., above, of the CBO Recipient(s) through which the proposed

project(s) will be implemented. With each Priority Area 1.0 REACH Plan

there must be included a Letter of Agreement from each designated CBO

Recipient subscribing to the project concept as described in the

appropriate Segment One narrative section of the Plan and agreeing to

operate the REACH project as proposed. The Letter of Agreement must

also commit the CBO Recipient(s) to a process of Low-Income Citizen

Participation in the establishment of the local REACH Project, as

described in Section A. 5., below.

The REACH Plan must include a description of the methodology the

State and local agencies will use to determine--

(i) which households will receive one or more forms of benefits

under the REACH Initiative;

(ii) the cases in which nonmonetary benefits are likely to provide

more cost-effective long-term outcomes than payment benefits alone; and

(iii) the amount of such benefits required to meet the goals of the

program.

The Plan must also include a method to be used for targeting REACH

nonmonetary benefits. It should further provide that the State will

award the grant(s) or contract(s) for implementation of the REACH

Project within a time frame that will allow for adequate start-up and

an implementation period of at least two years, followed by a phase-out

period that will permit completion of the required evaluation. (See

Part II-B. 1., Project Periods, and Part IV-A, Sub-Element I(c))

Finally, the REACH Plan must include:

(A) a brief description of the crisis and emergency assistance

activities the State will undertake that are designed to:

(1) discourage family energy crises;

(2) encourage responsible vendor and consumer behavior; and

(3) provide only financial incentives that encourage household

payment; (See Part IV-A, Sub-Element I(b))

(B) a brief description of the activities the State will undertake

to--

(1) provide incentives for recipients of assistance to pay home

energy costs; and

(2) provide incentives to vendors to help reduce the energy burdens

of recipients of assistance.

(C) an assurance that, subject to the methodologies described

above, each CBO Recipient will provide a variety of services and

benefits, including--

(i) payments to, or on behalf of, individuals eligible for

residential energy assistance services and benefits under Section

2605(b) for home energy costs;

(ii) energy efficiency education;

(iii) residential energy demand management services, including any

other energy related residential repair and energy efficiency

improvements in coordination with, or delivered by, Department of

Energy weatherization assistance programs at the discretion of the

State;

(iv) family services, such as counseling and needs assessment,

related to energy budget management, payment plans, and related

services; and

(v) negotiation with home energy suppliers on behalf of households

eligible for REACH services and benefits. (See Part IV-A, Sub-Element

I(b)). Project activities should be closely coordinated with the

applicant's LIHEAP Program and with Empowerment Zone/-Enterprise

Community Initiatives where applicable; (See Part IV-A, Element VIII)

and,

(D) an assurance that no regulated utility covered by the plan will

be required to act in a manner that is inconsistent with applicable

regulatory requirements. (See Part IV-A, Element VII.)

5. Low-Income Citizen Participation. To be considered for funding a

REACH Plan must include provision for the systematic and regularized

solicitation, by the designated CBO Recipient(s), of the views of

eligible low-income individuals in the community; and for the

assurance, by means of an advisory board or similar process, that such

organization(s) will be responsive to such views in the development and

implementation of the local Project. Assurance for compliance with

these requirements may be accomplished through the Letter of Agreement

required in Paragraph 4, above. (See Part IV-A, Sub-Element I(a))

6. Third-Party Project Evaluation. REACH Plans must include

provision for an independent, methodologically sound evaluation of the

effectiveness of the activities carried out with the grant and their

efficacy in achieving stated project goals related to reducing

participant home energy costs and increasing the ability of

participants to meet such costs independent of payment subsidy,

including, specifically, the performance goals set out above at the

opening of Section A. 2., Program Focus, above.

The Plan should include a well thought through outline of an

evaluation plan for the proposed project(s). The outline should explain

how the applicant proposes to answer the key questions about how

effectively the project is being/was implemented (the Process

Evaluation) and whether and why/why not the project activities or

interventions achieved the expected outcomes and goals of the

project(s) (the Outcome Evaluation). (See Part I, Section B for

definitions of Process and Outcome Evaluations.) Applicants may propose

a single evaluation for their overall REACH Initiative, or separate

evaluations for individual projects, as and where appropriate.

In addition to the performance goals mentioned above, the outline

should include a description of the indicators that will be used by the

State (and the CBO Recipient(s)) to measure whether the goals have been

achieved.

The evaluation must be conducted by an independent, third-party

evaluator, i.e., a person with recognized evaluation skills who has

experience with social programs and is organizationally distinct from,

and not under the control of, the applicant or the local

organization(s) implementing the REACH Project. It is important that

each successful applicant have a third-party evaluator selected, and

performing at the very latest by the time the work program of the

project is begun, and if possible before that time so that he or she

can participate in the final design of the program, in order to assure

that data necessary for the evaluation will be collected and available.

7. Consistency With LIHEAP Legislation. To be funded, a REACH Plan

must include a demonstration that

[[Page 35523]]

it is consistent with the following Sections of the Low Income Home

Energy Assistance Act, as amended: Section 2603; paragraphs (2), (3),

(4), (5), (7), (10), (11), (12), (13), and (14) of Section 2605(b);

Subsections (d), (e), (f), (g), (h), (i), and (j) of Section 2605; and

Section 2606.

The definitions in Section 2603 have been incorporated into the

definitions in Part I, Section B of this Announcement and will apply to

the REACH Initiative. The rest of the cited sections, subsections and

paragraphs are set forth in Attachment K to this Announcement.

8. Dissemination of Project Results. REACH Plans should include

provision for disseminating the results of the project. Applicants may

budget up to $5,000 for dissemination purposes.

B. Special Program Requirements for Priority Area 2.0

1. Eligible Applicants for Priority Area 2.0. Eligible Applicants

for these grants under Priority Area 2.0 are Indian Tribes and Tribal

Organizations which are current grantees of the LIHEAP Program; and the

Insular Areas of American Samoa, Commonwealth of the Northern Mariana

Islands, the U.S. Virgin Islands, and Guam, provided they are LIHEAP

grantees that use LIHEAP funds to implement a LIHEAP Program. In

accordance with 45 CFR 96.42(a), the Secretary has determined that

inasmuch as these applicants are generally representative of and close

to their communities, which with few exceptions are relatively small;

and inasmuch as they generally implement their LIHEAP programs and

other social service programs directly; that therefore the requirements

of Section 2607B(e)(2) (A) and (B) are not applicable to eligible

applicants under Priority Area 2.0; and that consequently REACH

grantees under Priority Area 2.0 may implement REACH programs directly,

without delegation to CBO Recipients. However, as explained in Part II

B, Budget Periods, above, applicants electing to implement their REACH

Projects directly will be limited to projects of one year duration

(Project and Budget Periods of one year only).

Applicants under Priority Area 2.0 may also elect to operate their

projects through grants or contracts to non-profit organizations.

However, in such cases the non-profit organization does not have to be

a community based organization (CBO) as defined Part I. If they choose

to operate their projects through non-profit organizations, the Project

and Budget Periods applicable to Priority Area 1.0 will apply.

2. Program Focus. The Program Focus for Priority Area 2.0 REACH

projects should be the same as for Priority Area 1.0, described above

in Section A.2.

3. Economic Development Strategy. Although OCS is interested in

having applicants under Priority Area 2.0 approach the energy needs of

low-income families within a holistic context of the economic, social,

physical, and environmental barriers to achieving self-sufficiency,

applicants under Priority Area 2.0 will not be required to include a

specific Economic Development Strategy in their REACH Plan.

4. Scope of the Priority Area 2.0 REACH Plan. The Priority 2.0

REACH Plan should describe the concept of the proposed REACH Project,

describing the goals or outcomes that the project seeks to achieve; the

needs of the target population that the project seeks to address, and

the assumptions about how those needs can be met; and the activities or

interventions that the project will undertake to meet the needs and

achieve the goals and outcomes of the project.

The REACH Plan must include a description of the methodology the

State and local agencies will use to determine--

(i) which households will receive one or more forms of benefits

under the REACH Initiative;

(ii) the cases in which nonmonetary benefits are likely to provide

more cost-effective long-term outcomes than payment benefits alone; and

(iii) the amount of such benefits required to meet the goals of the

program;

The Plan must also include a method to be used for targeting REACH

nonmonetary benefits.

Finally, the REACH Plan must include:

(A) a brief description of the crisis and emergency assistance

activities the applicant will undertake that are designed to:

(1) discourage family energy crises;

(2) encourage responsible vendor and consumer behavior; and

(3) provide only financial incentives that encourage household

payment;

(B) a brief description of the activities the applicant will

undertake to--

(1) provide incentives for recipients of assistance to pay home

energy costs; and

(2) provide incentives to vendors to help reduce the energy burdens

of recipients of assistance.

(C) an assurance that, subject to the methodologies described

above, each applicant or nonprofit sub-recipient, as appropriate, will

provide a variety of services and benefits, including at least two of

the following--

(i) payments to, or on behalf of, individuals eligible for

residential energy assistance services and benefits under Section

2605(b) for home energy costs;

(ii) energy efficiency education;

(iii) residential energy demand management services, including any

other energy related residential repair and energy efficiency

improvements in coordination with, or delivered by, Department of

Energy weatherization assistance programs at the discretion of the

State;

(iv) family services, such as counseling and needs assessment,

related to energy budget management, payment plans, and related

services; and

(v) negotiation with home energy suppliers on behalf of households

eligible for REACH services and benefits. (See Part IV-B, Sub-Element

I(b)).

Given the size of most tribal and small insular territory LIHEAP

programs, the Secretary has determined, in accordance with 45 CFR

96.42(a), that REACH applications from tribal and small insular area

LIHEAP grantees under Priority Area 2.0 do not have to provide all of

the above services.

Project activities should be closely coordinated with the

applicant's LIHEAP Program.

and

(D) an assurance that no regulated utility covered by the plan will

be required to act in a manner that is inconsistent with applicable

regulatory requirements. (See Part IV-B, Element VI)

5. Low-Income Citizen Participation. To be considered for funding,

a REACH Plan must include provision for the systematic and regularized

solicitation by the grantee of the views of eligible low-income

individuals in the community. (See Part IV-B, Sub-Element I(a))

6. Third-Party Project Evaluation. As noted above, the Priority

Area 1.0 requirement for a third party evaluation does not apply out to

Priority Area 2.0 grantees. However, Priority Area 2.0 REACH Plans must

describe the indicators they will use to measure whether their

performance goals have been achieved, and they must submit a report

summarizing these results at the end of the grant period.

7. Consistency With LIHEAP Legislation. To be funded, a REACH Plan

under Priority Area 2.0 must include a demonstration that it is

consistent with the following Sections of the Low Income Home Energy

Assistance Act, as amended: Section 2603; paragraphs (2), (3), (4),

(5), (7),

[[Page 35524]]

(10), (11), (12), (13), and (14) of Section 2605(b); Subsections (d),

(e), (f), (g), (h), (i), and (j) of Section 2605; and Section 2606.

The definitions in Section 2603 have been incorporated into the

definitions in Part I, Section B of this Announcement and will apply to

the REACH Initiative. The rest of the cited sections, subsections and

paragraphs are set forth in Attachment K to this Announcement.

8. Dissemination of Project Results. Applicants under Priority 2.0

may budget up to $1,000 for dissemination of project results.

Part IV. Reach Plan Elements and Review Criteria

The ultimate goals of the projects to be funded under the REACH

Program are to realize significant improvements in the ability of

eligible households to meet energy costs and pay home energy bills with

regularity, through innovative project interventions which will reduce

energy costs and increase the capability of low-income participants to

pay; in the case of REACH Projects under Priority Area 1.0, to evaluate

the effectiveness of these interventions and of the project design

through which they were implemented; and thus to make possible the

replication of successful programs. OCS intends to make the awards of

all the above grants on the basis of brief, concise REACH Plans. The

elements and format of these plans, along with the review criteria that

will be used to judge them, will be outlined in this Part.

The competitive review of REACH Plans will be based on the degree

to which applicants:

(1) incorporate each of the Elements and Sub-Elements below into

their plans, so as to describe convincingly a project that will develop

and implement new and innovative approaches to address critical energy

needs or problems of the poor;

(2) include the required assurances and program activities set

forth in Part III, above; and,

(3) in the case of applications under Priority Area 1.0; test and

evaluate such approaches and activities so as to make possible

replication of a successful program.

A. Program Elements, Review and Assessment Criteria for REACH Plans

under Priority Area 1.0

This Section has been divided into Two Segments: Segment One made

up of Element I (with three Sub-Elements) which should be completed for

each different and distinct local REACH Project to be carried out by a

CBO Recipient, and must not be more than ten pages in length; and

Segment Two made up of Elements II through VIII, which should be

completed only once for the applicant's entire REACH Initiative, and

must not be more than twenty pages in length. As explained in Part III-

A. 4., Scope of REACH Plan, a State may submit a REACH Plan which

proposes one local REACH Project to be implemented by one CBO

Recipient; it may submit a Plan in which the same project is proposed

to be implemented in several localities by separate CBO Recipients; or

it may submit a plan proposing two or more different and distinct

Projects, each to be implemented through a separate CBO Recipient.

Where a State proposes different and distinct REACH Projects to be

carried out by more than one CBO Recipient, the REACH Plan should

include, for each of these projects/CBO Recipients a separate Segment

One Narrative; where a REACH Plan proposes only one distinct project,

to be implemented either in one locality or in several, by either one

or more than one CBO Recipient, then the Plan need include only one

Segment One narrative.

In order to simplify the application preparation and review

process, OCS seeks to keep applications cogent and brief. For each of

the Project Elements or Sub-Elements below there is at the end of the

discussion a suggested number of pages to be devoted to the particular

element or sub-element. These are suggestions only; but the applicant

must remember that each Narrative Segment One cannot be more than ten

pages in length, and that the single Project Narrative Segment Two,

covering Program Elements II through VIII for the overall REACH

Initiative, cannot be more than 20 pages in length.

REACH Plans with project narratives (excluding appendices) that

exceed these limits will not be reviewed for funding. Project

narratives should be on letter-sized pages in 12 c.p.i. type or

equivalent on a single side. Applicants should prepare and assemble

their project description using the following outline of required

project elements. They should, furthermore, build their project

concept, plans, and project description upon the guidelines set forth

for each of the project elements.

In reviewing REACH Plans for funding, where Plans include more than

one narrative Segment One describing a local Project/CBO Recipient, OCS

reserves the right to consider each such Project/CBO Recipient on its

own merits, and where review scores and other considerations merit, may

choose not to fund a particular local Project/CBO Recipient. In such a

case, OCS will negotiate an appropriate budget for the applicant's

overall REACH Initiative.

Segment One

[Priority Area 1.0 applicants to complete for each local Project/CBO

Recipient; each completed Segment (1) limited to ten pages in length]

Element I. Project Theory, Design, and Plan. (Total Weight of 0-30

points in application review.) OCS seeks to learn from the application

why and how the project as proposed is expected to lead to significant

improvements in individual and family energy self-sufficiency.

Applicants are urged to design and present their project in terms

of a conceptual cause-effect framework. In the following paragraphs a

logic model or framework is described, that suggests a way to present a

project so as to show the logic of the cause-effect relations between

project activities and project results. Applicants don't have to use

the exact logic model language described; but it is important to

present the project in a way that makes clear the cause-effect

relationship between what the project plans to do and the results it

expects to achieve.

Applicants are reminded that Part III-A, Section 4, Scope of the

REACH Plan under Priority Area 1.0, includes a discussion of those

activities which should be included in this element of their REACH

Plan.

Sub-Element I(a). Description of Target Population, Analysis of

Need, and Project Assumptions. (Weight of 0-10 points in application

review.) The logic model begins with identifying the underlying

assumptions about the program. These are the beliefs on which the

proposed program is built: the assumptions about the needs of the

client population to be served; about the current services available to

those clients, and where and how they fail to meet their needs; about

why the services or interventions proposed in the REACH Plan are

appropriate, and will meet those needs; and about the impact the

proposed interventions will have on the clients.

In other words, the underlying assumptions of the program are the

applicant's analysis of the needs and problems to be addressed by the

project, and the applicant's theory of how its proposed interventions

will address those needs and problems to achieve the desired result.

Thus a strong application is based upon a clear description of the

needs and problems to be addressed and a persuasive understanding of

the causes of those problems.

In this sub-element of the REACH Plan the applicant should

precisely

[[Page 35525]]

identify the target population to be served. The geographic area to be

impacted should then be briefly highlighted, selectively emphasizing

the socioeconomic/poverty and other data that are relevant to the

project design. This sub-element to the REACH Plan, might include, for

instance, data on the building type, condition, and age of low-income

housing; the predominant fuel used for home heating; the number and

percent of utility shut-offs among low-income energy consumers;

climatic conditions; unemployment statistics for the area; the price of

fuels; and the demand management services offered by local utilities.

The needs of this target population should then be clearly defined,

and the applicant should state its underlying assumptions about how

these needs can be addressed by the proposed project.

Applicants must include in this element a brief description of the

provision that has been and will be made for the systematic and regular

solicitation by CBO Recipients of the views of eligible low-income

individuals in the community on the design and implementation of the

REACH Project, and the mechanism(s) that will be employed by the

applicant and the CBO Recipients to assure their responsiveness to such

views in the establishment of the REACH Project. (See Part III-A,

Section 5.)

It is suggested that applicants use no more than 4 pages for this

narrative sub-element.

Sub-Element I(b). Project Strategy and Design Framework:

Interventions, Outcomes, and Goals. (Weight of 0-10 points in

application review.) To continue with the ``logic model'':

The underlying assumptions concerning client needs and the theory

of how they can be effectively addressed, which are discussed above,

lead in the project design to the conduct of a variety of project

activities or interventions, each of which is assumed to result in

immediate changes, or outcomes.

The immediate changes lead to intermediate outcomes; and the

intermediate outcomes lead to attainment of the final project goals.

So in this sub-element the applicant should describe the major

activities, or interventions, which are to be carried out to address

the needs and problems identified in the previous sub-element. And it

should discuss the immediate changes, or outcomes, which are expected

to result. These are the results expected from each service or

intervention immediately after it is provided. For example, a survey of

home furnaces for safety and efficiency might be expected to result in

identification of repairs and retrofits that could increase efficiency

and lower costs. Or providing energy efficiency education to families

in the low income community might be expected to result in modifying

behavior of family members so that they would dress more warmly to be

more comfortable at a lower thermostat setting, would not leave doors

or windows open, would hang curtains over windows, and would use hot

water more conservatively, by, for example, installing low-flow shower

heads, etc.

At the next level are the intermediate outcomes which result from

these immediate changes. Often an intermediate project outcome is the

result of several immediate changes resulting from a number of related

interventions such as repairs and education. Intermediate project

outcomes should be expressed in measurable changes in knowledge,

attitudes, behavior, or status/condition. In the above examples, the

immediate changes achieved by the home energy survey program could be

expected to lead to intermediate outcomes of furnace retrofits and home

weatherization. The acquisition of energy conservation skills, coupled

with the availability of energy saving devices such as efficient light

bulbs or low-flow shower heads, could result in the actual installation

of these devices in the home.

Finally, the REACH Plan should describe how the achievement of

these intermediate outcomes will be expected to lead to the attainment

of the project goals: energy efficient and healthy housing, energy

consumption at a level which is affordable for the household, a

successful community fuel cooperative that lowers fuel prices, new

demand management services, or whatever they may be.

Applicants don't have to use the exact ``logic model'' terminology

described above, but it is important to describe the project in a way

that makes clear the expected cause-and-effect relationship between

what the project plans to do--the activities or interventions, the

changes that are expected to result, and how those changes will lead to

achievement of the project goals of greater energy self-sufficiency.

It is suggested that applicants use no more than 4 pages for this

design section of the REACH Plan.

Sub-Element I(c), Work Plan. (Weight of 0-10 points in the

application review.) Once the project strategy and design framework are

established, the applicant should present the highlights of a work plan

for the project. The plan should explicitly tie into the project design

framework and should be feasible, i.e., capable of being accomplished

with the resources, time, staff, and partners available. The plan

should briefly describe the key project tasks, and show the timelines

and major milestones for their implementation. Critical issues or

potential problems that might affect the achievement of project

objectives should be explicitly addressed, with an explanation of how

they would be overcome, and how the objectives will be achieved

notwithstanding any such problems. The plan should be presented in such

a way that it can be correlated with the Budget Justification included

in the application following the budget forms. (See Element V.)

Applicant may be able to use a simple Gantt or time line chart to

convey the work plan in minimal space.

It is suggested that the applicant use no more than 2 pages for

this Sub-Element.

Segment Two

[Priority Area 1.0 applicants to complete once for overall REACH Plan;

Segment Two limited to twenty pages in length.]

Element II. Organizational Experience and Capability. (Weight of 0

to 10 points in application review.) Applicants should cite the

capability and relevant experience of each of the community-based

organizations (CBO Recipients) designated to implement the proposed

REACH Project in developing and operating programs which deal with

poverty problems similar to those to be addressed by the proposed

project. Applicants should explain how in their designation they have

given priority, as required by the authorizing legislation, to eligible

entities described in Section 673 of the Community Services Block Grant

Act which have a record of successfully providing service under LIHEAP

and which receive funds from the Department of Energy's Weatherization

Assistance Program. (See Part III-A, Section I, Eligible Applicants for

Priority Area 1.0) The applicant should also cite each such

organization's experience in collaborative programming and operations

which involve evaluations and data collection. The designated CBO

Recipient(s)' capabilities and status in these regards should be

established by a letter of certification to that effect by the

Applicant, and by the State CSBG Director or the State LIHEAP or

Weatherization Program administering agency(ies) where they are not the

same. While the proposed project management team will be identified and

described elsewhere in the application, applicants

[[Page 35526]]

should identify agency executive leadership in this section and briefly

describe their involvement in the proposed project and provide

assurance of their commitment to its successful implementation.

It is suggested that applicants use no more than 4 pages for this

element.

Element III. Economic Development Strategies, Mobilization of

Resources, and Project Innovations. (Weight of 0 to 10 points in the

application review.) Applicants should in this Element explain how its

REACH Initiative approaches the energy needs of low-income families

within a holistic context of the economic, social, physical, and

environmental barriers to achieving self-sufficiency. This should

include an explanation of how the proposed project(s) will be

integrated with and support a larger economic development strategy

within the target community or communities.

Thus REACH Initiatives are expected to be closely coordinated with

other public and private sector programs involved with community

revitalization, housing rehabilitation and weatherization, and family

development; and OCS will give favorable consideration in the

application review process to applicants who mobilize cash and/or

third-party in-kind contributions for direct use in the REACH Project.

Even though there is no matching requirement for the REACH Program,

grantees will be held accountable for any match, cash or in-kind

contribution proposed or pledged as part of an approved application.

(See Part III-A, Section 4(C))

Within the context of this holistic and coordinated plan, applicant

should highlight the ways in which the proposed project represents a

new and innovative approach or approaches to provide for greater energy

self-sufficiency of the poor and/or to deal with particularly critical

energy needs or problems of the poor that are common to a number of

communities. Innovation can be in the characteristics of the target

population to be served, or the needs to be addressed; the kinds of

activities, or interventions, that will be carried out; the ways in

which they will be carried out; new and different combinations of

activities or interventions that will be implemented; or in the

settings in which the project will function: e.g., new and innovative

types of technologies or institutions in which the project will

function.

It is suggested that applicants use no more than 4 pages for this

element.

Element IV. Project Management and Organization. (Weight of 0 to 10

points in the application review.) While the experience of agency

leadership is important to project success, the caliber of day-to-day

project management is critical. Applicants should identify the State

Project Coordinator, and key staff including the Project Director(s) in

CBO Recipient(s) that will be implementing the project at the local

level, and any other staff they feel are especially important to the

success of the project, and include resumes as an Appendix to the REACH

Plan. Where the staff have not been identified, a position description

should be included in the Appendix. The REACH Plan should describe the

staff's relevant capabilities for managing this multi-faceted project,

with emphasis placed on successful management experience in directing

both on-budget and leveraged resources to create community conditions

capable of supporting effective interventions and transforming lives.

REACH Plans will be assessed, for this element, on the relevant

experience, capabilities, commitment and planned level of effort of the

Project Coordinator and key staff members as described in the Plan.

Applicants should also, in this section, describe (and diagram if

necessary) the organization of the project. The relationships among the

State and the participating community-based organizations, the Project

Coordinator and the key officials in those organizations, and any other

partnering organizations should be depicted, and the project-related

responsibilities of these key actors should be made clear.

This element should include a brief description of the crisis and

emergency assistance activities the applicant will undertake that are

designed to: (1) provide incentives for recipients of assistance to pay

home energy costs, and (2) provide incentives to vendors to help reduce

the energy burdens of recipients of assistance. (See Part III-A,

Section 4 (B))

It is suggested that applicants use no more than 4 pages for this

element (not counting the resumes and/or position descriptions, which

should be in an Appendix).

Element V. Project Budget Appropriateness. (Weight of 0-10 points

in the application review.) Applicants will be required to submit

Federal forms with their REACH Plans to provide basic applicant and

project information (SF 424) and information about how Federal and

other project funds will be used (SF 424A). In addition to and

immediately following the completed Federal budget forms, applicants

must submit a Budget Justification, or explanatory budget information.

This Budget Justification is not considered a part of the Project

Narrative, and does not count as within the limitation on number of

pages; but rather is to be included in the application following the

budget forms. Each Applicant must submit one SF 424, one SF 424A, and

one Budget Justification in its own name, which cover the entire REACH

Initiative, and one SF 424A and Budget Justification for each local CBO

Recipient.

The Budget Narrative should briefly explain the adequacy of the

Federal funds and other mobilized resources to accomplish project

purposes, should explain the source and nature of mobilized resources,

and should identify and briefly explain any imbalances between the

level of activities undertaken and project funds expended.

Applicants under Priority Area 1.0 may include in the REACH

Initiative budget an amount up ten percent (10%) of the total REACH

grant for planning, administration, and coordinating costs at the State

level during the first project year of the REACH Initiative, and for

contracting with a third-party evaluator as defined under Element VI,

below, and discussed in Part III-A.6.

Applicants should include funds in the project budget for travel by

State and CBO Recipient Project Directors and Chief Evaluators to

attend two national evaluation workshops in Washington, D.C., and are

encouraged to seek agreement from CBO Recipients to attend also. (See

Part IX-B, Attendance at Workshops.)

Note: None of the costs of providing service or benefits under

the REACH Program shall be considered to be an administrative cost

or function for purposes of any limitation on administrative costs

or functions contained in the Low-Income Home Energy Assistance Act

of 1981, as amended, 42 U.S.C. 8621 et seq.

Element VI. Project Evaluation. (Weight of 0-15 points in the

application review.) Sound evaluations are essential to the REACH

Program. Applicants are required to include in their applications a

well thought through outline of an evaluation plan for their project.

The outline should explain how the applicant proposes to answer the key

questions about how effectively the project is being/was implemented

(the Process Evaluation) and whether and why/why not the project

activities, or interventions, achieved the expected outcomes and goals

of the project (the Outcome Evaluation). (See Part I, Section B for

definitions of process and outcome evaluation, and Part III-A.6. for a

discussion of evaluation requirements.)

[[Page 35527]]

OCS plans to engage an Evaluation Technical Assistance Contractor

which will assist REACH Priority Area 1.0 Grantees and CBO Recipients

in the finalization of Evaluation Plans, the establishment of data

collection systems, the preparation of Evaluation Reports, and other

aspects of project evaluation so as to assure that project evaluations

will provide accurate and useful information to those interested in

replication.

Applicants are not being asked to submit a complete and final

Evaluation Plan as part of their REACH Plan; but they must include:

(1) A well thought through outline of an evaluation plan which

identifies the principal cause-and-effect relationships to be tested,

and which demonstrates the applicant's understanding of the role and

purpose of both Process and Outcome Evaluations (see previous

paragraph);

(2) the identity and qualifications of the proposed third party

evaluator, or if not selected, the qualifications which will be sought

in choosing an evaluator, which must include successful experience in

evaluating social service delivery programs, and the planning and/or

evaluation of programs designed to foster energy self-sufficiency in

low income populations; and

(3) a commitment to the selection of a third-party evaluator

approved by OCS, and to completion of a final evaluation design and

plan, in collaboration with the approved evaluator and the OCS

Evaluation Technical Assistance Contractor during the first six-months

of the project, if funded.

Applicants should ensure, above all, that the evaluation outline

presented is consistent with their project design. A clear project

framework of the type recommended earlier identifies the key project

assumptions about the target populations and their needs, and the

hypotheses, or expected cause-effect relationships to be tested in the

project: that the proposed project activities, or interventions, will

address those needs in ways that will lead to the achievement of the

project goals of energy self-sufficiency. It also identifies in advance

the most important process and outcome measures that will be used to

identify performance success and expected changes in individual

participants, the grantee organization, the CBO Recipient(s), and the

community.

For these reasons, the evaluator that the applicant expects to work

with should be involved--at least briefly but substantively--in the

development of the project design and proposal.

It is suggested that applicants use no more than 4 pages for this

element, plus the Resume or Position Description for the evaluator,

which should be in an Appendix.

Element VII. Significant and Beneficial Impact. (Weight of 0-10

points in the application review.) OCS seeks, with the REACH Program,

to support innovative approaches that will create significant benefits

for low-income energy consumers, their families, and their communities.

Accordingly, it intends to make grants that have a strong likelihood of

creating beneficial impacts both within the project communities and,

through wide dissemination of useful project results and findings, in

other communities facing similar challenges.

The proposed project is expected to lead to tangible achievements

toward reducing household energy burdens on the poor and increasing

their ability to pay for the household energy they need. As a result,

the project should lead to verifiable reductions in homelessness and

health and safety risks associated with high energy costs that are

beyond the resources of low income families in the targeted

community(ies). Applicants should summarize, in this section, the

beneficial impacts that they propose to make in that community, their

expectations for the continuation of those benefits beyond the

project's life, and the kind of information that they expect to share

with OCS and the social service/community development fields from their

pilot project. Project proposals will be assessed, for this element, on

the likely value of the project to the target community over time--

given the proposed outcomes and the likelihood that they will be

realized--and to the larger community of LIHEAP and CSBG grantees

across the nation.

Applicants should include in this element a brief assurance that no

regulated utility covered by the REACH Plan will be required to act in

a manner that is inconsistent with applicable regulatory requirements.

(See Part III-A, Section 4(D))

It is suggested that applicants use no more than 2 pages for this

element. The score for this element will be based to some extent on the

coherence and feasibility of the entire REACH Plan.

Element VIII. Community Empowerment Consideration. (Weight of 0-5

points in application review.) Special consideration will be given to

applicants whose proposed REACH Projects will be located in areas which

are characterized by severe poverty and other indicators of socio-

economic distress such as a poverty rate of at least 20%, designation

as an Empowerment Zone or Enterprise Community, high levels of

unemployment, and a high incidence of violence, gang activity, crime,

or drug use. If such is the case, applicants should document that they

or their proposed CBO Recipients were involved in the preparation and

planned implementation of a comprehensive community-based strategic

plan to achieve both economic and human development in an integrated

manner and how the proposed project supports the goal(s) of that plan.

(See Part III-A, Section 3 and Section 4(C))

It is suggested that applicants use no more than 2 pages for this

element.

B. Special Program Elements, Review and Assessment Criteria for REACH

Plans Under Priority Area 2.0

In order to simplify the application preparation and review

process, OCS seeks to keep grant applications cogent and brief. For

each of the Project Elements or Sub-Elements below there is at the end

of the discussion a suggested number of pages to be devoted to the

particular element or sub-element. These are suggestions only; but the

applicant must remember that Project Narratives must not be more than

twenty (20) pages in length.

REACH Plans with project narratives (excluding appendices) that

exceed these limits will not be reviewed for funding. Project

narratives should be on letter-sized pages in 12 c.p.i. type or

equivalent on a single side. Applicants should prepare and assemble

their project description using the following outline of required REACH

Plan elements. They should, furthermore, build their project concept,

plans, and project description upon the guidelines set forth for each

of the elements.

Element I. Project Theory, Design, and Plan. (Total Weight of 0 to

50 points in application review.) OCS seeks to learn from the

application why and how the project as proposed is expected to lead to

significant improvements in individual and family energy self-

sufficiency.

Applicants are urged to design and present their project in terms

of a conceptual cause-effect framework. In the following paragraphs a

logic model, or framework, is described that suggests a way to present

a project so as to show the logic of the cause-effect relations between

project activities and project results. Applicants don't have to use

the exact logic model language described; but it is important to

present the project in a way that makes clear the cause-effect

relationship between what the project plans to do and the results it

expects to achieve.

[[Page 35528]]

Applicants under Priority Area 2.0 are not required to carry out

REACH activities through community-based organizations (CBO

Recipients), but may implement REACH Plans directly themselves.

However, as explained in Part II B, Budget Periods, above, applicants

electing to implement their REACH Projects directly will be limited to

projects of one year duration (Project and Budget Periods of one year

only). Applicants under Priority Area 2.0 may also elect to operate

their projects through grants or contracts to nonprofit organizations.

In such cases the nonprofit organization does not have to be a

community based organization (CBO) as defined in Part I. If they choose

to operate their projects through nonprofit organizations, the Project

and Budget Periods applicable to Priority Area 1.0 will apply. Note

also that applicants under Priority 2.0 need only include two of the

REACH Program activities listed in Part III B. Section 4.(C) under

Scope of the Priority Area 2.0 REACH Plan.

Sub-Element I(a). Description of Target Population, Analysis of

Need, and Project Assumptions. (Weight of 0 to 20 points in application

review.) This sub-element should be the same as under Priority Area 1.0

and it suggested that it take no more than 4 pages of the Project

Narrative.

Sub-Element I(b). Project Strategy and Design Framework:

Interventions, Outcomes, and Goals. (Weight of 0 to 20 points in

application review.) This sub-element should be the same as under

Priority Area 1.0 and it is suggested that it take no more than 4 pages

of the Project Narrative.

Sub-Element I(c), Work Plan. (Weight of 0 to 10 points in the

application review.) This sub-element should be the same as under

Priority Area 1.0 and it is suggested that it take no more than 2 pages

of the Project Narrative.

Element II. Organizational Experience and Capability. (Weight of 0

to 10 points in application review.) Applicants should cite their

capability and relevant experience in developing and operating programs

which deal with energy and poverty problems similar to those to be

addressed by the proposed project. While the proposed project

management team will be identified and described below in Element III,

applicants should identify organization executive leadership in this

section and briefly describe their involvement in the proposed project

and provide assurance of their commitment to its successful

implementation.

It is suggested that applicants use no more than 2 pages for this

element.

Element III. Project Management and Organization. (Weight of 0 to

10 points in the application review.) While the experience of agency

leadership is important to project success, the caliber of day-to-day

project management is critical. Applicants should identify key staff,

including the Project Director, who will be implementing the project,

and any other staff they feel are especially important to the success

of the project. Resumes should be included as an Appendix to the REACH

Plan. Where the staff have not been identified, a position description

should be included in the Appendix. REACH Plans will be assessed, for

this element, on the relevant experience, capabilities, commitment and

planned level of effort to the project of the Project Director and key

staff members as described in the Plan.

It is suggested that applicants use no more than 2 pages for this

element (plus the resumes and/or position descriptions which should be

in an Appendix).

Element IV. Project Budget Appropriateness. (Weight of 0-10 points

in the application review.) Applicants will be required to submit

Federal forms with their REACH Plans to provide basic applicant and

project information (SF-424) and information about how Federal and

other project funds will be used (SF-424A). Where Priority Area 2.0

applicants elect to have REACH services provided through a nonprofit

organization sub-recipient, an SF-424A must be completed for the

applicant, and another SF-424A must be completed for the nonprofit

organization sub-recipient. The sub-recipient SF-424A should include

budget information for all three years of the project period, divided

into three separate budget periods as explained in Part VII and the

instructions accompanying the forms. In addition to and immediately

following the completed Federal budget forms, applicants must submit a

Budget Justification, or explanatory budget information for the first

12-month budget period. Again, where a Priority Area 2.0 applicant

elects to implement the REACH project services through a nonprofit sub-

recipient, a Budget Justification should be included for the sub-

recipient, covering the full three year project budget. The Budget

Justification is not considered a part of the Project Narrative, and

does not count as part of the twenty page limit; but rather is included

in the application following the budget forms.

The Budget Justification should briefly explain the adequacy of the

Federal funds and other mobilized resources to accomplish project

purposes, should explain the source and nature of any mobilized

resources.

Applicants should include funds in the project budget for travel by

the Project Director to attend an orientation workshop in Washington,

D.C.

Note: None of the costs of providing service or benefits under

the REACH Program shall be considered to be an administrative cost

or function for purposes of any limitation on administrative costs

or functions contained in the Low-Income Home Energy Assistance Act

of 1981, as amended, 42 U.S.C. 8621 et seq.

Element V. Project Evaluation. (Weight of 0-10 points in the

application review.) As noted in Part III above, REACH grantees under

Priority Area 2.0 will not be required to carry out a third-party

evaluation of their projects. However, their REACH Plans must describe

the indicators they will use to measure whether the performance goals

of their project have been achieved. It is suggested that applicant use

no more than 1 page for this Element.

Element VI. Significant and Beneficial Impact. (Weight of 0-10

points in the application review.) This element should be the same as

under Priority Area 1.0 and it is suggested that it take no more than 3

pages of the Application Narrative.

Part V--Quality Standards for Energy Efficiency Education Services

Plans

The REACH authorizing legislation includes a section which

describes a separate Energy Efficiency Education Services program which

applicants may include in their REACH Initiative. Those applicants

which include this program in their REACH Initiative must submit

separate Energy Efficiency Education Services Plans; and if they meet

the quality standards set forth below, and have the potential for being

replicable model designs for other programs, are eligible for

supplemental payments as outlined in Part II C. This Part sets out the

Quality Standards for Energy Efficiency Education Services Plans.

Section 2607B(b)(2) of the REACH authorizing legislation provides

for a reservation of funds by the Secretary to make additional payments

to qualifying REACH applicants that have energy efficiency education

services plans that meet quality standards established in consultation

with the Secretary of Energy, and have the potential for being

replicable model designs for other programs. This Part sets forth those

standards. As explained in Part II above, those REACH applicants under

Priority Area 1.0 that are selected to receive

[[Page 35529]]

REACH grants will receive an additional amount of $100,000, and REACH

applicants under Priority Area 2.0 will receive an additional $25,000,

for the same project and budget periods, if they have submitted, as an

appendix to their REACH Plans, an Energy Efficiency Education (EEE)

Services Plan that has the potential for being a replicable model

design for other programs and meets the following quality standards:

A. Purpose

The Plan should state the purpose of the proposed EEE services,

which should be generally consistent with and include the following

goals: to assist low-income households, especially those with high

energy burdens, to use energy efficiently, to reduce their home energy

costs, to minimize health and safety risks within their homes, to

increase their indoor comfort level, and to maintain their highest

possible level of energy self-sufficiency.

B. Target Population

The Plan should identify a target population for the EEE services

which includes LIHEAP recipients and at least some who have received

services from the Weatherization Assistance Program, and others

consistent with the stated purpose and goals of the program. The Plan

should include assurances that the defined target population is one

from whom data on energy usage and costs before and after receipt of

the EEE services will be available, and should indicate how such data

will be collected.

C. Needs Assessment and Project Design Process

The Plan should describe the needs assessment that the applicant

has undertaken or will undertake among the target population, how the

design of the EEE Services Program will respond to the needs identified

(see Paragraph D, below), and how the EEE Program priorities have been

or will be determined by the needs discovered.

D. Service Delivery

(1) Setting: the Plan should indicate the setting or settings--in-

office instruction (e.g. at time of initial intake), workshops, or home

visits--in which the EEE services will be delivered, and project the

number of service units planned for each.

(2) Services: the Plan should identify the types of services to be

delivered and how--whether by lecture, audio-visual media, written

materials, hands on experience, or other educational technique--and if

appropriate, which services are planned to be used in which of the

identified settings.

E. Relation of Services to Changes, of Changes to Outcomes, and of

Outcomes to Goals (a ``Logic Model'')

The Plan should briefly set forth each EEE service planned (e.g. a

demonstration and discussion on air infiltration), the immediate

changes expected to result from delivery of the service (e.g. a better

understanding of the importance of stopping infiltration), the

intermediate outcomes expected to result from the changes (e.g. action

by the client to stop infiltration in their dwelling), and how these

changes and outcomes will be expected to achieve a program goal (e.g.

reduced energy consumption). This exact terminology need not be used in

the Plan; but the cause and effect relationship between the EEE

services planned and the achievement of program goals should be briefly

explained. This part of the Plan should include provision for the

development with EEE service recipients of an Action Plan through which

the recipient will make a commitment to take actions based on the EEE

information received; and it should also include a provision for

reinforcement of the commitment through follow-up activities by the

grantee or other ``interventions''.

F. Evaluation

The EEE Services Plan submitted by applicants under Priority Area

1.0 should provide for the inclusion of an Evaluation of the Energy

Efficiency Education Services Program as a part of the Evaluation Plan

Outline for the overall REACH Initiative. It should provide for Process

and Outcome Evaluations, and should describe what data will be

collected and how it will relate to the achievement of EEE program

goals. The EEE portion of the evaluation plan outline should make

specific provision for consumer evaluation of the EEE service program

interventions; and should conclude with a commitment from the grantee

to revise and improve its EEE program in response to the overall

evaluation where appropriate.

For applicants under Priority Area 2.0, the EEE Services Plan

should provide assurances that the applicant will: (1) provide for

consumer evaluation of the EEE Services program, and (2) revise and

improve its EEE program in response to such evaluation, where

appropriate.

The EEE Services Plan, if included, should be an Appendix to the

Applicant's REACH Plan, and should not exceed ten pages in length.

Part VI. Application Procedures

A. Availability of Forms

Attachments B through J contain all of the standard forms necessary

for the application for awards under this OCS program. These

attachments and Parts VI and VII of this Notice contain all the

instructions required for submittal of applications.

Additional copies of this Notice may be obtained by writing or

telephoning the office listed under the section entitled FOR FURTHER

INFORMATION CONTACT at the beginning of this announcement. In addition,

this Notice is accessible on the OCS Electronic Bulletin Board for

downloading through your computer modem by calling 1-800-627-8886. For

assistance in accessing the Bulletin Board, a Guide to Accessing and

Downloading is available from Ms. Minnie Landry at (202) 401-5309.

B. Application Submission

1. Number of Copies Required. One signed original REACH Plan and

four copies should be submitted. Applicants have the option to omit

from copies to be made available to non-Federal reviewers the specific

salary rates or amounts for individuals identified in the application

budget. Rather, only summary information is required in these copies.

2. Acknowledgment of Receipt. All applicants will receive an

acknowledgement with an assigned identification number. Applicants are

requested to supply a self-addressed mailing label with their State

Plan which can be attached to this acknowledgement. The assigned

identification number, along with any other identifying codes, must be

referenced in all subsequent communications concerning the State Plan.

If an acknowledgement is not received within three weeks after the

deadline date, please notify ACF by telephone at (202) 401-9365.

3. Deadline: Mailed applications shall be considered as meeting an

announced deadline if they are received on or before the deadline time

and date at the U.S. Department of Health and Human Services,

Administration for Children and Families, Office of Community Services,

Division of Community Demonstration Programs, 370 L Enfant Promenade,

S.W., Washington, D.C. 20447; Attention: Application for REACH Program.

Applicants are responsible for mailing applications well in advance,

when using all mail services, to ensure that the applications are

received on or before the deadline time and date.

[[Page 35530]]

Applications hand carried by applicants, applicant couriers, or by

overnight/express mail couriers shall be considered as meeting an

announced deadline if they are received on or before the deadline date,

between the hours of 8:00 a.m. and 4:30 p.m., at DHHS, Administration

for Children and Families, Office of Community Services, Division of

Community Demonstration Programs, Mail Room, 2nd Floor Loading Dock,

Aerospace Center, 901 D Street, S.W., Washington, D.C. 20024, between

Monday and Friday (excluding Federal holidays). (Applicants are

cautioned that express/overnight mail services do not always deliver as

agreed.)

ACF cannot accommodate transmission of applications by fax or

through other electronic media. Therefore, applications transmitted to

ACF electronically will not be accepted regardless of date or time of

submission and time of receipt.

4. Late applications: Applications which do not meet the criteria

above are considered late applications. ACF will notify each late

applicant that its application will not be considered in the current

competition.

5. Extension of deadline: ACF may extend the deadline for all

applicants because of acts of God such as floods, hurricanes, etc., or

when there is widespread disruption of the mails. However, if ACF does

not extend the deadline for all applicants, it may not waive or extend

the deadline for any applicants.

C. Paperwork Reduction Act of 1995

Under the Paperwork Reduction Act of 1995, Public Law 104-13, as

amended, the Department is required to submit to OMB for review and

approval any reporting and record keeping requirements in regulations,

including program announcements. This program announcement does not

contain information collection requirements beyond those approved for

ACF grant applications under OMB Control Number 0970-0139.

D. Application Consideration

Applications which meet the screening requirements in Section E

below will be reviewed competitively. Such applications will be

referred to reviewers for a numerical score and explanatory comments

based solely on responsiveness to the Legislative Authority, the

Requirements outlined in Part III, and the Application Elements and

Review Criteria set forth in Part IV of this Announcement.

The results of these reviews will assist the Director and OCS

program staff in considering competing applications. Reviewers' scores

will weigh heavily in funding decisions but will not be the only

factors considered. Applications will be considered in rank order of

the averaged scores. However, highly ranked applications are not

guaranteed funding since other factors are taken into consideration,

including, but not limited to: the timely and proper completion of

projects funded with OCS funds granted in the last (5) years; comments

of reviewers and government officials; staff evaluation and input;

geographic distribution; previous program performance of applicants;

compliance with grant terms under previous DHHS grants; audit reports;

investigative reports; and applicant's progress in resolving any final

audit disallowances on OCS or other Federal agency grants.

OCS reserves the right to discuss applications with other Federal

or non-Federal funding sources to determine the applicant's performance

record.

E. Criteria for Screening Applications

All applications that meet the published deadline for submission

will be screened to determine completeness and conformity to the

requirements of this announcement. Only those applications meeting the

following requirements will be reviewed and evaluated competitively:

1. Eligibility: The applicant must be an ``eligible applicant'' as

defined in Part III-A, Section 1 or Part III-B, Section 1. Applicants

must also be aware that the applicant's legal name as required on the

SF-424 (Item 5) must match that listed as corresponding to the Employer

Identification Number (Item 6).

2. The application must contain a Standard Form 424 ``Application

for Federal Assistance'' (SF-424), signed by an official of the

organization applying for the grant who has authority to obligate the

organization legally; one budget form (SF-424A) covering the entire

REACH Project, and one SF-424A for each CBO Recipient (or nonprofit

sub-recipient in the case of Priority Area 2.0 applicants electing to

delegate their REACH Projects) and signed ``Assurances'' (SF-424B)

completed according to instructions published in Part VII and

Attachment D to this Announcement.

3. A project narrative must also accompany the standard forms, and,

for Priority Area 1.0, must be limited to no more than ten (10) pages

for Narrative Segment One and twenty (20) pages for Narrative Segment

Two; and for Priority Area 2.0, must be limited to no more than twenty

(20) pages. Narratives must be typewritten on one side of the paper

only, in type no smaller than 12 c.p.i., 11 point, or equivalent, with

margins no less than one inch. Charts, exhibits, letters of support,

cooperative agreements, resumes and position descriptions are not

counted against this page limit and should be included in the

appendices to the proposal. It is strongly recommended that applicants

follow the format for the narrative discussed in Part IV, REACH Plan

Elements and Review Criteria.

Part VII--Instructions for Completing Application Forms

The standard forms attached to this announcement shall be used to

apply for funds under this program announcement.

It is suggested that you reproduce single-sided copies of the SF-

424 and SF-424A, and type your application on the copies. Please

prepare your application in accordance with instructions provided on

the forms (Attachments B and C) as modified by the OCS specific

instructions set forth below:

A. SF-424--Application for Federal Assistance

One SF-424 to be completed by applicant. Top of Page. Where the

applicant is a previous Department of Health and Human Services

grantee, enter the Central Registry System Employee Identification

Number (CRS/EIN) and the Payment Identifying Number, if one has been

assigned, in the Block entitled Federal Identifier located at the top

right hand corner of the form (third line from the top).

Item 1. For the purposes of this announcement, all projects are

considered Applications; there are no Pre-Applications.

Item 7. Enter ``A'' in the box for State. If applicant is an Indian

Tribe enter ``K'' in the box for Indian Tribe.

Item 9. Name of Federal Agency - Enter DHHS-ACF/OCS.

Item 10. The Catalog of Federal Domestic Assistance number for OCS

programs covered under this announcement is 93.568. The title is

``LIHEAP/REACH''.

Item 11. Enter a brief descriptive title of the project.

Item 13. Proposed Project--The project start date must begin on or

before September 30, 1996; the ending date should be calculated on the

basis of a 12-month or 36-month Project Period, whichever is

applicable.

Item 15a. This amount should be no greater than $1,500,000 for

applications under Priority Area 1.0; no greater than

[[Page 35531]]

$150,000 for applications under Priority Area 2.0.

Item 15b-e. These items should reflect both cash and third-party,

in-kind contributions for the Project Period.

B. SF-424A--Budget Information - Non-Construction Programs

One SF-424A completed for applicant, covering entire REACH Project,

and one SF-424A to be completed for each CBO Recipient (or nonprofit

sub-recipient in the case of Priority Area 2.0 applicants electing to

delegate their REACH Projects).

In completing these sections, the Federal Funds budget entries will

relate to the requested OCS funds only, and Non-Federal will include

mobilized funds from all other sources--applicant, state, local, and

other. Federal funds other than requested OCS funding should be

included in Non-Federal entries.

Sections A, B, and C of SF-424A should reflect budget estimates for

each year of the Project Period.

Section A--Budget Summary. You need only fill in lines 1 and 5

(with the same amounts)

Col. (a): Enter ``LIHEAP/REACH.''

Col. (b): Catalog of Federal Domestic Assistance number is 93.568.

Col. (c) and (d): not relevant to this program.

Column (e)-(g): enter the appropriate amounts (column e should not

be more than $1,500,000 for applications under Priority Area 1.0; or

more than $150,000 for applications under Priority Area 2.0.

Section B--Budget Categories. (1) For applicants, a single SF-424A

covering entire REACH Project: complete a one-year budget in accordance

with the instructions provided, entering the amount of grant or

contract to CBO Recipient(s) or nonprofit sub-recipient under the

Object Class Category ``Contractual''.

(2) For CBO Recipients (or nonprofit sub-recipients in the case of

Priority Area 2.0 applicants), an SF-424A to be completed for each,

covering the full three year project as follows:

(Note that the following information supersedes the instructions

provided with the Form in Attachment C.)

Columns (1)-(5): For each of the relevant Object Class Categories:

Column 1: Enter the OCS grant funds for the first year.

Column 2: Enter the OCS grant funds for the second year.

Column 3: Enter the OCS grant funds for the third year.

Column 4: Leave blank.

Column 5: Enter the total federal OCS grant funds for the three

year budget by Class Categories, showing a total budget of not more

than $1,500,000.

Note: With regard to Class Categories, only out-of-town travel

should be entered under Category c. Travel. Local travel costs

should be entered under Category h. Other. Costs of supplies should

be included under Category e. ``Supplies'' is tangible personal

property other than ``equipment''. ``Equipment'' means an article of

nonexpendable, tangible personal property having a useful life of

more than one year and an acquisition cost which equals or exceeds

the lesser of (a) the capitalization level established by the

organization for financial statement purposes, or (b) $5,000. (ref.:

OMB Circular A-87) In other words, unless the level established

under (a) is less than $5,000, equipment costing less than $5,000

should be included in Category e. Supplies.

Section C--Non Federal Resources should be completed in accordance

with the instructions provided, remembering that ``all non-OCS funds''

fall in this category.

Sections D, E, and F may be left blank.

As previously noted in Part IV, a supporting Budget Justification

must be submitted providing details of expenditures under each budget

category, and justification of dollar amounts which relate the proposed

expenditures to the work program and goals of the project.

C. SF-424B Assurances-Non-Construction

One SF-424B to be submitted by applicant. Applicants requesting

financial assistance for a non- construction project must file the

Standard Form 424B, ``Assurances: Non-Construction Programs.''

Applicants must sign and return the Standard Form 424B with their

applications.

Applicants must provide a certification concerning Lobbying. Prior

to receiving an award in excess of $100,000, applicants shall furnish

an executed copy of the lobbying certification. Applicants must sign

and return the certification with their applications. Applicants should

note that the Lobbying Disclosure Act of 1995 has simplified the

lobbying information required to be disclosed under 31 USC 1352 (The

Byrd Amendment).

Applicants must make the appropriate certification on their

compliance with the Drug-Free Workplace Act of 1988 and the Pro-

Children Act of 1994 (Certification Regarding Smoke Free Environment).

By signing and submitting the applications, applicants are providing

the certification and need not mail back the certification with the

applications.

Applicants must make the appropriate certification that they are

not presently debarred, suspended or otherwise ineligible for award. By

signing and submitting the applications, applicants are providing the

certification and need not mail back the certification with the

applications.

Copies of the certifications and assurances are located at the end

of this announcement.

Part VIII--Contents of Reach Plan

Application pages should be numbered sequentially throughout the

application package, beginning with an Abstract of the Plan as page

number one, and each REACH Plan must include all of the following, in

the order listed below:

1. An Abstract of the plan--very brief, not to exceed 250 words,

that would be suitable for use in an announcement that the application

has been selected for a grant award; which identifies the type of

project(s), the target population, the CBO Recipient(s) (in the case of

Priority Area 1.0 applicants), and the nonprofit organization sub-

recipient (in the case of Priority Area 2.0 applicants electing to

delegate their REACH Project), and the major elements of the work

plan(s).

2. Table of Contents;

3. A completed Standard Form 424 which has been signed by an

official of the organization applying for the grant who has authority

to obligate the organization legally.

[Note: The original SF-424 must bear the original signature of

the authorizing representative of the applicant organization].

4. A single Budget Information--Non-Construction Programs (SF-424A)

for the applicant, covering the entire REACH Project; and separate SF-

424A forms for each CBO Recipient or nonprofit sub-recipient as

appropriate;

5. A narrative budget justification for each object class category

included under Section B, for each SF-424A;

6. Filled out, signed and dated Assurances--Non-Construction

Programs (SF-424B), Attachment D;

7. Restrictions on Lobbying--Certification for Contracts, Grants,

Loans, and Cooperative Agreements: fill out, sign and date form found

at Attachment G;

8. Disclosure of Lobbying Activities, SF-LLL: Fill out, sign and

date form found at Attachment H, if appropriate (omit Items 11-15 on

the SF LLL and ignore references to continuation sheet SF-LLL-A)

9. A project narrative, limited to the number of pages specified

below, which includes all of the required elements described in Part

IV; [Specific information/data required under each

[[Page 35532]]

component is described in Part IV Application Elements and Review

Criteria].

For Plans submitted under Priority Area 1.0, the total number of

pages for Segment One of the Project Narrative(s) dealing with Element

I, Project Theory, Design, and Plan, must not exceed 10 pages for each

such narrative submitted for a specific local project; and Segment Two

of the narrative dealing with Elements II through VII must not exceed

20 pages, excluding Appendices. The Project Narratives for Plans

submitted under Priority Area 2.0 must not exceed 20 pages in length.

Plans for supplemental EEE Services should not exceed 10 pages in

length. (See Part V) Plans must be typewritten on one side of the paper

only, in type no smaller than 12 c.p.i., 11 point, or equivalent, with

margins no less than one inch. Pages should be numbered sequentially

throughout the application package, excluding Appendices, beginning

with the Abstract as Page #1.

10. Appendices, including Maintenance of Effort Certification (See

Attachment J); Letter(s) of Agreement from designated CBO Recipients

(or nonprofit sub-recipients, as appropriate) through which project

will be implemented; resumes and/or position descriptions (see Program

Element IV); Certification Regarding Lobbying, if appropriate; and any

letters from cooperating or partnering agencies in target communities.

Such letters are not part of the narrative and should be included in

the Appendices. These letters are, therefore, not counted against the

page limitations.

REACH Plans must be uniform in composition since OCS may find it

necessary to duplicate them for review purposes. Therefore,

applications must be submitted on white 8\1/2\ x 11 inch paper only.

They must not include colored, oversized or folded materials. Do not

include organizational brochures or other promotional materials,

slides, films, clips, etc. in the proposal. They will be discarded if

included. The applications should be two-hole punched at the top center

and fastened separately with a compressor slide paper fastener, or a

binder clip. The submission of bound plans, or plans enclosed in

binders is specifically discouraged.

Attachment M provides a checklist to applicants in preparing a

complete application package.

Part IX--Post-Award Information and Reporting Requirements

A. Notification of Grant Award

Following approval of the REACH Plans selected for funding, notice

of project approval and authority to draw down project funds will be

made in writing. The official award document is the Financial

Assistance Award which provides the amount of Federal funds approved

for use in the project, the project and budget periods for which

support is provided, the terms and conditions of the award, the total

project period for which support is contemplated, and the total

required grantee financial participation, if any.

B. Attendance at Workshops

Project coordinators, Project Directors at the local CBO

Recipient(s), and chief evaluators (in the case of REACH Initiatives

funded under Priority Area 1.0) and Project Directors (in the case of

REACH Initiatives funded under Priority Area 2.0) are encouraged to

attend a national REACH Orientation workshop in Washington, D.C.

scheduled during the first six months of the Project Period. They are

also encouraged to attend, as presenters, a workshop on utilization and

dissemination to be held at the end of the project period. Project

budgets should include funds for travel to and attendance at these

workshops. (See Part IV, Element V, Budget Appropriateness)

C. Reporting Requirements

Grantees will be required to submit semi-annual program progress

and financial reports (SF 269) throughout the project period, as well

as a final program and financial report within 90 days of the

termination of the project. For REACH Projects under Priority Area 1.0

an interim evaluation report, along with the written policies and

procedures resulting from the process evaluation, will be due 30 days

after the first eighteen months of the project period and a final

evaluation report will be due 90 days after the expiration of the

grant. These reports will be submitted in accordance with instructions

to be provided by OCS, and will be the basis for the dissemination

effort to be conducted by the Office of Community Services.

D. Audit Requirements

Grantees are subject to the audit requirements in Section 2605B(10)

of the Low Income Home Energy Assistance Act of 1981, as amended, 42

U.S.C. 8621 et seq.

E. Prohibitions and Requirements With Regard to Lobbying

Section 1352 of Public Law 101-121, signed into law on October 23,

1989, imposes prohibitions and requirements for disclosure and

certification related to lobbying on recipients of Federal contracts,

grants, cooperative agreements, and loans. It provides exemptions for

Indian tribes and tribal organizations. Current and prospective

recipients (and their subtier contractors and/or grantees) are

prohibited from using Federal funds, other than profits from a Federal

contract, for lobbying Congress or any Federal agency in connection

with the award of a contract, grant, cooperative agreement or loan. In

addition, for each award action in excess of $100,000 (or $150,000 for

loans) the law requires recipients and their subtier contractors and/or

subgrantees (1) to certify that they have neither used nor will use any

appropriated funds for payment to lobbyists; (2) to disclose the name,

address, payment details, and purpose of any agreements with lobbyists

whom recipients or their subtier contractors or subgrantees will pay

with profits or nonappropriated funds on or after December 22, 1989 and

(3) to file quarterly up-dates about the use of lobbyists if material

changes occur in their use. The law establishes civil penalties for

noncompliance. See Attachments H and I for certification and disclosure

forms to be submitted with the applications for this program.

F. Applicable Federal Regulations

Attachment L indicates the regulations which apply to all

applicants/grantees under the REACH Program.

Dated: June 19, 1996.

Donald Sykes,

Director, Office of Community Services.

Attachment A--1996 Poverty Guidelines for the 48 Contiguous States and

the District of Columbia

------------------------------------------------------------------------

Povery

Size of family unit guideline

------------------------------------------------------------------------

1............................................................ $7,740

2............................................................ 10,360

3............................................................ 12,980

4............................................................ 15,600

5............................................................ 18,220

6............................................................ 20,840

7............................................................ 23,460

8............................................................ 26,080

[[Page 35533]]

For family units with more than 8 members, add $2,226 for each

additional member. (The same increment applies to smaller family sizes

also, as can be seen in the figures above.)

------------------------------------------------------------------------

1996 Poverty Guidelines for Alaska

------------------------------------------------------------------------

Povery

Size of family unit guideline

------------------------------------------------------------------------

1............................................................ $9,660

2............................................................ 12,940

3............................................................ 16,220

4............................................................ 19,500

5............................................................ 22,780

6............................................................ 26,060

7............................................................ 29,340

8............................................................ 32,620

For family units with more than 8 members, add $3,280 for each

additional member. (The same increment applies to smaller family sizes

also, as can be seen in the figures above.)

------------------------------------------------------------------------

1996 Poverty Guidelines for Hawaii

------------------------------------------------------------------------

Povery

Size of family unit guideline

------------------------------------------------------------------------

1............................................................ $8,910

2............................................................ 11,920

3............................................................ 14,930

4............................................................ 17,940

5............................................................ 20,950

6............................................................ 23,960

7............................................................ 26,970

8............................................................ 29,980

For family units with more than 8 members, add $3,010 for each

additional member. (The same increment applies to smaller family sizes

also, as can be seen in the figures above.)

------------------------------------------------------------------------

BILLING CODE 4184-01-P

[[Page 35534]]

[GRAPHIC] [TIFF OMITTED] TN05JY96.000

BILLING CODE 4184-01-C

[[Page 35535]]

Instructions for the SF 424

This is a standard form used by applicants as a required

facesheet for preapplications and applications submitted for Federal

assistance. It will be used by Federal agencies to obtain applicant

certification that States which have established a review and

comment procedure in response to Executive Order 12372 and have

selected the program to be included in their process, have been

given an opportunity to review the applicant's submission.

Item and Entry

1. Self-explanatory.

2. Date application submitted to Federal agency (or State if

applicable) & applicant's control number (if applicable).

3. State use only (if applicable).

4. If this application is to continue or revise an existing

award, enter present Federal identifier number. If for a new

project, leave blank.

5. Legal name of applicant, name of primary organizational unit

which will undertake the assistance activity, complete address of

the applicant, and name and telephone number of the person to

contact on matters related to this application.

6. Enter Employer Identification Number (EIN) as assigned by the

Internal Revenue Service.

7. Enter the appropriate letter in the space provided.

8. Check appropriate box and enter appropriate letter(s) in the

space(s) provided:

--``New'' means a new assistance award.

--``Continuation'' means an extension for an additional funding/

budget period for a project with a projected completion date.

--``Revision'' means any change in the Federal Government's

financial obligation or contingent liability from an existing

obligation.

9. Name of Federal agency from which assistance is being

requested with this application.

10. Use the Catalog of Federal Domestic Assistance number and

title of the program under which assistance is requested.

11. Enter a brief descriptive title of the project. If more than

one program is involved, you should append an explanation on a

separate sheet. If appropriate (e.g., construction or real property

projects), attach a map showing project location. For

preapplications, use a separate sheet to provide a summary

description of this project.

12. List only the largest political entities affected (e.g.,

State, counties, cities).

13. Self-explanatory.

14. List the applicant's Congressional District and any

District(s) affected by the program or project.

15. Amount requested or to be contributed during the first

funding/budget period by each contributor. Value of in-kind

contributions should be included on appropriate lines as applicable.

If the action will result in a dollar change to an existing award,

indicate only the amount of the change. For decreases, enclose the

amounts in parentheses. If both basic and supplemental amounts are

included, show breakdown on an attached sheet. for multiple program

funding, use totals and show breakdown using same categories as item

15.

16. Applicants should contact the State Single Point of Contact

(SPOC) for Federal Executive Order 12372 to determine whether the

application is subject to the State intergovernmental review

process.

17. This question applies to the applicant organization, not the

person who signs as the authorized representative. Categories of

debt include delinquent audit disallowances, loans and taxes.

18. To be signed by the authorized representative of the

applicant. A copy of the governing body's authorization for you to

sign this application as official representative must be on file in

the applicant's office. (Certain Federal agencies may require that

this authorization be submitted as part of the application.)

BILLING CODE 4184-01-P

[[Page 35536]]

[GRAPHIC] [TIFF OMITTED] TN05JY96.001

[[Page 35537]]

[GRAPHIC] [TIFF OMITTED] TN05JY96.002

BILLING CODE 4184-01-C

[[Page 35538]]

Instructions for the SF-424A

General Instructions

This form is designed so that application can be made for funds

from one or more grant programs. In preparing the budget, adhere to

any existing Federal grantor agency guidelines which prescribe how

and whether budgeted amounts should be separately shown for

different functions or activities within the program. For some

programs, grantor agencies may require budgets to be separately

shown by function or activity. For other programs, grantor agencies

may require a breakdown by function or activity. Sections A,B,C, and

D should include budget estimates for the whole project except when

applying for assistance which requires Federal authorization in

annual or other funding period increments. In the latter case,

Sections A,B,C, and D should provide the budget for the first budget

period (usually a year) and Section E should present the need for

Federal assistance in the subsequent budget periods. All

applications should contain a breakdown by the object class

categories shown in Lines a-k of Section B.

Section A. Budget Summary

Lines 1-4, Columns (a) and (b)

For applications pertaining to a single Federal grant program

(Federal Domestic Assistance Catalog number) and not requiring a

functional or activity breakdown, enter on Line 1 under Column (a)

the catalog program title and the catalog number in Column (b).

For applications pertaining to a single program requiring budget

amounts by multiple functions or activities, enter the name of each

activity or function on each line in Column (a), and enter the

catalog number in Column (b). For applications pertaining to

multiple programs where none of the programs require a breakdown by

function or activity enter the catalog program title on each line in

Column (a) and the respective catalog number on each line in Column

(b).

For applications pertaining to multiple program where one or

more programs require a breakdown by function or activity, prepare a

separate sheet for each program requiring the breakdown. Additional

sheets should be used when one form does not provide adequate space

for all breakdown of data required. However, when more than one

sheet is used, the first page should provide the summary totals by

programs.

Lines 1-4, Columns (c) Through (g.)

For new applications, leave Columns (c) and (d) blank. For each

line entry in Columns (a) and (b), enter in Columns (e), (f), and

(g) the appropriate amounts of funds needed to support the project

for the first funding period (usually a year).

For continuing grant program applications, submit these forms

before the end of each funding period as required by the grantor

agency. Enter in Columns (c) and (d) the estimated amounts of funds

which will remain unobligated at the end of the grant funding period

only if the Federal grantor agency instructions provide for this.

Otherwise, leave these columns blank. Enter in columns (e) and (f)

the amounts of funds needed for the upcoming period. The amount(s)

in Column (g) should be the sum of amounts in Columns (e) and (f).

For supplemental grants and changes to existing grants, do not

use Columns (c) and (d). Enter in Column (e) the amount of the

increase or decrease of Federal funds and enter in Column (f) the

amount of the increases or decrease of non-Federal funds. In Column

(g) enter the new total budgeted amount (Federal and non-Federal)

which includes the total previous authorized budgeted amounts plus

or minus, as appropriate, the amounts shown in Columns (e) and (f).

The amount(s) in Column (g) should not equal the sum of amounts in

Columns (e) and (f).

Line 5--Show the totals for all columns used.

Section B. Budget Categories

In the column headings (1) through (4), enter the titles of the

same programs, functions, and activities shown on Lines 1-4, Column

(a), Section A. When additional sheets are prepared for Section A,

provide similar column headings on each sheet. For each program,

function or activity, fill in the total requirements for funds (both

Federal and non-Federal) by object class categories.

Lines 6a-i--Show the totals of Lines 6a to 6h in each column.

Line 6j--Show the amount of indirect cost.

Line 6k--Enter the total of amounts on Lines 6i and 6j. For all

applications for new grants and continuation grants the total amount

in column (5), Line 6k, should be the same as the total amount shown

in Section A, Column (g), Line 5. For supplemental grants and

changes to grants, the total amount of the increase or decrease as

shown in columns (1)-(4), Line 6k should be the same as the sum of

the amounts in Section A, Columns (e) and (f) on Line 5.

Line 7--Enter the estimated amount of income, if any, expected

to be generated from this project. Do not add or subtract this

amount from the total project amount. Show under the program

narrative statement the nature and source of income. The estimated

amount of program income may be considered by the federal grantor

agency in determining the total amount of the grant.

Section C. Non-Federal Resources

Lines 8-11--Enter amounts of non-Federal resources that will be

used on the grant. If in-kind contributions are included, provide a

brief explanation on a separate sheet.

Column (a)--Enter the program titles identical to Column (a),

Section A. A breakdown by function or activity is not necessary.

Column (b)--Enter the contribution to be made by the applicant.

Column (c)--Enter the amount of the State's cash and in-kind

contributions if the applicant is not a State or State agency.

Applicants which are a State or State agencies should leave this

column blank.

Column (d)--Enter the amount of cash and in-kind contributions

to be made from all other sources.

Column (e)--Enter totals of Columns (b), (c), and (d).

Line 12--Enter the total for each of Columns (b)-(e). The amount

in Column (e) should be equal to the amount on Line 5, Column (f),

Section A.

Section D. Forecasted Cash Needs

Line 13--Enter the amount of cash needed by quarter from the

grantor agency during the first year.

Line 14--Enter the amount of cash from all other sources needed

by quarter during the first year.

Line 15--Enter the totals of amounts of Lines 13 and 14.

Section E. Budget Estimates of Federal Funds Needed for Balance of

the Project

Lines 16-19--Enter in Column (a) the same grant program titles

shown in Column (a), Section A. A breakdown by function or activity

is not necessary. For new applications and continuation grant

applications, enter in the proper columns amounts of Federal funds

which will be needed to complete the program or project over the

succeeding funding periods (usually in years). This section need not

be completed for revisions (amendments, changes, or supplements) to

funds for the current year of existing grants.

If more than four lines are needed to list the program titles,

submit additional schedules as necessary.

Line 20--Enter the total for each of the Columns (b)-(e). When

additional schedules are prepared for this Section, annotate

accordingly and show the overall totals on this line.

Section F. Other Budget Information

Line 21--Use this space to explain amounts for individual direct

object-class cost categories that may appear to be out of the

ordinary or to explain the details as required by the Federal

grantor agency.

Line 22--Enter the type of indirect rate (provisional,

predetermined, final or fixed) that will be in effect during the

funding period, the estimated amount of the base to which the rate

is applied, and the total indirect expense.

Line 23--Provide any other explanations or comments deemed

necessary.

Attachment D--Assurances--Non-Construction Programs

Note: Certain of these assurances may not be applicable to your

project or program. If you have questions, please contact the

awarding agency. Further, certain Federal awarding agencies may

require applicants to certify to additional assurances. If such is

the case, you will be notified.

As the duly authorized representative of the applicant I certify

that the applicant:

1. Has the legal authority to apply for Federal assistance, and

the institutional, managerial and financial capability (including

funds sufficient to pay the non-Federal share of project costs) to

ensure proper planning, management and completion of the project

described in this application.

2. Will give the awarding agency, the Comptroller General of the

United States, and if appropriate, the State, through any authorized

representative, access to and the right to examine all records,

books, papers,

[[Page 35539]]

or documents related to the award; and will establish a proper

accounting system in accordance with generally accepted accounting

standards or agency directives.

3. Will establish safeguards to prohibit employees from using

their positions for a purpose that constitutes or presents the

appearance of personal or organizational conflict of interest, or

personal gain.

4. Will initiate and complete the work within the applicable

time frame after receipt of approval of the awarding agency.

5. Will comply with the Intergovernmental Personnel Act of 1970

(42 U.S.C. Secs. 4728-4763) relating to prescribed standards for

merit systems for programs funded under one of the nineteen statutes

or regulations specified in Appendix A of OPM's Standards for a

Merit System of Personnel Administration (5 C.F.R. 900, Subpart F).

6. Will comply with all Federal statutes relating to

nondiscrimination. These include but are not limited to: (a) Title

VI of the Civil Rights Act of 1964 (P.L. 88-352) which prohibits

discrimination on the basis of race, color or national origin; (b)

Title IX of the Education Amendments of 1972, as amended (20 U.S.C.

Secs. 1681-1683, and 1685-1686), which prohibits discrimination on

the basis of sex; (c) Section 504 of the Rehabilitation Act of 1973,

as amended (29 U.S.C. Sec. 794), which prohibits discrimination on

the basis of handicaps; (d) the Age Discrimination Act of 1975, as

amended (42 U.S.C Secs. 6101-6107), which prohibits discrimination

on the basis of age;

(e) the Drug Abuse Office and Treatment Act of 1972 (P.L. 92-

255), as amended, relating to nondiscrimination on the basis of drug

abuse; (f) the Comprehensive Alcohol Abuse and Alcoholism

Prevention, Treatment and Rehabilitation Act of 1970 (P.L. 91-616),

as amended, relating to nondiscrimination on the basis of alcohol

abuse or alcoholism; (g) Secs. 523 and 527 of the Public Health

Service Act of 1912 (42 U.S.C. 290 dd-3 and 290 ee-3), as amended,

relating to confidentiality of alcohol and drug abuse patient

records; (h) Title VIII of the Civil Rights Act of 1968 (42 U.S.C.

Sec. 3601 et seq.), as amended, relating to nondiscrimination in the

sale, rental or financing of housing; (i) any other

nondiscrimination provisions in the specific statute(s) under which

application for Federal assistance is being made; and (j) the

requirements of any other nondiscrimination statute(s) which may

apply to the application.

7. Will comply, or has already complied, with the requirements

of Titles II and III of the Uniform Relocation Assistance and Real

Property Acquisition Policies Act of 1970 (P.L. 91-646) which

provide for fair and equitable treatment of persons displaced or

whose property is acquired as a result of Federal or federally

assisted programs. These requirements apply to all interests in real

property acquired for project purposes regardless of Federal

participation in purchases.

8. Will comply with the provisions of the Hatch Act (5 U.S.C.

Secs. 1501-1508 and 7324-7328) which limit the political activities

of employees whose principal employment activities are funded in

whole or in part with Federal funds.

9. Will comply, as applicable, with the provisions of the Davis-

Bacon Act (40 U.S.C. Secs. 276a to 276a-7), the Copeland Act (40

U.S.C. Sec. 276c and 18 U.S.C. Secs. 874), and the Contract Work

Hours and Safety Standards Act (40 U.S.C. Secs. 327-333), regarding

labor standards for federally assisted construction subagreements.

10. Will comply, if applicable, with flood insurance purchase

requirements of Section 102(a) of the Flood Disaster Protection Act

of 1973 (P.L. 93-234) which requires recipients in a special flood

hazard area to participate in the program and to purchase flood

insurance if the total cost of insurable construction and

acquisition is $10,000 or more.

11. Will comply with environmental standards which may be

prescribed pursuant to the following: (a) institution of

environmental quality control measures under the National

Environmental Policy Act of 1969 (P.L. 91-190) and Executive Order

(EO) 11514; (b) notification of violating facilities pursuant to EO

11738; (c) protection of wetlands pursuant to EO 11990; (d)

evaluation of flood hazards in floodplains in accordance with EO

1988; (e) assurances of project consistency with the approved State

management program developed under the Coastal Zone Management Act

of 1972 (16 U.S.C. Secs. 1451 et seq.); (f) conformity of Federal

actions to State (Clear Air) Implementation Plans under Section

176(c) of the Clear Air Act of 1955, as amended (42 U.S.C. Sec. 7401

et seq.); (g) protection of underground sources of drinking water

under the Safe Drinking Water Act of 1974, as amended, (P.L. 93-

523); and (h) protection of endangered species under the Endangered

Species Act of 1973, as amended, (P.L. 93-205).

12. Will comply with the Wild and Scenic Rivers Act of 1968 (16

U.S.C. Secs. 1271 et seq.) related to protecting components or

potential components of the national wild and scenic rivers system.

13. Will assist the awarding agency in assuring compliance with

Section 106 of the National Historic Preservation Act of 1966, as

amended (16 U.S.C. 470), EO 11593 (identification and protection of

historic properties), and the Archaeological and Historic

Preservation Act of 1974 (16 U.S.C. 469a-1 et seq.).

14. Will comply with P.L. 93-348 regarding the protection of

human subjects involved in research, development, and related

activities supported by this award of assistance.

15. Will comply with the Laboratory Animal Welfare Act of 1966

(P.L. 89-544. as amended, 7 U.S.C. 2131 et seq.) pertaining to the

care, handling, and treatment of warm blooded animals held for

research, teaching, or other activities supported by this award of

assistance.

16. Will comply with the Lead-Based Paint Poisoning Prevention

Act (42 U.S.C. Secs. 4801 et seq.) which prohibits the use of lead

based paint in construction or rehabilitation of residence

structures.

17. Will cause to be performed the required financial and

compliance audits in accordance with the Single Audit Act of 1984.

18. Will comply with all applicable requirements of all other

Federal laws, executive orders, regulations and policies governing

this program.

----------------------------------------------------------------------

Signature of authorized certifying official

----------------------------------------------------------------------

Title

Applicant organization

----------------------------------------------------------------------

Date submitted

BILLING CODE 4184-01-P

[[Page 35540]]

[GRAPHIC] [TIFF OMITTED] TN05JY96.003

[[Page 35541]]

[GRAPHIC] [TIFF OMITTED] TN05JY96.004

BILLING CODE 4184-01-C

[[Page 35542]]

Attachment F--Certification Regarding Debarment, Suspension, and Other

Responsibility Matters--Primary Covered Transactions

By signing and submitting this proposal, the applicant, defined

as the primary participant in accordance with 45 CFR Part 76,

certifies to the best of its knowledge and belief that it and its

principals:

(a) are not presently debarred, suspended, proposed for

debarment, declared ineligible, or voluntarily excluded from covered

transactions by any Federal Department or agency;

(b) have not within a 3-year period preceding this proposal been

convicted of or had a civil judgment rendered against them for

obtaining, attempting to obtain, or performing a public (Federal,

State, or local) transaction or contract under a public transaction;

violation of Federal or State antitrust statutes or commission of

embezzlement, theft, forgery, bribery, falsification or destruction

of records, making false statements, or receiving stolen property.

(c) are not presently indicated or otherwise criminally or

civilly charged by a governmental entity (Federal, State or local)

with commission of any of the offenses enumerated in paragraph

(1)(b) of this certification; and

(d) have not within a 3-year period preceding this application/

proposal had one or more public transactions (Federal, State or

local) terminated for cause or default.

The inability of a person to provide the certification required

above will not necessarily result in denial of participation in this

covered transaction. If necessary, the prospective participant shall

submit an explanation of why it cannot provide the certification.

The certification or explanation will be considered in connection

with the Department of Health and Human Services' (HHS)

determination whether to enter into this transaction. However,

failure of the prospective primary participant to furnish a

certification or an explanation shall disqualify such person from

participation in this transaction.

The prospective primary participant agrees that by submitting

this proposal, it will include the clause entitled ``Certification

Regarding Debarment, Suspension, Ineligibility, and Voluntary

Exclusion--Lower Tier Covered Transactions'' provided below without

modification in all lower tier covered transactions and in all

solicitations for lower tier covered transactions.

Certification Regarding Debarment, Suspension, Ineligibility and

Voluntary Exclusion--Lower Tier Covered Transactions

(To Be Supplied to Lower Tier Participants)

By signing and submitting this lower tier proposal, the

prospective lower tier participant, as defined in 45 CFR Part 76,

certifies to the best of its knowledge and belief that it and its

principals:

(a) are not presently debarred, suspended, proposed for

debarment, declared ineligible, or voluntarily excluded from

participation in this transaction by any federal department or

agency.

(b) where the prospective lower tier participant is unable to

certify to any of the above, such prospective participant shall

attach an explanation to this proposal.

The prospective lower tier participant further agrees by

submitting this proposal that it will include this clause entitled

``Certification Regarding Debarment, Suspension, Ineligibility, and

Voluntary Exclusion--Lower Tier Covered Transactions'' without

modification in all lower tier covered transactions and in all

solicitations for lower tier covered transactions.

Attachment G--Certification Regarding Lobbying

Certification for Contracts, Grants, Loans, and Cooperative Agreements

The undersigned certifies, to the best of his or her knowledge

and belief, that:

(1) No Federal appropriated funds have been paid or will be

paid, by or on behalf of the undersigned, to any person for

influencing or attempting to influence an officer or employee of any

agency, a Member of Congress, an officer or employee of Congress, or

an employee of a Member of Congress in connection with the awarding

of any Federal contract, the making of any Federal grant, the making

of any Federal loan, the entering into of any cooperative agreement,

and the extension continuation, renewal, amendment, or modification

of any Federal contract, grant, loan, or cooperative agreement.

(2) If any funds other than Federal appropriated funds have been

paid or will be paid to any person for influencing or attempting to

influence an officer or employee of any agency, a Member of

Congress, an officer or employee of Congress, or an employee of a

Member of Congress in connection with this Federal contract, grant,

loan or cooperative agreement, the undersigned shall complete and

submit Standard Form-LLL, ``Disclosure Form to Report Lobbying,'' in

accordance with its instructions.

(3) The undersigned shall require that the language of this

certification be included in the award documents for all subawards

at all tiers (including subcontracts, subgrants, and contracts under

grants, loans, and cooperative agreements) and that all

subrecipients shall certify and disclose accordingly.

This certification is a material representation of fact upon

which reliance was placed when this transaction was made or entered

into. Submission of this certification is a prerequisite for making

or entering into this transaction imposed by section 1352, title 31,

U.S. Code. Any person who fails to file the required certification

shall be subject to a civil penalty of not less than $10,000 and not

more than $100,000 for each such failure.

State for Loan Guarantee and Loan Insurance

The undersigned states, to the best of his or her knowledge and

belief, that:

If any funds have been paid or will be paid to any person for

influencing or attempting to influence an officer or employee of any

agency, a Member of Congress, an officer or employee of Congress, or

an employee of a Member of Congress in connection with this

commitment providing for the United States to insure or guarantee a

loan, the undersigned shall complete and submit Standard Form-LLL

``Disclosure Form to Report Lobbying,'' in accordance with its

instructions.

Submission of this statement is a prerequisite for making or

entering into this transaction imposed by section 1352, title 31,

U.S. Code. Any person who fails to file the required statement shall

be subject to a civil penalty of not less than $10,000 and not more

than $100,000 for each such failure.

----------------------------------------------------------------------

Signature

----------------------------------------------------------------------

Title

----------------------------------------------------------------------

Organization

----------------------------------------------------------------------

Date

BILLING CODE 4184-01-P

[[Page 35543]]

[GRAPHIC] [TIFF OMITTED] TN05JY96.005

BILLING CODE 4184-01-C

[[Page 35544]]

Attachment I--Certification Regarding Environmental Tobacco Smoke

Public Law 103-227, Part C--Environmental Tobacco Smoke, also

known as the Pro-Children Act of 1994 (Act), requires that smoking

not be permitted in any portion of any indoor facility owned or

leased or contracted for by an entity and used routinely or

regularly for the provision of health, day care, education, or

library services to children under the age of 18, if the services

are funded by Federal programs either directly or through State or

local governments, by Federal grant, contract, loan, or loan

guarantee. The law does not apply to children's services provided in

private residences, facilities funded solely by Medicare or Medicaid

funds, and portions of facilities used for inpatient drug or alcohol

treatment. Failure to comply with the provisions of the law may

result in the imposition of a civil monetary penalty of up to $1,000

per day and/or the imposition of an administrative compliance order

on the responsible entity.

By signing and submitting this application the applicant/grantee

certifies that it will comply with the requirements of the Act. The

applicant/grantee further agrees that it will require the language

of this certification be included in any subawards which contain

provisions for children's services and that all subgrantees shall

certify accordingly.

Attachment J--Certification Regarding Maintenance of Effort

The undersigned certifies that:

(1) activities funded under this program announcement are in

addition to, and not in substitution for, activities previously

carried on without Federal assistance.

(2) funds or other resources currently devoted to activities

designed to meet the needs of the poor within a community, area, or

State have not been reduced in order to provide the required

matching contributions.

When legislation for a particular block grant permits the use of

its funds as match, the applicant must show that it has received a

real increase in its block grant allotment and must certify that

other anti-poverty programs will not be scaled back to provide the

match required for this project.

----------------------------------------------------------------------

Organization

----------------------------------------------------------------------

Authorized Signature

----------------------------------------------------------------------

Title

----------------------------------------------------------------------

Date

Attachment K--Low-Income Home Energy Assistance Act of 1981, Omnibus

Budget Reconciliation Act of 1981

[Public Law 97-35, August 13, 1981, as amended (95 Stat. 357)]

* * * * *

Title XXVI--Low-Income Home Energy Assistance

Short Title

Sec. 2601

This title may be cited as the ``Low-Income Home Energy

Assistance Act of 1981''

Applications and Requirements

Sec. 2605

* * * * *

(b) As part of the annual application required by subsection

(a), the chief executive officer of each State shall certify that

the State agrees to--

* * * * *

(2) make payments under this title only with respect to--

(A) households in which 1 or more individuals are receiving--

(i) aid to families with dependent children under the State's

plan approved under part A of title IV of the Social Security Act

(other than such aid in the form of foster care in accordance with

section 408 of such Act);

(ii) supplemental security income payments under title XVI of

the Social Security Act;

(iii) food stamps under the Food Stamp Act of 1977; or

(iv) payments under section 415, 521, 541, or 542 of title 38,

United States Code, or under section 306 of the Veterans' and

Survivors' Pension Improvement Act of 1978; or

(B) households with incomes which do not exceed the greater of--

(i) an amount equal to 150 percent of the poverty level for such

State; or

(ii) an amount equal to 60 percent of the State median income;

except that a State may not exclude a household from eligibility in

a fiscal year solely on the basis of household income if such income

is less than 110 percent of the poverty level for such State, but

the State may give priority to those households with the highest

home energy costs or needs in relation to household income;

(3) conduct outreach activities designed to assure that eligible

households, especially households with elderly individuals or

disabled individuals, or both, and households with high home energy

burdens, are made aware of the assistance available under this

title, and any similar energy-related assistance available under

subtitle B of title VI (relating to community services block grant

program) or under any other provision of law which carries out

programs which were administered under the Economic Opportunity Act

of 1964 before the date of the enactment of this Act;

(4) coordinate its activities under this title with similar and

related programs administered by the Federal Government and such

State, particularly low-income energy-related programs under

subtitle B of title VI (relating to community services block grant

program), under the supplemental security income program, under part

A of title IV of the Social Security Act, under title XX of the

Social Security Act, under the low-income weatherization assistance

program under title IV of the Energy Conservation and Production

Act, or under any other provision of law which carries out programs

which were administered under the Economic Opportunity Act of 1964

before the date of the enactment of this Act;

(5) provide, in a timely manner, that the highest level of

assistance will be furnished to those households which have the

lowest incomes and the highest energy costs or needs in relation to

income, taking into account family size, except that the State may

not differentiate in implementing this section between the

households described in clauses (2)(A) and (2)(B) of this

subsection;

(6) if the State chooses to pay home energy suppliers directly,

establish procedures to--

(A) notify each participating household of the amount of

assistance paid on its behalf;

(B) assure that the home energy supplier will charge the

eligible household, in the normal billing process, the difference

between the actual cost of the home energy and the amount of the

payment made by the State under this title;

(C) assure that the home energy supplier will provide assurances

that any agreement entered into with a home energy supplier under

this paragraph will contain provisions to assure that no household

receiving assistance under this title will be treated adversely

because of such assistance under applicable provisions of State law

or public regulatory requirements; and

(D) ensure that the provision of vendored payments remains at

the option of the State in consultation with local grantees and may

be contingent on unregulated vendors taking appropriate measures to

alleviate the energy burdens of eligible households, including

providing for agreements between suppliers and individuals eligible

for benefits under this Act that seek to reduce home energy crisis,

and encourage regular payments by individuals receiving financial

assistance for home energy costs;

(10) provide that such fiscal control and fund accounting

procedures will be established as may be necessary to assure the

proper disbursal of and accounting for Federal funds paid to the

State under this title, including procedures for monitoring the

assistance provided under this title, and provide that the State

will comply with the provisions of chapter 75 of title 31, United

States Code (commonly known as the ``Single Audit Act'');

(11) permit and cooperate with Federal investigations undertaken

in accordance with section 2608;

(12) provide for timely and meaningful public participation in

the development of the plan described in subsection (c);

(13) provide an opportunity for a fair administrative hearing to

individuals whose claims for assistance under the plan described in

subsection (c) are denied or are not acted upon with reasonable

promptness;

(14) cooperate with the Secretary with respect to data

collecting and reporting under section 2610;

* * * * *

(d) The State shall expend funds in accordance with the State

plan under this title or in accordance with revisions applicable to

such plan.

(e) Each State shall, in carrying out the requirements of

subsection (b)(10), obtain

[[Page 35545]]

financial and compliance audits of any funds which the State

receives under this title. Such audits shall be made public within

the State on a timely basis. The audits shall be conducted in

accordance with chapter 75 of title 31, United States Code.

(f)(1) Notwithstanding any other provision of law unless enacted

in express limitation of this paragraph, the amount of any home

energy assistance payments or allowances provided directly to, or

indirectly for the benefit of, an eligible household under this

title shall not be considered income or resources of such household

(or any member thereof) for any purpose under any Federal or State

law, including any law relating to taxation, food stamps, public

assistance, or welfare programs.

(2) For purposes of paragraph (1) of this subsection and for

purposes of determining any excess shelter expense deduction under

section (5)(e) of the Food Stamp Act of 1977 (7 U.S.C. 2014(e))--

(A) the full amount of such payments or allowances shall be

deemed to be expended by such household for heating or cooling

expenses, without regard to whether such payments or allowances are

provided directly to, or indirectly for the benefit of, such

household; and

(B) no distinction may be made among households on the basis of

whether such payments or allowances are provided directly to, or

indirectly for the benefit of, any of such households.

(g) The State shall repay to the United States amounts found not

to have been expended in accordance with this title or the Secretary

may offset such amounts against any other amount to which the State

is or may become entitled under this title.

(h) The Comptroller General of the United States shall, from

time to time (but not less frequently than every three years),

evaluate the expenditures by States of grant under this title in

order to assure that expenditures are consistent with the provisions

of this title and to determine the effectiveness of the State in

accomplishing the purposes of this title.

(i) A household which is described in subsection (b)(2)(A)

solely by reason of clause (ii) thereof shall not be treated as a

household described in subsection (b)(2) if the eligibility of the

household is dependent upon--

(1) an individual whose annual supplemental security income

benefit rate is reduced pursuant to section 1611(e)(1) of the Social

Security Act by reason of being in an institution receiving payments

under title XIX of the Social Security Act with respect to such

individual;

(2) an individual to whom the reduction specified in section

1612(a)(2)(A)(1) of the Social Security Act applies; or

(3) a child described in section 1614(f)(2) of the Social

Security Act who is living together with a parent, or the spouse of

a parent, of the child.

(j) In verifying income eligibility for purposes of subsection

(b)(2)(B), the State may apply procedures and policies consistent

with procedures and policies used by the State agency administering

programs under part A of title IV of the Social Security Act, under

title XX of the Social Security Act, under subtitle B of title VI of

this Act (relating to community services block grant program), under

any other provision of law which carries out programs which were

administered under the Economic Opportunity Act of 1964 before the

date of the enactment of this Act, or under other income assistance

or service programs (as determined by the State).

Nondiscrimination Provisions

Sec. 2606

(a) No person shall on the ground of race, color, national

origin, or sex be excluded from participation in, be denied the

benefits of, or be subjected to discrimination under, any program or

activity funded in whole or in part with funds made available under

this title. Any prohibition against discrimination on the basis of

age under the Age Discrimination Act of 1975 or with respect to an

otherwise qualified handicapped individual as provided in section

504 of the Rehabilitation Act of 1973 also shall apply to any such

program or activity.

(b) Whenever the Secretary determines that a State that has

received a payment under this title has failed to comply with

subsection (a) or an applicable regulation, he shall notify the

chief executive officer of the State and shall request him to secure

compliance. If within a reasonable period of time, not to exceed 90

days, the chief executive officer fails or refuses to secure

compliance, the Secretary is authorized to (1) refer the matter to

the Attorney General with a recommendation that an appropriate civil

action be instituted; (2) exercise the powers and functions provided

by title VI of the Civil Rights Act of 1964, the Age Discrimination

Act of 1975, or section 504 of the Rehabilitation Act of 1973, as

may be applicable; or (3) take such other action as may be provided

by law.

(c) When a matter is referred to the Attorney General pursuant

to subsection (b), or whenever he has reason to believe that the

State is engaged in a pattern or practice in violation of the

provisions of this section, the Attorney General may bring a civil

action in any appropriate United States district court for such

relief as may be appropriate, including injunctive relief.

(42 U.S.C. 8625)

PART 96--BLOCK GRANTS

Subpart A--Introduction

Sec.

96.1 Scope.

96.2 Definitions.

96.3 Information collection approval numbers.

Subpart B--General Procedures

96.10 Prerequisites to obtain block grant funds.

96.11 Basis of award to the States.

96.12 Grant payment.

96.13 Reallotments.

96.14 Time period for obligation and expenditure of grant funds.

96.15 Waivers.

96.16 Applicability of Title XVII of the Reconciliation Act (31

U.S.C. 7301-7305).

96.17 Annual and biennial reporting deadlines.

Subpart C--Financial Management

96.30 Fiscal and administrative requirements.

96.31 Audits.

96.32 Financial settlement.

96.33 Referral of cases to the Inspector General.

Subpart D--Direct Funding of Indian Tribes and Tribal Organizations

96.40 Scope.

96.41 General determination.

96.42 General procedures and requirements.

96.43 Procedures during FY 1982.

96.44 Community services.

96.45 Preventive health and health services.

96.46 Alcohol and drug abuse and mental health services.

96.47 Primary care.

96.48 Low-income home energy assistance.

Subpart E--Enforcement

96.50 Complaints.

96.51 Hearings.

96.52 Appeals.

Subpart F--Hearing Procedure

96.60 Scope.

96.61 Initiation of hearing.

96.62 Presiding officer.

96.63 Communications to presiding officer.

96.64 Intervention.

96.65 Discovery.

96.66 Hearing procedure.

96.67 Right to counsel.

Subpart G--Social Services Block Grants

96.70 Scope.

96.71 Definitions.

96.72 Transferability of funds.

96.73 Sterilization.

Subpart H--Low Income Home Energy Assistance Program

96.80 Scope.

96.81 Reallotment report.

96.82 Required report.

96.83 Increase in maximum amount that may be used for

weatherization and other energy related home repair.

96.84 Miscellaneous.

96.85 Exemption from requirement for additional outreach and intake

services.

96.86 Exemption from requirement for additional outreach and intake

services.

96.87 Leveraging incentive program.

96.88 Administrative costs.

96.89 Exemptions from standards for providing energy crisis

intervention assistance.

Attachment M

In view of the numerous legislative requirements of the REACH

Program as to elements and assurances in the REACH Plan, the

following ``REACH Plan Elements and Assurances Checklist'' has been

prepared as Attachment L, for the assistance of applicants under

Priority Areas 1.0 and 2.0.

[[Page 35546]]

REACH Plan Elements and Assurances Checklist

A. Service delivery through community-based nonprofit entity.

(For applicants under Priority Area 1.0 only.)

[Include in Plan Elements I, II, and IV]

B. Priority given to CSBG eligible entities that are successful

LIHEAP service providers and receive Weatherization Assistance

Program funds from the Department of Energy. (For applicants under

Priority Area 1.0 only.)

[Include in Plan Element II and attach letter(s) of certification as

described therein]

C. Each CBO Recipient to provide a variety of services, to

include:

(i) payments to, or on behalf of, individuals eligible for

residential energy assistance services and benefits under section

2605(b) for home energy costs;

(ii) energy efficiency education;

(iii) residential energy demand management services, including

any other energy related residential repair and energy efficiency

improvements in coordination with, or delivered by, Department of

Energy weatherization assistance programs at the discretion of the

State;

(iv) family services, such as counseling and needs assessment,

related to energy budget management, payment plans, and related

services; and

(v) negotiation with home energy suppliers on behalf of

households eligible for REACH services and benefits;

[Include in Plan Element I, and for applicants under Priority Area

1.0, Element III also, as appropriate]

D. a description of the methodology the State and local agencies

will use to determine--

(i) which households will receive one or more forms of benefits

under the State REACH initiative;

(ii) the cases in which nonmonetary benefits are likely to

provide more cost-effective long-term outcomes than payment benefits

alone; and

(iii) the amount of such benefit required to meet the goals of

the program;

[Include in Elements I(b), I(c), and for applicants under Priority

Area 1.0, Elements III and VI also, as appropriate]

E. (F.) a method for targeting nonmonetary benefits;

[Include in Elements I(a), I(b), IV (under Priority Area 1.0), and

III, (under Priority Area 2.0)]

G. a description of the crisis and emergency assistance

activities the State will undertake are designed to--

(i) discourage family energy crises;

(ii) encourage responsible vendor and consumer behavior; and

(iii) provide only financial incentives that encourage household

payment;

[Include in Element I and, under Priority Area 1.0, Element III

also, as appropriate]

H. a description of the activities the State will undertake to--

(i) provide incentives for recipients of assistance to pay home

energy costs; and

(ii) provide incentives for vendors to help reduce the energy

burdens of recipients of assistance;

[Include as appropriate in Element I and, under Priority Area 1.0,

Elements III and IV also, as appropriate]

I. an assurance that the State will require each entity that

receives a grant or enters into a contract under this section to

solicit and be responsive to the views of individuals who are

financially eligible for benefits and services under this section in

establishing its local program;

[Include in Elements I(a) and I(c)]

J. a description of performance goals for the State REACH

initiative including--

(i) a reduction in the energy costs on participating households

over one or more fiscal years;

(ii) an increase in the regularity of home energy bill payments

by eligible households; and

(iii) an increase in energy vendor contributions towards

reducing energy burdens of eligible households;

[Include in Element I(b) and, under Program Area 1.0, Element VI

also]

K. a description of the indicators that will be used by the

State to measure whether the performance goals have been achieved;

[Include in Element VI]

L. a demonstration that the plan is consistent with Section

paragraphs (2), (3), (4), (5), (7), (10), (11), (12), (13), and (14)

of section 2605(b) of the Low Income Home Energy Assistance Act of

1981, as amended; subsections (d), (e), (f), (g), (h), (i), and (j)

of section 2605; and section 2606 of this title;

[See Attachment K for texts of these Sections and subsections;

include as appropriate in Elements I, III, IV, and VII]

M. an assurance that benefits and services will be provided in

addition to other benefit payments and services provided under this

title and in coordination with such benefit payments and services;

[Include in Element I]

N. an assurance that no regulated utility covered by the plan

will be required to act in a manner that is inconsistent with

applicable regulatory requirements.

[Include in Element VII]

[FR Doc. 96-16558 Filed 7-2-96; 12:02 pm]

BILLING CODE 4184-01-P-M

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.