Clean Air Act Final Interim Approval of Operating Permits Program; the State of Texas

Federal RegisterJun 25, 1996

Ask Donna

What actually matters in this document.

Text

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 70

[TX-FRL-5526-4]

Clean Air Act Final Interim Approval of Operating Permits

Program; the State of Texas

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final Source Category-Limited Interim Approval.

-----------------------------------------------------------------------

SUMMARY: The EPA is promulgating source category-limited interim

approval of the Operating Permits program submitted by the Texas

Natural Resource Conservation Commission (TNRCC) for the State of Texas

for the purpose of complying with Federal requirements for an

approvable State program to issue operating permits to all major

stationary sources, except any sources of air pollution over which an

indian tribe has jurisdiction.

EFFECTIVE DATE: July 25, 1996.

ADDRESSES: Copies of the State's submittal and other supporting

information used in developing this source category-limited interim

approval are available for inspection during normal business hours at

the following location:

EPA, Region 6, Permits Section (6PD-R), 1445 Ross Avenue, Suite 700,

Dallas, Texas 75202-2733.

TNRC

C, Office of Air Quality, 12124 Park 35 Circle, Austin, Texas 78753.

FOR FURTHER INFORMATION CONTACT: David F. Garcia, Permits Section (6PD-

R), EPA, Region 6, 1445 Ross Avenue, Suite 700, Dallas, Texas 75202-

2733, telephone (214) 665-7217.

SUPPLEMENTARY INFORMATION:

I. Background and Purpose

Title V of the 1990 Clean Air Act Amendments (sections 501-507 of

the Clean Air Act (the Act), and implementing regulations at 40 CFR

part 70 require that States develop and submit Operating Permits

programs to EPA by November 15, 1993, and that EPA act to approve or

disapprove each program within one year after receiving the submittal.

The EPA's program review occurs pursuant to section 502 of the Act and

the part 70 regulations, which together outline criteria for approval

or disapproval. Where a program substantially, but not fully, meets the

requirements of part 70, EPA may grant the program interim approval for

a period of up to two years. If EPA has not fully approved a program by

two years after November 15, 1993, or by the end of an interim program,

it must establish and implement a Federal program.

On June 7, 1995, EPA proposed source category-limited interim

approval of the Operating Permits program for the State of Texas. See

60 FR 30037 (June 7, 1995). The EPA received comments on the proposal

and compiled an updated Technical Support Document which describes the

Operating Permits program in greater detail. In this document, EPA is

taking final action to promulgate source category-limited interim

approval of the Operating Permits program for the State of Texas.

II. Final Action and Implications

A. Analysis of State Submission

The Governor of Texas submitted a title V Operating Permits program

for the State of Texas on September 17, 1993, and supplemental

submittals from the Executive Director of TNRCC on October 28, 1993,

and November 12, 1993. The Texas title V Operating Permits program

includes among other things TNRCC Regulation XII, title 30 of the Texas

Administrative Code (TAC) Chapter 122 ``Federal Operating Permits''

(the Texas permit regulation) and TNRCC General Rules, title 30 of TAC,

section 101 (the Texas fee regulation).

The EPA identified and discussed the specific inconsistencies

precluding full approval of the Texas program in the June 7, 1995,

Federal Register document. It is essential that these inconsistencies

be remedied by the State consistent with the Act and part 70 prior to

EPA granting full approval of the State's Operating Permits program.

The State committed to address certain of the identified inconsistences

in a letter dated October 3, 1995, in a manner sufficient to satisfy

EPA concerns. The State in the October 3, 1995, letter agreed to: (1)

Revise section 122.120(4)(A-B) of the Texas permit regulation regarding

source applicability; (2) revise section 122.010 of the Texas permit

regulation to make the Texas definition of ``air pollutant'' consistent

with part 70, as it relates to regulated air pollutant; (3) revise

section 122.010 of the Texas permit regulation to make the definition

of ``site'' consistent with part 70, as it relates to research and

development activities; (4) revise section 122.132 of the Texas permit

regulation in regard to compliance schedule requirements; (5) revise

section 122.211 of the Texas permit regulation to require ``similar''

changes allowed under an Administrative Amendment to be approved by

EPA; and (6) revise section 122.202 of the Texas permit regulation as

it relates to General Permits. These particular rules will be

acceptable for full approval if the State makes the changes in its

rules as specified in the letter. Also, the State's criminal

enforcement provisions meet title V and part 70. The EPA proposed in

the June 7, 1995, notice to accept that these criminal enforcement

statutory provisions satisfied the intent of part 70 and solicited

comments. No adverse comments were received. The EPA's position is that

the State's criminal enforcement provisions are acceptable for both

interim and full approval.

During the State's process to revise the Operating Permit

regulation for full title V approval, EPA will comment based on the

part 70 rule in place at the time. In the action on the State's

submittal for full approval, EPA will use the criteria in whatever is

the final part 70 regulation, whether it be the existing July 21, 1992,

regulation or a later version (part 70).

B. Response to Comments

The EPA received three comment letters (including one from TNRCC)

during the 30-day public comment period held on the proposed interim

approval of the Texas program. The commenters requested a 90-day

extension of the public comment period based on interest to reevaluate

the Texas title V program and submit a plan with a redesigned Texas

title V program. The EPA extended the comment period until October 5,

1995, in a Federal Register notice published August 4, 1995. Comments

were received from 27 parties during the extended period. Below is

EPA's response to comments received on the proposed source category-

limited interim approval for the Texas Operating Permits program.

1. Comment 1--All the comments received unanimously suggested EPA

delay and/or defer final approval of the Texas interim program until

such time as TNRCC is able to submit a revised Regulation XII and

program submittal.

EPA Response--The EPA cannot ``delay and/or defer'' an action on a

pending title V program submittal. However, in addition to preparing a

Response to Comments and a Federal

[[Page 32694]]

Register notice after the end of the comment period in October, EPA

also met with TNRCC a number of times to discuss possible significant

changes to the State's program design. Thus, EPA tried to accommodate

the State and industry's wishes to submit a revised program design and

yet meet its own obligation to move forward on the pending program

submittal. The EPA has expressed fundamental concerns regarding the

approvability of such significant changes to the existing program

design. Mary Nichols, Assistant Administrator for the Office of Air and

Radiation, sent a letter, dated February 7, 1996, to Mr. Barry McBee,

Chairman of TNRCC, which outlined EPA's broad concern with such a

program redesign as presented to EPA in discussion meetings. A copy of

the letter has been placed in the docket and is available for public

review.

During this same timeframe, EPA reviewed and drafted a detailed

response to comments received during the public comment period. In

addition, EPA continued working on promulgation of part 71, the Federal

operating permit rule. After the promulgation of the part 71 rule,

States such as Texas without an approved program will be subject to a

part 71 program. This rule is expected to be finalized and made

effective in the summer of 1996. On March 14, 1996, EPA then received a

request from Texas to proceed expeditiously with a final action on the

June 7, 1995, proposal.

2. Comment 2--A commenter noted that EPA cannot impose the three

conditions stated in the August 29, 1994, proposal for Operating

Permits Programs Interim Approval Criteria until that action is

promulgated. That proposal would revise part 70 to allow interim

approval for States such as Texas whose programs do not provide for

permits to incorporate all requirements established through an EPA-

approved minor new source review (MNSR) program. The EPA proposed at 60

FR 30039 three conditions a State must meet in order to be eligible for

interim approval. Texas must: (1) include in each operating permit

issued during the interim approval period, a statement that MNSR

requirements are not included; (2) include a cross-reference in each

operating permit to the MNSR permit for that source; and (3) require

reopening of permits for incorporation of MNSR permit conditions upon

completion of the interim approval period.

EPA Response--The EPA agrees, and the August 29, 1994, proposal for

Operating Permits Programs Interim Approval Criteria was finalized on

June 20, 1996.

3. Comment 3--A commenter said that all companies cannot meet the

three proposed conditions outlined in the August 29, 1994, Federal

Register notice as previously discussed in comment 2. The concern is

that EPA is assuming companies can list modifications found in State

MNSR permits made years before, and cross-reference the modification in

the MNSR permit with then-applicable enabling authority.

EPA Response--The EPA does not agree with the comment. Facilities

that emit air pollutants are required to obtain and maintain the

appropriate new source review authorization whether it is a major or

MNSR permit. Due to these requirements, EPA believes that companies

will be able to list and cross reference MNSR permits modifications

made in the past. Where adequate company records do not exist, the

facility may use State records. Where no company or State records

exist, the facility must take steps to obtain the required permit and

may be subject to appropriate enforcement action.

4. Comment 4--A commenter requested that the negative applicability

requirement be eliminated for ``tier 3 permits.'' Only applicable

requirements should be addressed in the application; no negative

applicability requirements are necessary.

EPA Response--The EPA does not consider this comment relevant to

this action. The TNRCC has not adopted a permitting program that

includes ``tier 3 permits,'' nor has such a proposal been submitted for

EPA approval.

5. Comment 5--The State commented that it does not agree with EPA

that MNSR should be considered an ``applicable requirement'' under part

70. Should EPA determine MNSR to be an applicable requirement in the

final part 70 rule, the State requested EPA allow it to use the

``program substitution'' concept presented in its comments on the EPA's

August 29, 1994, proposed rulemaking.

EPA Response--The EPA does not agree with the State's comment.

First, it continues to be the EPA's position that MNSR is an applicable

requirement. Since July 21, 1992, in the promulgated rules which define

the minimum elements of an approvable State Operating Permits program,

EPA has interpreted the Federal definition of ``applicable

requirement'' to include terms and conditions of ``any preconstruction

permits issued pursuant to regulations approved or promulgated through

rulemaking under title I.'' Such permits include all MNSR permits.

While the exclusion of certain MNSR provisions may be allowed under

interim approval of the program, for full program approval, the State

program must provide permits that include all MNSR permits.

Second, the State can use its ``program substitution'' concept as

long as it meets all requirements of title V, including requirements

for annual and initial compliance certification, the EPA veto,

compliance plans and schedules, six month reporting, and prompt

reporting of deviations. The Texas ``program substitution'' concept as

presented to EPA does not meet title V and part 70. Furthermore, in the

area of compliance for all part 70 permits, EPA believes that

compliance certification places the burden of proof on the source, not

on the permitting agency, for certifying compliance with all applicable

requirements. It is EPA's position the burden of proof is placed on the

source since the Texas permit regulation 122.132(b)(1) requires the

responsible official of a source, not of the permitting agency, to sign

the compliance documents.

6. Comment 6--The conditions on permits issued during the interim

approval period were proposed in the August 1994 proposal for programs

that do not require MNSR changes to be incorporated in the operating

permit as applicable requirements. These conditions were subsequently

addressed in the June 7, 1995, proposal, and were commented on by the

State. The State proposes to: (a) Include in each operating permit a

standardized permit provision stating ``Preconstruction authorizations

including permits, standard permits, flexible permit, special permits,

or special exemptions which are referenced in this permit will only be

enforced under Regulation VI''; (b) use the permit form entitled

``Preconstruction Authorization References'' for cross referencing; and

(c) if MNSR is determined to be an applicable requirement in the final

part 70 rule, the TNRCC staff will propose to use the ``program

substitution'' concept.

EPA Response--The final regulation revising the interim approval

criteria (Operating Permits Program Interim Approval Criteria) requires

any operating permit issued during an interim approval meet certain

conditions if the permit does not incorporate minor New Source Review

(MNSR) requirements. These conditions are:

(1) Each permit must state that MNSR requirements are not

incorporated.

(2) Each permit must provide a cross reference, such as a listing

of the permit number, for each MNSR permit

[[Page 32695]]

containing an excluded minor NSR term.

(3) The State must reopen or use a substantially equivalent

revision process to incorporate any excluded MNSR applicable

requirements into each operating permit prior to or upon program

transition to full approval.

(4) Each permit must indicate how citizens may obtain access to

excluded MNSR permits.

(5) Each permit must state that the MNSR requirements which are

excluded are not eligible for the permit shield under section 70.6(f).

The State's comment in (a) above indicates that the title V permit

will reference NSR permit actions as enforceable under Regulation VI.

The EPA does not agree this response satisfies criterion (1) above.

This provision must be revised to state that MNSR requirements are not

incorporated in each operating permit issued during the interim

approval period. Additionally, the State must be quite clear in any

standardized permit provision that all its major ``preconstruction

authorizations including permits, standard permits, flexible permit,

special permits, or special exemptions'' are incorporated by reference

into the operating permit as if fully set forth therein and therefore

enforceable under regulation XII (the Texas operating permit

regulation) as well as regulation VI (the Texas preconstruction permit

regulation). As noted in (b) above of the comment, the State plans to

use the ``Preconstruction Authorization Reference'' form. This form

must list all MNSR authorizations (permit number) for each minor

emission unit not being incorporated into the operating permit. This

reference form which is part of the permit application and permit will

adequately meet criterion (2). Criterion (3) requires the State to

reopen/revise permits for incorporation of MNSR permit conditions prior

to or upon full program approval. As noted in (c) above, the State

proposes to use its ``program substitution'' concept. The EPA believes

that this concept is acceptable as long as each permit issued during

the interim period is revised to meet all requirements of title V,

including requirements for annual and initial compliance certification,

the EPA veto, compliance plans and schedules, six month reporting, and

prompt reporting of deviations.

The State must also ensure that the additional conditions of the

final interim approval criteria rule, not addressed in its comments,

are met during the interim period. As noted in (4) above, the State

must indicate in the operating permit how citizens may obtain access to

excluded MNSR permits. Finally, criterion (5) requires the State to

document in the title V permit that excluded minor MNSR terms are not

eligible for the permit shield under section 70.6(f).

7. Comment 7--The State proposes to revise section 122.120(4)(C),

pertaining to Applicability, to state ``any area source, in a source

category designated by the Administrator'' shall obtain an operating

permit. The TNRCC believes this revision to the Texas permit regulation

is consistent with 40 CFR 70.3(a). The TNRCC believes this suggested

revision to the Texas permit regulation corrects the deficiency

identified by EPA in the June 1995 Federal Register and makes section

122.120(4)(C) consistent with 40 CFR 70.3(a).

EPA Response--The EPA does not agree with TNRCC's comment. The

proposed language restricts the Administrator to only ``area sources''

for designation to title V permitting. Pursuant to 40 CFR 70.3(a), the

Administrator may designate a number of different types of sources

other than area sources subject to title V permitting. As a condition

for full approval, TNRCC must revise section 122.120(4)(C) to be

consistent with 40 CFR 70.3(a).

8. Comment 8--The State commented that until a final part 70 and

section 302(j) rulemaking become final they do not plan to correct the

identified deficiency requiring the definition of ``major source'' to

be revised to require the inclusion of fugitive emissions for source

categories regulated under section 111 or 112 of the Act. Specifically,

in the State's definition, source category xxvii only applies to ``any

other stationary source category which as of August 7, 1980, is being

regulated under section 111 or 112 of the Act.''

EPA Response--Currently, part 70 requires fugitive emissions to be

counted for all sources subject to section 111 and 112 standards, and

does not limit the stationary source categories to those which existed

as of August 7, 1980. However, the August 29, 1994, part 70 proposed

revisions and the August 31, 1995, supplemental part 70 proposal, if

finalized, would not include fugitive emissions for source categories

subject to section 111 or section 112 standards which were promulgated

after August 7, 1980. The August 31, 1995, supplemental proposal

further requires the Administrator to make an affirmative determination

under section 302(j). For full approval, the State must revise the

Texas permit regulation to be consistent with part 70.

9. Comment 9--The State defines in the Texas permit regulation and

also requests that the EPA define ``title I modification'' to include

only prevention of significant deterioration, nonattainment, new source

performance standard and section 112(g) modifications. The State does

not propose to change their definition which was identified by EPA as a

deficiency in the June 1995 Federal Register notice until this issue

has been resolved definitively and is defined in the final part 70.

EPA Response--The EPA has proposed to define ``title I

modification'' in the August 31, 1995, Operating Permits program and

Federal Operating Permits program, proposed rule. The EPA proposed to

define title I modification to mean any modification under part C and D

of title I or sections 111(a)(4), 112(a)(5), or 112(g) of the Act and

regulations promulgated pursuant to Sec. 61.07 of part 61. If the

definition of ``title I modification'' is finalized as proposed in the

August 31, 1995, proposed rule, the State's definition of ``title I

modification'' would be consistent with part 70. If the definition of

``title I modification'' is changed from that proposed in the August

31, 1995, proposed rule to include MNSR changes, the State must revise

the Texas permit regulation to be consistent with part 70.

10. Comment 10--The State does not agree to revise section 122.138

of the Texas permit regulation as it relates to the application shield

for significant modifications at this time. Instead, this section will

be revised when part 70 becomes final and the issue is resolved

definitively.

EPA Response--The EPA does not agree with this comment. For full

approval, the Texas permit regulation must be revised with whatever is

the final part 70 regulation, whether it be the existing July 21, 1992,

regulation or a later version at the time a corrected program is

submitted. However, EPA cannot approve a State program based on

revisions to part 70 that have not been finalized.

11. Comment 11--The State provided comments on the permit revisions

process. In regard to permit additions (section 122.215) and off-permit

(section 122.215), TNRCC does not propose to change existing language

in the Texas permit regulation to correct the identified deficiencies

until part 70 becomes final and these issues are resolved definitively.

EPA Response--In order to receive full program approval, the State

must

[[Page 32696]]

revise its rules to be consistent with part 70, in accordance with

whatever is the final part 70 regulation, whether it be the existing

July 21, 1992, regulation or a later version at the time a corrected

program is submitted. However, EPA cannot approve a State program based

on revisions to part 70 that have not been finalized.

12. Comment 12--The State proposes not to further define section

502(b)(10) as it relates to the operational flexibility provisions in

section 122.221 of the Texas permit regulation.

EPA Response--In order to receive full program approval, the State

must revise its rules to be consistent with part 70, in accordance with

whatever is the final part 70 regulation, whether it be the existing

July 21, 1992, regulation or a later version at the time a corrected

program is submitted. However, EPA cannot approve a State program based

on revisions to part 70 that have not been finalized.

13. Comment 13--The State disagrees with the EPA-identified

deficiency that the public notification for an operating permit should

include such information as the emission changes from any modification.

The State believes section 122.153 of the Texas permit regulation does

not include this requirement because its program should not be based on

emission changes.

EPA Response--The EPA disagrees with this comment. The EPA

specifies in 40 CFR 70.7(h)(2) the information that the public notice

must include. For full program approval, the State must include the

emissions change involved in any permit modification.

14. Comment 14--The State commented that fugitive emissions from

units without applicable requirements need not be quantified in permit

applications, especially if the source declares that it has major

status.

EPA Response--The EPA agrees with a portion of the comment. On July

10, 1995, EPA released White Paper I from Lydia Wegman, Deputy Director

for the Office of Air Quality Planning and Standards. A copy of this

guidance document has been placed in the docket and is available for

public review. Under section B.2. ``Required Emission Information and

Source Descriptions'' of White Paper I, for fugitive emissions that are

not subject to any applicable requirements, the source would be

required to provide a general description of the emission units and

their emissions in the application. However, fugitive emissions from

units covered by an applicable requirement need to be quantified. For

full approval, the Texas permit regulation must be revised to reflect

this position.

15. Comment 15--The State commented that section 122.122 (relating

to establishment of federally enforceable restrictions on potential to

emit) of the Texas permit regulation serves as an acceptable

certification process for grandfathered sites who choose to limit their

potential to emit under the Operating Permit program. The State also

has concerns regarding the January 25, 1995, guidance memorandum which,

among other things, announced the availability of a two-year transition

period during which a State could give sources additional options for

seeking federally enforceable limitations on potential to emit. The

time period allotted--January 25, 1995, through January 25, 1997--may

not be adequate given the expected delay of the part 70 rule and

approval of the Texas Operating Permits program. Therefore, the State

requests EPA to extend the transition period for two years following

interim approval of the Texas program.

EPA Response--The EPA will consider this request to extend the

transition period for two years after interim approval for States such

as Texas. However, this issue is not being addressed in this document.

This issue will be addressed in EPA guidance and/or memorandum at a

later date. The EPA is not addressing here whether section 122.122 of

the Texas permit regulation is acceptable for purposes of limiting

potential to emit other than during the transition period.

16. Comment 16--The State believes that the notice of emergency

required in section 70.6(g)(3)(iv) is satisfied in the TNRCC General

Rules, section 101.6 and therefore does not agree with EPA that there

is a deficiency for full approval. Section 101.6 has two opportunities

to submit information to the State. First, the occurrence of a major

upset must be reported to the agency as soon as possible. If a company

does not have all the information available at the time of the initial

notification, then a second report is to be submitted within two weeks

of the upset.

EPA Response--The EPA does not agree with this comment. The State's

allowance of time for agency notification is inconsistent with the part

70 regulation. The part 70 regulation, at section 70.6(g)(3), requires

the permittee to submit notice of the emergency to the permitting

authority within two working days. For full approval, the Texas permit

regulation must be consistent with part 70.

17. Comment 17--The State commented that the Texas Legislature

convenes every two years and approves the TNRCC budget for two-year

periods only. Therefore, the State is unable to provide a four year

estimate of the permit program cost, as required in the June 1995

Federal Register notice for full approval, but will continue to provide

budgetary information when it becomes available.

EPA Response--The EPA disagrees with this comment. Pursuant to 40

CFR 70.4(b)(8), the State must include in the fee demonstration an

estimate of the permit program cost for the first four years after

approval and a plan detailing how the State plans to cover these costs.

The EPA is not requiring a budgetary allowance from the Legislature,

but instead a projected estimate of the permit program cost.

18. Comment 18--The State provided in the October 3 letter a

response to EPA regarding the requirements for interim authorization to

clarify the ambiguity of section 122.145(e)--the ``interpretation

shield''. The response is:

(a) Interpretations made pursuant to section 122.145(e) will be

limited to whether and how a rule applies to a specific unit.

(b) The EPA has the ability to order TNRCC to reopen a permit in

the event EPA guidance becomes available after a permit or revision is

issued. Further, because each interpretation will be a provision of the

permit, it will be subject to EPA review and veto during the EPA 45-day

review period as provided by the revision section of the Texas

regulation.

(c) The State will develop guidance documents to assure proper

applicability determinations for each applicable requirement. All

interpretations will be based on the most current information

available, including guidance already received from EPA. The State will

request EPA's input prior to the development of the guidance documents.

EPA Response--The EPA agrees with TNRCC's comments for interim

approval issues. However, for full approval the State must revise the

Texas permit regulation in accordance to the June 7, 1995, Federal

Register notice.

C. Statutory Changes Enacted After the Submittal of the State Program

Significant changes to Texas laws were made by the Texas

Legislature in 1995. These statutory changes raise issues of concern

which the State must address before full approval for title V can be

granted. The State has the obligation to address all the relevant,

recently enacted laws and demonstrate how they meet title V and part

70.

This final agency action today does not waive the EPA's right to

raise statutory concerns and any attendant

[[Page 32697]]

regulatory revisions the EPA deems necessary to the State and identify

inconsistencies with those legislative changes which must be corrected

for full approval. The EPA will present its position on the laws to

TNRCC prior to the Texas 1997 legislative session, during TNRCC's

corrective rulemaking process, and in its FRN proposing action on the

State's submittal for full approval. Therefore, interested parties will

have full opportunity to comment on the merits of the EPA's positions

on the acceptability of the Texas 1995 laws (such as the Texas Senate

Bill 14, ``Takings Impact Assessment,'' among others) for full title V

program approval. The following is a specific discussion on the new

audit and standing laws.

On May 23, 1995, Texas enacted House Bill 2473, the Texas

Environmental, Health, and Safety Audit Privilege Act (the Audit

Privilege Act) creating an immunity from civil, administrative, and

criminal penalties for environmental violations discovered through an

audit as defined by the Act. The Audit Privilege Act also created a

privilege for information associated with audits which prohibits their

disclosure in administrative, civil, or criminal actions for violations

of environmental law. The EPA has reviewed the Audit Privilege Act, in

light of Clean Air Act requirements, title V delegation requirements

set forth in 40 CFR Part 70, and guidelines for full title V approval

issued jointly by the Office of Enforcement and Compliance Assurance

and the Office of Air and Radiation dated April 5, 1996, entitled

``Effect of Audit/Immunity Privilege Laws on States' Ability to Enforce

Title V Requirements'', referred to below as the ``Guidelines''. A copy

of the document has been placed in the docket and is available for

public review. The EPA is concerned that the Audit Privilege Act may

extend penalty immunity to facilities which commit repeat violations

and violations which may cause harm to human health and the

environment, and makes no provision for recoupment of penalties for

economic benefit. Section 113(e) of the Clean Air Act specifically

enumerates these three factors (among others) for consideration in

assessing civil penalties. To the extent that the Audit Privilege Act

provides immunity from civil penalties that does not permit

consideration of these factors, appropriate civil penalties cannot be

assessed by a state. It is clear, pursuant to the Guidelines, that EPA

should not approve state title V programs in states where civil penalty

immunity is granted to violators without consideration of compliance

history, harm or risk of harm, and economic benefit.

The EPA is also concerned that the Audit Privilege Act may prevent

the State from obtaining appropriate criminal penalties. Evidence

necessary to prove that a crime has been committed may be protected by

privilege which may inhibit or prevent the State from assessing

appropriate criminal penalties. The State must demonstrate that it has

the ability to obtain appropriate criminal penalties where an audit

report reveals evidence of prior criminal conduct on the part of

managers or employees. Another problematic aspect of the Audit

Privilege Act is the disparity between its provisions limiting

disclosure of audit report information by employees and others, and the

Clean Air Act Sections 113 and 322 which specifically protect

whistleblowers from retaliation and provide awards for persons who

furnish information that leads to a criminal conviction or civil

penalty. The Texas Audit Privilege Act does not, by its terms, create

or impose special sanctions on informants, but it asserts that a

``Party to a confidentiality agreement . . . who violates that

agreement is liable for damages caused by the disclosure. . . '' In

addition, sanctions are created with regard to government officials who

disclose privileged information. Pursuant to the Guidelines, EPA is

concerned that both of these provisions may have a negative impact on

disclosures well beyond the intended reach of the privilege.

Confidential informants are an important source of leads for state and

federal enforcement programs.

The above analysis of the Audit Privilege Act is intended to be

illustrative and does not preclude EPA from raising additional issues

of concern. The analysis is solely limited to title V of the Act and

does not relate to any other environmental program. As noted

previously, all interested parties will have opportunity to comment on

the acceptability of this law for full title V approval.

The Act authorizes States to implement title V Operating Permit

programs in section 502(d). The statute also sets forth the minimum

elements of a State permit program, including the requirement that the

permitting authority have adequate authority to assure that sources

comply with all applicable Act requirements, as well as authority to

enforce permits, including recovering minimum civil penalties and

appropriate criminal penalties, Sec. 502(b)(5) (A) and (E). Pursuant to

title V, EPA promulgated regulations specifying the minimum required

elements of State Operating Permit programs, found at 40 CFR Part 70.

These regulations explicitly require States to have certain enforcement

authorities, including authority to seek injunctive relief to enjoin a

violation, to bring suit to restrain persons where a facility is posing

an imminent and substantial endangerment to public health or welfare,

and suit to recover appropriate criminal and civil penalties. Section

113(e) of the Act sets forth penalty factors for EPA or a court to

consider in assessing penalties for civil or criminal violations of the

Act, factors which necessarily apply to penalties for violations of

title V permits. The EPA is concerned about the potential impact of

some State audit privilege and immunity laws on the ability of the

States to enforce Federal requirements, including those under title V

of the Act. Upon review and consideration of the statutory and

regulatory provisions discussed above, EPA issued guidance on April 5,

1996, entitled ``Effect of Audit Immunity/Privilege Laws on States'

Ability to Enforce Title V Requirements.'' This guidance outlines

certain elements of the State audit immunity and privilege laws which,

in EPA's view, may so hamper the State's ability to enforce as to

render the Agency unable to delegate the title V Operating Permit

program. The guidance is consistent with EPA's audit policy,

``Incentives for Self-Policing: Discovery, Disclosure, Correction and

Prevention of Violations'' (60 FR 246, December 22, 1995).

Section 502(b)(6) of the Act requires an approvable State title V

program to include an opportunity for judicial review in State court of

the final permit action by the applicant, any person who participated

in the public comment process, and any other person who could obtain

judicial review under applicable law. The EPA interprets the statute to

require, at a minimum, that States provide judicial review of

permitting decisions to any person who would have standing under

Article III of the United States Constitution. See 59 FR 31183 (June

17, 1994). In the 1993 program submittal, Texas included an Attorney

General (AG) Opinion which set forth State laws and court decisions and

certified that Texas State laws on standing were no narrower than the

Federal ones under Article III. Since the time of the submittal in

November 1993, the Texas State Legislature met in January 1995 and

adopted revisions to the existing standing law (Senate Bill 1546, an

Act relating to persons affected by matters in hearings before the

Texas Natural Resource Conservation

[[Page 32698]]

Commission). The bill was enacted on June 16, 1995, and became

effective September 1, 1995.

On the bill's face, it does not impact standing in a title V

permitting decision. This is because the bill applies only to those

State administrative actions requiring an evidentiary hearing. The bill

on its face does not apply to State administrative actions subject to a

legislative hearing (presentation of comments with no right to cross-

examination). Title V permit decisions are only required to be subject

to a legislative hearing. Nevertheless, since there had been a change

which could possibly impact the judicial review of title V permit

decisions, EPA required the State to provide an Attorney General

Opinion setting forth all laws and court decisions issued since the

1993 Opinion and recertifying that State laws on standing were still no

narrower than the Federal ones.

This Opinion was submitted on May 6, 1996. In addition, EPA

required the General Counsel and the Executive Director to submit a

letter committing to implementing a permitting process that provides

for a standing test no narrower than the Federal one. The letter also

describes in greater detail the public participation process which is

outlined in sections 122.150 to 122.155 and sections 122.310 to 122.316

of Regulation XII. This letter was submitted on May 6, 1996.

The EPA received on March 18, 1996, a Petition to Reopen the

Comment Period for Texas Application for Delegation of title V Programs

under the CAA. The Petition was submitted on behalf of the Sierra Club,

the Environmental Defense Fund, Galveston-Houston Area Smog Prevention,

and Clean Water Action. The Request to Reopen was specifically on the

standing issue. The Petitioners requested EPA to require that a new

certification be submitted by the Texas Attorney General. The Opinion

should address the legislation passed in 1995 and all court opinions

issued since the 1993 Attorney General's Opinion. The EPA was urged to

obtain an explanation from the Attorney General's (AG) office of its

actual positions and to obtain a written commitment from the AG to take

a position in future TNRCC appeals that the Federal test be used. They

also asked EPA to require TNRCC to promulgate rules that define the

term ``person who may be affected'' (the term used in the Texas title V

regulations for a person who may request a hearing and therefore has

the right to appeal a title V permit decision). They also asked that

the rules explain how and when TNRCC will give public notice, how and

when TNRCC will respond to comments, and how and when TNRCC will

provide new notice and an opportunity for comments when the application

or proposed permit is changed significantly because of public input.

The EPA believes that the above concerns of the Petitioners have

already been addressed by EPA's requiring a revised Attorney General's

Opinion and the TNRCC letter. Although EPA did not request the State to

address the above issues in exactly the same manner as requested by

Petitioners, EPA does believe that all the concerns have been addressed

satisfactorily. Therefore, it is EPA's position that the Petition to

Reopen the Standing Issue has been rendered moot.

A Motion to Deny the Petition was filed April 9, 1996, on behalf of

the Texas title V Planning Committee. Movants pleaded that the comment

period of 120 days should be sufficient and that it has been over five

months since that lengthy comment period ended. They also disagree that

any of the information is new and that reopening of the comment period

would be prejudicial to the commenters that prepared and submitted

their comments under the October 5, 1995, deadline. Nevertheless, if

EPA decides to consider the Petitioners' allegations either officially

or unofficially, they ask that they be notified and provided an

opportunity to respond to the merits of the Petition. The EPA again

believes that the Motion to Deny the Petition has been rendered moot by

EPA's earlier actions of requiring a revised AG Opinion and a TNRCC

letter.

Both Petitioner and Movant will have the opportunity to provide

their comments on the merits of EPA's positions on the laws enacted in

the 1995 legislative session during the 1997 legislative session, the

TNRCC's corrective rulemaking public comment period, and EPA's comment

period on the corrective Texas title V program submittal.

Petitioners raised another issue of concern but did not

specifically request a reopening of the comment period on it. The issue

concerned TNRCC's laws and procedures governing public availability of

emissions data. This area will be reviewed by EPA during the State's

rulemaking process, and EPA will determine if rule revisions and/or a

Program Implementation Agreement specific to confidentiality are

necessary for full approval.

D. Final Action

The EPA is promulgating source category-limited interim approval of

the Operating Permits program submitted by the State on September 17,

1993, and supplemental submittals on October 28, 1993, and November 12,

1993. The submittals have been reviewed for adequacy to meet the

requirements of 40 CFR part 70. The results of this review are included

in the updated technical support document, which will be available in

the docket in the locations noted above. The submittal has adequately

addressed all 11 elements required for interim approval as discussed in

part 70. However, there are inconsistencies between the submittal and

the part 70 regulations which have been generally discussed in this

notice and are described in greater detail in the June 7, 1995, notice.

These inconsistencies involve the Texas permit regulation and program

implementation particularly with regard to applicability, permit

application requirements, and permit issuance and revisions. It is

essential that all the inconsistencies specifically identified in the

June 7, 1995, notice be remedied by the State prior to EPA granting

full approval of the State's Operating Permits program.

The part 70 revisions are projected to be promulgated in the fall

of 1996. These revisions may in some respects be used as the criteria

for granting full approval and may require the State to make regulatory

and statutory changes.

The scope of the Texas part 70 program approved in this notice

applies to all part 70 sources (as defined in the approved program)

within the State of Texas, except any sources of air pollution over

which an indian tribe has jurisdiction. See, e.g., 59 FR 55813, 55815-

55818 (November 9, 1994). The term ``indian tribe'' is defined under

the Act as ``any indian tribe, band, nation, or other organized group

or community, including any Alaska Native village, which is Federally

recognized as eligible for the special programs and services provided

by the United States to indians because of their status as indians.''

See section 302(r) of the CAA; see also 59 FR 43956, 43962 (August 25,

1994); 58 FR 54364 (October 21, 1993).

Requirements for approval, specified in 40 CFR 70.4(b), encompass

section 112(l)(5) requirements for approval of a program for delegation

of section 112 standards as promulgated by EPA as they apply to part 70

sources. Section 112(l)(5) requires that the State's program contain

adequate authorities, adequate resources for implementation, and an

expeditious compliance schedule, which are also requirements under part

70. Therefore, EPA is also promulgating approval under section

112(l)(5) and 40 CFR 63.91 of the State's program for receiving

delegation of

[[Page 32699]]

section 112 standards that are unchanged from Federal standards as

promulgated. This program for delegations only applies to sources

covered by the part 70 program.

This interim approval, which may not be renewed, extends until July

27, 1998. During this interim approval period, the State of Texas is

protected from sanctions, and EPA is not obligated to promulgate,

administer, and enforce a Federal Operating Permits program in the

State of Texas. Permits issued under a program with source category-

limited interim approval have full standing with respect to part 70,

and the one year time period for submittal of permit applications by

subject sources begins upon the effective date of this interim

approval. The State's transition schedule requires the State to take

final action on applications for 400 sites each of the first two years,

1,000 sites the third year, and 600 sites each of the last two years.

If Texas fails to submit a complete corrective program for full

approval by January 26, 1998, EPA will start an 18-month clock for

mandatory sanctions. If Texas then fails to submit a corrective program

that EPA finds complete before the expiration of that 18-month period,

EPA will apply sanctions as required by section 502(d)(2) of the Act,

which will remain in effect until EPA determines that the State of

Texas has corrected the deficiency by submitting a complete corrective

program.

If EPA disapproves Texas' complete corrective program, EPA will

apply sanctions as required by section 502(d)(2) on the date 18 months

after the effective date of the disapproval, unless prior to that date

Texas has submitted a revised program and EPA has determined that it

corrected the deficiencies that prompted the disapproval.

In addition, discretionary sanctions may be applied where warranted

any time after the expiration of an interim approval period if the

State of Texas has not timely submitted a complete corrective program

or EPA has disapproved its submitted corrective program. Moreover, if

EPA has not granted full approval to the Texas program by the

expiration of this interim approval and that expiration occurs after

November 15, 1995, EPA must promulgate, administer, and enforce a

Federal permits program for the State of Texas upon interim approval

expiration.

III. Administrative Requirements

A. Docket

Copies of the State's submittal, other information relied upon for

the final source category-limited interim approval, including the 27

public comment letters received and reviewed by EPA on the proposal,

and information referenced in this notice, are contained in docket

number OPP-7-9-1 maintained at the EPA Regional Office. The docket is

an organized and complete file of all the information submitted to, or

otherwise considered by, EPA in the development of this final source

category-limited interim approval. The docket is available for public

inspection at the location listed under the ADDRESSES section of this

document.

B. Executive Order 12866

The Office of Management and Budget has exempted this action from

Executive Order 12866 review.

C. Regulatory Flexibility Act

The EPA's actions under section 502 of the Act do not create any

new requirements, but simply address Operating Permits programs

submitted to satisfy the requirements of 40 CFR part 70. Because this

action does not impose any new requirements, it does not have a

significant impact on a substantial number of small entities.

D. Unfunded Mandates

Under Section 202 of the Unfunded Mandates Reform Act of 1995,

signed into law on March 22, 1995, EPA must prepare a budgetary impact

statement to accompany any proposed or final rule that includes a

Federal mandate that may result in estimated costs to State, local, or

tribal governments in the aggregate; or to the private sector, of $100

million or more. Under Section 205, EPA must select the most cost-

effective and least burdensome alternative that achieves the objectives

of the rule and is consistent with statutory requirements. Section 203

requires EPA to establish a plan for informing and advising any small

governments that may be significantly or uniquely impacted by the rule.

The EPA has determined that the approval action promulgated today

does not include a Federal mandate that may result in estimated costs

of $100 million or more to either State, local, or tribal governments

in the aggregate, or to the private sector. This Federal action

approves pre-existing requirements under State or local law, and

imposes no new Federal requirements. Accordingly, no additional costs

to State, local, or tribal governments, or to the private sector,

result from this action.

List of Subjects in 40 CFR Part 70

Environmental protection, Administrative practice and procedure,

Air pollution control, Intergovernmental relations, Operating permits,

Reporting and recordkeeping requirements.

Authority: 42 U.S.C. 7401-7671q.

Dated: June 13, 1996.

Jane N. Saginaw,

Regional Administrator (6RA).

Part 70, title 40 of the Code of Federal Regulations, is amended as

follows:

PART 70--[AMENDED]

1. The authority citation for part 70 continues to read as follows:

Authority: 42 U.S.C. 7401, et seq.

2. Appendix A to part 70 is amended by adding the entry for the

State of Texas in alphabetical order to read as follows:

Appendix A to Part 70--Approval Status of State and Local Operating

Permits Programs

* * * * *

Texas

(a) The TNRCC submitted its Operating Permits program on

September 17, 1993, and supplemental submittals on October 28, 1993,

and November 12, 1993, for approval. Source category-limited interim

approval is effective on July 25, 1996. Interim approval will expire

July 27, 1998. The scope of the approval of the Texas part 70

program excludes all sources of air pollution over which an Indian

Tribe has jurisdiction.

(b) (Reserved)

* * * * *

[FR Doc. 96-16126 Filed 6-24-96; 8:45 am]

BILLING CODE 6560-50-P