Summary of Decisions Granting in Whole or in Part Petitions for Modification

Federal RegisterMay 23, 1996

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF LABOR

Mine Safety and Health Administration

Summary of Decisions Granting in Whole or in Part Petitions for

Modification

AGENCY: Mine Safety and Health Administration (MSHA), Labor.

ACTION: Notice of affirmative decisions issued by the Administrators

for Coal Mine Safety and Health and Metal and Nonmetal Mine Safety and

Health on petitions for modification of the application of mandatory

safety standards.

-----------------------------------------------------------------------

SUMMARY: Under section 101(c) of the Federal Mine Safety and Health Act

of 1977, the Secretary of Labor may modify the application of a

mandatory safety standard to a mine if the Secretary determines either

that an alternate method exists at a specific mine that will guarantee

no less protection for the miners affected than that provided by the

standard, or that the application of the standard at a specific mine

will result in a diminution of safety to the affected miners.

Summaries of petitions received by the Secretary appear

periodically in the Federal Register. Final decisions on these

petitions are based upon the petitioner's statements, comments and

information submitted by interested persons, and a field investigation

of the conditions at the mine. MSHA has granted or partially granted

the requests for modification submitted by the petitioners listed

below. In some instances, the decisions are conditioned upon compliance

with stipulations stated in the decision.

FOR FURTHER INFORMATION CONTACT: Petitions and copies of the final

decisions are available for examination by the public in the Office of

Standards, Regulations, and Variances, MSHA, Room 627, 4015 Wilson

Boulevard, Arlington, Virginia 22203. Contact Barbara Barron at 703-

235-1910.

Dated: May 14, 1996.

Patricia W. Silvey,

Director, Office of Standards, Regulations and Variances.

Affirmative Decisions on Petitions for Modification

Docket No.: M-93-024-C.

FR Notice: 58 FR 13805.

Petitioner: Peabody Coal Company.

Reg Affected: 30 CFR 77.900.

Summary of Findings: Petitioner's proposal to use a magnetic motor

starter instead of tripping a circuit breaker for ground phase

protection and undervoltage protection, use a circuit breaker for short

circuit protection, and use the magnetic motor starter and circuit

breaker for overload protection for serving portable or mobile phase

alternating current equipment considered acceptable alternative method.

Granted Hawthorn Mine with conditions.

Docket No.: M-93-087-C.

FR Notice: 58 FR 39236.

Petitioner: Neumeister Coal Company.

Reg Affected: 30 CFR 75.360(b)(5).

Summary of Findings: Petitioner's proposal to examine each seal for

physical damage from the slope gunboat during the preshift examination

after an air quantity reading is taken in by the intake portal, to test

for the quantity and quality of air at the intake air split locations

off the slope in the gangway portion of the working section and

physically examine the entire length of the slope once a month

considered acceptable alternative method. Granted for No. 2 Slope Mine

with conditions for examinations of seals in the intake air haulage

slope of this mine.

Docket No.: M-93-089-C.

FR Notice: 58 FR 39236.

Petitioner: Neumeister Coal Company.

Reg Affected: 30 CFR 75.1002-1(a).

Summary of Findings: Petitioner's proposal to use nonpermissible

electric equipment within 150 feet of the pillar line and to suspend

equipment operation anytime the methane concentration at the equipment

reaches 0.25 percent, either during operation or a preshift examination

considered acceptable alternative method. Granted for No. 2 Slope Mine

with conditions for the use of nonpermissible electric drags and

associated nonpermissible electric components located within 150 feet

from pillar workings.

Docket No.: M-93-090-C.

FR Notice: 58 FR 39236.

Petitioner: Neumeister Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for No. 2 Slope Mine with

conditions for firefighting equipment in the working section.

Docket No.: M-93-091-C.

FR Notice: 58 FR 39236.

Petitioner: Neumeister Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for No. 2 Slope Mine with conditions for the use of

cross-sections, in lieu of contour lines, limiting the mapping of mines

above or below this mine to those within 100 feet of the vein being

mined.

Docket No.: M-93-092-C.

FR Notice: 58 FR 39236.

Petitioner: Neumeister Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative method. Granted for No. 2 Slope Mine with conditions for

annual revisions and supplements of the mine map.

Docket No.: M-93-099-C.

FR Notice: 58 FR 39237.

Petitioner: E & E Fuels Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for Orchard Slope Mine with

conditions for firefighting equipment in the working section.

Docket No.: M-93-100-C.

FR Notice: 58 FR 39237.

Petitioner: E & E Fuels Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet

[[Page 25914]]

intervals of advance from the intake slope and to limit the mapping of

mine workings above and below to those present within 100 feet of the

vein being mined except when veins are interconnected to other veins

beyond the 100 feet limit through rock tunnels considered acceptable

alternative method. Granted for Orchard Slope Mine with conditions for

the use of cross-sections, in lieu of contour lines, limiting the

mapping of mines above or below this mine to those within 100 feet of

the vein being mined.

Docket No.: M-93-101-C.

FR Notice: 58 FR 39237.

Petitioner: E & E Fuels Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative method. Granted for Orchard Slope Mine with conditions for

annual revisions and supplements of the mine maps.

Docket No.: M-93-109-C.

FR Notice: 58 FR 39238.

Petitioner: Wenrich Coal Company.

Reg Affected: 30 CFR 75.360(b)(5).

Summary of Findings: Petitioner's proposal to examine each seal for

physical damage from the slope gunboat during the preshift examination

after an air quantity reading is taken in by the intake portal, to test

for the quantity and quality of air at the intake air split locations

off the slop in the gangway portion of the working section, and to

physically examine the entire length of the slope once a month

considered acceptable alternative method. Granted for Buck Mountain

Slope Mine with conditions for examinations of seals in the intake air

haulage slope of this mine.

Docket No.: M-93-111-C.

FR Notice: 58 FR 39238.

Petitioner: Wenrich Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for Buck Mountain Slope Mine

with conditions for firefighting equipment in the working section.

Docket No.: M-93-119-C.

FR Notice: 58 FR 39239.

Petitioner: R. and D. Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Buck Mountain Slope Mine with conditions for the

use of cross-sections, in lieu of contour lines, limiting the mapping

of miner above or below this mine to those within 100 feet of the vein

being mined.

Docket No.: M-93-120-C.

FR Notice: 58 FR 39239.

Petitioner: R. and D. Coal Company.

Reg Affected: 30 CFR 1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative method. Granted for Buck Mountain Slope Mine with

conditions for annual revisions and supplements of the mine map.

Docket No.: M-93-124-C.

FR Notice: 58 FR 39240.

Petitioner: Kintzel Coal Company.

Reg Affected: 30 CFR 75.360(b)(5).

Summary of Findings: Petitioner's proposal to examine each seal for

physical damage from the slope gunboat during the preshift examination

after an air quantity reading is taken inby the intake portal, to test

for the quantity and quality of air at the intake air split locations

off the slope in the gangway portion of the working section, and to

physically examine the entire length of the slope once a month

considered acceptable alternative method. Granted for Lykens No. 6 Mine

with conditions for examinations of seals in the intake air haulage

slope of this mine.

Docket No.: M-93-127-C.

FR Notice: 58 FR 39240.

Petitioner: Kintzel Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for Lykens No. 6 Mine with

conditions for firefighting equipment in the working section.

Docket No.: M-93-128-C.

FR Notice: 58 FR 39240

Petitioner: Kintzel Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Lykens No. 6 Mine with conditions for the use of

cross-sections, in lieu of contour lines, limiting the mapping of mines

above or below this mine to those within 100 feet of the vein being

mined.

Docket No.: M-93-129-C.

FR Notice: 58 FR 39240.

Petitioner: Kintzel Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative method. Granted for Lykens No. 6 Mine with conditions for

annual revisions and supplements of the mine map.

Docket No.: M-93-134-C.

FR Notice: 58 FR 39241.

Petitioner: M & S Coal Company.

Reg Affected: 30 CFR 75.1002-1(a).

Summary of Findings: Petitioner's proposal to use nonpermissible

electric equipment within 150 feet of the pillar line and to suspend

equipment operation anytime the methane concentration at the equipment

reaches 0.25 percent, either during operation or a preshift examination

considered acceptable alternative method. Granted for Buck Mountain

Slope Mine with conditions for the use of nonpermissible electric drags

and associated nonpermissible electric components located within 150

feet from pillar workings.

Docket No.: M-93-135-C.

FR Notice: 58 FR 39241.

Petitioner: M & S Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers to replace existing requirements where rock dust,

water cars, and other water storage are not practical considered

acceptable alternative method. Granted for Buck Mountain Slope Mine

with conditions for firefighting equipment in the working section.

Docket No.: M-93-136-C.

FR Notice: 58 FR 39241.

Petitioner: M & S Coal Company.

[[Page 25915]]

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Buck Mountain Slope Mine with conditions for the

use of cross-sections, in lieu of contour lines, limiting the mapping

of mines above or below this mine to those within 100 feet of the vein

being mined.

Docket No.: M-93-138-C.

FR Notice: 58 FR 39241.

Petitioner: Jeff Coal Company.

Reg Affected: 30 CFR 75.1002-1(a).

Summary of Findings: Petitioner's proposal to use nonpermissible

electric equipment within 150 feet of the pillar line and to suspend

equipment operation anytime the methane concentration at the equipment

reaches 0.25 percent, either during operation or a preshift examination

considered acceptable alternative method. Granted for Tracy Vein Slope

Mine with conditions for use of nonpermissible battery-powered

locomotives located within 150 feet from pillar workings.

Docket No.: M-93-139-C.

FR Notice: 58 FR 39241.

Petitioner: Jeff Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers where rock dust, water cars, and other water storage

are not practical considered acceptable alternative method. Granted for

Tracy Vein Slope Mine with conditions for firefighting equipment in the

working section.

Docket No.: M-93-140-C.

FR Notice: 58 FR 39242.

Petitioner: Jeff Coal Company.

Reg Affected: 30 CFR 1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Tracy Vein Slope Mine with conditions for the use

of cross-sections, in lieu of contour lines, limiting the mapping of

mines above or below this mine to those within 100 feet of the vein

being mined.

Docket No.: M-93-141-C.

FR Notice: 58 FR 39242.

Petitioner: Jeff Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative method. Granted for Tracy Vein Slope Mine with conditions

for annual revisions and supplements of the mine map.

Docket No.: M-93-155-C.

FR Notice: 58 FR 39570.

Petitioner: Little Rock Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for No. 1 Slope Mine with conditions for the use of

cross-sections, in lieu of contour lines, limiting the mapping of mines

above or below this mine to those within 100 feet of the vein being

mined.

Docket No.: M-93-156-C.

FR Notice: 58 FR 39570.

Petitioner: Little Rock Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative method. Granted for No. 1 Slope Mine with conditions for

annual revisions and supplement of the mine map.

Docket No.: M-93-163-C.

FR Notice: 58 FR 41295.

Petitioner: Nowacki Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers where rock dust, water cars, and other water storage

are not practical considered acceptable alternative method. Granted for

Nowacki Coal Company Slope Mine with conditions for firefighting

equipment in the working section.

Docket No.: M-93-164-C.

FR Notice: 58 FR 41295.

Petitioner: Nowacki Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Nowacki Coal Company Slope Mine with conditions for

the use of cross-sections, in lieu of contour lines, limiting the

mapping of mines above or below this mine to those within 100 feet of

the vein being mined.

Docket No.: M-93-165-C.

FR Notice: 58 FR 41295.

Petitioner: Nowacki Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative method. Granted for Nowacki Coal Company Slope Mine with

conditions for annual revisions and supplements of the mine map.

Docket No.: M-93-169-C.

FR Notice: 58 FR 41295.

Petitioner: Tito Coal.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers where rock dust, water cars, and other water storage

are not practical considered acceptable alternative method. Granted for

White Vein Slope Mine with conditions for firefighting equipment in the

working section.

Docket No.: M-93-170-C.

FR Notice: 58 FR 41296.

Petitioner: Tito Coal.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

[[Page 25916]]

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for White Vein Slope Mine with conditions for the use

of cross-sections, in lieu of contour lines, limiting the mapping of

mines above or below this mine to those within 100 feet of the vein

being mined.

Docket No.: M-93-171-C.

FR Notice: 58 FR 41296.

Petitioner: Tito Coal.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative method. Granted for White Vein Slope Mine with conditions

for annual revisions and supplements of the mine map.

Docket No.: M-93-176-C.

FR Notice: 58 FR 41296.

Petitioner: Little Buck Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers where rock dust, water cars, and other water storage

are not practical considered acceptable alternative method. Granted for

No. 2 Slope Mine with conditions for firefighting equipment in the

working section.

Docket No.: M-93-177-C.

FR Notice: 58 FR 41296.

Petitioner: Little Buck Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for No. 2 Slope Mine with conditions for the use of

cross-sections, in lieu of contour lines, limiting the mapping of mines

above or below this mine to those within 100 feet of the vein being

mined.

Docket No.: M-93-178-C.

FR Notice: 58 FR 41296.

Petitioner: Little Buck Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative method. Granted for No. 2 Slope Mine with conditions for

annual revisions and supplements of the mine map.

Docket No.: M-93-184-C.

FR Notice: 58 FR 41297.

Petitioner: Primrose Coal Company.

Reg Affected: 30 CFR 75.1002-1.

Summary of Findings: Petitioner's proposal to use nonpermissible

electric equipment within 150 feet of the pillar line and to suspend

equipment operation anytime the methane concentration at the equipment

reaches 0.25 percent, either during operation or a preshift examination

considered acceptable alternative method. Granted for Primrose Slope

Mine with conditions for use of nonpermissible battery-powered

locomotives located within 150 feet from pillar workings.

Docket No.: M-93-185-C.

FR Notice: 58 FR 41297.

Petitioner: Primrose Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers where rock dust, water cars, and other water storage

are not practical considered acceptable alternative method. Granted for

Primrose Slope Mine with conditions for firefighting equipment in the

working section.

Docket No.: M-93-186-C.

FR Notice: 58 FR 41297.

Petitioner: Primrose Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Primrose Slope Mine with conditions for the use of

cross-sections, in lieu of contour lines, limiting the mapping of mines

above or below this mine to those within 100 feet of the vein being

mined.

Docket No.: M-93-194-C.

FR Notice: 58 FR 41298.

Petitioner: Brookside Coal Company.

Reg Affected: 30 CFR 1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers where rock dust, water cars, and other water storage

are not practical considered acceptable alternative method. Granted for

Four Foot Slope Mine with conditions for firefighting equipment in the

working section.

Docket No.: M-93-203-C.

FR Notice: 58 FR 44700.

Petitioner: Sunset Coal Company.

Reg Affected: 30 CFR 75.360(b)(5).

Summary of Findings: Petitioner's proposal to examine each seal for

physical damage from the slope gunboat during the preshift examination

after an air quantity reading is taken inby the intake portal, to test

for the quantity and quality of air at the intake air split locations

off the slope in the gangway portion of the working section, and to

physically examine the entire length of the slope once a month

considered acceptable alternative method. Granted for Orchard Slope

Mine with conditions for examinations of seals in the intake air

haulage slope of this mine.

Docket No.: M-93-205-C.

FR Notice: 58 FR 44700.

Petitioner: Sunset Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers where rock dust, water cars, and other water storage

are not practical considered acceptable alternative method. Granted for

Orchard Slope Mine with conditions for firefighting equipment in the

working section.

Docket No.: M-93-206-C.

FR Notice: 58 FR 44701.

Petitioner: Sunset Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Orchard Slope Mine with conditions for the use of

cross-sections, in lieu of contour lines, limiting the mapping of mines

above or below this mine to those within 100 feet of the vein being

mined.

Docket No.: M-93-218-C.

FR Notice: 58 FR 46219.

Petitioner: Rhen Coal Company.

Reg Affected: 30 CFR 75.360(b)(5).

Summary of Findings: Petitioner's proposal to examine each seal for

physical damage from the slope gunboat

[[Page 25917]]

during the preshift examination after an air quantity reading is taken

inby the intake portal, to test for the quantity and quality of air at

the intake air split locations off the slope in the gangway portion of

the working section, and to physically examine the entire length of the

slope once a month considered acceptable alternative method. Granted

for Skidmore Slope Mine with conditions for examinations of seals in

the intake air haulage slope of this mine.

Docket No.: M-93-220-C.

FR Notice: 58 FR 46219.

Petitioner: Rhen Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers where rock dust, water cars, and other water storage

are not practical considered acceptable alternative method. Granted for

Skidmore Slope Mine with conditions for firefighting equipment in the

working section.

Docket No.: M-93-221-C.

FR Notice: 58 FR 46219.

Petitioner: Rhen Coal Company.

Reg Affected: 30 CFR 1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Skidmore Slope Mine with conditions for the use of

cross-sections, in lieu of contour lines, limiting the mapping of mines

above or below this mine to those within 100 feet of the vein being

mined.

Docket No.: M-93-232-C.

FR Notice: 58 FR 46221.

Petitioner: S & M Coal Company.

Reg Affected: 30 CFR 75.360(b)(5).

Summary of Findings: Petitioner's proposal to examine each seal for

physical damage from the slope gunboat during the preshift examination

after an air quantity reading is taken inby the intake portal, to test

for the quantity and quality of air at the intake air split locations

off the slope in the gangway portion of the working section, and to

physically examine the entire length of the slope once a month

considered acceptable alternative method. Granted for Buck Mountain

Slope Mine with conditions for examinations of seals in the intake air

haulage slope of this mine.

Docket No.: M-93-234-C.

FR Notice: 58 FR 46221.

Petitioner: S & M Coal Company.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers where rock dust, water cars, and other water storage

are not practical considered acceptable alternative method. Granted for

Buck Mountain Slope Mine with conditions for firefighting equipment in

the working section.

Docket No.: M-93-235-C.

FR Notice: 58 FR 46221.

Petitioner: S & M Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Buck Mountain Slope Mine with conditions for the

use of cross-sections, in lieu of contour lines, limiting the mapping

of mines above or below this mine to those within 100 feet of the vein

being mined.

Docket No.: M-93-236-C.

FR Notice: 58 FR 46221.

Petitioner: S & M Coal Company.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative. Granted for Buck Mountain Slope Mine with conditions for

annual revisions and supplements of the mine map.

Docket No.: M-93-263-C.

FR Notice: 58 FR 57626.

Petitioner: B & B Anthracite Coal Company.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Rock Ridge Slope Mine with conditions for the use

of cross-sections, in lieu of contour lines, limiting the mapping of

mines above or below this mine to those within 100 feet of the vein

being mined.

Docket No.: M-93-264-C.

FR Notice: 58 FR 57626.

Petitioner: B & B Anthracite Coal Company.

Reg Affected: 30 CFR 1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for Rock Ridge No. 1 Slope Mine with conditions for the

use of cross-sections, in lieu of contour lines, limiting the mapping

of mines above or below this mine to those within 100 feet of the vein

being mined.

Docket No.: M-93-285-C.

FR Notice: 58 FR 57626.

Petitioner: International Anthracite Corp.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative. Granted for B & M Tunnel Mine with conditions for annual

revisions and supplements of the mine map.

Docket No.: M-93-289-C.

FR Notice: 58 FR 58567.

Petitioner: R S & W Coal Company, Inc.

Reg Affected: 30 CFR 75.360(b)(5).

Summary of Findings: Petitioner's proposal to examine each seal for

physical damage from the slope gunboat during the preshift examination

after an air quantity reading is taken inby the intake portal, to test

for the quantity and quality of air at the intake air split locations

off the slope in the gangway portion of the working section, and to

physically examine the entire length of the slope once a month

considered acceptable alternative method. Granted for R S & W Drift

Mine with conditions for examinations of seals in the intake air

haulage slope of this mine.

Docket No.: M-93-291-C.

FR Notice: 58 FR 58567.

[[Page 25918]]

Petitioner: R S & W Coal Company, Inc.

Reg Affected: 30 CFR 75.1002-1(a).

Summary of Findings: Petitioner's proposal to use nonpermissible

electric equipment within 150 feet of the pillar line and to suspend

equipment operation anytime the methane concentration at the equipment

reaches 0.25 percent, either during operation or a preshift examination

considered acceptable alternative method. Granted for R S & W Drift

Mine with conditions for use of nonpermissible battery-powered

locomotives located within 150 feet from pillar workings.

Docket No.: M-93-292-C.

FR Notice: 58 FR 58568.

Petitioner: R S & W Coal Company, Inc.

Reg Affected: 30 CFR 75.1100-2(a)(2).

Summary of Findings: Petitioner's proposal to use only portable

fire extinguishers where rock dust, water cars, and other water storage

are not practical considered acceptable alternative method. Granted for

R S & W Drift Mine with conditions for fire-fighting equipment in the

working section.

Docket No.: M-93-293-C.

FR Notice: 58 FR 58568.

Petitioner: R S & W Coal Company, Inc.

Reg Affected: 30 CFR 75.1200 (d), (h), and (i).

Summary of Findings: Petitioner's proposal to use cross-sections

instead of contour lines through the intake slope, at locations of rock

tunnel connections between veins, and at 1,000 feet intervals of

advance from the intake slope and to limit the mapping of mine workings

above and below to those present within 100 feet of the vein being

mined except when veins are interconnected to other veins beyond the

100 feet limit through rock tunnels considered acceptable alternative

method. Granted for R S & W Drift Mine with conditions for the use of

cross-sections, in lieu of contour lines, limiting the mapping of mines

above or below this mine to those within 100 feet of the vein being

mined.

Docket No.: M-93-294-C.

FR Notice: 58 FR 58568.

Petitioner: R S & W Coal Company, Inc.

Reg Affected: 30 CFR 75.1202-1(a).

Summary of Findings: Petitioner's proposal to revise and supplement

mine maps on an annual basis instead of the required 6 month interval

and to update maps daily by hand notations considered acceptable

alternative. Granted for R S & W Drift Mine with conditions for annual

revisions and supplements of the mine map.

[FR Doc. 96-12973 Filed 5-22-96; 8:45 am]

BILLING CODE 4510-43-P