DEPARTMENT OF ENERGY
Bonneville Power Administration
Bonneville Power Administration/Lower Valley Power and Light;
Transmission System Reinforcement Project
AGENCY: Bonneville Power Administration (BPA), Department of Energy
(DOE).
ACTION: Notice of Intent to Prepare an Environmental Impact Statement
(EIS).
-----------------------------------------------------------------------
SUMMARY: Lower Valley Power and Light (LVPL) buys electricity from BPA
and sells it to the homes and businesses of the Jackson and Afton,
Wyoming, areas. Since the mid-1980s, LVPL's electrical load has been
growing by an average of 4-5 megawatts per year and continued growth is
expected. LVPL's customers use the greatest amount of electricity in
the winter when temperatures are low and heating needs are high. By
2001, during the winter season, an outage of one of the BPA or LVPL
transmission lines that serves these areas could cause voltage to dip
below acceptable levels in the Jackson area and to a lesser extent in
the Afton area. Low voltage levels can cause brown-outs or, under
certain conditions, a black-out. Without electricity, homes and
businesses are left without heat and lights. These conditions can be
dangerous to residents and businesses in winter. The transmission
system that serves the Afton and Jackson, Wyoming, areas needs to be
reinforced by 2001 to maintain voltage stability. BPA and LVPL propose
to maintain voltage stability by building an additional 115-kilovolt
line from BPA's Swan Valley Substation in Swan Valley, Idaho, to Teton
Substation in Jackson, Wyoming.
Potential Federal cooperating agencies include the U.S. Department
of Interior--Bureau of Land Management, and the U.S. Department of
Agriculture--Targhee and Bridger-Teton National Forests. In accordance
with National Environmental Policy Act requirements, BPA and the
cooperating agencies will prepare an EIS on this proposal to inform
decisionmakers about potential environmental effects of the proposal.
In addition, LVPL will take an active role in providing information to
BPA, the cooperating agencies, and identified publics.
DATES: Interested and affected publics such as landowners, special
interest groups, local and State governments, Tribes, utilities, and
community groups are invited to help BPA and the cooperating agencies
identify alternatives, environmental resources, and issues to be
addressed in the draft EIS. A packet of information to explain the
proposal, the environmental process, and how to participate will be
sent to interested or potentially affected publics at the beginning of
the scoping period. Four BPA-sponsored scoping meetings will be held in
May or June in Idaho Falls, Swan Valley, and Victor or Driggs, Idaho;
and Jackson, Wyoming. Meetings will be open-house style and project
material will be available for public review. BPA, the cooperating
agencies, and LVPL staff will answer questions and BPA will accept
verbal and written comments. The time and place of scoping meetings
will be announced in the packet of information being sent to interested
publics and in local newspapers. Written comments before, during, or
after scoping meetings should be sent to the Public Involvement Manager
at the address below. Close of the comment period will be announced in
the information packet and at the public meetings.
BPA, in conjunction with the cooperating agencies, plans to file
and distribute a draft EIS for public review in the spring of 1997.
BPA, the cooperating agencies, and LVPL will hold public meetings in
local communities to give the public an opportunity to review and
comment on the draft EIS.
ADDRESSES: BPA invites participation, comments, and suggestions on the
proposed scope of the draft EIS. Send comment letters, requests to be
placed on the project mail list, and requests for more information to
the Public Involvement Manager, Bonneville Power Administration--CKP,
P.O. Box 12999, Portland, Oregon, 97212, or call 503-230-3478, toll-
free 1-800-622-4519, or fax 503-230-3984. Comments
[[Page 19268]]
may also be sent to the BPA Internet address: [email protected].
Documents can be requested by calling toll-free 1-800-622-4520.
FOR FURTHER INFORMATION, CONTACT: Mike Johns, Project Manager,
Bonneville Power Administration--TE, P.O. Box 3621, Portland, Oregon,
97208-3621. E-mail requests or questions should be sent to
[email protected], or call toll-free 1-800-662-6963. You may also contact
Nancy Wittpenn, Environmental Project Lead, Bonneville Power
Administration--ECN, P.O. Box 3621, Portland, Oregon, 97208-3621. E-
mail requests or questions should be sent to [email protected], or
call toll-free 1-800-662-6963. In the local area, contact Rick Knori,
Lower Valley Power and Light, P.O. Box 572, Jackson, Wyoming, 83001, or
call him at 307-739-6038 or toll-free 1-800-882-5875.
SUPPLEMENTARY INFORMATION: LVPL serves its customers from two 115-
kilovolt transmission lines. One line, owned and operated by BPA, runs
from Swan Valley Substation near Swan Valley in Bonneville County,
Idaho, east to Teton Substation near Jackson in Teton County, Wyoming.
The other line, owned by LVPL, runs from Palisades Substation at
Palisades Dam, southeast along the reservoir to LVPL's Snake River
Substation in Alpine, Wyoming. At Snake River Substation, the line
splits; one line follows the Snake River most of the way into Jackson,
the other line runs south to serve the Afton area.
BPA can reliably provide 125 megawatts (MW) of electricity to LVPL
even if one of the lines described above goes out of service. In 1994,
LVPL's system winter peak was 120.0 MW. In 1995, the winter peak
unexpectedly hit 139.5 MW. In 1996, the peak climbed to 141.2 MW. A 5-
MW load from a commercial mine was not operating at the time. If one of
the transmission lines had gone out of service during the winter peak
in 1995 or 1996, voltages would have quickly dropped and the
transmission system could have collapsed, leaving homes and businesses
without electricity.
During winter conditions in this area, twice as much electricity is
needed at the time of shut down to re-energize the transmission system.
That is more than the existing system can handle, requiring BPA, LVPL,
the Bureau of Reclamation, and others to bring the system up in stages.
This requires a lot of time and could create a dangerous situation for
LVPL's customers without their own source of fuel for heat and lights.
As loads continue to grow, LVPL's ability to reliably serve its
customers will decrease. Reinforcing the BPA transmission system now
will provide LVPL with a reliable transmission system they need to
serve their customers.
Alternatives Proposed for Consideration: BPA and LVPL have been
studying ways to reinforce the transmission system. (1) Proposed
Action--Construct a new single-circuit 115-kilovolt line from BPA's
Swan Valley Substation, west of Swan Valley in Bonneville County,
Idaho, 36 miles east to BPA's Teton Substation northwest of Jackson in
Teton County, Wyoming. The new line would parallel the existing Swan
Valley-Teton No. 1 115-kilovolt line where feasible and would be a mix
of wood pole H-frame structures and lattice steel structures.
Approximately 75 feet of additional right-of-way width would be needed.
(2) Construct a new single-circuit 115-kilovolt line from BPA's Targhee
Tap substation south of Victor in Bonneville County, Idaho, 18 miles
east to Teton Substation northwest of Jackson in Teton County, Wyoming.
The new line would parallel the existing Swan Valley-Teton No. 1 115-
kilovolt line where feasible and would be a mix of wood pole H-frame
structures and lattice steel structures. Approximately 75 feet of
additional right-of-way width would be needed. A new switching station
would need to be constructed on or near the existing right-of-way near
Targhee Tap. The new switching station could occupy about three to five
acres of land. (3) Install Static Var Compensation at either BPA's
Teton Substation, or LVPL's Wilson or Rafter J Substation. All of these
substations are in the Jackson area and, depending on location, the
existing substation fence line may need to be expanded. (4) No Action--
The consequences of not taking any action.
Identification of Environmental Issues: Potential issues presently
identified for this proposal include: (1) effects on fish, wildlife,
and vegetation, including threatened and endangered species; (2) socio-
economic effects of potentially removing property from the local tax
base; (3) effects of construction and placement of electrical
facilities in floodplains and wetlands; (4) concern over visual
effects, noise, and other interference produced by electrical
facilities in rural and populated areas; (5) impacts on range, forest,
and agricultural resources due to construction and placement of
electrical facilities; (6) concern over human exposure to electric and
magnetic fields created by electrical facilities; (7) impacts to
cultural resources; (8) impacts to recreational resources; (9)
conflicting land use; (10) impact to property values; and (11)
potential impacts to soils (erosion) and water quality. Additional
issues identified through the scoping process may also be examined in
the Draft EIS.
Issued in Portland, Oregon, on April 23, 1996.
John S. Robertson,
Deputy Chief Executive Officer.
[FR Doc. 96-10755 Filed 4-30-96; 8:45 am]
BILLING CODE 6450-01-P