ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 60

[AD-FRL-5327-5]

RIN 2060-AD00

Standards of Performance for New Stationary Sources and Emission

Guidelines for Existing Sources

Municipal Waste Combustors

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: This action adds standards of performance for new municipal

waste combustor (MWC) units and emission guidelines for existing MWC's.

The standards and guidelines implement sections 111 and 129 of the

Clean Air Act and are based on the Administrator's determination that

MWC's cause, or contribute significantly to, air pollution that may

reasonably be anticipated to endanger public health or welfare. The

standards and guidelines apply to MWC units at plants with aggregate

capacities to combust greater than 35 megagrams per day (Mg/day)

(approximately 40 tons per day) of municipal solid waste (MSW) and

require sources to achieve emission levels reflecting the maximum

degree of reduction in emissions of air pollutants that the

Administrator determined is achievable, taking into consideration the

cost of achieving such emission reduction, and any non-air-quality

health and environmental impacts and energy requirements. The

promulgated standards and guidelines establish emission levels for MWC

organics (dioxins/furans), MWC metals (cadmium (Cd), lead (Pb), mercury

(Hg), particulate matter (PM), and opacity), MWC acid gases (hydrogen

chloride (HCl) and sulfur dioxide (SO2)), nitrogen oxides

(NOX), and MWC fugitive ash emissions. Some of the pollutants

being regulated are considered to be carcinogens and at sufficient

concentrations can cause toxic effects following exposure. The

standards and guidelines also establish requirements for MWC operating

practices (carbon monoxide (CO), load, flue gas temperature at the PM

control device inlet, and operator training/certification).

Additionally, the standards for new MWC plants also require a siting

analysis and materials separation plan.

DATES: Effective Dates. June 19, 1996 for the standards for new sources

(Secs. 60.50b through 60.59b) and December 19, 1995 for the emission

guidelines for existing sources (Secs. 60.30b through 60.39b). The

incorporation by reference of certain publications listed in the

regulations is approved by the Director of the Federal Register as of

June 19, 1996 for the standards for new sources. See table 3 of this

preamble for a summary of the retrofit schedules for existing MWC

sources. See SUPPLEMENTARY INFORMATION for a discussion of the schedule

for judicial review.

Comments. Comments on the Information Collection Request (ICR)

document associated with the final standards for new sources are

requested, as discussed in section VI.B of this preamble. Comments on

the ICR document must be received on or before February 20, 1996. Refer

to Section VI.B for further information on this request for comment.

ADDRESSES: Comments. As noted above, comments on the ICR document

[[Page 65388]]

associated with the final standards for new source are requested. See

section VI.B and the SUPPLEMENTARY INFORMATION section of this preamble

for further information on obtaining a copy of the ICR document and

addresses for submitting comments on the ICR document.

Background Information. The principal background information for

the final standards and guidelines includes: (1) A background

information document (BID) entitled, ``Municipal Waste Combustion:

Background Information for Promulgated Standards and Guidelines--

Summary of Public Comments and Responses'' (EPA-453/R-95-0136), which

contains a summary of all the significant public comments submitted

regarding the proposed standards and guidelines, the EPA's response to

these comments, and a summary of the changes made to the standards and

guidelines as a result of the comments; and (2) several technical

documents listed under SUPPLEMENTARY INFORMATION, including all of the

background information documents that supported the proposal and

promulgation of the subpart Ea standards and subpart Ca guidelines. A

document entitled ``FACT SHEET: New Municipal Waste Combustors--Subpart

Eb Standards,'' which succinctly summarizes the final standards, and a

document entitled ``FACT SHEET: Existing Municipal Waste Combustors--

Subpart Cb Emission Guidelines,'' which succinctly summarizes the

guidelines, are also available. See SUPPLEMENTARY INFORMATION for

instructions and addresses for obtaining these documents.

Docket. Docket Nos. A-90-45 and A-89-08, containing supporting

information used in developing the standards and guidelines, are

available for public inspection and copying between 8:00 a.m. and 4:00

p.m., Monday through Friday except for Federal holidays at the

following address: U.S. Environmental Protection Agency, Air and

Radiation Docket and Information Center (Mail Code 6102), 401 M Street

SW, Washington DC 20460 [phone: (202) 260-7548]. The docket is located

at the above address in room M-1500, Waterside Mall (ground floor,

central mall). A reasonable fee may be charged for copying.

FOR FURTHER INFORMATION CONTACT: Mr. Walter Stevenson at (919) 541-5264

or Mr. Fred Porter at (919) 541-5251, Combustion Group, Emission

Standards Division (MD-13), U.S. Environmental Protection Agency,

Research Triangle Park, North Carolina 27711.

SUPPLEMENTARY INFORMATION:

Background Information.

On December 20, 1989, the EPA proposed standards and guidelines for

MWC's in subparts Ea and Ca of 40 CFR 60, respectively. The subparts Ea

and Ca were promulgated on February 11, 1991 and were developed under

authority of paragraph (b) of section 111 of the Clean Air Act of 1977.

The 1990 Amendments to the Clean Air Act required the EPA to review

these emission standards and guidelines and determine if they were

fully consistent with the requirements of section 129. The EPA reviewed

the subpart Ea standards and subpart Ca guidelines and concluded that

they were not fully consistent with the requirements of section 129.

Therefore, the EPA proposed to revise the standards and guidelines in a

September 20, 1994 proposal to make the standards and guidelines fully

consistent with the requirements of section 129. Municipal waste

combustors that begin construction after September 20, 1994 or that

begin modification or reconstruction after June 19, 1996 and that meet

all other applicability criteria are subject to the revised standards

(subpart Eb). Municipal waste combustors that were constructed on or

before September 20, 1994 and that meet all other applicability

criteria are subject to the revised guidelines (subpart Cb). Municipal

waste combustors that were constructed after December 20, 1989 and on

or before September 20, 1994 and that meet all other applicability

criteria are subject to both the subpart Ea standards (1991 standards

for new sources) and the subpart Cb guidelines (1995 retrofit

guidelines for existing sources). In this final rule, the EPA is

withdrawing the subpart Ca guidelines (1991 guidelines for existing

sources). In a separate action in today's Federal Register the EPA is

publishing a direct final rule amending the text of subpart Ea.

This Federal Register final rule discusses: (1) The standards for

new MWC's, (2) the guidelines for existing MWC's, (3) the withdrawal of

the 1991 subpart Ca guidelines for existing MWC's, and (4) a request

for public comment on the ICR document. This preamble and regulatory

text are available on the EPA's Technology Transfer Network (TTN)

electronic bulletin board. Also available on the EPA's TTN are FACT

SHEETS, which summarize the final standards and guidelines. They are

suggested reading for persons requiring an overview of the standards

and guidelines. The FACT SHEETS can also be obtained by calling Donna

Collins at (919) 541-5578. The TTN contains 18 electronic bulletin

boards, and the following 5 items are included in the Clean Air Act

Amendments (CAAA) bulletin board under menu item ``Recently Signed

Rules'' in file ``MWC2.ZIP'':

(1) ``FACT SHEET: New Municipal Waste Combustors--Subpart Eb

Standards (1995).''

(2) ``FACT SHEET: Existing Municipal Waste Combustors--Subpart Cb

Emission Guidelines (1995).''

(3) Federal Register notice for this promulgation: ``Standards of

Performance for New Stationary Sources and Emission Guidelines for

Existing Sources: Municipal Waste Combustors'' (this document).

(4) ``Municipal Waste Combustion: Background Information for

Promulgated Standards and Guidelines--Summary of Public Comments and

Responses,'' EPA-453/R-95-0136.

(5) Information Collection Request document for these standards for

new sources: ``Standard Form 83 Supporting Statement for ICR No.

1506.5--1995 Standards for New Municipal Waste Combustors (Subpart

Eb),'' September 29, 1995.

The TTN is accessible 24 hours per day, 7 days per week except

Monday morning from 8:00 a.m. to 12:00 p.m. when the system is updated.

The service is free except for the cost of the phone call. Dial (919)

541-5742 to access the TTN. The TTN is compatible with up to a 14,400

bits-per-second (bps) modem. An alternative way to access the TTN is by

``telenet,'' using access code ``ttnbbs.rtpnc.epa.gov''. Further

instructions for accessing the TTN can be obtained by calling the help

desk at (919) 541-5384.

Documents in the Docket. The background information for today's

promulgation includes all of the documents that supported the proposal

and promulgation of the subpart Ea standards and subpart Ca guidelines

(docket No. A-90-45 and docket No. A-89-08). Key background information

documents used in developing the subpart Ea standards, the subpart Ca

guidelines, and today's promulgated standards and guidelines are as

follows:

(1) ``Municipal Waste Combustors--Background Information for

Proposed Standards: 111(b) Model Plant Description and Cost Report,''

EPA-450/3-89-27b, August 1989;

(2) ``Municipal Waste Combustors--Background Information for

Proposed Standards: Post-Combustion Technology Performance,'' EPA-450/

3-89-27c, August 1989;

(3) ``Municipal Waste Combustion Assessment: Combustion Control at

[[Page 65389]]

Existing Facilities,'' EPA-600/8-89-057, August 1989;

(4) ``Municipal Waste Combustion Assessment, Technical Basis for

Good Combustion Practices,'' EPA-600/8-89-063, August 1989;

(5) ``Municipal Waste Combustors--Background Information for

Proposed Standards: Control of NOX Emissions,'' EPA-450/3-89-27d,

August 1989;

(6) ``Municipal Waste Combustors--Background Information for

Proposed Standards: Cost Procedures,'' EPA-450/3-89-27a, August 1989;

(7) ``Economic Impact Analysis for Proposed Emission Standards and

Guidelines for Municipal Waste Combustors,'' EPA-450/3-91-029, March

1994;

(8) ``Municipal Waste Combustors--Background Information for

Proposed Guidelines for Existing Facilities,'' EPA-450/3-89-27e, August

1989;

(9) ``Municipal Waste Combustion: Background Information for

Promulgated Standards and Guidelines--Summary of Public Comments and

Responses,'' EPA-453/R-95-0136, 1995.

These documents and additional technical information are contained

in dockets A-90-45 and A-89-08. Docket materials are available for

inspection and copying as described in the ADDRESSES section of this

preamble.

Judicial Review. Under section 307(b)(1) of the Clean Air Act,

judicial review of the actions taken by this notice is available by

filing of a petition for review in the U.S. Court of Appeals for the

District of Columbia Circuit within 60 days of today's publication of

this rule. Under section 307(b)(2) of the Clean Air Act, the

requirements that are in today's notice may not be challenged later in

the civil or criminal proceedings brought by the EPA to enforce these

requirements (42 U.S.C. 7607(b)).

Preamble Outline. The following outline is provided to aid in

locating information in the introductory text (preamble) to the final

standards and guidelines.

I. Acronyms, Abbreviations, and Measurement Units

A. Acronyms

B. Abbreviations and Measurement Units

II. Background and Withdrawal of the 1991 Subpart Ca Emission

Guidelines

III. Summary of Considerations in Developing the 1995 Standards for New

Sources and Guidelines for Existing Sources

A. Purpose of the Standards and Guidelines

B. Technical Basis of the Standards and Guidelines

C. Stakeholders and Public Involvement

IV. Standards of Performance for New Sources (1995)--Summary of the

Standards, Impacts of the Standards, and Significant Issues and Changes

to the Proposed Standards

A. Summary of the Standards

B. Significant Issues and Changes to the Proposed Standards

1. Applicability

2. Emission Limits for MWC Metals, Acid Gases, Organics,

Nitrogen Oxides, and Ash Fugitive Emissions

3. Good Combustion Practices

4. Operator Training and Certification

5. Air Curtain Incinerators

6. Siting Analysis/Materials Separation Plan

7. Compliance and Performance Testing

8. Reporting and Recordkeeping Requirements

C. Impacts of the Standards

V. Guidelines for Existing Sources (1995)--Summary of the Guidelines,

Impacts of the Guidelines, and Significant Issues and Changes to the

Proposed Guidelines

A. Summary of the Guidelines

B. Significant Issues and Changes to the Proposed Guidelines

1. Designated Facilities

2. Emission Limits for MWC Metals, Acid Gases, Organics,

Nitrogen Oxides, and Fugitive Ash Emissions

3. Good Combustion Practices

4. Operator Training and Certification

5. Air Curtain Incinerators

6. Compliance and Performance Testing

7. Reporting and Recordkeeping Requirements and Compliance

Schedules

C. Impacts of the Guidelines

VI. Administrative Requirements

A. Docket

B. Paperwork Reduction Act

C. Executive Order 12866

D. Unfunded Mandates Act

E. Executive Order 12875

F. Regulatory Flexibility Act

G. Clean Air Act Procedural Requirements

I. Acronyms, Abbreviations, and Measurement Units

The following definitions, acronyms, and measurement units are

provided to clarify the preamble to the final standards and guidelines.

A. Acronyms

ASME American Society of Mechanical Engineers

BID Background Information Document

CEMS continuous emissions monitoring system(s)

COMS continuous opacity monitoring system(s) dioxins/furans

polychlorinated dibenzo-p-dioxins and polychlorinated dibenzofurans

DSI dry sorbent injection

EPA U.S. Environmental Protection Agency

ESP electrostatic precipitator

FF fabric filter

GCP good combustion practices

ICR information collection request

MACT maximum achievable control technology

MSW municipal solid waste

MWC municipal waste combustor

MWI medical waste incinerator

NSR New Source Review

NOX nitrogen oxides

OAQPS Office of Air Quality Planning Standards

OMB Office of Management and Budget

PM particulate matter

RDF refuse-derived fuel

RFA Regulatory Flexibility Act

SD spray dryer

SNCR selective noncatalytic reduction

TEQ basis 2,3,7,8-tetrachlorinated dibenzo-p-dioxin toxic equivalent

based on the 1989 international toxic equivalency factors

B. Abbreviations and Measurement Units

deg.C=degrees Celsius (degrees Fahrenheit= deg.C*9/5+32)

Cd=cadmium

CO=carbon monoxide

CO2=carbon dioxide

dscf=dry standard cubic feet (at 14.7 pounds per square inch, 68

deg.F)

dscm=dry standard cubic meters (at 14 pounds per square inch, 68

deg.F)

g=gram (454 grams per pound)

g/yr=grams per year

gr=grains (7,000 grains per pound)

HCl=hydrogen chloride

Hg=mercury

kg=kilogram (0.454 kilograms per pound)

kg/yr=kilograms per year

m3=cubic meter (35.3 cubic feet per cubic meter)

mg=milligrams (10-3 grams)

Mg=megagram (1.1 tons)

Mg/d=megagrams per day

Mg/yr=megagrams per year

ng=nanogram (10-9 grams)

Pb=lead

ppmv=parts per million by volume

SO2=sulfur dioxide

tons/d=tons per day

tons/yr=tons per year

total mass basis (dioxins/furans=total mass of tetra- through octa-

chlorinated dibenzo-p-dioxins and dibzofurans

II. Background and Withdrawal of the 1991 Subpart Ca Emission

Guidelines

By the mid-1980's, several studies had been performed to determine

whether MWC emissions should be regulated and, if so, under what

section of the Clean Air Act. As set forth in the Advanced Notice of

Proposed Rulemaking (52 FR 25399, July 7, 1987), the EPA decided to

regulate air emissions from MWC's under section 111 of the Clean Air

Act, and to base the

[[Page 65390]]

regulation on best demonstrated technology, as required by section 111.

On December 20, 1989, the EPA proposed standards for new MWC's and

guidelines for existing MWC's (54 FR 52251 and 54 FR 52209,

respectively). On November 15, 1990, 1990 Amendments to the Clean Air

Act were enacted and added section 129 to the Clean Air Act. Section

129 of the Clean Air Act specifies that revised standards and

guidelines must be developed for MWC's in accordance with the

requirements of both section 111 and new section 129. Section 129

further specifies that revised standards and guidelines be developed

for both large and small MWC plants and that the revised standards and

guidelines must reflect more restrictive performance levels. Section

129 includes a schedule for revising the 1991 standards and guidelines.

When the EPA did not comply with the section 129 schedule, the

Sierra Club, the Natural Resources Defense Council, and the Integrated

Waste Services Association filed complaints with the U.S. District

Court for the Eastern District of New York. The resulting consent

decree required the EPA Administrator to sign a notice of proposed

rulemaking not later than September 1, 1994 and a notice of

promulgation not later than October 31, 1995 (Nos. CV-92-2093, CV-93-

0284, and CV-93-5144). The proposal notice for the standards and

guidelines was signed as scheduled and published on September 20, 1994

(59 FR 48198 and 59 FR 48228, respectively). This notice responds to

the requirement for the Administrator to sign the final standards and

guidelines by October 31, 1995.

The standards and guidelines promulgated on February 11, 1991 (56

FR 5488 and 56 FR 5514, respectively) apply to only large MWC's

(capacities above 225 Mg/day) and reflect best demonstrated technology.

Today's notice promulgates revised standards and guidelines that are

fully consistent with sections 111 and 129 of the Clean Air Act and

extend coverage of the revised standards and guidelines to MWC units

located at MWC plants with aggregate plant capacity above 35 Mg/day.

Today's promulgated standards for new sources are more stringent

than the standards promulgated on February 11, 1991. Today's

promulgated standards will apply to plants for which construction

commenced after September 20, 1994 or for which reconstruction or

modification commenced after June 19, 1996. The guidelines will apply

to all MWC's constructed prior to September 20, 1994. The February 11,

1991 subpart Ea standards will remain in effect for plants constructed,

modified, or reconstructed between December 20, 1989 and September 20,

1994. Sources subject to the February 11, 1991 subpart Ea standards are

also subject to the guidelines being promulgated today under subpart

Cb. In some cases, the promulgated subpart Cb guidelines are more

stringent than the existing subpart Ea standards. The control

technologies being used to meet the emission limits included in the

1991 subpart Ea standards will be able to comply with the promulgated

subpart Cb guidelines, except supplemental controls would be required

to reduce Hg emissions and fugitive ash emissions. The direct final

rule also being published in today's Federal Register will provide

consistency between the subpart Ea and Cb rules.

Today's promulgated guidelines under subpart Cb for existing

sources are more stringent than the guidelines promulgated under

subpart Ca on February 11, 1991. Today's promulgated guidelines will

apply to MWC's for which construction commenced on or before September

20, 1994. Today's promulgated guidelines are based on maximum

achievable control technology, or MACT, and will require MWC plants to

purchase and install different types of air pollution control equipment

than the best demonstrated technology-based guidelines promulgated in

1991 under subpart Ca. In consideration of public comments, which

supported the withdrawal of subpart Ca, and to satisfy the MACT

requirements of section 129 of the Clean Air Act, the EPA is

withdrawing the 1991 subpart Ca guidelines as a part of today's action.

III. Summary of Considerations in Developing the 1995 Standards for New

Sources and Guidelines for Existing Sources

A. Purpose of the Standards and Guidelines

Under sections 111 and 129 of the Clean Air Act, the EPA is

required to develop and adopt performance standards and guidelines for

MWC's. Congress specifically added section 129 to the Clean Air Act to

address public concerns about MWC's and other solid waste combustion

units. Under section 111, performance standards and guidelines must be

developed for new and existing stationary sources that may contribute

to air pollution and that may reasonably be anticipated to endanger

public health or welfare. Under section 129 of the Clean Air Act, the

standards and guidelines adopted for MWC's must be based on MACT.

Independent of Clean Air Act requirements, the general public is

concerned about emissions from all sources including MWC's. This is

understandable considering (1) about two-thirds of the MWC population

is located in air quality nonattainment areas with high population

densities, and (2) the EPA's 1994 MWC Dioxin Survey identified a

limited number of older poorly controlled MWC's with atypically high

dioxin/furan emissions (interim corrective actions have been taken at

these MWC's).

The MWC industry has aggressively controlled new MWC plants built

since 1990, and almost half of the existing population currently is

equipped with high efficiency air pollution control equipment. The

other older half of the population has control equipment with lower

efficiency. As mentioned earlier, health effects are associated with

many of the pollutants emitted from MWC's, and the standards and

guidelines being promulgated today will bring all MWC units up to the

same high performance level.

The EPA estimates that in the United States, there are about 307

operating MWC units at 128 plants, providing a total U.S. MSW

combustion capacity of about 94,000 Mg/day. Approximately 16 percent of

MSW generated in the United States is combusted.

Emissions from MWC's contain organics (dioxins/furans), metals (Cd,

Pb, Hg, PM, and opacity), acid gases (Hcl and SO2), and NOX.

These pollutants can have adverse effects on both public health and

welfare. The EPA recently released a draft report reassessing the

health effects of human exposure to dioxins/furans. In the draft

report, which is currently undergoing review, MWC's are identified as

one source of dioxin/furan emissions. Other MWC emissions of principal

concern include Pb, Cd, and Hg. Acid gas and NOX emissions

contribute to acid rain when emissions of SO2 and NOX are

chemically transformed in the atmosphere into sulfuric and nitric acids

and return to earth as wet deposition such as rain, fog, or snow, or as

dry deposition such as fine particles or gases. Acid deposition damages

lakes and harms forests and buildings. Nitrogen oxides also contribute

to low-level ozone and urban area smog formation.

Today's standards and guidelines are set forth as emission limits

and will significantly reduce MWC emissions.

[[Page 65391]]

B. Technical Basis of Standards and Guidelines

Section 129(a)(2) of the Clean Air Act requires the revised

standards for new MWC's and revised guidelines for existing MWC's to

reflect the maximum degree of reduction in emissions of designated air

pollutants, taking into consideration the cost of achieving such

emission reduction, and any non-air-quality health and environmental

impacts and energy requirements that the Administrator determines are

achievable for a particular category of sources. (This control level is

commonly referred to as the ``maximum achievable control technology, or

``MACT''.) Section 129 also provides that standards for new sources may

not be less stringent than the emissions control achieved in practice

by the best controlled similar unit. This is commonly referred to as

the ``MACT floor'' for new MWC units. Additionally, section 129

provides that the emission limitations in the guidelines for existing

MWC's may not be less stringent than the average emission limitations

achieved by the best performing 12 percent of units in the category.

This is commonly referred to as the ``MACT floor'' for existing MWC

units. Emission control options less stringent than the MACT floor can

not be considered in developing section 129 standards and guidelines.

Technical data on the number and size of MWC's, control

technologies in use, permit emission limits, and emission test data

were used to determine the MACT floor for new and existing MWC's and to

define control alternatives. The types of data EPA considered in

selecting final standards and guidelines included the following: (1)

Over 100 MWC plant-specific questionnaires; (2) emissions information

from literature, and State and local agencies; and (3) EPA and industry

test reports. Overall, the EPA used performance test data from over 60

MWC plants to develop the standards and guidelines. After proposal, the

EPA reviewed additional data submitted with public comments on the

proposal and data that EPA gathered from States and industry. Based on

the new information, the EPA reviewed both the proposed MACT

determinations for new and existing MWC's and the regulatory

alternatives. The reassessment of the standards and guidelines in light

of the new data resulted in the EPA revising the MACT emission rates

for some pollutants.

The most significant changes to the standards and guidelines since

proposal are summarized in sections IV.B and V.B., respectively, of

this preamble. The rationales for these changes as well as other

changes are summarized in the preamble and discussed in more detail in

the BID. In keeping with the Administrator's ``reinventing government''

initiative, several of the changes to the guidelines and standards were

made to streamline the regulations and provide increased flexibility

while optimizing environmental control by using common sense

initiatives. Examples of these changes include the following: (1)

Reduced dioxin/furan testing for MWC plants with low dioxin/furan

emission levels; (2) NOX guidelines for large MWC plants that

allow plants to use an emissions averaging plan to demonstrate

compliance for two or more existing MWC units located at the same

facility; (3) clarification of siting requirements for new MWC's; (4)

providing additional time for MWC operators to obtain operator training

and certification; (5) replacing quarterly reporting with annual

reporting (semiannual reporting if noncompliance); (6) revised text to

clarify that the regulations do not apply to MWC plants with combustion

capacity less than 35 Mg/day; (7) exemption for plants firing small

amounts of MSW (10 Mg/day or less); (8) exemption for combustion of

clean wood; and (9) allowing certain records to be maintained in either

electronic or paper format without duplication. All of these changes

are discussed further in sections IV and V of this preamble, and

represent changes that improve the effectiveness and efficiency of the

standards and guidelines without any reduction in environmental

protection.

C. Stakeholders and Public Involvement

Prior to proposal, in accordance with section 117 of the Clean Air

Act, the EPA consulated with advisory committees, independent experts,

Federal departments and agencies, and owners, operators, and

manufacturers of MWC's. Numerous discussions were held with

governmental entities, industry representatives, and environmental

groups including, but not limited to, the following groups: the U.S.

Conference of Majors, the National League of Cities, the National

Association of Counties, the Municipal Waste Management Association,

the Solid Waste Association of North America, the Integrated Waste

Services Association, the Sierra Club, and the Natural Resources

Defense Council.

The standards and guidelines being adopted today were proposed in

the Federal Register on September 20, 1994 (59 FR 48198 and 59 FR

48228, respectively). The preambles for the proposed standards and

guidelines describe the rationale for the proposed standards and

guidelines. After proposal, the EPA provided interested persons the

opportunity to comment through a written comment period. The public

comment period was from September 20, 1994 to November 21, 1994.

Comments were received from private citizens, industry representatives,

environmental groups, and governmental entities. The comments have been

carefully considered, and changes have been made in the standards and

guidelines where appropriate. Sections IV and V of this preamble

discuss the major revisions to the standards and guidelines to address

the commenters' concerns.

IV. Standards of Performance for New Sources (1995)--Summary of the

Standards, Impacts of the Standards, and Significant Issues and Changes

to the Proposed Standards

This section presents a summary of the final standards, including

identification of the source category and pollutants being regulated,

and presentation of the final emission limits and their associated

performance testing, monitoring, recordkeeping and reporting

requirements. This section also discusses the most significant changes

to the proposed standards. Also discussed are the impacts of the final

standards.

A. Summary of the Standards

The final standards (subpart Eb) apply to each new MWC unit located

at an MWC facility that has an aggregate plant capacity to combust over

35 Mg/day of MSW, for which construction commenced after September 20,

1994 or modification or reconstruction commenced after June 19, 1996.

Municipal waste combustors that commenced construction on or before

September 20, 1994 are not covered under the subpart Eb standards.

Municipal waste combustors constructed on or before September 20, 1994

are considered existing sources and are subject to the guidelines that

are addressed in section V of this notice.

An MWC is defined as any setting or equipment that combusts MSW

including air curtain incinerators. Municipal solid waste combustion

includes the direct combustion of MSW or the combustion of MSW gases

from pyrolysis or gasification. The MWC unit includes any type of

setting or equipment including combustion equipment with or without

heat recovery.

[[Page 65392]]

Municipal solid waste is defined as a mixture or a single-item

waste stream of household, commercial, and/or institutional discards.

This would include materials such as paper, yard waste, plastics,

leather, rubber, glass, metals, and other combustible and

noncombustible materials. The final MSW definition is revised slightly

from proposal to make it clear that MSW does not include used motor

oil; sewage sludge; wood pallets; construction, renovation, and

demolition wastes (including but not limited to railroad ties and

telephone poles); clean wood; industrial process or manufacturing

wastes; medical waste; or motor vehicles. Although these wastes are not

MSW, they can be intermixed with MSW and can be combusted in MWC

plants. The regulations do not prohibit their combustion. The

definition of MSW includes RDF, which is municipal solid waste that is

shredded (or pelletized) before combustion. Any medical, industrial, or

other type of waste combustor plant with capability to combust greater

than 35 Mg/day of MSW and is in compliance with a federally enforceable

permit to combust less than 10 Mg/day of MSW is not covered by this

standard. Furthermore, cofired MWC plants that combust less than 30

percent MSW (on a calendar quarter basis) are exempt. A summary of the

final standards is presented in table 1. In table 1, significant

revisions made since proposal are marked with an asterisk (*) and are

discussed in section IV.B.

Table 1.--Summary of Standards for new MWC's (Subpart Eb)a

[* indicates a significant change since proposal and the change is

discussed in this preamble]

------------------------------------------------------------------------

------------------------------------------------------------------------

Applicability

The final standards apply to new MWC

units located at plants with

capacities to combust greater than 35

Mg/day of residential, commercial, and/

or institutional discards. Industrial

manufacturing discards are not covered

by the standards. Any medical,

industrial manufacturing, municipal,

or other type of waste combustor plant

with capacity to combust greater than

35 Mg/day of MSW and with a federally

enforceable permit to combust less

than 10 Mg/day of MSW is not covered.*

Plant Size (MSW combustion capacity) Requirement.

35 Mg/day*.................. Not covered by standards.

>Mg/day but 225 Mg/day Subject to provisions listed

(referred to as small MWC plants). below.

>225 Mg/day (referred to as large MWC Subject to provisions listed

plants). below.

Good Combustion Practices

Applies to large and small MWC plants.

A site-specific operator training manual is required to be

developed and made available for MWC personnel.

The EPA or State MWC operator training course must be completed

by the MWC chief facility operator, shift supervisors, and control room

operators.

The ASME (or State-equivalent) operator certification must be

obtained by the MWC chief facility operator (mandatory), shift

supervisors (mandatory), and control room operators (optional).*

The MWC load level is required to be measured and not to exceed

110 percent of the maximum load level measured during the most recent

dioxin/furan performance test.

The PM control device inlet flue gas temperature is required to

be measured and not to exceed the temperature 17 deg.C above the

maximum temperature measured during the most recent dioxin/furan

performance test.

The CO level is required to be measured using CEMS, and the

concentration in the flue gas is required not to exceed the following:

------------------------------------------------------------------------

Averaging

MWC type CO level time

(hours)

Modular starved-air and excess-air. 50 ppmv............... 4

Mass burn waterwall and refractory. 100 ppmv.............. 4

Mass burn rotary refractory........ 100 ppmv.............. 4

Fluidized-bed combustion........... 100 ppmv.............. 4

Pulverized coal/RDF mixed fuel- 150 ppmv*............. 4

fired.

Spreader stoker coal/RDF mixed fuel- 150 ppmv*............. 24

fired.

RDF stoker......................... 150 ppmv.............. 24

Mass burn rotary waterwall......... 100 ppmv.............. 24

MWC Organic Emissions (measured as

total mass dioxins/furans):

Dioxins/furans

(performance test by EPA Reference

Method 23)

Large and small MWC plants......... 13 ng/dscm total mass

(mandatory) or 7 ng/

dscm total mass

(optional to qualify

for less frequent

testing).*b.

[[Page 65393]]

Basis for dioxin/furan GCP and SD/FF/carbon

limit injection.

MWC Metal Emissions:

PM (performance test by

EPA Reference Method 5)

Large and small MWC plants....... 24 mg/dscm (0.010 gr/

dscf).*

Opacity (performance test

by EPA Reference Method 9)

Large and small MWC plants....... 10 percent (6-minute

average)

Cd (performance test by

EPA Reference Method 29)

Large and small MWC plants....... 0.020 mg/dscm (8.7 gr/

million dscf).*

Pb (performance test by

EPA Reference Method 29)

Large and small MWC plants....... 0.20 mg/dscm (87 gr/

million dscf).*

Hg (performance test by

EPA Reference Method 29)

Large and small MWC plants....... 0.080 mg/dscm (35 gr/

million dscf) or 85-

percent reduction in

Hg emissions

Basis for PM, opacity, Cd,

Pb, and Hg limits

Large and small MWC plants....... See basis for dioxin/

furan limit

MWC Acid Gas Emissions:

SO2 (performance test by

CEMS)

Large and small MWC plants....... 30 ppmv or 80-percent

reduction in SO2

emissions

HCl (performance test by

EPA Reference Method 26)

Large and small MWC plants....... 25 ppmv or 95-percent

reduction in HCl

emissions

Basis for SO2 and HCl See basis for dioxin/

limits furan limit..

Nitrogen Oxides Emissions:

NOx (performance test by

CEMS)

Large MWC plants................. 150 ppmv, except 180

ppmv is allowed for

the first year of

operation.*

Small MWC plants................. No NOX control

requirement

Basis for NOX limit

Large MWC plants................. SNCR

Small MWC plants................. No NOX control

requirement.

[[Page 65394]]

Fugitive Ash Emissions:

Fugitive emissions

(performance test by EPA Reference

Method 22)

Large and small MWC plants....... Visible emissions less

than 5 percent of the

time from the ash

transfer system

except during

maintenance and

repair activities.*.

Basis for fugitive Wet ash handling or

emissions limit. enclosed ash handling.

Siting Requirements:

Large and small MWC (1) Siting analysis*,

plants. (2) materials

separation plan, and

(3) public meetings

(including response

to comments)

Performance Testing and Monitoring

Requirements:

Reporting frequency..... Annual (semiannual if

violation).*

Load, flue gas Continuous monitoring,

temperature. 4-hour block

arithmetic average.

CO...................... CEMS, 4-hour block or

24-hour daily

arithmetic average,

as applicable.

Dioxins/furans, PM, Cd,

Pb, HC1, and Hg

Large MWC plants................. Annual stack test (see

reduced testing

option for low

emitters of dioxins/

furans).*

Small MWC plants................. Annual or third year

stack test.*

Opacity................. COMS (6-minute

average) and annual

stack test.

SO2..................... CEMS, 24-hour daily

geometric mean.

[[Page 65395]]

NOX (large MWC plants CEMS, 24-hour daily

only). arithmetic average.

Fugitive ash emissions.. Annual test.

*=a significant change since proposal, and the change is discussed in

this preamble.

a All concentration levels in the table are corrected to 7 percent O2,

dry basis.

b Although not part of the dioxin/furan limit, the limit of 13 ng/dscm

total mass is equal to about 0.1 to 0.3 ng/dscm TEQ. The optional

reduced testing limit of 7 ng/dscm total mass is equal to about 0.1 to

0.2 ng/dscm TEQ.

B. Significant Issues and Changes to the Proposed Standards (Issues

were marked with the ``*'' symbol in table 1)

The most significant changes to the standards since proposal are

discussed below. Additional rationales for these changes, as well as

other changes being made are provided in the promulgation BID (EPA-453/

R-95-0136). Some of the changes made that are not discussed below

include GCP requirements, monitoring requirements, and reporting and

recordkeeping requirements.

1. Applicability

At proposal, an MWC plant of 35 Mg/day capacity that cofired 30

percent (10 Mg/day) or less MSW would have been exempt from the

standards. This 30 percent cofiring provision was retained in the final

rule. Additionally, a 10 Mg/day exemption has been added to the final

rule to exempt all combustion units independent of size that fire only

a small amount of MSW. In the final standards, any medical, industrial

manufacturing, or other type of waste combustor capable of combusting

more than 35 Mg/day MSW but actually combusting less than 10 Mg/day of

MSW is not subject to this rule, provided it submits an initial report

containing a copy of the plant's federally enforceable permit limiting

the amount of MSW that may be combusted by the plant to less than 10

Mg/day and keeps records on the daily weight of MSW fired.

At proposal, a cofired combustor was defined as a unit combusting a

fuel feed stream where 30 percent or less was comprised of MSW, as

measured on a 24-hour daily basis. Several commenters expressed concern

about a cofired status determination being made on a daily basis. For

example, some facilities that burn biomass material including yard

waste would have difficulty making a determination of cofired status on

a daily basis. Biomass material including yard waste (which is MSW) and

clean wood (which is not MSW) are often collected together and stored

on- or off-site for a period of time and intermixed before being

combusted. In such cases, it is difficult or impossible to determine

what percentage of the waste combusted daily was yard waste. After

considering the public comments, the EPA determined that the definition

of cofired combustor should be revised to allow for measuring the

percent MSW burned on a calendar quarterly basis. This change is

consistent with current waste refuse storage and recordkeeping

procedures.

Also under the proposal, MWC plants of 25 to 35 Mg/day capacity

were required to submit an initial notification of construction, but

they were not subject to the proposed standards or guidelines. Only MWC

plants greater than 35 Mg/day capacity were covered by the proposal. As

part of the Administrator's ``reinventing government'' initiative, the

initial notification requirement for MWC plants between 25 and 35 Mg/

day capacity was removed from the final rule to minimize the reporting

requirement for smaller plants. This change reduced reporting and

recordkeeping requirements for both the MWC and the EPA, but did not

reduce the level of environmental protection provided by the standards

and guidelines being adopted today.

Under the proposed standards, clean wood was included in the

definition of MSW. Several commenters disagreed with this decision to

cover clean wood under the MWC standards. Under the final rule, clean

wood is not considered to be MSW. Clean wood includes untreated wood or

untreated wood products including clean untreated lumber, tree stumps

(whole or chipped), and tree limbs (whole or chipped). Clean wood is

exempt from the definition of MSW because available data indicate that

combustion of clean wood results in low emission of dioxins/furans, Hg,

and other pollutants. Clean wood is predominantly an agricultural,

industrial, or other nonmunicipal solid waste; regulation of the

combustion of these types of wastes is currently being addressed under

a separate rulemaking. Clean wood does not include yard waste, which is

covered by the final MWC standards; yard waste includes grass, grass

clippings, bushes, shrubs, and clippings from bushes and shrubs that

are generated by residential, commercial/retail, institutional, or

nonmanufacturing industrial sources as part of maintenance activities

associated with yards or other private or public lands.

2. Emission Limits for MWC Metals, Acid Gases, Organics, Nitrogen

Oxides, and Ash Fugitive Emissions

Many commenters expressed concern as to whether the proposed

emission limits for all regulated pollutants are actually achievable by

an MWC. These commenters noted that no single MWC existed with all the

controls proposed as MACT (SD/FF/SNCR and carbon injection) and the

standards may not be achievable. Since proposal, the EPA has obtained

data from 12 new MWC units at 5 MWC plants that have recently begun

operation and all are equipped with the full set of controls proposed

as MACT (SD/FF/SNCR and carbon injection). Data from these plants show

that all proposed emission limits for all pollutants are simultaneously

being achieved. Therefore, the EPA remains convinced that properly

designed, constructed, maintained, and operated MWC plants can comply

with all pollutant emission limits included in the final standards.

For new sources, the MACT floor for each regulated pollutant was

established as the emission level achievable by the best controlled

source. To determine new source MACT for proposal, the EPA evaluated

the performance of SD/FF/SNCR/carbon injection. Since proposal, the EPA

obtained additional information regarding the performance of the

control technologies determined to be MACT (SD/FF/SNCR/carbon

injection). Based on the new information and a reevaluation of the data

used for proposal, the EPA revised the achievable performance levels

for PM, Cd, Pb, Hg, dioxins/furans, and NOX. Changes to the MACT

floor levels and the selected MACT standards resulting from these

reevaluations are discussed below.

[[Page 65396]]

a. MWC Acid Gases. The MACT floor levels and selected MACT emission

limits for MWC acid gases are the same as proposed.

b. MWC Metals. Based on comments and data received since proposal,

the EPA reassessed the achievable performance levels for PM, Cd, and Pb

by SD/FF systems. Based on this reassessment of available data, the

selected PM, Cd, and Pb MACT emission limits were revised. For both

large and small plants, the PM MACT floor and selected MACT limit were

revised to 24 mg/dscm (proposal was 15 mg/dscm). The Cd MACT floor and

selected MACT limit were revised to 0.020 mg/dscm (proposal was 0.010

mg/dscm). The Pb MACT floor and selected MACT limit were revised to

0.20 mg/dscm (proposal was 0.10 mg/dscm). The selected MACT limits for

all three pollutants were revised because, based on available data,

emission levels more stringent than these levels are not considered to

be continuously achievable.

The final MACT limits for Hg emissions for large and small plants

remain at the same levels as proposed (0.080 mg/dscm or an 85 percent

reduction in Hg emissions); however, the MACT floor level was revised.

At proposal, the MACT floor for Hg was based on use of an SD/FF system

combined with GCP. Carbon injection was not commercially operational at

any MWC. At proposal, MACT for Hg was based on use of an SD/FF system

in combination with carbon injection. This MACT selection was based on

evaluation of emission reductions, costs, and other factors, as

described in the proposal preamble (59 FR 48198, September 20, 1994).

Several commenters questioned the selection of an Hg MACT limit based

on carbon injection when carbon injection was not commercially

operated. Since proposal, data have become available for 12 new MWC

units initiating operation using carbon injection commercially, and all

were meeting the proposed Hg limits. Since carbon injection is now in

commercial operation, the EPA revised the final MACT floor for Hg to be

based on SD/FF in combination with carbon injection and GCP.

c. MWC Organics. The final emission limits for dioxins/furans for

new MWC's remain at the same level as proposed; however, the technology

basis for the floor level of control has been changed. As discussed in

section IV.B.2.b regarding MWC metals (Hg), the EPA reviewed new data

received since proposal and concluded that SD/FF combined with GCP and

carbon injection is the best emission control technology being used by

MWC's for Hg and dioxin/furan control, and is, therefore, the basis of

the final MACT floor. The data gathered prior to proposal as well as

data for new units operating with these controls show that a dioxin/

furan level of 13 ng/dscm is achievable. The final MACT emission limit

for dioxins/furans for new units at both large and small plants is

equal to the MACT floor and remains at 13 ng/dscm (total mass basis).

The format of the final dioxin/furan emission limit changed from

the proposed format. The EPA proposed a dual format for the dioxin/

furan emission limit (total or TEQ) and requested comments on the use

of this dual format. No commenters agreed with the dual format as

proposed. The EPA has selected total mass dioxin/furan emissions in the

final standards. The TEQ format is not used. There is no indication

that TEQ's would be a better measure of emissions control performance

than total dioxins/furans. Furthermore, most test data on which the

standards are based were expressed as total dioxins/furans.

Additionally, because there have been different methods for calculating

TEQ over time and the ratio of total dioxins/furans to TEQ dioxins/

furans varies among MWC's, there would be additional uncertainty in

using a TEQ data base. Refer to the promulgation preamble (56 FR 5504)

for the 1991 subpart Ea standards for additional discussion.

Although not part of the dioxin/furan limit, the limit of 13 ng/

dscm total mass is equal to about 0.1 to 0.3 ng/dscm TEQ.

In addition to the final dioxin/furan limit of 13 ng/dscm, a

provision has been added to the final standards allowing less frequent

dioxin/furan testing for new plants achieving dioxin/furan emission

levels lower than 7 ng/dscm. Data for new MWC's using SD/FF/SNCR/carbon

injection technology suggest this is a realistic goal for many new

MWC's and will encourage MWC's to optimize performance of pollution

control systems. Refer to section IV.B.7 for a description of the

alternative dioxin/furan testing schedule.

d. Nitrogen Oxides. As explained at proposal (59 FR 48198,

September 20, 1994), the combination of SD/FF, GCP, and SNCR was the

basis of the new source MACT floor for NOX. These technologies

remain the basis for the final NOX MACT floor. Since proposal, the

EPA has obtained additional NOX data showing that large MWC plants

equipped with SNCR can continuously achieve an emission level of 150

ppmv over a 24-hour averaging period. The new data were obtained from

the same plant that was the basis of the proposed NOX emission

level of 180 ppmv. The new data are representative of what NOX

emission level can be achieved after a plant has had a period of time

to adjust to operation with the SNCR system. Applications of SNCR

typically require some site-specific fine-tuning to achieve optimum

performance levels. Based on the revised data, a two-phase standard is

being adopted. The final NOX standard for MWC's at large plants

allows time to ``fine-tune'' the SNCR system. The final standard for

MWC's at large plants is 180 ppmv (24-hour averaging period) for the

first year of operation, and 150 ppmv (24-hour averaging period)

thereafter.

The final standards do not require NOX control for MWC's at

small plants.

e. MWC Fugitive Ash Emissions. The proposed fugitive ash emission

limit allowed no visible emissions from ash handling and transfer

points. Several commenters objected to the proposed level of no visible

emissions. The commenters were concerned that even where the best ash

management practices such as wetting the ash or enclosing transfer

systems, there may be short periods of time when visible emissions are

observed, such as during maintenance. The proposal was based on about

16 hours of method 22 visible emissions data for ash handling practices

at two MWC plants and observations (not using method 22) at two

additional MWC plants. Since proposal, the EPA has reviewed visible

emission data from other industries that use similar transfer systems.

Based on comments received and the review of additional data, the final

fugitive ash emission limit was revised to limit visible emissions to

no more than 5 percent of the time.

As part of the final fugitive ash emission requirements, an

exemption has been provided during maintenance and repair activities,

because these necessary activities may require opening of an enclosure

that could generate short-term visible emissions.

3. Good Combustion Practices

The proposed standards included CO limits for nine categories of

combustor technologies, including, among others, RDF stoker combustors

and coal/RDF mixed fuel-fired combustors. Commenters requested

clarification on which CO limit applies to a stoker unit that is

designed to combust coal and RDF but only combusts RDF. Under the final

standards, a spreader stoker unit burning RDF only or cofiring RDF with

coal would be subject to the proposed RDF stoker CO limit. To clarify

this

[[Page 65397]]

requirement, the final CO requirements include an additional category

of combustor technology referred to as ``spreader stoker coal/RDF mixed

fuel-fired combustors,'' which are assigned the same CO limit and

averaging time as RDF stoker combustors (150 ppmv, 24-hour averaging

time). The final standards further clarify that the category of

combustors referred to in the proposed standards as coal/RDF mixed

fuel-fired combustors only includes pulverized coal/RDF mixed fuel

streams, and the CO limit and averaging time remains the same as

proposed (150 ppmv, 4-hour averaging time).

4. Operator Training and Certification

The proposed standards required full ASME certification of chief

facility operators and shift supervisors within 6 months of startup of

an affected MWC. Various commenters including ASME pointed out that the

proposed standards did not include sufficient time for ASME to conduct

full certification exams for all MWC operators. After considering these

comments, the EPA revised the operator training requirements to allow

additional time for ASME (or State) certification exams. In the final

standards, chief facility operators and shift supervisors at new MWC

plants must obtain ASME or State-approved provisional certification

within 1 year after promulgation or 6 months after startup, whichever

is later. In addition, by this same date (1 year after promulgation or

6 months after startup, whichever is later), the same personnel must be

either fully certified or scheduled with ASME or the State to take a

full certification exam (instead of actually obtaining full

certification within 1 year, as proposed).

5. Air Curtain Incinerators

No changes were made to the proposed standards for air curtain

incinerators. As discussed above in section IV.B.1, the final standards

do not cover combustion of clean wood; therefore, air curtain

incinerators combusting only clean wood are not covered by the

standards.

6. Siting Analysis/Materials Separation Plan

Various commenters said the proposed siting analysis was not

consistent with section 129 of the Clean Air Act. Commenters also

argued that the proposed siting requirements were either too stringent

or not stringent enough. The siting analysis in the final rule has been

reworded to allow for a consideration of alternatives, on a site-

specific basis, to minimize to the maximum extent practicable potential

risks to the public health or the environment. These changes ensure

consistency with section 129(a)(3) of the Clean Air Act.

7. Compliance and Performance Testing

Both the proposed and final standards require all plants to perform

annual performance tests for dioxin/furan emissions. However, a

provision for less frequent dioxin/furan testing has been added to the

final rule to encourage MWC plants to achieve emission levels

significantly lower than 13 ng/dscm. By achieving low dioxin/furan

emissions, they would qualify for less frequent testing and thereby

reduce their testing costs. If all MWC units at an MWC plant achieve 7

ng/dscm dioxins/furans or less during performance testing for 2

consecutive years of operation, the plant can elect to conduct dioxin/

furan testing on one unit per year. The plant must test units in

sequence (e.g., a 3-unit plant would test unit 1 (year 1), unit 2 (year

2), unit 3 (year 3), unit 1 (year 4), etc.). If an annual performance

test conducted on any unit indicates total dioxin/furan emissions are

greater than 7 ng/dscm, the plant must revert to testing all units

annually beginning the following year until the 2-year compliance

record is reestablished.

For small plants, two options are provided. The one-unit incentive

schedule discussed above is provided for dioxin/furan testing. An

alternative 3-year testing option is also provided for small plants.

The alternative 3-year testing option allows small plants to conduct

performance tests for dioxins/furans, as well as PM, HCl, Cd, Pb, and

Hg only once every 3 years if the plant demonstrates compliance with

all pollutant emission limits for 3 consecutive years and continues to

demonstrate compliance every third year. The owner or operator of a

small plant may choose either option for performance testing.

8. Reporting and Recordkeeping Requirements

Reporting requirements have been changed from quarterly as proposed

to annual (semiannual if any emission limits or operating parameters

are violated) to reduce the burden on affected plants. In recognition

of the cost associated with reporting requirements, the EPA

reconsidered the effectiveness of quarterly versus annual reporting for

the purpose of determining compliance. After careful reconsideration,

the EPA has concluded that annual reporting will provide adequate

information for most plants. [The EPA notes, however, that once an MWC

is required to obtain a Title V Operating Permit, the Title V reporting

requirements given in Section 504(a) of the Act will supersede the

annual reporting requirements presented above. Section 504(a) requires

permittees to submit monitoring reports to the permitting authority no

less often than every six months. See 42 U.S.C. 7661c(a).]

C. Impacts of the Standards

The final standards can be achieved by utilizing any technology.

The basis for the MACT-based limits at both proposal and promulgation

remain the combination of GCP/SD/FF and carbon injection for new large

and small plants, and the additional use of SNCR at large plants.

Because the technology basis for the final standards is the same as at

proposal, the impacts analysis presented at proposal has not been

revised. Table 2 provides a brief summary of the air and cost impacts

of the standards. The summary in table 2 provides impacts estimates

relative to two baseline scenarios: a pre-1989 baseline (typical

control prior to the 1991 subpart Ea standards) and a 1991 baseline

(typical control under the 1991 subpart Ea standards). Refer to the

preamble to the proposed standards (59 FR 48198) for a detailed summary

of these air and control cost impacts, as well as a discussion of the

water, solid waste, energy, and economic impacts of the rule. The

national impacts estimates provided in table 2 and discussed in the

proposal preamble represent the EPA's estimate of the worst case of

impacts that would result from implementation of the standards. Recent

data suggest a reduction in the construction of new MWC's. This would

reduce the cost of the standards.

[[Page 65398]]

Table 2.--Impacts of the Current Subpart Ea and Promulgated Subpart Eb Standards

----------------------------------------------------------------------------------------------------------------

Increment of

promulgated

Parameter standards over 1991 Standards Total b

the 1991 a

standards

----------------------------------------------------------------------------------------------------------------

New MWC's subject to Standards in the Fifth Year After

Promulgation:

Combustion capacity (106 Mg/yr)............................. 0.8 16.8 17.6

Number of MWC plants........................................ 24 48 72

Cost (1990 Dollars):

Capital cost ($106)......................................... 156 613 769

Annualized cost ($106/yr)................................... 43 157 200

Average cost increase ($/Mg MSW combusted).................. 1.95 11.55 13.50

Annual Emissions Reduction (Mg/yr):

SO2......................................................... 3,000 35,000 38,000

Hcl......................................................... 4,000 46,000 50,000

PM.......................................................... 800 5,700 6,500

Cd.......................................................... 1 9 10

Pb.......................................................... 17 140 157

Hg.......................................................... 18 9 27

Nox......................................................... 200 10,300 10,500

Total dioxins/furans (kg/yr)................................ 1 28 29

----------------------------------------------------------------------------------------------------------------

a The impacts are based on a pre-1989 baseline (i.e., a baseline prior to the effective date of the subpart Ea

standards.

b The total impacts are calculated by adding the incremental impacts of the promulgated standards (subpart Eb)

to the impacts of the 1991 standards (subpart Ea). These impacts would be equivalent to the total impacts of

the promulgated standards over a pre-1989 baseline.

A number of comments were received on the possible effects on EPA's

costing analysis following the recent Supreme Court decision that

``flow control'' is unconstitutional. The EPA considered the effect of

flow control on the financing of new MWC's. In summary, the EPA finds

that if tipping fees are raised to cover the increased costs of these

regulations, then the lack of ``flow control'' requirements will likely

result in fewer MWC's being constructed and a shift of wastes to other

disposal options. The impacts of the flow control decision is likely to

be very place-specific depending on the relative tipping fees of MWC's

and other disposal options, transportation costs, and institutional

factors.

V. Guidelines for Existing Sources (1995)--Summary of the Guidelines,

Impacts of the Guidelines, and Significant Issues and Changes to the

Proposed Guidelines

This section presents a summary of the final guidelines, including

identification of the source category and pollutants being regulated,

and presentation of the final emission limits and their associated

performance testing, monitoring, recordkeeping, and reporting

requirements and compliance schedules. This section also provides a

discussion of the most significant issues and changes to the proposed

guidelines. Also mentioned are the impacts of the final guidelines.

The EPA strongly believes (based on emissions data from MWC's which

incorporate the necessary control technology) that the air pollution

control technology to be retrofitted to existing MWC's to meet the

emission guidelines will reduce actual emissions to levels

significantly below the limits established by the emission guidelines.

There remains, however, some uncertainty as to the actual performance

level that will be achieved on a continuous basis by the control

technology when installed at large MWC plants where ESP-based scrubber

systems are used. Therefore, the dioxin/furan emission limits included

in the emission guidelines for some types of MWC's, while still

significantly below the MACT floor, are slightly less stringent than

those included in the proposal.

The EPA will track the implementation of the guidelines and annual

performance test results in order to monitor the level of emissions

including dioxin/furan control actually achieved by the guidelines.

Additionally, the EPA may conduct supplemental dioxin/furan tests. The

EPA will also meet with MWC owners and operators as needed to review

the performance of the air pollution control technology and the

effectiveness of maintenance and operational practices in order to

provide information that will lead to optimal performance of emission

control technology, and will work with MWC owners and operators to

assure a continued high level of public safety.

A. Summary of the Guidelines

The final guidelines require States to develop emission regulations

limiting air emissions from each existing MWC unit located at a MWC

plant that has an aggregate plant capacity to combust more than 35 Mg/

day of MSW, for which construction commenced on or before September 20,

1994.

The aggregate design capacity of all existing MWC's at an MWC plant

shall be considered in determining: (1) Whether a plant is subject to

the guidelines; and (2) what control levels are applicable. The

capacity of new MWC's (i.e., those that commenced construction after

September 20, 1994 or that commenced modification or reconstruction

after June 19, 1996 that are located at the MWC plant are not

considered in determining applicability of the guidelines but would be

considered in determining the applicability of subpart Eb (standards

for new sources). Only MWC units constructed before September 20, 1994

are considered for determining the applicability of the guidelines.

Modification of an existing MWC (or funds spent) to comply with the

emission guidelines would not be considered in determining if an

existing MWC unit was subject to the standards for new MWC's (subpart

Ea or Eb).

Municipal waste combustion plants with a federally enforceable

permit to combust less than 10 Mg/day of MSW are exempt from the

requirements of the guidelines as long as they submit a notification of

exemption and keep daily records of the weight of MSW combusted.

Cofired combustors (i.e., that combust less than 30 percent MSW)

located at a plant with an aggregate plant capacity greater than 35 Mg/

day are exempt from the requirements of the guidelines as

[[Page 65399]]

long as they submit a notification of exemption and keep records of the

weight of MSW combusted on a calendar quarter basis.

The definitions of MWC and MSW have been revised but are the same

for the guidelines as for the standards, and are discussed in the

summary of the standards in section IV.A of this notice.

A summary of the final guidelines is presented in table 3.

Table 3. Summary of Guidelines for Existing MWC's (Subpart Cb) a

[* indicates a significant change since proposal and the change is

discussed in this preamble]

------------------------------------------------------------------------

------------------------------------------------------------------------

Applicability

The final guidelines apply to existing

MWC's located at plants with

capacities to combust greater than 35

Mg/day of residential, commercial, and/

or institutional discards. Industrial

manufacturing discards are not covered

by the guidelines. Any medical,

industrial manufacturing, municipal,

or other type of waste combustor plant

with capacity to combust greater than

35 Mg/day of MSW and with a federally

enforceable permit to combust less

than 10 Mg/day of MSW is not covered.*

Plant Size (MSW combustion capacity) Requirement

35 Mg/day but 225 Mg/day Subject to provisions listed

(referred to as small MWC plants). below.

> 225 Mg/day (referred to as large MWC Subject to provisions listed

plants). below.

Good Combustion Practices

Applies to large and small MWC plants.

A site-specific operator training manual is required to be

developed and made available for MWC personnel.

The EPA or a State MWC operator training course would be

required to be completed by the MWC chief facility operator, shift

supervisors, and control room operators.

The ASME (or State-equivalent) provisional and full operator

certification must be obtained by the MWC chief facility operator

(mandatory), shift supervisors (mandatory), and control room operators

(optional).*

The MWC load level is required to be measured and not to exceed

110 percent of the maximum load level measured during the most recent

dioxin/furan performance test.

The maximum PM control device inlet flue gas temperature is

required to be measured and not to exceed the temperature 17 deg.C

above the maximum temperature measured during the most recent dioxin/

furan performance test.

The CO level is required to be measured using a CEMS, and the

concentration in the flue gas is required not to exceed the following:

------------------------------------------------------------------------

Averaging

MWC type CO level time

(hours)

Modular starved-air and excess-air. 50 ppmv............... 4

Mass burn waterwall and refractory. 100 ppmv.............. 4

Mass burn rotary refractory........ 100 ppmv.............. 24

Fluidized-bed combustion........... 100 ppmv.............. 4

Pulverized coal/RDF mixed fuel- 150 ppmv*............. 4

fired.

Spreader stoker coal/RDF mixed fuel- 200 ppmv*............. 24

fired.

RDF stoker......................... 200 ppmv.............. 24

Mass burn rotary waterwall......... 250 ppmv.............. 24

MWC Organic Emissions (measured as total mass dioxins/furans):

Dioxins/furans (performance test by EPA Reference Method 23)

Large MWC plants

MWC units utilizing an ESP-based 60 ng/dscm total mass

air pollution control system. (mandatory) or 15 ng/dscm

total mass (optional to

qualify for less frequent

testing).* c

MWC units utilizing a nonESP-based 30 ng/dscm total mass

air pollution control system. (mandatory) or 15 ng/dscm

total mass (optional to

qualify for less frequent

testing).* c

Small MWC plants..................... 125 ng/dscm total mass

(mandatory) or 30 ng/dscm

total mass (optional to

qualify for less frequent

testing).* c

Basis for dioxin/furan limits

Large MWC plants..................... GCP and SD/ESP or GCP and SD/

FF, as specified above.

Small MWC plants..................... GCP and DSI/ESP.

MWC Metal Emissions:

PM (performance test by EPA Reference Method 5)

Large MWC plants..................... 27 mg/dscm (0.012 gr/dscf).

Small MWC plants..................... 70 mg/dscm (0.030 gr/dscf).*

Opacity (performance test by EPA Reference Method 9)

Large and small MWC plants........... 10 percent (6-minute average)

Cd (performance test by EPA Reference Method 29)

Large MWC plants..................... 0.040 mg/dscm (18 gr/million

dscf).

Small MWC plants..................... 0.10 mg/dscm (44 gr/million

dscf).

Pb (performance test by EPA Reference Method 29)

Large MWC plants..................... 0.49 mg/dscm (200 gr/million

dscf).*

Small MWC plants..................... 1.6 mg/dscm (700 gr/million

dscf).

Hg (performance test by EPA Reference Method 29)

Large and small MWC plants........... 0.080 mg/dscm (35 gr/million

dscf) or 85-percent reduction

in Hg emissions.

Basis for PM, opacity, Cd, Pb, and Hg limits

Large MWC plants..................... GCP and SD/ESP/CI or GCP and SD/

FF/CI

[[Page 65400]]

Small MWC plants..................... GCP and DSI/ESP/CI.

MWC Acid Gas Emissions:

SO2 (performance test by CEMS)

Large MWC plants..................... 31 ppmv or 75-percent reduction

in SO2 emissions.*

Small MWC plants..................... 80 ppmv or 50-percent reduction

in SO2 emissions.

HCl (performance test by EPA Reference Method 26)

Large MWC plants..................... 31 ppmv or 95-percent reduction

in HCl emissions.*

Small MWC plants..................... 250 ppmv or 50-percent

reduction in HCl emissions.

Basis for SO2 and HCl limits

Large and small MWC plants........... See basis for MWC metals.

Nitrogen Oxides Emissions

NOX (performance test by CEMS)

Large MWC plants:

Mass burn waterwall................ 200 ppmvb.

Mass burn rotary waterwall......... 250 ppmvb.

Refuse-derived fuel combustor...... 250 ppmvb.

Fluidized bed combustor.............. 240 ppmvb.

Mass burn refractory................. No NOX controlb requirement

Other................................ 200 ppmvb.

Small MWC plants..................... No NOx control requirement.

Basis for NOx limits

Large MWC plants..................... SNCR.

Refractory MWC plants................ No NOX control requirement

Small MWC plants..................... No NOX control requirement.

Fugitive Ash Emissions:

Fugitive Emissions

(performance test by EPA Reference

Method 22)

Large and small plants............... Visible emissions 5 percent of

the time from ash transfer

systems except for maintenance

and repair activities.*

Basis for fugitive emission Wet ash handling or enclosed

limit ash handling.

Performance Testing and Monitoring

Requirements:

Reporting frequency Annual (semiannual if

violation)*.

Load, flue gas temperature Continuous monitoring, 4-hour

block arithmetic average

CO CEMS, 4-hour block or 24-hour

daily arithmetic average, as

applicable

Dioxins/furans, PM, Cd, Pb,

HCl, and Hg

Large MWC plants..................... Annual stack test.*

Small MWC plants..................... Annual or third year stack

test.

Opacity COMS (6-minute average) and

annual stack test.

SO2 CEMS, 24-hour daily geometric

mean.

NOX (large MWC plants only) CEMS, 24-hour daily arithmetic

average.

Fugitive ash emissions Annual test.*

Compliance Schedule:

Large MWC plants

State plans are required to include one of the following three

retrofit schedules for compliance with regulatory requirements: (1)

Full compliance or closure within 1 year following EPA approval of

the State plan; (2) full compliance in 1 to 3 years following

issuance of a revised construction or operation permit if a permit

modification is required or 1 to 3 years following EPA approval of

the State plan if a permit modification is not required, provided the

State plan includes measurable and enforceable incremental steps of

progress toward compliance; or (3) closure in 1 to 3 years following

approval of the State plan, provided the State plan includes a

closure agreement. If a State plan allows the second or third

scheduling options (i.e., more than 1 year), the State plan submitted

to EPA must contain post-1990 test data for dioxins/furans for all

MWC units at large plants under the extended schedule. (See Sec.

60.21(h) of subpart B of 40 CFR 60 for additional information

relating to measurable and enforceable incremental steps of progress

toward compliance).

Small MWC plants

State plans must require full

compliance or closure with

regulatory requirements in 3 years

or less following issuance of a

revised construction or operation

permit if a permit modification is

required, or within 3 years

following EPA approval of the State

plan if a permit modification is not

required.

State plans are required to specify that all MWC's at large MWC

plants for which construction was commenced after June 26, 1987 comply

with the guidelines for Hg and dioxins/furans within 1 year following

issuance of a revised construction or operation permit if a permit

modification is required, or within 1 year following EPA approval of

the State plan, whichever is later.

State plans are required to

specify that owners or operators of

MWC's comply with the operator

training and certification

requirements by 6 months after startup

or 1 year after State plan approval by

the EPA, whichever is later, for large

plants and by 6 months after startup

or 18 months after State plan approval

by the EPA, whichever is later, for

small plants.

*=significant change since proposal, and the change is discussed in this

preamble.

a All concentration levels in the table are converted to 7 percent O2,

dry basis.

b State plans may allow NOX emissions averaging between existing MWC

units at a large MWC plant. The daily weighted average NOX emissions

concentration from the MWC units included in the emissions averaging

plan must comply with the following 24-hour limits: 180 ppmv for mass

burn waterwall combustors; 220 ppmv for mass burn rotary waterwall

combustors; 230 ppmv for refuse-derived fuel combustors; 220 ppmv for

fluidized bed combustors; and 180 ppmv for other combustor types

(excluding mass burn refractory combustors). Refer to the regulatory

text of the emission guidelines for additional requirements. State

plans may also establish a program to allow emissions trading between

non-contiguous MWC plants. Such a program shall meet the requirements

of the Open Market Trading Rule of Ozone Smog Precursors, proposed

August 3, 1995 (60 FR 39668) as finally promulgated.

c Although not part of the dioxin/furan limit, the dioxin/furan total

mass limits of 30 ng/dscm, 60 ng/dscm, and 125 ng/dscm are equal to

about 0.3 to 0.8 ng/dscm TEQ, 0.7 to 1.4 ng/dscm TEQ, and 1.7 to 2.9

ng/dscm TEQ, respectively. The optional reduced testing limits of 15

ng/dscm and 30 ng/dscm total mass are equal to about 0.1 to 0.3 ng/

dscm TEQ and 0.3 to 0.8 ng/dscm TEQ, respectively.

[[Page 65401]]

B. Significant Issues and Changes to the Proposed Guidelines

The most significant changes to the proposed guidelines are

discussed below. Rationales for these changes as well as other changes

not discussed below are provided in the promulgation BID (EPA-453/R-95-

0136). Issues not discussed below include additional changes to GCP

requirements, monitoring requirements, recordkeeping and reporting

requirements, and compliance schedules.

1. Designated Facilities

Under the final guidelines, any medical, municipal, industrial

manufacturing, or other type of waste combustion plant capable of

combusting greater than 35 Mg/day MSW but actually combusting less than

10 Mg/day of MSW is not a designated facility, as long as the plant

submits an initial report and keeps certain records. This exemption was

not included in the proposed guidelines. This exemption is identical to

the exemption in the standards for new sources. Section IV.B.1 provides

further discussion of the exemption.

Under the final guidelines, a cofired combustor is defined as a

unit combusting a fuel feed stream 30 percent or less MSW, as measured

on a calendar quarterly basis. At proposal, determination of status as

a cofired combustor was measured on a daily basis. This change is

identical to the change made in the standards. Refer to section IV.B.1

for further discussion on the change.

The initial reporting requirement in the proposed guidelines for

MWC plants with combustion capacity greater than 25 Mg/day but less

than or equal to 35 Mg/day is not included in the final guidelines.

Both the proposed and final guidelines exempt plants with capacity less

than 35 Mg/day. Also, an exemption for combustion of clean wood or

clean wood products is included in the final guidelines. This exemption

is identical to the exemption in the standards. Refer to section IV.B.1

for discussion of EPA's rationale for this exemption.

2. Emission Limits for MWC Metals, Acid Gases, Organics, and Nitrogen

Oxides, and Ash Fugitive Emissions

For existing MWC's, the MACT floor levels and the emission limits

for several pollutants have been revised since proposal. See the

proposal preamble (59 FR 48228, September 20, 1994), the promulgation

BID (EPA-453/R-95-0136), and docket A-90-45 for additional details on

the MACT floor analysis methodology and the selection of MACT.

Since proposal, the EPA revised the MACT floors for existing plants

based on new permit information received and an updated inventory of

operating MWC plants. This revision resulted in revised MACT floor

levels for various pollutants for small and large MWC plants. The

revised MACT floor pollutant levels for large plants have resulted in

more stringent MACT emission limits for SO2, HCl, and Pb. In

addition, the revised MACT floors and emission limits for NOX for

large plants include emission levels based on combustor type. Revisions

to the MACT floor that resulted in revisions to the selected MACT level

of control for specific pollutants are discussed below.

While the final emission limits are somewhat different from

proposal, the limits can be achieved using the same control

technologies that were the basis of the proposed emission limits. The

technology bases for large and small plants are summarized in table 3.

a. MWC Acid Gases. Based on the new information and test data

received after proposal and the revised MACT floor analysis, the EPA

revised the MACT limits for SO2 and HCl for the final guidelines

for large plants.

The revised SO2 MACT floor for large plants is 31 ppmv. The

final SO2 emission limit for large plants, which was set at the

MACT floor level of 35 ppmv at proposal, is 31 ppmv because of the

change in the MACT floor at promulgation.

The MACT-based SO2 limit of 80 ppmv for small plants has not

changed from proposal; however, the SO2 MACT floor for small

plants is revised to 98 ppmv. Because the revised floor is more

stringent than the proposal floor (the floor at proposal was 118 ppmv),

the EPA's conclusion that acid gas controls will be needed to achieve

the floor remains the same. In addition, the EPA's conclusion that a

lower emission rate of 80 ppmv is achievable at minimal cost also

remains the same. Therefore, the final SO2 emission limit for

small plants remains at 80 ppmv.

The revised HCl MACT floor for large plants is 31 ppmv. The final

HCl emission limit for large plants, which was set at the MACT floor

level of 35 ppmv at proposal, is 31 ppmv because of the change in the

MACT floor at promulgation.

b. MWC Metals. Based on the new information and test data received

after proposal and the revised MACT floor analysis, the Pb limit for

large plants was revised for the final guidelines. The proposed Pb MACT

emission level for large plants was 0.50 mg/dscm; however, the revised

Pb MACT floor emission level for large plants is 0.49 mg/dscm.

Therefore, the final Pb emission limit for large plants has been

revised to 0.49 mg/dscm.

c. MWC Organics. The dioxin/furan emission limits for large and

small plants were revised since proposal. The MACT floor for dioxins/

furans for MWC's at large plants is 126 ng/dscm total mass. As

documented in the preambles to these proposed guidelines (59 FR 48228,

September 20, 1994) and the promulgated subpart Ca guidelines (56 FR

5514, February 11, 1991), in combination with GCP, SD/ESP systems can

achieve dioxin/furan total mass emissions of 60 ng/dscm and SD/FF

systems can achieve dioxin/furan total mass emissions of 30 ng/dscm.

Therefore, the MACT floor of 126 ng/dscm can be achieved with either

SD/ESP or SD/FF systems.

When determining the final MACT standard (which may be more

stringent than the MACT floor), section 129(a)(2) requires the

Administrator to consider certain factors, including the cost of

achieving the emission reduction. In the Administrator's judgment, it

would be prohibitively expensive and unreasonable to require existing

MWC's with ESP's that can meet a dioxin/furan emission limit of 60 ng/

dscm to retrofit an SD/FF in order to achieve an additional 30 ng/dscm

reduction in emissions. For example, at a typical 1,400 Mg/day MWC

plant already equipped with an SD/ESP, the capital cost to remove the

ESP and retrofit a new FF would be about $14 million. This cost would

be in addition to paying the remaining debt for a relatively new ESP

(about $5 million including interest payments) and would result in a

relatively small increase in control device efficiency.

For the final rule, the Administrator considered several regulatory

options more stringent than the MACT floor; however, because of this

high pollution control device retrofit cost, the Administrator decided

to set separate MACT limits for MWC's with ESP-based control systems

and MWC's with nonESP-based control systems. For MWC's with ESP-based

control systems, the EPA selected a MACT level of 60 ng/dscm total

mass, based on the performance of SD/ESP systems. For MWC's using or

retrofitting nonESP-based control systems, the EPA selected a MACT

level of 30 ng/dscm total mass, based on the performance of SD/FF

systems. The number of MWC plants that will comply by using an SD/ESP

will be limited (only about 10 percent of the MWC plants). The vast

majority of MWC's are expected to use SD/FF systems to comply.

[[Page 65402]]

The MACT floor for dioxins/furans at small MWC plants is 1,500 ng/

dscm total mass. As with large MWC plants, the final emission

guidelines limit for dioxins/furans is more stringent than the MACT

floor. The final guideline limit for dioxins/furans at small MWC plants

is 125 ng/dscm total mass and is based on DSI/ESP technology.

The final MACT limit for Hg is based on use of activated carbon

injection. Activated carbon injection technology used in combination

with DSI/ESP, SD/ESP, or SD/FF technology is expected to result in

supplemental dioxin/furan control, reducing dioxin/furan emissions from

these control systems by more than 50 percent. The final MACT guideline

levels for dioxins/furans for existing units at small and large plants

do not consider supplemental dioxin/furan control from activated carbon

injection because an insufficient amount of emissions data exist to

adequately determine the performance level of activated carbon

injection retrofitted to existing MWC air pollution control systems.

Nonetheless, it is expected that the use of activated carbon injection

will result in additional reduction of dioxins/furans to levels below

the emission limits in the final guidelines.

As with the standards for new MWC's, the final guidelines include a

provision that allows less frequent dioxin/furan testing if a plant is

achieving a significantly lower level of dioxin/furan emissions (15 ng/

dscm for MWC's at large plants and 30 ng/dscm for MWC's at small

plants). This option will encourage optimal performance and minimal

emissions. Refer to section IV.B.7 for a description of the alternative

testing schedule.

Relative to the proposal, the optional TEQ format of the proposed

dioxin/furan emission limits was removed in the final standards, as

explained in section IV.B.2.c. Although not part of the dioxin/furan

limit, the dioxin/furan total mass limits of 30 ng/dscm, 60 ng/dscm,

and 125 ng/dscm are equal to about 0.3 to 0.8 ng/dscm TEQ, 0.7 to 1.4

ng/dscm TEQ, and 1.7 to 2.9 ng/dscm TEQ, respectively.

d. Nitrogen Oxides. After considering data submitted by commenters

regarding requiring SNCR for MWC units at large plants where some could

already achieve the MACT floor level without SNCR, the EPA changed the

proposed NOX emission limit of 180 ppmv for all large plants. The

NOX MACT floor was revised by calculating the MACT floor

separately for each subcategory of combustor type, and the MACT limits

are being promulgated at levels equivalent to the MACT floors for each

combustor type. The final guideline MACT limits are: 200 ppmv for mass

burn waterwall combustors; 250 ppmv for refuse-derived fuel combustors;

250 ppmv for mass burn rotary waterwall combustors; 240 ppmv for

fluidized bed combustors; no limit for mass burn refractory combustors;

and 200 ppmv for other combustors not listed above.

In addition, the EPA has revised the emission guidelines to allow

States to include in their State plans options for averaging of

emissions from units within a large MWC plant, and for trading

emissions between MWC plants. The plant average emission limits for

units being included in an emissions averaging plan within a plant are

approximately 10 percent less than the MACT limits for each combustor

type, as follows: 180 ppmv for mass burn waterwall combustors; 220 ppmv

for mass burn rotary waterwall combustors; 230 ppmv for refuse-derived

fuel combustors; 220 ppmv for fluidized bed combustors; and 180 ppmv

for other combustor types (excluding mass burn rotary refractory

combustors). Emissions trading between units at noncontiguous plants

must be consistent with the requirements of the Open Market Trading

Rule for Ozone Smog Precursors, proposed August 3, 1995 (60 FR 39668),

as finally promulgated. Until the Open Market trading rule is

finalized, it is not possible to reference the rule in the guidelines

text. In the interim, the guideline text indicates NOX emissions

trading must be approved by the Administrator prior to implementation.

After the Open Market Trading Rule is finalized, it is preapproved for

use under the guidelines.

e. Fugitive Ash Emissions. The emission limit for fugitive ash

emissions under the final guidelines is visible emissions no more than

5 percent of the time from ash conveying and transfer systems at MWC's.

An exemption for maintenance and repair activities has been added.

These same changes were made to the standards for new sources. See the

discussion of the standards in section IV.B.2.e for an explanation of

the reasons for these changes.

3. Good Combustion Practices

The final CO guidelines include an additional category of combustor

technology referred to as ``spreader stoker coal/RDF mixed fuel-fired

combustors,'' which is assigned the same CO limit and averaging time as

the RDF stoker combustor category (200 ppmv, 24-hour averaging time).

In the final guidelines, the category of combustors referred to in the

proposal as ``coal/RDF mixed fuel-fired combustors'' was revised to

``pulverized coal/RDF mixed fuel-fired combustors,'' and the CO limit

and averaging time remains the same as proposed (150 ppmv, 4-hour

averaging time). These same changes were made to the standards for new

sources. See the discussion of the standards in section IV.B.3 for an

explanation of the reasons for these changes.

4. Operator Training and Certification

As discussed in section IV.B.4 for the standards for new sources,

the EPA has clarified the provisional certification requirements and

revised the schedule for full certification of chief facility operators

and shift supervisors to allow sufficient time to schedule exams. As

stated in the proposal preamble, a State-approved ASME-equivalent

certification program may be substituted for ASME certification.

For large plants, the final guidelines specify that a State plan

must require chief facility operators and shift supervisors to obtain

ASME provisional certification by 1 year after State plan approval or 6

months after startup, whichever is later. In addition, a State plan

must require that, by the same date, these personnel obtain full

certification or be scheduled with ASME to take the ASME full

certification exam (instead of actually obtaining full certification

within 1 year as proposed).

For small plants, the final guidelines specify that a State plan

must require chief facility operators and shift supervisors to obtain

ASME provisional certification by 18 months after State plan approval

or 6 months after startup, whichever is later. In addition, a State

plan must require that, by the same date, these personnel obtain full

certification or be scheduled with ASME to take the ASME full

certification exam (instead of actually obtaining full certification

within 1 year as proposed).

5. Air Curtain Incinerators

No changes were made to the proposed guidelines for air curtain

incinerators. As discussed in section V.B.1, the final guidelines do

not cover combustion of clean wood; therefore, air curtain incinerators

combusting only clean wood are not covered by the guidelines.

6. Compliance and Performance Testing

Under the final guidelines, State plans must specify that all

plants are required to perform annual performance testing for dioxin/

furan emissions. However, a provision for less frequent testing has

been added to encourage plants to

[[Page 65403]]

optimize performance and achieve emission levels significantly lower

than the dioxin/furan emission limits in the final guidelines. State

plans may require that, to take advantage of this provision, existing

MWC's must meet a dioxin/furan level of 15 ng/dscm (large plants) or 30

ng/dscm (small plants), for 2 consecutive years. Refer to the

discussion on the standards for new MWC's under section IV.B.7 for a

description of this reduced testing schedule.

7. Reporting and Recordkeeping Requirements and Compliance Schedules

Reporting requirements have been changed from quarterly to annual

(semiannual if exceeding the emission limit for any pollutant) to

reduce the economic burden on MWC's. Refer to section IV.B.8 for an

explanation of the reasons for this change.

The EPA revised the proposed compliance schedule for large and

small plants to allow more time for small plants to comply with the

guidelines and to clarify the schedule for plants that select to close

down operation rather than retrofit to comply with the guidelines. The

final compliance schedule is as follows. For large MWC plants, State

plans may allow three alternative compliance schedules: (1) Full

compliance or closure within 1 year following approval of the State

plan; (2) full compliance in 1 to 3 years following issuance of a

revised construction or operation permit if a permit modification is

required or 1 to 3 years following approval of the State plan if a

permit modification is not required, provided the State plan includes

measurable and enforceable incremental steps of progress toward

compliance; or (3) closure in 1 to 3 years following approval of the

State plan, provided the State plan includes a closure agreement. If a

State plan allows the second or third scheduling options (i.e., more

than 1 year), the State plan submitted to EPA must include post-1990

test data for dioxins/furans for all MWC units at large plants under

the schedule. For small MWC plants, State plans must require full

compliance or closure in up to 3 years following issuance of a revised

construction or operation permit if a permit modification is required,

or 3 years following approval of the State plan if a permit

modification is not required.

C. Impacts of the Guidelines

The final guidelines can be achieved by designated facilities that

utilize the same control technologies that were the basis for the

proposed guidelines. The basis for the MACT guidelines selected at both

proposal and promulgation is GCP/SD/ESP(or FF)/SNCR and carbon

injection for large plants and GCP/DSI/ESP and carbon injection for

small plants. Because the technology basis for the final guidelines is

the same as at proposal, the impacts analysis presented at proposal has

not been revised for the promulgated rule. Table 4 provides a brief

summary of the air and cost impacts of the guidelines. The summary in

table 4 provides impacts estimates based on two baseline scenarios: A

pre-1989 baseline (control level prior to the 1991 subpart Ca

guidelines) and a 1991 baseline (control level after the 1991 subpart

Ca guidelines.) Refer to the preamble to the proposed guidelines (59 FR

48228) for a detailed summary of these air and control cost impacts, as

well as a discussion of the water, solid waste, energy, and economic

impacts of the guidelines.

Table 4.--Impacts of the 1991 Subpart Ca and Promulgated Subpart Cb Guidelines

----------------------------------------------------------------------------------------------------------------

Increment of

promulgated 1995

1991 subpart Ca Promulgated 1995 subpart Cb

Parameter guidelines a subpart Cb guidelines over

guidelines a the 1991 subpart

Ca guidelines b

----------------------------------------------------------------------------------------------------------------

Characteristics of Existing MWC's:

Combustion capacity (10 \6\ Mg/yr)................... 35.9 39.0 3.1

Number of MWC plants................................. 158 179 21

Cost (1990 Dollars):

Capital cost ($10 \6\)............................... 888 2,100 1,212

Annualized cost ($10 \6\/yr)......................... 168 445 277

Average cost increase ($/Mg MSW combusted)........... 6.40 13.60 7.20

Annual Emissions Reduction (Mg/yr):

SO2.................................................. 25,000 43,000 18,000

HCl.................................................. 36,000 56,000 20,000

PM................................................... 1,100 3,100 2,000

Cd................................................... 2 5 3

Pb................................................... 30 83 53

Hg................................................... 11 47 36

NOX.................................................. 0 19,000 19,000

Total dioxins/furans (kg/yr)..................... 117 157 40

----------------------------------------------------------------------------------------------------------------

a The impacts are based on a pre-1989 baseline (i.e., a baseline prior to the effective date of the subpart Ca

guidelines).

b The impacts are calculated by subtracting the impacts of the 1991 subpart Ca guidelines from the impacts of

the promulgated 1995 subpart Cb guidelines (based on a pre-1989 baseline).

The national impacts estimates provided in table 4 and discussed in

the proposal preamble represent EPA's estimate of the upper limit of

impacts that would result from implementation of the guidelines. To the

extent that any existing MWC's close rather than comply with the

guidelines or switch to other disposal options that may cost less, the

national costs will be lower and air emissions will be less.

A number of comments were received on the possible effects on EPA's

costing analysis following the recent Supreme Court decision that

``flow control'' is unconstitutional. The EPA considered the effect of

flow control on the financing of existing MWC's. In summary, the EPA

finds that if MWC's raise tipping fees to cover the increased costs of

these regulations, then the lack of ``flow control'' will likely result

in a shift of some wastes to other disposal options. The combined

impacts of no flow control and increased tipping fees on individual

MWC's and municipalities are likely to be very

[[Page 65404]]

place-specific depending on the relative tipping fees of MWC's and

other disposal options, transportation costs, and institutional

factors. If tipping fees are not raised to offset emission control

costs, then operators of MWC's will have to finance the costs of the

regulations out of current revenues.

The EPA has identified several ways that State and local

governments can guarantee a continued source of MSW for the MWC's and

provide funds from the general revenue to support the operation of MWC

facilities, accomplishing some of the outcomes that flow control can

produce, including: (1) Government provision of collection services;

(2) contractor provision of collection services under government

contract; (3) franchising collection and hauling to designated

facilities; (4) subsidizing facilities from the general revenues; and

(5) supporting integrated solid waste management programs from the

general revenue.

VI. Administrative Requirements

This section addresses the following administrative requirements:

Docket, Paperwork Reduction Act, Executive Orders 12866 and 12875,

Unfunded Mandates Act, Regulatory Flexibility Act, and Clean Air Act

Procedural Requirements.

A. Docket

The docket is an organized and complete file of all the information

considered in the development of this rulemaking. The principal

purposes of the docket are: (1) To allow interested parties to identify

and locate documents so that they can effectively participate in the

rulemaking process; and (2) to serve as the record in case of judicial

review, except for interagency review material. 42 U.S.C.

Sec. 7607(d)(7)(A). The docket number for this rulemaking is A-90-45.

Docket No. A-89-08 also includes background information for this

rulemaking that supported the proposal and promulgation of the subpart

Ea standards and subpart Ca guidelines.

B. Paperwork Reduction Act

The information collection requirements in this rule have been

submitted for approval to the Office of Management and Budget (OMB)

under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. An

Information Collection Request (ICR) document has been prepared by EPA

(ICR No. 1506.5) and a copy may be obtained from Sandy Farmer, OPPE

Regulatory Information Division; U.S. Environmental Protection Agency

(2136); 401 M St., S.W.; Washington, DC 20460 or by calling (202) 260-

2740. This ICR document is also available on the EPA's TTN Clean Air

Act Amendments electronic bulletin board. See the SUPPLEMENTARY

INFORMATION section of this preamble for information on accessing EPA's

TTN electronic bulletin board.

The information required to be collected by this rule is necessary

to identify the regulated entities who are subject to the rule and to

ensure their compliance with the rule. The recordkeeping and reporting

requirements are mandatory and are being established under authority of

Section 114 of the Act. All information submitted as part of a report

to the Agency for which a claim of confidentiality is made will be

safeguarded according to the Agency policies set forth in Title 40,

Chapter 1, part 2, subpart B--Confidentiality of Business Information

(see 40 CFR 2; 41 FR 36902, September 1, 1976, amended by 43 FR 39999,

September 28, 1978; 43 FR 42251, September 28, 1978; 44 FR 17674, March

23, 1979).

The annual reporting and recordkeeping burden presented in this ICR

document reflects only part of the burden imposed by this rule. The

rest of the burden was presented to and approved by the OMB in an ICR

document in 1991 for the subpart Ea NSPS promulgated in February 1991.

The ICR document that accompanied the subpart Ea rulemaking summarized

the reporting and recordkeeping requirements that MWC owners and

operators of large MWC units are required to follow to demonstrate

compliance with the 1991 NSPS. As explained elsewhere in this document,

the Clean Air Act Amendments were passed by Congress in 1990, and they

included section 129 that directs the Administrator to extend the NSPS

to small MWC plants, as well as to include emission limits for

additional pollutants and siting requirements. This ICR document for

subpart Eb presents this additional burden imposed by section 129 of

the Act, by summarizing the total annual burden on small plants (i.e.,

for the reporting and recordkeeping requirements associated with all

pollutant emission limits and siting) and the additional annual burden

on large MWC plants (i.e., only for requirements associated with Cd,

Pb, Hg, and fugitive ash emission limits and siting).

The total annual reporting and recordkeeping burden summarized in

this ICR document for this collection averaged over the first 3 years

of NSPS application to new MWC's is estimated to be about 69,700 person

hours per year. This would be the estimated annual burden for 64

respondents (i.e., MWC units). This is a worst-case burden estimate, as

discussed under section IV.C. If fewer MWC units are constructed than

have been projected, then the burden will be less than reported here.

The average burden per respondent is about 1,100 person hours per year.

The rule requires an initial one-time notification from each new MWC

regarding all pollutant emission levels and siting and subsequent

annual compliance reports regarding all pollutant emission levels.

Additionally, if any of the pollutant emission limits are exceeded,

respondents would be required to submit semi-annual reports. The rule

includes continuous monitoring requirements for SO2, opacity, CO,

CO2, O2 and annual stack testing requirements for PM,

dioxins/furans, opacity, HCl, Cd, Pb, Hg, and fugitive ash. Efforts

were made to reduce the burden on small plants by allowing them to test

emissions once every 3 years instead of annually if they demonstrate

that they consistently meet the emissions requirements. This burden

estimate includes the time needed to review instructions; develop,

acquire, install, and utilize technology and systems for the purposes

of collecting, validating, and verifying information, processing and

maintaining information, and disclosing and providing information;

adjust the existing ways to comply with any previously applicable

instructions and requirements; train personnel to be able to respond to

a collection of information; search data sources; complete and review

the collection of information; and transmit or otherwise disclose the

information.

Comments on the ICR document are requested, including the Agency's

need for the information presented in this ICR document, the accuracy

of the provided burden estimates, and any suggested methods for

minimizing respondent burden. Send comments on the ICR to the Director,

OPPE Regulatory Information Division; U.S. Environmental Protection

Agency (2136); 401 M St. S.W.; Washington, DC 20460; and to the Office

of Information and Regulatory Affairs, Office of Management and Budget,

725 17th St. N.W.; Washington, DC 20503; marked ``Attention: Desk

Officer for EPA''. Include the ICR number in any correspondence. Since

the OMB is required to make a decision concerning the ICR between 30

and 60 days after December 19, 1995, a comment to OMB is best assured

of having its full effect if OMB receives it by January 18, 1996. The

EPA will publish a response to

[[Page 65405]]

OMB and public comments on the information collection requirements

contained in this proposal in a subsequent Federal Register notice.

C. Executive Order 12866

Under Executive Order 12866 (58 FR 51735, October 4, 1993), the EPA

must determine whether the regulatory action is ``significant,'' and

therefore, subject to OMB review and the requirements of the Executive

Order. The Order defines ``significant'' regulatory action as one that

is likely to lead to a rule that may:

(1) Have an annual effect on the economy of $100 million or more,

or adversely affect in a material way the economy, a sector of the

economy, productivity, competition, jobs, the environment, public

health or safety, or State, local or tribal governments or communities;

(2) Create a serious inconsistency or otherwise interfere with an

action taken or planned by another agency;

(3) Materially alter the budgetary impact of entitlements, grants,

user fees, or loan programs or the rights and obligations of recipients

thereof; or

(4) Raise novel legal or policy issues arising out of legal

mandates, the President's priorities, or the principles set forth in

the Executive Order.

Pursuant to the terms of Executive Order 12866, the promulgated

standards for new sources will not be a ``significant'' rule because

the annual effect on the economy is expected not to exceed $43 million

over the cost of the existing subpart Ea standards. However, the EPA

considers these promulgated standards to be ``significant'' because of

their relationship to the guidelines for MWC's that are also being

promulgated today. The final guidelines will cost $450 million per year

or less based on a baseline prior to the effective date of the subpart

Ea standards. As such, this action was submitted to OMB for review.

Changes made in response to OMB suggestions or recommendations are

documented in the public docket for this rulemaking.

D. Unfunded Mandates Act

Under section 202 of the Unfunded Mandates Reform Act of 1995

(``Unfunded Mandates Act''), signed into law on March 22, 1995, the EPA

must prepare a statement to accompany any rule where the estimated

costs to State, local, or tribal governments, or to the private sector,

will be $100 million or more in any 1 year. Section 203 requires the

EPA to establish a plan for informing and advising any small

governments that may be significantly or uniquely impacted by the rule.

Under section 205(a), the EPA generally must select the ``least costly,

most cost-effective or least burdensome alternative that achieves the

objectives of the rule'' and is consistent with statutory requirements.

The EPA has complied with section 205 of the Unfunded Mandates Act, by

promulgating a rule that is the most cost-effective alternative for

regulation of these sources that meets the statutory requirements under

the Clean Air Act. For Hg and dioxins/furans, the EPA adopted standards

that are more stringent than the MACT floor level of control. In the

case of dioxins/furans, the EPA concluded that a standard more

stringent than the MACT floor can be achieved at little or no cost, and

thus represents the most cost-effective control. In the case of Hg, the

MACT floor emissions level is equal to current uncontrolled levels.

However, the EPA concluded, after considering the requisite factors in

section 129(a)(2), that an uncontrolled floor level could not be

justified under the Clean Air Act and that a more stringent emissions

standard based on the use of carbon injection as an add-on control

would be cost-effective. The EPA was unable in this rulemaking to

identify any alternatives other than carbon injection for control of Hg

emissions. To the extent that section 205(a) of the Unfunded Mandates

Reform Act (UMRA) may be read to have the EPA consider a less stringent

level of Hg control, the EPA concluded that such an alternative would

be ``inconsistent with law'' within the meaning of section 205(b)(2) of

the UMRA. Accordingly, the alternative selected for Hg is the most

cost-effective one available under these circumstances.

The unfunded mandates statement under section 202 must include: (1)

A citation of the statutory authority under which the rule is proposed,

(2) an assessment of the costs and benefits of the rule including the

effect of the mandate on health, safety and the environment, and the

Federal resources available to defray the costs, (3) where feasible,

estimates of future compliance costs and disproportionate impacts upon

particular geographic or social segments of the nation or industry, (4)

where relevant, an estimate of the effect on the national economy, and

(5) a description of the EPA's consultation with State, local, and

tribal officials.

Since this rule is estimated to impose costs to the private sector

and government entities in excess of $100 million, the EPA has prepared

the following statement with respect to these impacts.

1. Statutory Authority

The statutory authority for this rulemaking, sections 111 and 129

of the Clean Air Act, is fully discussed in section II of this

preamble. The rule establishes emission guidelines for existing MWC's

and standards of performance for new MWC's.

Section 129(a)(2) requires the Administrator to promulgate

standards for new solid waste incinerator units and emission guidelines

for existing units that ``reflect the maximum degree of reduction in

emissions of air pollutants listed under section (a)(4) that the

Administrator, taking into consideration the cost of achieving such

emission reduction, and any non-air-quality health and environmental

impacts and energy requirements, determines is achievable for new or

existing units in each category. The Administrator may distinguish

among classes, types (including mass-burn, refuse-derived fuel, modular

and other types of units), and sizes of units within a category in

establishing such standards * * *'' 42 U.S.C Sec. 7429(a)(2) (emphasis

added). This is commonly referred to as maximum achievable control

technology, or MACT. Section 129(a)(2) further defines a minimum level

of stringency that can be considered for MACT standards--commonly

referred to as the MACT floor--which for new units, is the level of

control achieved by the best controlled similar unit, and for existing

units, is the level of control achieved by the average of the best

performing 12 percent of units in the category. Id.

In the final rule, the Administrator determined for new MWC's that

MACT for all pollutants was equivalent to the pollutants' MACT floor

levels--i.e., the MACT floor levels reflect the maximum achievable,

cost-effective reduction in emissions of the air pollutants specified

in section 129(a)(4) of the Clean Air Act. The promulgated MACT levels

reflect the performance of emission control technology that is in

commercial use at the best controlled similar source (i.e., an MWC

equipped with an SD/FF system, carbon injection, and SNCR, in

combination with GCP's). The September 20, 1994 proposed standards were

more stringent than the MACT floor levels because the proposed levels

were based on carbon injection technology, which was not in commercial

use at the time of proposal. Since proposal, a dozen MWC units equipped

with carbon injection technology have initiated operation; thus, the

best controlled similar unit in the final rule includes carbon

injection (i.e., basis for the MACT floor).

[[Page 65406]]

For existing MWC's, some of the emission limits included in the

emission guidelines promulgated today are the same as the final MACT

floor levels. For several pollutants, however, the Administrator

decided, consistent with section 129(a)(2) after considering costs and

non-air-quality health and environmental impacts and energy

requirements, to set MACT standards more stringent than the MACT floor,

since more stringent levels could be achieved at either no additional

cost, or minimal costs. The MACT floor levels for acid gases and PM are

stringent enough for existing units at both small and large plants that

they require an acid gas/PM control system. Since an acid gas/PM

control system also controls emissions of all regulated pollutants

except Hg and NOx, establishing emission limits for acid gases and

PM effectively establishes emission limits for the other pollutants

(except Hg and NOx). The cost to comply with the selected emission

limits relative to the cost of the acid gas/PM control system are

minimal.

For example, the same acid gas/PM control system that owners and

operators of MWC's need to meet the MACT emissions guideline levels for

SO2 and PM also controls dioxins/furans to levels more stringent

than the dioxin/furan MACT floor level. Thus, the Administrator

determined that the final dioxin/furan emission guidelines may be

achieved at no additional control costs. In the final rule, for MWC's

at large plants, the Administrator distinguished between the dioxin/

furan emission guidelines for MWC's equipped with ESP-based control

systems and MWC's equipped with nonESP-based control systems. In the

Administrator's judgment, it would be prohibitively expensive and

unreasonable to require existing ESP's that can meet a limit of 60 ng/

dscm to retrofit an SD/FF in order to achieve additional reduction in

emissions beyond the MACT floor (see the proposal preamble, 50 FR

48228, September 20, 1994, for a more detailed discussion). For the

final rule, the Administrator considered several regulatory options

more stringent than the MACT floor; however, because of the high cost

of pollution control device retrofit, the Administrator determined that

MACT for dioxins/furans emitted from MWC's with ESP-based control

systems is 60 ng/dscm, and MACT for dioxins/furans emitted from MWC's

with SD/FF systems is 30 ng/dscm.

The MACT floor for Hg is 0.36 mg/dscm, and MACT for Hg is more

stringent than the MACT floor at a level of 0.080 mg/dscm. To achieve

the Hg emission limit in the emission guidelines, carbon injection will

be required (this exceeds MACT floor requirements). Because of the

toxicity and bioaccumulation potential of Hg, the Administrator

considered the small cost of adding Hg control to be cost-effective.

The cost of Hg control is about $0.25 to $0.35 per gram Hg removed

($250,000 to $350,000 per Mg), which translates to approximately $0.05

to $0.07 per month for a household served by an MWC.

2. Social Costs and Benefits

This assessment of the cost and benefits to State, local, and

tribal governments of the guidelines is based on EPA's ``Economic

Impact Analysis for Proposed Emission Standards and Guidelines for

Municipal Solid Waste Combustors.'' Measuring the social costs of the

guidelines requires identification of the affected entities by

ownership (public or private), consideration of regulatory

alternatives, calculation of the regulatory compliance costs for each

affected entity, and assessment of the market implications of the

additional pollution control costs. Calculating the social benefits of

the guidelines requires estimating the anticipated reductions in

emissions at MWC's due to regulation, identification of the harmful

effects of exposure to MWC emissions, and valuing the expected

reductions in these damages to society.

a. Affected Entities. For 1996, the base year of the analysis,

there are 179 MWC's in the population of operational facilities

affected by the guidelines. Of this total, 100 are publicly owned and

operated (i.e., facilities owned by State or local governments). There

are no MWC's currently owned, or expected to be owned in the near

future, by tribal governments, so there is no impact on tribal

governments. The remaining 79 MWC's are privately owned and operated.

The EPA developed 16 model plants to characterize the existing

facilities based on the technologies used for combustion and air

pollution control at baseline. Table 5 shows the distribution of

publicly and privately owned MWC's and the estimated MSW volumes

managed by the existing MWC model plants. Of the 100 publicly owned and

operated MWC plants, 38 plants are located in communities with a

population less than 50,000, 11 plants are located in communities with

a population between 50,000 and 100,000, 21 plants are located in

communities with a population between 100,000 and 250,000, and 30

plants are located in communities with a population greater than

250,000. A detailed description of the model plants used to

characterize operational MWC's is presented in table 3-4 of the

``Economic Impact Analysis of Proposed Emissions Standards and

Guidelines for Municipal Waste Combustors'' (EPA-450/3-91-029, 1994).

Table 5.--Summary of Total MSW Throughput at Public and Private MWC's by Model Plant

----------------------------------------------------------------------------------------------------------------

Ownership

---------------------------------------------------------------------

Model planta Public Private Total

throughput (Mg/ Public throughput (Mg/ Private throughput (Mg/

yr) share (%) yr) share (%) yr)

----------------------------------------------------------------------------------------------------------------

1......................................... 813,244 100.0 0 0.0 813,244

2......................................... 1,158,112 81.9 256,034 18.1 1,414,146

3......................................... 1,397,867 100.0 0 0.0 1,397,867

4......................................... 1,914,896 19.3 7,995,967 80.7 9,910,863

5......................................... 3,956,410 61.1 2,523,329 38.9 6,479,739

6......................................... 374,566 56.7 286,119 43.3 660,685

7......................................... 1,008,603 57.5 746,477 42.5 1,755,080

8......................................... 1,547,612 66.5 777,981 33.5 2,325,593

9......................................... 400,346 73.3 145,661 26.7 546,007

10........................................ 425,552 82.5 90,472 17.5 516,024

11........................................ 166,082 42.0 228,966 58.0 395,048

12........................................ 284,596 72.6 107,219 27.4 391,815

14........................................ 343,596 48.4 366,785 51.6 710,381

15........................................ 937,280 29.2 2,277,088 70.8 3,214,368

[[Page 65407]]

16........................................ 58,462 6.7 819,320 93.3 877,782

17........................................ 745,501 52.9 662,673 47.1 1,408,174

---------------------------------------------------------------------

Total:................................ 15,078,823 45.9 17,737,993 54.1 32,816,816

----------------------------------------------------------------------------------------------------------------

a There is no model plant that matches model plant #13 in the Economic Impact Analysis (EPA-450/3-91-029, March

1994).

b. Regulatory Alternatives Considered. The two broad categories of

regulatory standards available include design standards and emission

standards. Design standards specify the type of control equipment

polluters must install, whereas emission standards specify the maximum

quantity of a given pollutant that any one polluter may release.

Design standards offer the least flexible approach considered in

this analysis. Municipal waste combustors would have to install the

specified control equipment regardless of the additional emission

reductions achieved or the relative cost of alternative means of

emission reductions.

Emission standards allow greater flexibility in the methods used to

reduce emissions. Municipal waste combustors are free to meet the

emission limit in the manner that is least costly to them.

Consequently, for a given level of emission reductions, emission

standards are generally less costly than design standards. Furthermore,

emission standards give MWC's an incentive to develop more effective

means of controlling emissions. In addition, the Act requires the

Administrator to promulgate emission standards unless such standards

are not feasible. See 42 U.S.C. Secs. 7411(h) and 7429(a)(1). Since

emission standards for MWC's are feasible, the EPA is barred from

promulgating design standards for MWC's.

Even though emission standards generally result in a more efficient

allocation of costs than design standards, uniform emission standards

can be more costly than necessary. Uniform emission standards require

the same level of emission control of every discharger. Because

marginal control costs differ for plants of different sizes, different

technologies, different levels of product recovery (i.e., in the

chemical industry), and different levels of baseline control, an

effective solution can be reached if standards are carefully tailored

to the special characteristics of each discharger. This type of

standard is referred to as a differentiated standard.

In formulating its MWC regulatory alternatives, EPA selected

candidate regulatory alternatives that contain control limits for MWC's

differentiated by MWC size classification. Large facilities are defined

as MWC plants with aggregate plant capacities over 225 Mg/day. Small

facilities are defined as MWC plants with aggregate plant capacities

between 35 and 225 Mg/day. Plants with aggregate plant capacities less

than 35 Mg/day are not covered by today's rulemaking. The lower size

threshold of 35 Mg/day aggregate plant capacity for controlling MWC

emissions under today's rulemaking was selected after reviewing the

population distributions of MWI's and MWC's. Most incinerators at

medical waste facilities are smaller incinerators that fire segregated

medical waste with general hospital discards (MSW), and these

incinerators would have the potential to be covered by today's

rulemaking. To avoid overlap with the upcoming MWI rulemaking, this

rulemaking includes the lower size cutoff of 35 Mg/day plant capacity

and MWC plants with aggregate capacities less than or equal to 35 Mg/

day will be addressed under a separate rulemaking. With a lower size

cutoff of 35 Mg/day, today's promulgated MWC rulemaking will cover over

99 percent of the total U.S. MWC combustion capacity but will exclude

97 percent of the total MWI combustion capacity.

The regulatory alternatives for the two selected size

classifications did not specify a particular control technology;

rather, they specified emission limits that facilities would be

required to meet. Current practice indicates that the emission

guideline limits for acid gases, PM, and metals will likely be met with

one of six different types of control technologies, depending on the

applicable emission limits. Table 6 presents acid gas, PM, and metals

control technologies listed in order of increasing efficiency.

Table 6.--Control Technologies Associated With Acid Gas, Particulate

Matter, and Metals Control

------------------------------------------------------------------------

-------------------------------------------------------------------------

GCP + ESP

GCP + DSI/ESP

GCP + DSI/FF

GCP + SD/ESP

GCP + SD/FF

------------------------------------------------------------------------

In designing MWC regulatory alternatives, the EPA considered

emission limits consistent with the combinations of the acid gas

control technologies listed in table 6. Small plants may be required to

meet one control limit and large plants another under a given

regulatory alternative. Under the final guidelines, more stringent

control requirements are in fact applicable to large plants than to

small plants. This was done in an attempt to equalize the cost impact

on small and large plants. Under the final guidelines the unit cost for

air pollution control retrofit for large plants would be about $16 per

Mg of waste combusted. For similar small plants the retrofit costs

would be about $17 per Mg of waste combusted. Table 7 shows the control

technologies evaluated for the guidelines regulatory alternatives under

two compliance scenarios for acid gas, PM, and metals control. The

control technology bases identified in this table are not intended to

imply a design standard. Rather, the technology bases are identified

only for the purpose of estimating costs and emission reductions.

[[Page 65408]]

Table 7.--Emission Guidelines for Existing MWC'S: Control Technology Bases Used to Estimate the Impacts of the

Regulatory Alternatives a b

----------------------------------------------------------------------------------------------------------------

Size Classification (Mg MSW/day)

Regulatory alternative, and baseline ------------------------------------------------------------------------

APCD Small (35 to 225) Large (over 225)

----------------------------------------------------------------------------------------------------------------

Reg. Alt. I:

No control........................... GCP+ESP GCP+SD/FF+CI+SNCR

ESP (low)............................ GCP+ESP GCP+SD/ESP(m)+CI+SNCR

SD/ESP............................... GCP+SD/ESP GCP+SD/ESP(m)+CI+SNCR

SD/FF................................ GCP+SD/FF GCP+SD/FF+CI+SNCR

Reg. Alt. II-A:

No control........................... GCP+DSI/FF+CI GCP+SD/FF+CI+SNCR

ESP (low)............................ GCP+DSI/ESP+CI GCP+SD/ESP(m)+CI+SNCR

SD/ESP............................... GCP+SD/ESP+CI GCP+SD/ESP(m)+CI+SNCR

SD/FF................................ GCP+SD/FF+CI GCP+SD/FF+CI+SNCR

Reg. Alt. II-B:

No control........................... GCP+DSI/FF+CI GCP+SD/FF+CI+SNCR

ESP (low)............................ GCP+DSI/ESP+CI GCP+SD/FF+CI+SNCR

SD/ESP............................... GCP+SD/ESP+CI GCP+SD/ESP(m)+CI+SNCR

SD/FF................................ GCP+SD/FF+CI GCP+SD/FF+CI+SNCR

Reg. Alt. III;

No control........................... GCP+SD/FF+CI GCP+SD/FF+CI+SNCR

ESP (low)............................ GCP+SD/FF+CI GCP+SD/FF+CI+SNCR

SD/ESP............................... GCP+SD/FF+CI GCP+SD/FF+CI+SNCR

SD/FF................................ GCP+SD/FF+CI GCP+SD/FF+CI+SNCR

MACT Floor:

No control............................. GCP+DSI/FF GCP+SD/FF+SNCR

ESP (low).............................. GCP+DSI/ESP GCP+SD/ESP(M)+SNCR

SD/ESP................................. GCP+SD/ESP GCP+SD/ESP(m)+SNCR

SD/FF.................................. GCP+SD/FF GCP+SD/FF+SNCR

----------------------------------------------------------------------------------------------------------------

Source: This table is an extract of table 4-2 of the document entitled ``Economic Impact Analysis for Proposed

Emission Standards and Guidelines for Municipal Waste Combustors,'' EPA-450/3-91-029, March 1994. See

SUPPLEMENTARY INFORMATION for information on obtaining this document.

a The MWC regulation does not mandate a specific type of control equipment. The MWC owner/operator may use any

control equipment that meets the emission standards. The control technologies are the projected compliance

strategies used as the basis for computing costs. If the MWC has equipment that is meeting or exceeding the

control requirements, no additional costs are incurred.

b CI=carbon injection.

Table 7A.--Emission Guidelines for Existing MWC's: Emission Reductions and Annualized Costs of the Regulatory

Alternatives a

----------------------------------------------------------------------------------------------------------------

Regulatory alternative

Pollutant category (Mg/yr)/annualized --------------------------------------------------------------------------

cost ($1990 10 6/yr) Reg. alt. II- Reg. alt. II-

Reg. alt. I A B Reg. alt. III Mact floor

----------------------------------------------------------------------------------------------------------------

SO2.................................. 41,200 43,300 43,300 45,000 43,300

HCl.................................. 51,600 56,300 56,300 57,300 56,300

PM................................... 3,070 3,070 3,070 3,240 3,070

Pb................................... 74.8 74.8 91.1 102 74.8

Cd................................... 5.24 5.24 5.56 6.02 5.24

Hg................................... 44.7 47.5 47.5 47.5 0

NOX.................................. 8,680 8,680 8,690 8,690 8,680

CO................................... 19,300 19,300 19,300 19,300 19,300

Dioxins/furans (total mass).......... 0.154 0.156 0.157 0.158 b 0.153

[[Page 65409]]

Annualized cost ($1990 10 6/yr)...... 412 443 448 487 425

----------------------------------------------------------------------------------------------------------------

Source: This table is an extract of tables 5-14 and 5-21 of the document entitled ``Economic Impact Analysis for

Proposed Emission Standards and Guidelines for Municipal Waste Combustors,'' EPA-450/3-91-029, March 1994. See

SUPPLEMENTARY INFORMATION for information on obtaining this document.

a The MWC regulation does not mandate a specific type of control equipment. The MWC owner/operator may use any

control equipment that meets the emission standards. The control technologies are the projected compliance

strategies used as the basis for computing costs. If the MWC has equipment that is meeting or exceeding the

control requirements, no additional costs are incurred.

b The MACT floor is regulatory alternative II-A without carbon injection for mercury and dioxin/furan control.

The majority of the dioxin/furan emission control is achieved by acid gas controls included in alternative II-

A and the floor. It is assumed that adding mercury control (carbon injection) to acid gas control reduces

dioxin/furan emissions by at least an additional 50 percent. The dioxin/furan emission reduction estimate for

the MACT floor is not provided in the ``Economic Impacts Analysis.''

The regulatory alternatives represent alternative levels of control

considered by the EPA, whereas the compliance scenarios represent

potential alternative responses by the MWC owners and operators to the

emission requirements. Generally speaking, the EPA assumed that MWC

owners and operators will choose the minimum-cost control technology

that will meet the emission requirements. However, where there is

uncertainty regarding the actual emission limits that a particular

control technology will achieve in practice, owners may choose a more

conservative (and potentially more costly) compliance strategy to

reduce the risk of noncompliance. A conservative investment decision is

particularly likely when the investment decision affects the facility's

ability to remain in operation (e.g., noncompliance results in plant

shutdown), is a long-term decision, or involves a significant capital

outlay. Consequently, we evaluate two compliance scenarios for meeting

the acid gas, PM, and metals control requirements for existing plants

subject to guidelines.

A more detailed discussion of the regulatory alternatives EPA

considered may be found in the ``Economic Impact Analysis for Proposed

Emission Standards and Guidelines for Municipal Waste Combustors,''

EPA-450/3-91-029, March 1994 (see SUPPLEMENTARY INFORMATION for

information on obtaining this document). Control alternatives were also

developed for NOX control and Hg control. Discussion of these

alternatives can be found in the following memos that may be obtained

from the EPA's Air Docket, as specified in the SUPPLEMENTARY

INFORMATION section of this preamble: (1) ``Update Report on Mercury

Control Technologies for Municipal Waste Combustors'' prepared by K.

Nebel and D. White, Radian Corporation, for W. Stevenson, U.S.

Environmental Protection Agency, July 1993; (2) ``NOX Control on

Existing MWC's,'' prepared by E. Soderberg et al., Radian Corporation,

for W. Stevenson, U.S. Environmental Protection Agency, August 23,

1991; (3) ``Wet Scrubbing Systems Performance and Cost,'' prepared by

K. Nebel, et al., Radian Corporation, for W. Stevenson, U.S.

Environmental Protection Agency, June 22, 1994; and (4) ``A Summary of

Mercury Emissions and Applicable Control Technologies for Municipal

Waste Combustors,'' prepared by K. Nebel and D. White, Radian

Corporation, for W. Stevenson, U.S. Environmental Protection Agency,

September 1991.

c. Social Costs. The regulatory compliance costs of reducing air

emissions from MWC's include the total and annualized capital costs;

operating and maintenance costs; monitoring, inspection, recordkeeping,

and reporting costs; and total annual costs. The annualized capital

cost is calculated using a 4-percent discount rate for publicly-owned

MWC's and an 8-percent discount rate for privately-owned MWC's. The

total annual cost is calculated as the sum of the annualized capital

cost; operating and maintenance costs; and the monitoring, inspection,

recordkeeping, and reporting costs. There are no Federal funds

available to assist State and local governments in meeting these costs.

Table 8 provides the estimated compliance costs for the final

regulations and their distribution across public and private MWC's. As

shown, the national annual compliance costs for existing MWC's total

$405.5 million, with publicly-owned facilities incurring $229.9

million. This total both represents 56.7 percent of the estimated

national compliance costs and forms the basis for allocating benefits

to publicly-owned MWC's. (The analysis has assumed that benefits are

linear with emission reductions). The level of compliance costs depends

not only on the absolute number of facilities, but also on the baseline

level of pollution control. It is assumed that higher compliance costs

are associated with higher emission reductions and are, thus,

appropriate for allocating the benefits associated with the reduced

emissions.

Table 8.--Summary of Regulatory Compliance Costs for Existing MWC's by Ownership ($1990, 10 \3\)

----------------------------------------------------------------------------------------------------------------

Annual

Annual operating Annual Total

Ownership category capital and MIRR annual

costs maintenance costs a costs

costs

----------------------------------------------------------------------------------------------------------------

Public............................................................ 67,625 154,163 8,092 229,881

Private........................................................... 83,936 87,161 4,575 175,672

---------------------------------------------

Total....................................................... 151,561 241,325 12,667 405,553

----------------------------------------------------------------------------------------------------------------

a MIRR=Monitoring, inspection, reporting, and recordkeeping.

[[Page 65410]]

The analysis assumes that the entire increase in costs of

combustion services for both public and private entities will be passed

through to MWC customers in the form of increases in the tipping fee

charged by MWC's. As shown in table 9, the estimated increases in the

average tipping fee for publicly-owned MWC's are significant and range

from 36 to 59 percent. The range for privately-owned MWC's is 41 to 65

percent.

Table 9.--Average Tipping Fee In-creases for Existing MWC's by Ownership

------------------------------------------------------------------------

Small MWC Large MWC

plants (35 plants a

to 225 Mg/ (over 225 Mg/

Ownership day MSW) day MSW)

(percent (percent

change) change)

------------------------------------------------------------------------

Public...................................... 59 36

Private..................................... 65 41

------------------------------------------------------------------------

a Fee increases are computed using the average cost per megagram of MSW

reported in tables 5-10 and 5-11 of the EPA's ``Economic Impact

Analysis for Proposed Emission Standards and Guidelines for Municipal

Solid Waste Combustors,'' (EPA-450/3-91-029) and an average tipping

fee of $57/Mg of MSW. The average tipping fee is based on the 1993

average tipping fee for MWC's reported in Waste Age (Berenyi & Gould,

1993) converted to 1990 dollars.

Section 7.3.1 of the EPA's economic impact analysis (EPA-450/3-91-

029) provides a distributional analysis of the impacts on governmental

entities with respect to their ability to finance the regulatory

compliance capital through revenue bonds. A community's ability to

finance the regulatory compliance capital through revenue bonds is

estimated by comparing the estimated average annual cost per household

to the average annual household income for the community. If the cost

per household exceeds one percent of average annual household income,

then the community is assumed to have potential difficulty issuing

revenue bonds. Of the estimated 100 governmental entities subject to

the guidelines, no governmental entities with a population above 50,000

are projected to have difficulty issuing revenue bonds as a result of

the regulation on existing sources. Overall, 3 of the 100 governmental

entities (all 3 of which have population below 50,000) are projected to

have difficulty issuing such bonds.

Without market adjustments, the social costs of the guidelines

should be equivalent to the national compliance costs shown in table 8.

However, in this analysis, the social costs differ, both because the

total capital costs for both public and private MWC's were discounted

at the social rate equal to 7 percent, and because of tax differences.

Table 10 shows the estimated social cost of the regulations and the

distribution across public and private MWC's. The estimated annual

social cost of the guidelines is $443 million of which 56.7 percent, or

$251.1 million, is attributed to publicly-owned MWC's. This estimate of

social cost is greater than the national compliance costs because the

total capital costs for publicly-owned MWC's is discounted at the

social rate of 7 percent, as opposed to the 4 percent rate used to

compute the national compliance costs.

Table 10.--Summary of Estimated Annual Social Cost by Ownership ($1990)

------------------------------------------------------------------------

Total

social

Ownership category costs Share

($10 \3\ (percent)

per year)

------------------------------------------------------------------------

Public............................................ 251,107 56.7

Private........................................... 191,893 43.3

---------------------

Total....................................... 443,000 100.0

------------------------------------------------------------------------

Table 10A provides typical costs of air pollution control retrofits

for existing MWC's. The costs shown in table 10A are for 17 model

existing plants.

Table 10A.--Typical Cost of Air Pollution Control Retrofit for Existing MWC'S

----------------------------------------------------------------------------------------------------------------

Costs ($1990 x 10 6)

Plant size (Mg/day) MWC type -------------------------- Model plant

Capital Annual number

----------------------------------------------------------------------------------------------------------------

45.......................................................... MOD/SA 2 0.5 10

136......................................................... MOD/SA 3 10.5 9

181......................................................... MOD/EA 3 0.4 11

181......................................................... MB/WW 5 0.9 6

454......................................................... MB/RWW 13 1.6 12

980......................................................... MB/WW 25 3.2 5

2,041....................................................... MB/WW 46 5.0 4

181......................................................... MB/WW a5 0.8 14

454......................................................... MB/RWW a13 1.6 17

544......................................................... RDF 28 2.3 8

1,814....................................................... RDF 64 4.8 7

1,814....................................................... RDF a33 4.4 15

544......................................................... RDF a17 2.0 16

218......................................................... MB/REF 8 0.9 2

680......................................................... MB/REF 39 2.3 1

816......................................................... MB/REF 35 4.1 3

----------------------------------------------------------------------------------------------------------------

Note: See table 5-1 of the ``Economic Impacts Analysis for Proposed Emission Standards and Guidelines for

Municipal Waste Combustors'' (EPA-450/3-91-029) for more information.

a These model plants are assumed to be relatively new units that originally incorporated good combustion in

their design and, therefore, do not need to retrofit good combustion to comply with the guidelines.

[[Page 65411]]

d. Social Benefits. Society will benefit from the proposed

guidelines through the reduction of emissions of dioxins/furans, Cd,

Pb, Hg, PM, HCl, SO2, and NOX. These pollutant categories are

emitted by various types of sources, including MWC's. The level of

pollutant emissions and health effects vary among types of sources, and

total national emissions of these pollutants has been shown to have the

health effects listed in table 11.

Table 11.--Health and Other Effects

------------------------------------------------------------------------

Pollutant category Health and other effects

------------------------------------------------------------------------

Organics............................... Mortality, morbidity.

Carcinogenicity.

Metals................................. Retardation and brain

damage.

Hypertension.

Central nervous

system injury.

Renal dysfunction.

Acid gases............................. Materials damage.

Dental erosion.

Acid rain.

Mortality, morbidity.

Respiratory tract

problems, permanent harm to

lung.

Soiling and materials

damage.

Reduced agricultural

yield.

Ozone formation.

Particulate matter..................... Mortality, morbidity.

Eye and throat

irritation, bronchitis, lung

damage.

Impaired visibility.

Soiling and materials

damage.

------------------------------------------------------------------------

Because of limitations on data on the concentration-response

function and valuation of these functions, benefits have not been

quantified for all pollutants. Benefits have been quantified only for

emissions of SO2 and PM. Benefits have not been quantified for

dioxins/furans, Cd, Pb, Hg, HCl or NOX emission control. Benefits

to the public and environment will result from the control of these

hazardous air pollutants (HAP's) and criteria pollutants. For the

HAP's, dioxin/furan compounds have been associated with chloracne,

reproductive/developmental effects, immune system toxicity, and cancer

(probable human carcinogen). Particulate-associated metals including Pb

and Cd are toxic and can cause effects such as mucous membrane

irritation, gastrointestinal effects, nervous system disorders, skin

irritation, and reproductive and developmental disorders. In regard to

volatile metals, Hg in all forms may be characterized as quite toxic

with each form exhibiting different health effects, including

gastrointestinal and respiratory tract disturbances, central nervous

system effects, and developmental effects. Additionally, HCl is

corrosive and effects the eyes, skin, and mucus membranes, and

dermatitis has been reported from long-term exposure.

Table 12 provides the estimated social benefits associated with

reductions in PM and SO2 emissions from MWC's and their

distribution across public and private MWC's. The estimated social

benefit of reduced PM and SO2 emissions is $106 million with $60.3

million being attributed to reductions at publicly-owned MWC

facilities. These benefits would be experienced annually by the

residents of these municipalities. Proper allocation of these benefits

would be based on the expected emission reductions at public and

private MWC's. However, due to lack of data at the model plant level,

these benefits are allocated across public and private MWC's in the

same proportion as the estimated national compliance costs (i.e., 56.7

percent for public and 43.3 percent for private).

Table 12.--Social Benefit Estimates for SO2 and PM Emission Reductions

by Ownership ($1990)

------------------------------------------------------------------------

Social benefits ($10 \3\ per

year) a b

Ownership category --------------------------------

PM SO2 Total

------------------------------------------------------------------------

Public................................. 30,779 29,475 60,254

Private................................ 23,521 22,525 46,046

Total.................................. 54,300 52,000 106,300

------------------------------------------------------------------------

a Benefit estimates are $1,200 per Mg of SO2 reduced and $17,700 per Mg

of PM reduced. (This estimate is derived valuing all mortalities at

$4.4 million per life saved. This approach does not consider the

length of the changes in longevity resulting from PM exposure). Social

benefits attributable to public and private MWC's are proportionate to

their share of the total annual costs.

b Does not include benefit credits for dioxins/furans, Cd, and Hg

control.

Table 13 presents a comparison of the estimated social costs and

benefits of the guidelines. Unfortunately, because benefit estimates

are not computed for all pollutants, the social benefit provided in

table 13 is a partial estimate. Because of this fact, the net benefits

(i.e., benefits minus costs) shown in table 13 cannot be used to reach

conclusions regarding the total net benefits of the rule for existing

sources.

Table 13.--Social Costs and Partial Social Benefits From Reducing

Emissions at MWC's by Ownership ($1990, 10 \3\ Per Year)

------------------------------------------------------------------------

Total Partial

Ownership category social social

costs benefits

------------------------------------------------------------------------

Public............................................ 251,107 60,254

Private........................................... 191,893 46,046

---------------------

Total....................................... 443,000 106,300

------------------------------------------------------------------------

3. Effects on the National Economy

The Unfunded Mandates Act requires that the EPA estimate ``the

effect'' of this rule

``on the national economy, such as the effect on productivity,

economic growth, full employment, creation of productive jobs, and

international competitiveness of the U.S. goods and services, if and

to the extent that the EPA in its sole discretion determines that

[[Page 65412]]

accurate estimates are reasonably feasible and that such effect is

relevant and material.''

As stated in the Unfunded Mandates Act, such macroeconomic effects tend

to be measurable, in nationwide econometric models, only if the

economic impact of the regulation reaches 0.25 to 0.5 percent of gross

domestic product (in the range of $1.5 billion to $3 billion). A

regulation with a smaller aggregate effect is highly unlikely to have

any measurable impact in macroeconomic terms unless it is highly

focused on a particular geographic region or economic sector. For this

reason, no estimate of this rule's effect on the national economy has

been conducted.

4. Consultation with Government Officials

The Unfunded Mandates Act requires that the EPA describe the extent

of the EPA's consultation with affected State, local, and tribal

officials, summarize the officials' comments or concerns, and summarize

the EPA's response to those comments or concerns. In addition, section

203 of the Clean Air Act requires that the EPA develop a plan for

informing and advising sm

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Standards of Performance for New Stationary Sources and Emission Guidelines for Existing Sources · 60 FR 65387 | Frix